Home India Ministry of Environment, Forest and Climate Change The following draft of the notification, which the Central G...
Date: 2015-11-17 Category: Extra Ordinary State: Union Government Country: India

The following draft of the notification, which the Central Government proposes to issue in exercise of the powers conferred by sub-section (1), read with clause (v) and clause (xiv) of sub-section (2) and sub-section

Issued by Ministry of Environment, Forest and Climate Change · NOT available

Research with AI Agent Chat with Document Generate Summary Translate Helpful Share Add to Project Create Task

Executive Summary & Key Takeaways

Executive Summary: This notification declares an area up to 1.5 km around the Pong Dam Lake Wildlife Sanctuary in Himachal Pradesh as an Eco-sensitive Zone (ESZ). It outlines permitted, prohibited, and regulated activities within the ESZ to protect its ecological integrity. The State Government must prepare a Zonal Master Plan within two years of the final notification. A monitoring committee is constituted to oversee compliance and implementation of the notification's provisions. Key Points / Main Content: * **Declaration of Eco-sensitive Zone:** * An area of 46.31 square kilometers, extending up to 1.5 km around the Pong Dam Lake Wildlife Sanctuary, is declared an Eco-sensitive Zone. * The ESZ lies between latitude 31°49'50" N to 32°14'36" N and longitude 76°53'31" E to 77°17'53" E. * **Zonal Master Plan (ZMP):** * The State Government must prepare a Zonal Master Plan within two years, in consultation with local people. * The ZMP should align with Central and State laws and guidelines, integrating environmental and ecological considerations. * The ZMP should demarcate existing worshipping places, settlements, forests, tribal areas, agricultural lands, and water bodies and provide for restoration of denuded areas, conservation of existing water bodies. * **Measures by State Government:** * Land Use: Restrictions on converting forests, horticulture, agriculture, and parks into commercial or industrial areas, except under specific conditions with approval. * Natural Springs: Identification and conservation plans for natural springs within the ZMP. * Tourism: Regulated as per a Tourism Master Plan, emphasizing eco-tourism, with restrictions on new hotel construction within 1 km of the sanctuary boundary. * Heritage: Preservation plans for natural and man-made heritage sites. * Pollution Control: Guidelines for noise, air, and effluent discharge, adhering to relevant pollution control acts and rules. * Waste Management: Solid and biomedical waste disposal as per existing rules, with a focus on segregation and recycling. * Vehicular Traffic: Regulation of traffic in a habitat-friendly manner. * **Prohibited Activities:** * Commercial mining, stone quarrying, and crushing units (with exceptions for local residents' domestic needs). * Setting up of sawmills. * Use or production of hazardous substances. * Establishment of industries causing pollution. * New major thermal and hydroelectric projects. * Commercial use of firewood and plastic bags. * Tourism activities like overflying by aircraft or hot air balloons. * Discharge of untreated effluents and solid waste in water bodies or land. * **Regulated Activities:** * Establishment of hotels and resorts, construction activities, trenching grounds, discharge of effluents and solid waste, air and vehicular pollution, noise pollution, extraction of groundwater, felling of trees, migratory graziers, existing establishments, insulation of electric lines, widening of roads, fencing of properties, collection of fodder. * **Promoted Activities:** * Ongoing agriculture and horticulture practices, organic farming, green technology adoption, cottage industries, rainwater harvesting, small-scale non-polluting industries, and renewable energy use. * **Monitoring Committee:** * A monitoring committee is established, chaired by the Deputy Commissioner of Kangra. * The committee monitors compliance with the notification, scrutinizes activities within the ESZ, and addresses complaints. * The committee submits an annual action taken report to the Chief Wildlife Warden of the State. Impact Analysis: * **State Government:** * Impact: Responsible for preparing and implementing the Zonal Master Plan, enforcing regulations, and undertaking conservation measures. * Action Required: Formulate the Zonal Master Plan within two years, establish guidelines for regulated activities, and ensure compliance with environmental regulations. * **Local Residents:** * Impact: Restrictions on land use, construction, and certain activities, but also potential benefits from eco-tourism and conservation efforts. * Action Required: Adhere to regulations on land use and construction, participate in the Zonal Master Plan development process, and benefit from promoted eco-friendly activities. * **Industries/Businesses:** * Impact: Restrictions on establishing new polluting industries and conducting certain commercial activities within the ESZ. * Action Required: Comply with prohibited and regulated activities, adopt eco-friendly practices, and adhere to guidelines issued by regulatory authorities. * **Tourism Sector:** * Impact: Regulation of tourism activities, with a focus on eco-tourism and restrictions on hotel construction near the sanctuary. * Action Required: Align tourism activities with the Tourism Master Plan, promote eco-tourism, and comply with construction restrictions. * **Ministry of Environment, Forest and Climate Change:** * Impact: Oversees the implementation of the notification and provides guidance to the Monitoring Committee. * Action Required: Review reports from the Monitoring Committee, provide necessary directions for effective implementation, and address issues referred by the Committee.

Key Entities Referenced

Environment Protection Act, 1986: The primary legislation under which the notification regarding the Pong Dam Lake Wildlife Sanctuary Ecosensitive Zone is issued. Environment Protection Rules, 1986: Rules under the Environment Protection Act, 1986, that provide the framework for issuing the notification. Pong Dam Lake Wildlife Sanctuary: The protected area around which the Ecosensitive Zone is being established to provide a buffer against ecological and environmental damage. Kangra District, Himachal Pradesh: The district and state where the Pong Dam Lake Wildlife Sanctuary is located. Ministry of Environment, Forest and Climate Change: The central government ministry responsible for issuing the notification and overseeing the management of the Ecosensitive Zone. Zonal Master Plan: A plan to be prepared by the State Government for the Eco-sensitive Zone, outlining permitted activities and conservation measures. Himachal Pradesh State Pollution Control Board: The state agency responsible for drawing up guidelines and regulations for the control of pollution in the Ecosensitive Zone. Monitoring Committee: A committee constituted by the Central Government to monitor the compliance of the provisions of the notification related to the Ecosensitive Zone.
Official Source Record View Original Source →
See Full Document Text
jftLVªh laö Mhö ,yö&33004@99 REGD. NO. D. L.-33004/99 vlk/kj.k EXTRAORDINARY Hkkx II—[k.M 3—mi&[k.M (ii) PART II—Section 3—Sub-section (ii) izkf/dkj ls izdkf'kr PUBLISHED BY AUTHORITY la- 2447] ubZ fnYyh] eaxyokj] uoEcj 17] 2015@dk£rd 26] 1937 No. 2447] NEW DELHI, TUESDAY, NOVEMBER 17, 2015/KARTIKA 26, 1937 पपपपययययाााावव(cid:4)(cid:4)वव(cid:4)(cid:4) ररररणणणण,,,, ववववनननन औऔऔऔरररर जजजजललललववववाााायययय ुु ुुपपपप(cid:8)(cid:8)(cid:8)(cid:8)ररररववववततततनन(cid:4)(cid:4)नन(cid:4)(cid:4) ममममं(cid:13)ं(cid:13)ं(cid:13)ं(cid:13)ााााललललयययय अअअअििििधधधधससससूचूचूचूचननननाााा नई (cid:1)द(cid:3)ली, 16 नव(cid:8) बर, 2015 ककककाााा....आआआआ....3333000099999999((((अअअअ))))....-------- िन(cid:12)िलिखत (cid:15)ा(cid:17)प अिधसूचना, िजसे के(cid:21)(cid:22)ीय सरकार, पया(cid:24)वरण (संर(cid:29)ण) अिधिनयम, 1986 (1986 का 29) क(cid:30) धारा 3 क(cid:30) उपधारा (2) के खंड (v) और खंड (xiv) तथा उपधारा (3) के साथ प ठत उपधारा (1) "ारा (cid:15)द# शि%य& का (cid:15)योग करत े )ए, जारी करने का (cid:15)+ताव करती ह,ै पया(cid:24)वरण (संर(cid:29)ण) िनयम, 1986 के िनयम 5 के उपिनयम (3) क(cid:30) अपे(cid:29)ानुसार, जनसाधारण क(cid:30) जानकारी के िलए (cid:15)कािशत क(cid:30) जाती ह,ै िजनके उससे (cid:15)भािवत होन े क(cid:30) संभावना ह ै ; और यह सूचना दी जाती ह ै (cid:1)क उ% (cid:15)ा(cid:17)प अिधसूचना पर, उस तारीख से, िजसको इस अिधसूचना वाले भारत के राजप1 क(cid:30) (cid:15)ितया ं जनसाधारण को उपल2ध करा दी जाती ह,5 साठ (cid:1)दन क(cid:30) अविध क(cid:30) समाि7 पर या उसके प8 चात ्िवचार (cid:1)कया जाएगा ; ऐसा कोई :ि%, जो (cid:15)ा(cid:17)प अिधसूचना म; अंत<व= (cid:15)+ताव& के संबंध म; कोई आ(cid:29)ेप या सुझाव देन े म; िहतब? ह,ै इस (cid:15)कार िविन@द= अविध के भीतर, के(cid:21)(cid:22)ीय सरकार "ारा िवचार (cid:1)कए जाने के िलए, आ(cid:29)ेप या सुझाव सिचव, पया(cid:24)वरण, वन और जलवायु प रवत(cid:24)न मं1ालय, इं(cid:1)दरा पया(cid:24)वरण भवन, जोर बाग रोड, अलीगंज, नई (cid:1)द(cid:3)ली-110003 या ई-मेल पते: esz-mef@nic.in पर िलिखत (cid:17)प म; भेज सकेगा । (cid:15)(cid:15)(cid:15)(cid:15)ाााा(cid:16)(cid:16)(cid:16)(cid:16)पपपप अअअअििििधधधधससससचचूूचचूू ननननाााा प&ग डमै लेक व(cid:21)यजीव अभयारDय िहमाचल (cid:15)देश के कांगड़ा िजले म; 31o49’50” उ. से 32o14’36” उ. के बीच अ(cid:29)ांश तथा 76o53’31” पू. से 77o17’53” पू. दशे ा(cid:21)तर के बीच 207.59 वग(cid:24) (cid:1)कलोमीटर (cid:29)े1 म; फैला )आ है | औऔऔऔरररर,,,, वन+प ित और जीव-ज(cid:21)त ु इस अभयारDय के समृ? जैिवक महI व का (cid:15)ितिनधI व करते ह 5 । पपपप(cid:17)(cid:17)(cid:17)(cid:17)ीीीी :::: भारत म; 77 प(cid:29)ी प रवार& म; से लगभग 54 प(cid:29)ी प रवार& से संबंिधत 230 (cid:15)जाितयां अिभिलिखत ह 5 । जल (cid:15)पात& क(cid:30) मPु य (cid:15)जाितय& म; जार-हडे ेड गीज,िप(cid:21)ट (cid:3)े स,पोचाड(cid:24)स, कूRस, गे2 स, कोरमोरे(cid:21) Rस और + टोT स(cid:24) इI या(cid:1)द ह 5 । ििििततततततततललललीीीी :::: इंिडयन (cid:1)U टलरी, +ट ीVड टाईगर, ऑर;ज ओकलीफ, येलो प5सी, Zे-डिै नड एग[लाई इI या(cid:1)द । पपपपशशशश ुु ुु:::: नीलगाय, पोरTय ूपाइन, िसवेRस, म&गूज, त;दआु इI या(cid:1)द । 4815 GI/2015 (1)2 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] औऔऔऔरररर,,,, इस (cid:29)े1 का प र र(cid:29)ण और संर(cid:29)ण करना आव8 यक है तथा िज सके िव+ तार और सीमा\ को इस अिध सूचना के पैरा 1 म; प&ग डैम लेक व(cid:21)यजीव अभयारDय के चार& ओर पा र ि+थ तक(cid:30)य संवेदी जोन के ^प म; िव िन@ द _ ट (cid:1)क या गया ह ैऔर पया(cid:24)वरण क(cid:30) दिृ_ ट से उ‘ोग& या उ‘ोग& के वग(cid:24) को तथा उनक(cid:30) सं(cid:1)a या\ और (cid:15)(cid:1)a या\ को उT त पा र ि+ थ तक(cid:30)य संवेदी जोन म; (cid:15)ितिष ? करना आव8 यक है ; अतः, अब, के(cid:21)(cid:22)ीय सरकार, पयाव(cid:24) रण (संर(cid:29)ण) िनयम, 1986 के िनयम 5 के उपिनयम (3) के साथ प ठत पया(cid:24)वरण (संर(cid:29)ण) अिधिनयम, 1986 (1986 का 29) क(cid:30) धारा 3 क(cid:30) उपधारा (1), उपधारा (2) के खंड (v) और खंड (xiv) और उप धारा (3) "ारा (cid:15)द# शि%य& का (cid:15)योग करते )ए, िहमाचल (cid:15)देश राcय म; प&ग डमै लेक व(cid:21)यजीव अभयारDय क(cid:30) सीमा के 1.50 (cid:1)कलोमीटर चार& ओर तक के िव+त ा रत (cid:29)े1 को प&ग डमै लेक व(cid:21)यजीव अभयारDय पा रि+ थितक(cid:30)य संवेदी जोन (िजसे इसम; इसके प8 चात् पा रि+ थितक(cid:30)य संवेदी जोन कहा गया ह)ै के (cid:17)प म; अिधसूिचत करती ह,ै िजसका िववरण िन(cid:12)ानसु ार ह,ै अथा(cid:24)त् :- 1. पपपपाााा(cid:8)(cid:8)(cid:8)(cid:8)ररररिििि(cid:21)(cid:21)(cid:21)(cid:21)थथथथििििततततकककक ससससंवंवंवंवददेेददेे ीीीी जजजजोोोोनननन ककककाााा ििििवववव(cid:21)(cid:21)(cid:21)(cid:21)तततताााारररर औऔऔऔरररर उउउउससससकककक(cid:26)(cid:26)(cid:26)(cid:26) ससससीीीीममममााााएएएएंं-ंं-(1) पा रि+थितक संवेदी जोन प&ग डमै लेक व(cid:21)यजीव अभयारDय क(cid:30) सीमा के 1.5 (cid:1)कलोमीटर को चार& ओर 46.31 वग(cid:24) (cid:1)कलोमीटर का होगा| (2) पा रि+थितक संवेदी जोन के Zाम& क(cid:30) सूची उपाबंध-I पर उपाब? ह|ै (3) ऐसे जोन के जीपीएस िनदशg ांक सीमा के साथ उपाबंध-II पर है। (4) पा रि+थितक संवेदी जोन का मानिच1 सीमा िववरण अ(cid:29)ांश व देशा(cid:21)तर के साथ उपाबंध-III पर उपाब? ह|ै 2222.... पपपपाााा(cid:8)(cid:8)(cid:8)(cid:8)ररररिििि(cid:21)(cid:21)(cid:21)(cid:21)थथथथििििततततकककक ससससंवंवंवंवददेेददेे ीीीी जजजजोोोोनननन ककककेेेे ििििललललएएएए आआआआचचंंचचंं ििििललललकककक ममममहहहहााााययययोोोोजजजजननननाााा –––– (1) राcय सरकार, पा रि+ थितक संवेदी जोन के (cid:15)योजन& के िलए राजप1 म; इस अिधसूचना के अंितम (cid:15)काशन क(cid:30) तारीख से दो वष(cid:24) क(cid:30) अविध के भीतर, +थानीय :ि%य& के परामश(cid:24) से, और इस अिधसूचना म; (cid:1)दए गए अनुबंध& का पालन करते )ए आंचिलक महायोजना तैयार करेगी। (2) आंचिलक महायोजना का अनुमोदन राcय सरकार म; स(cid:29)म (cid:15)ािधकारी "ारा (cid:1)कया जाएगा| (3) पा रि+थितक(cid:30)य संवेदी जोन के िलए आंचिलक महायोजना राcय सरकार "ारा ऐसी रीित जैसा इस अिधसूचना म; िविन@द= ह ै और सुसंगत के(cid:21)(cid:22)ीय और राcय िविधय& तथा के(cid:21)(cid:22)ीय सरकार "ारा जारी माग(cid:24)दश(cid:24)क िस?ांत&, य(cid:1)द कोई हो, के अनु(cid:17)प भी तैयार क(cid:30) जाएगी| (4) आंचिलक महायोजना सभी संब? राcय िव भाग& के साथ परामश(cid:24) से पया(cid:24)वरणीय और पा रि+थितक(cid:30)य िवचारण& को उसम; एक(cid:30)कृत करने के िलए तैयार क(cid:30) जाएगी, अथा(cid:24)त्: (i) पया(cid:24)वरण ; (ii) वन ; (iii) नगर िवकास ; (iv) पय(cid:24)टन ; (v) नगरपािलक ; (vi) राज+ व ; (vii) कृिष ; (viii) िहमाचल (cid:15)दशे राcय (cid:15)दषू ण िनय1ं ण बोड,(cid:24) (ix) kसचाई (x) लोक िनमा(cid:24)ण िवभाग (5) आंचिलक महायोजना अनुमो(cid:1)दत िव‘मान भू-उपयोग, अवसंरचनाI मक और (cid:1)aयाकलाप& पर कोई िनबlधन अिधरोिपत नहm करेगी जब तक (cid:1)क इस अिधसूचना म; इस (cid:15)कार िविन@द= न हो और आंचिलक महायोजना सभी अवसंरचना और काय(cid:24)कलाप& म; द(cid:29)ता और पा र ि+थ ि तक(cid:30)य अनुकूलता का संव?न(cid:24) करेगी। (6) आंचिलक महायोजना म; अनाoछा(cid:1)दत (cid:29)े1& के जीणq?ार, िव‘मान जल िनकाय& के संर(cid:29)ण, आवाह (cid:29)े1& के (cid:15)बंधन, जल-संभर& के (cid:15)बंधन, भूतल जल के (cid:15)बंधन, मृदा और नमी संर(cid:29)ण, +थानीय समुदाय& क(cid:30) आव8यकता\ तथा पा रि+थितक(cid:30) और पया(cid:24)वरण से संबंिधत ऐसे अ(cid:21)य पहलु\, िजन पर rयान दने ा आव8यक ह,ै के िलए उपबंध ह&गे।¹Hkkx IIµ[k.M 3 (ii)º Hkkjr dk jkti=k % vlk/kj.k 3 (7) आंचिलक महायोजना सभी िव‘मान पूजा + थल&, Zाम& और नगरीय बंदोब+त&, वन& के (cid:15)कार और (cid:1)क+ म&, कृिष (cid:29)े1&, ऊपजाऊ भूिम, ह रत (cid:29)े1 जैसे उ‘ान और उसी (cid:15)कार के +थ ान, उ‘ान कृिष (cid:29)े1, आ@कड&, झील& और अ(cid:21)य जल िनकाय& का अt यंकन करेगी। (8) आंचिलक महायोजना पा रि+थितक संवेदी जोन म; िवकास को िविनयिमत करेगी िजससे (cid:1)क + थानीय समुदाय& के पा रि+थितक(cid:30)ज(cid:21)य िवकास और जीिवका को सुिनि8च त (cid:1)कया जा सके । 3. रररराााा(cid:27)(cid:27)(cid:27)(cid:27)यययय ससससररररककककाााारररर (cid:28)(cid:28)(cid:28)(cid:28)ाााारररराााा (cid:29)(cid:29)(cid:29)(cid:29)ककककएएएए जजजजाााानननन ेे ेेववववााााललललेे ेे उउउउपपपपाााायययय-------- राcय सरकार इस अिधसूचना के उपबंध& को (cid:15)भावी करने के िलए िन(cid:12)िलिखत उपाय करेगी, अथा(cid:24)त् :- (1) भभभभ--ूू--ूूउउउउपपपपययययोोोोगगगग ---- पा रि+थ ितक संवेदी जोन म; वन&, उ‘ान-कृिष (cid:29)े1&, कृिष (cid:29)े1&, आमोद-(cid:15)मोद के (cid:15)योजन के िलए िचि(cid:21)हत (cid:1)कए गए पाकu और खुले +थान& का वािणिcयक और औ‘ोिगक संब? िवकास (cid:1)aयाकलाप& के िलए उपयोग या संप रवत(cid:24)न नहm होगा : परंतु पा रि+थितक संवेदी जोन के भीतर कृिष भूिम का संप रवत(cid:24)न के अधीन मानीटरी सिमित क(cid:30) िसफा रश पर और राcय सरकार के पूव(cid:24) अनुमोदन से, +थानीय िनवािसय& क(cid:30) आवासीय ज(cid:17)रत& को पूरा करने के िलए और पैरा 4 क(cid:30) सारणी के +तंभ (2) के अधीन (cid:31)(cid:31)(cid:31)(cid:31)मममम ससससं.ं.ं.ं. 10, 21, 35, 36, और 37 म; सूचीब? (cid:1)aयाकलाप& को पूरा करने के िलए अनुwात ह&गे, अथा(cid:24)त् :- (ii) पय(cid:24)टक& के अ+थायी अिधभोग हते ु पा रि+थितक अनुकूल पय(cid:24)टन (cid:1)aयाकलाप& के िलए त(cid:8)बू, काx गृह आ(cid:1)द जैसे पा रि+थितक अनुकूल कुटीर ; (ii) िव‘मान सड़क& को चौड़ा और सुदढ़ृ करना और नई सड़क& का सि{मा(cid:24)ण (iii) (cid:15)दषू ण उIप{ न करने वाले लघु उ‘ोग; (iv) वषा(cid:24) जल संचय, और (v) कुटीर उ‘ोग, िजसके अंतग(cid:24)त Zामीण उ‘ोग, सुिवधा भंडार और +थानीय सुिवधाएं सि(cid:8)मिलत ह5 | परंतु यह और (cid:1)क राcय सरकार के पूव(cid:24) अनुमोदन और संिव धान के अनुo छेद 244 तथा तIसमय (cid:15)वृ# िविध के उपबंध& के अनुपालन के िबना, िजसके अंतग(cid:24)त अनुसूिचत जनजाित और अ(cid:21)य परंपरागत वन िनवासी (वन अिधकार& क(cid:30) मा(cid:21)यता) अिधिनयम, 2006 (2007 का 2) भी ह,ै वािणिcयक या उ‘ोग िवकास (cid:1)aयाकलाप& के िलए जनजातीय भूिम का उपयोग अनुwात नहm होगा : परंतु यह और भी (cid:1)क पा रि+थ ितक संवेदी जोन के भीतर भू-अिभलेख& म; उपसंजात कोई 1ु ट मानीटरी सिमित के िवचार (cid:15)ा7 करने के प|ात ् राcय सरकार "ारा (cid:15)Iयेक मामले म; एक बार संशोिधत होगी और उ% 1ु ट के संशोधन क(cid:30) भारत सरकार के पया(cid:24)वरण, वन और जलवायु प रवत(cid:24)न मं1ालय को सूचना दने ी होगी। परंतु यह और भी (cid:1)क उपयु(cid:24)% 1ु ट का संशोधन म; इस उप पैरा के अधीन यथा उपबंिधत के िसवाय (cid:1)कसी भी दशा म; भू-उपयोग का प रवत(cid:24)न सि(cid:8)मिलत नहm होगा। परंतु यह और भी (cid:1)क िजससे ह रत (cid:29)े1 म; जैसे वन (cid:29)े1, कृिष (cid:29)े1 आ(cid:1)द म; कोई पा रणािमक कटौती नहm होगी और अन(cid:15)युT त या अनुIपादक कृिष (cid:29)े1& म; पुन: वनीकरण करने के (cid:15)यास (cid:1)कए जाएंगे। (2) (cid:15)(cid:15)(cid:15)(cid:15)ााााककककृृृृििििततततकककक !!!!ोोोोतततत –––– सभी (cid:15)ाकृितक }ोत& के आवाह (cid:29)े1 क(cid:30) पहचान क(cid:30) जाएगी और उनके संर(cid:29)ण और पुनन(cid:24)वीकरण के िलए योजना\ को आंचिलक महायोजना म; सि(cid:8)मिलत (cid:1)कया जाएगा तथा राcय सरकार "ारा ऐसी रीित मे माग(cid:24)दश(cid:24)क िस?ांत तैयार (cid:1)कए जाएंगे िजससे (cid:1)क इन (cid:29)े1& म; या इनके समीप िवकास (cid:1)aयाकलाप& को रोका जा सके जो ऐसे (cid:29)े1& के िलए हािनकारक ह|5 (3) पपपपयययय(cid:4)ट(cid:4)ट(cid:4)ट(cid:4)टनननन –––– (क) पा रि+थितक संवेदी जोन के भीतर पय(cid:24)टन संबंधी (cid:1)aयाकलाप, जो आंचिलक महायोजना का भाग (cid:17)प म; िन(cid:12)िलिखत (cid:17)प म; ह&गे। (ख) पय(cid:24)टन महायोजना, पय(cid:24)टन िवभाग "ारा वन और पया(cid:24)वरण िवभाग, राcय सरकार के परामश(cid:24) से तैयार होगी। (ग) पय(cid:24)टन संबंधी (cid:1)aयाकलाप िन(cid:8) निलिखत के अधीन िविनयिमत ह&गे, अथा(cid:24)त् :- (i) पा रि+थितक संवेदी जोन के भीतर सभी नए पय(cid:24)टन (cid:1)aयाकलाप& या िव‘मान पय(cid:24)टन (cid:1)aयाकलाप& का िव+तार रा_ ~ीय (cid:127) या(cid:128) संर(cid:29)ण (cid:15)ािधकरण, पया(cid:24)वरण, वन और जलवायु प रवत(cid:24)न मं1ालय "ारा जारी (समय-समय पर यथा संशोिधत) माग(cid:24)िनदशे & के अनुसार होगा िजसम; पा रि+थितक पय(cid:24)टन, पा रि+थितक िश(cid:29)ा और पा रि+थितक िवकास को महIव (cid:1)दया जाएगा ;4 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] (ii) प&ग डमै लेक व(cid:21)यजीव अभयारDय क(cid:30) सीमा से एक (cid:1)कलोमीटर के भीतर नए होटल& और िव(cid:129)ाम+थल& के नए सि{मा(cid:24)ण क(cid:30) अनुwा पा रि+थितक अनुकूल पय(cid:24)टन (cid:1)aयाकलाप& से संबंिधत पय(cid:24)टक& के अ+थायी अिधभोग के िलए आवास के िसवाए नहm दी जाएगी ; पर(cid:21)तु पा रि+थितक संवेदी जोन के िव+तार तक संरि(cid:29)त (cid:29)े1& क(cid:30) सीमा से एक (cid:1)कलोमीटर क(cid:30) दरू ी से परे पय(cid:24)टन महायोजना के अनुसार पा रि+थितक पय(cid:24)टन सुिवधा\ के िलए पूव(cid:24)-प रभािषत और अिभिहत (cid:29)े1& म; ही नए होटल& और िव(cid:129)ाम+थल& क(cid:30) +थापना क(cid:30) अनुwा दी जाएगी| (iii) आंचिलक महायोजना का अनुमोदन (cid:1)कए जाने तक, पय(cid:24)टन के िलए िवकास और िव‘मान पय(cid:24)टन (cid:1)aयाकलाप& के िव+तार को वा+तिवक +थल िविन@द= संवी(cid:29)ा तथा मानीटरी सिमित क(cid:30) िसफा रश पर आधा रत संबंिधत िविनयामक (cid:15)ािधका रय& "ारा अनुwात (cid:1)कया होगा। (4) ननननैसैसैसैस%%%%गगगगकककक ििििववववररररााााससससतततत -------- पा रि+थितक संवेदी जोन म; महIवपूण(cid:24) नैस<गक िवरासत के सभी +थल& जैसे सभी जीन कोश आरि(cid:29)त (cid:29)े1, शैल िवरचनाएं, जल (cid:15)पात&, झरन&, घाटी मागu, उपवन&, गफु ाएं, +थल&, (cid:130)मण, अ(cid:131)रोहण, (cid:15)पात& आ(cid:1)द क(cid:30) पहचान क(cid:30) जाएगी और उ(cid:21)ह ; संरि(cid:29)त (cid:1)कया जाएगा तथा उनक(cid:30) सुर(cid:29)ा और संर(cid:29)ा के िलए इस अिधसूचना के (cid:15)काशन क(cid:30) तारीख से छह मास के भीतर, उपयु% योजना बनाएगी और ऐसी योजना जोनल मा+टर Vलान का भाग होगा। (5) ममममााााननननवववव ििििनननन%%%%ममममतततत ििििववववररररााााससससतततत (cid:21)(cid:21)(cid:21)(cid:21)थथ थथ लललल ---- पा रि+थ ितक संवेदी जोन म; भवन&, संरचना\, िश(cid:3)प-त(cid:132)य, ऐितहािसक, कलाIमक और सां+कृितक महIव के (cid:29)े1& क(cid:30) पहचान करनी होगी और इस अिधसूचना के (cid:15)काशन क(cid:30) तारीख से छह माह के भीतर उनके संर(cid:29)ण क(cid:30) योजनाए ंतैयार करनी ह&गी तथा आंचिलक महायोजना म; सि(cid:8)मिलत क(cid:30) जाएगी। (6) ’’’’वव व व ििििनननन (cid:15)(cid:15)(cid:15)(cid:15)ददददषषषषूूूू णणणण -- पा रि+थितक संवेदी जोन म; r विन (cid:15)दषू ण के िनयं1ण के िलए राc य सरकार का पया(cid:24)वरण िवभाग वायु ((cid:15)दषू ण िनवारण और िनयं1ण) अिधिनयम, 1981 (1981 का 14) और उसके अधीन बनाए गए िनयम& के उपबंध& के अनुसरण म; माग(cid:24)दश(cid:24)क िस?ांत और िविनयम तैयार करेगा। (7) ववववाााायययय ुु ुु (cid:15)(cid:15)(cid:15)(cid:15)ददददषषषषूूूू णणणण -- पा रि+थितक संवेदी जोन म;, वायु (cid:15)दषू ण के िनयं1ण के िलए राcय सरकार या िहमाचल (cid:15)दशे राcय (cid:15)दषू ण िनयं1ण बोड(cid:24) का पया(cid:24)वरण िवभाग वायु ((cid:15)दषू ण िनवारण और िनयं1ण) अिधिनयम, 1981 (1981 का 14) और उसके अधीन बनाए गए िनयम& के उपबंध& के अनुसरण म; माग(cid:24)दश(cid:24)क िस?ांत और िविनयम तैयार करेगा। (8) बबबबििििहहहह!!!!ाााावववव ककककाााा ििििनननन(cid:21)(cid:21)(cid:21)(cid:21)ससससााााररररणणणण -- पा रि+थितक संवेदी जोन म; उपचा रत बिह}ाव का िन+सारण जल ((cid:15)दषू ण िनवारण तथा िनयं1ण) अिधिनयम, 1974 (1974 का 6) और उसके अधीन बनाए गए िनयम& के उपबंध& के अनुसार होगा। (9) ठठठठोोोोसससस अअअअपपपपििििशशशश//// -------- ठोस अपिश=& का िनपटान िन(cid:12)िलिखत (cid:17)प म; होगा - (i) पा रि+थितक संवेदी जोन म; ठोस अपिश=& का िनपटान भारत सरकार के तIकालीन पया(cid:24)वरण और वन मं1ालय क(cid:30) समय-समय पर यथा संशोिधत अिधसूचना सं. का.आ. 908(अ), तारीख 25 िसतंबर, 2000 नगरपािलक ठोस अपिश= ((cid:15)बंध और हथालन) िनयम, 2000 के उपबंध& के अनुसार (cid:1)कया जाएगा ; (ii) +थानीय (cid:15)ािधकरण जैव िन(cid:12)ीकरणीय और अजैव िन(cid:12)ीकरणीय संघटक& म; ठोस अपिश=& के संपृथ(cid:134)न के िलए योजनाए ंतैयार कर;गे ; (iii) जैव िन(cid:12)ीकरणीय सामZी को अिधमानतः खाद बनाकर या कृिम खेती के माrयम से पुनःच(cid:1)aत (cid:1)कया जाएगा ; (iv) अकाब(cid:24)िनक सामZी का िनपटान पा रि+थितक संवेदी जोन के बाहर पहचान (cid:1)कए गए + थल पर (cid:1)कसी पया(cid:24)वरणीय +वीकृत रीित म; होगा और पा रि+थितक संवेदी जोन म; ठोस अपिश_ ट& को जलाना या भ_ मीकरण अनुwात नहm होगा। (10) जजजजववैैववैै ििििचचचच(cid:29)(cid:29)(cid:29)(cid:29)कककक2222सस सस ीीीीयययय अअअअपपपपििििशशशश3333टट टट - पा रि+थितक संवेदी जोन म; जैव िच(cid:1)कIसीय अपिश=& का िनपटान भारत सरकार के तIकालीन "ारा पया(cid:24)वरण और वन मं1ालय क(cid:30) समय-समय पर यथासंशोिधत अिधसूचना सं.का.आ.630 (अ) तारीख 20 जुलाई, 1998 "ारा (cid:15)कािशत जैव िच(cid:1)कIसीय अपिश= ((cid:15)बंध और हथालन) िनयम, 1998 के उपबंध& के अनुसार (cid:1)कया जाएगा। ((((11111111)))) ययययााााननननीीीीयययय पपपप(cid:8)(cid:8)(cid:8)(cid:8)ररररववववहहहहनननन - प रवहन क(cid:30) यानीय गितिविध (cid:15)ािणय& के अनुकूल रीित से िविनयिमत क(cid:30) जाएगी और इस संबंध म; आंचिलक महायोजना म; िवशेष उपबंध सि(cid:8)मिलत (cid:1)कए जाएंगे और जब तक ऐसी आंचिलक महायोजना राcय सरकार के स(cid:29)म (cid:15)ािधकारी "ारा¹Hkkx IIµ[k.M 3 (ii)º Hkkjr dk jkti=k % vlk/kj.k 5 तैयार और अनुमो(cid:1)दत नहm (cid:1)कया जाता ह ै | मानीटरी सिमित सुंसगत अिधिनयम& और उसके अधीन बनाए गए िनयम& िनयम& और िविनयम& के अधीन यानीय गितिविधय& के अनुपालन को मानीटर करेगी। (12) औऔऔऔ5555ोोोोििििगगगगकककक इइइइककककााााईईईईययययाााा ंं ंं–––– (क) (cid:15)+तािवत पा रि+थितक संवेदी जोन के भीतर नए काx आधा रत उ‘ोग& के (cid:1)कसी +थापन क(cid:30) अनुwा िविध के अनुसार +थािपत िव‘मान काx आधा रत उ‘ोग& के िसवाए नहm दी जाएगी| (ख) (cid:15)+तािवत पा रि+थितक संवेदी जोन के भीतर जल, वायु, मृदा, rविन (cid:15)दषू ण का रत करने वाले (cid:1)कसी नए उ‘ोग के (cid:1)कसी (cid:15)+थापन क(cid:30) अनुwा नहm दी जाएगी| 4444.... पपपपाााा(cid:8)(cid:8)(cid:8)(cid:8)ररररिििि(cid:21)(cid:21)(cid:21)(cid:21)थथथथििििततततकककक ससससंवंवंवंवददेेददेे ीीीी जजजजोोोोनननन मममम88 88 (cid:15)(cid:15)(cid:15)(cid:15)ििििततततििििषषषष9999 औऔऔऔरररर ििििववववििििननननययययििििममममतततत (cid:29)(cid:29)(cid:29)(cid:29)(cid:31)(cid:31)(cid:31)(cid:31)ययययााााककककललललाााापपपप:::: कककक(cid:26)(cid:26)(cid:26)(cid:26) ससससचचूूचचूू ीीीी –––– पा रि+थितक संवेदी जोन म; सभी (cid:1)aयाकलाप पया(cid:24)वरण (संर(cid:29)ण) अिधिनयम, 1986 (1986 का 29) के उपबंध& "ारा शािसत ह&गे और नीच े दी गई तािलका म; िविन@द= रीित म; िविनयिमत ह&ग,े अथा(cid:24)त् :- ससससााााररररणणणणीीीी (cid:31)(cid:31)(cid:31)(cid:31)मममम ससससं.ं.ं.ं. (cid:29)(cid:29)(cid:29)(cid:29)(cid:31)(cid:31)(cid:31)(cid:31)ययययााााककककललललाााापपपप टटटटीीीीककककाााा----(cid:8)(cid:8)(cid:8)(cid:8)टटटट;;;;पपपपणणणणीीीी (1) (2) (3) (cid:15)(cid:15)(cid:15)(cid:15)ििििततततििििषषषष9999 (cid:29)(cid:29)(cid:29)(cid:29)(cid:31)(cid:31)(cid:31)(cid:31)ययययााााककककललललाााापपपप :::: 1. वािणिcयक खनन, पIथर उIखनन और (क) नए खनन (लघु और वृहत खिनज), पIथर उIखनन और तोड़ने क(cid:30) अपघष(cid:24)ण इकाईया ं इकाईय& को :ि%गत उपभोग के िलए मकान& के स{िनमा(cid:24)ण या मर(cid:8)मत के िलए और भूिम को खोदने या मकान& के िलए दसे ी टाइ(cid:3)स या (cid:135)ट& के िनमा(cid:24)ण के (cid:15)ितिनदgश से +थानीय िनवािसय& के सदभािवक घरेलू आव8यकता\ के िसवाए (cid:15)ितिष? (cid:1)कया जाएगा ; (ख) खनन सं(cid:1)aयाएं, माननीय उ(cid:136)तम (cid:21)यायालय क(cid:30) रट यािचका (िसिवल) सं. 1995 का 202 टी.एन. गौडाबम(cid:24)न िथ^मूलपाद बनाम भारत सरकार के मामले म; आदेश तारीख 4.8.2006 और रट यािचका (सी) सं. 2012 का 435 गोवा फाउंडशे न बनाम भारत सरकार के मामले म; तारीख 21.04.2014 के अंत रम आदेश के अनुसरण म; सव(cid:24)दा (cid:15)चालन होगा। 2. आरा मशीन& क(cid:30) +थापना पा रि+थितक संवेदी जोन के भीतर नई और िव‘मान आरा मशीन& का िव+ तार अनुwात नहm होगा। 3. (cid:1)कसी प रसंकटमय पदाथu का उपयोग या लागू िविधय& के अनुसार (cid:15)ितिष? (अ(cid:21)यथा उपबंिधत के िसवाय)। उIपादन 4. जल या वायु या मृदा या rव िन (cid:15)दषू ण पा रि+थितक संवेदी जोन के भीतर नए और िव‘मान (cid:15)दषू ण का रत करने का रत करने वाले उ‘ोग& क(cid:30) +थ ापना वाले का िव+ तार अनुwात नहm होगा। 5. नए वृहत तापीय और जल-िव‘ुतीय लागू िविधय& के अनुसार (cid:15)ितिष? (अ(cid:21)यथा उपबिं धत के िसवाय)। प रयोजना 6. जलावन लकड़ी का वािणिcयक उपयोग लागू िविधय& के अनुसार (cid:15)ितिष? (अ(cid:21) यथा उपबंिधत के िसवाय)। 7. Vलाि+टक बैग का उपयोग लागू िविध के अनुसार (cid:15)ितिष? (अ(cid:21)यथा उपबंिधत के िसवाए)| 8. पय(cid:24)टन से संबंिधत (cid:1)aयाकलाप जैसे रोप-वे, लागू िविधय& के अनुसार (cid:15)ितिष? (अ(cid:21) यथा उपबंिधत के िसवाय)। गम(cid:24) वायु गुबार& आ(cid:1)द "ारा अtयारDय (cid:29)े1 के ऊपर से उड़ना जैसे (cid:1)aयाकलाप करना 9. (cid:15)ाकृितक जल िनकाय& या भू-(cid:29)े1 म; लागू िविधय& के अनुसार (cid:15)ितिष? (अ(cid:21) यथा उपबंिधत के िसवाय)। अनपचा रत बिह}ाव और ठोस अपिश=& का िन+तारण6 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] ििििववववििििननननययययििििममममतततत (cid:29)(cid:29)(cid:29)(cid:29)(cid:31)(cid:31)(cid:31)(cid:31)ययययााााककककललललाााापपपप 10. होटल और िव(cid:129)ाम +थल& का +थापन पा रि+थितक अनुकूल पय(cid:24)टन (cid:1)aयाकलाप& से संबंिधत पय(cid:24)टक& के अ+थायी अिधभोग के िलए आवास के िसवाय संरि(cid:29)त (cid:29)े1 क(cid:30) सीमा से 1 (cid:1)कलोमीटर के भीतर (cid:1)कसी नए वािणिcयक होटल& और िव(cid:129)ाम+थल& क(cid:30) अनुwा नहm दी जाएगी| ले(cid:1)कन संरि(cid:29)त (cid:29)े1 क(cid:30) सीमा के एक (cid:1)कलोमीटर से पा रि+थतक(cid:30)य संवेदी जोन के िव+तार तक होटल और िव(cid:129)ाम+थल& क(cid:30) +थापना आंचिलक महायोजना या िव‘मान (cid:1)aयाकलप& का िव+ तार पय(cid:24)टन महायोजना के अनुसार क(cid:30) जा सकती ह|ै 11. सि{मा(cid:24)ण (cid:1)aयाकलाप (क) संरि(cid:29)त (cid:29)े1 क(cid:30) सीमा से एक (cid:1)कलोमीटर के भीतर (cid:1)कसी भी (cid:15)कार के नए वािणिcयक सि{मा(cid:24)ण क(cid:30) अनwु ा नहm दी जाएगी| पर(cid:21)तु +थानीय लोग& को पैरा 3 के उप पैरा (1) म; सूचीब? (cid:1)aयाकलाप& सिहत अपने रहायशी उपयोग के िलए अपनी भूिम पर सि{मा(cid:24)ण करने क(cid:30) अनुwा दी जाएगी| (ख) पर(cid:21)तु यह और (cid:1)क (cid:15)दषू ण न का रत करने वाले लघु उ‘ोग& से संबंिधत सि{मा(cid:24)ण (cid:1)aयाकलाप& को िविनयिमत (cid:1)कया जाएगा और लागू िनयम& और िविनयम&, य(cid:1)द कोई ह,5 के अनुसार स(cid:29)म (cid:15)ािधकारी से पूव(cid:24) अनुwा के साथ (cid:21)यूनतम तक रखा जाएगा| (ग) पा रि+थितक संवेदी के जोन क(cid:30) सीमा से एक (cid:1)कलोमीटर के आगे वा+तिवक +थानीय आव8यकता\ के िलए सि{मा(cid:24)ण क(cid:30) अनुwा दी जाएगी और अ(cid:21)य सि{मा(cid:24)ण (cid:1)aयाकलाप& का िविनयमन आंचिलक महायोजना के अनुसार (cid:1)कया जाएगा| 12. खाई का मैदान नए खाई खोदन े के मैदान का +थािपत (cid:1)कया जाना (cid:15)ितिष? ह|ै पुरान े खाई के मैदान लागू िविधय& के अधीन िविनयिमत (cid:1)कए जाएं| 13. (cid:15)ाकृितक जल िनकाय& या सतही (cid:29)े1 म; शोिधत बिह}ाव& के पुनच(cid:24)aण को (cid:15)ोI सािहत (cid:1)कया जायेगा और अब मल उपचा रत बिह}ाव(cid:24) का िन+सारण एवं ठोस अपिश_ ट के िनपटान के िलए िव‘मान िविनयम& का पालन (cid:1)कया जायेगा| 14. वायु और यानीय (cid:15)दषू ण लागू िविधय& के अधीन िविनयिमत ह&गे। 15. rविन (cid:15)दषू ण लागू िविधय& के अधीन िविनयिमत ह&ग|े 16. भू-जल उIकष(cid:24)ण लागू िविधय& के अधीन िविनयिमत ह&ग।े 17. वृ(cid:29)& क(cid:30) कटाई (क) राcय सरकार म; स(cid:29)म (cid:15)ािधकारी क(cid:30) पूव(cid:24) अनुमित के िबना वन, सरकारी या राज+व या िनजी भूिम पर या वन& म; (cid:139)कही वृ(cid:29)& क(cid:30) कटाई नहm होगी। (ख) वृ(cid:29)& क(cid:30) कटाई संबंिधत के(cid:22)ीय या राcय अिधिनयम या उसके अधीन बनाए गए िनयम& के उपबंध के अनुसार िविनयिमत होगी। (ग) आरि(cid:29)त वन& और संरि(cid:29)त वन& क(cid:30) दशा म; काय(cid:24) योजना अनुदशे & का पालन (cid:1)कया जाएगा| 18. (cid:15)वासी चरवाह े लागू िविधय& के अधीन और आंचिलक महायोजना के अनुसार िविनयिमत ह&गे। 19. िव‘मान +थापन लागू िविधय& के अधीन िविनयिमत ह&गे। 20. िव‘ुत लाइन& को पृथक करना भूिमगत केबल& का (cid:15)ो{यन| पा रि+थितक संवेदी जोन के भीतर से गुजरने वाली सभी िव‘मान िव‘ुत लाइन& को आंचिलक महायोजना के अधीन िविहत समय सीमा के भीतर पया(cid:24)7 (cid:17)प से पृथTकृत (cid:1)कया जाएगा| 21. िव‘मान सड़क& को चौड़ा करना और उ(cid:21)ह; उिचत पया(cid:24)वरण (cid:15)भाव मू(cid:3) यांकन और (cid:21) यनू ीकरण उपाय यथा लागू अनुसार सुदढृ करना तथा नई सड़क& का संिनमा(cid:24)ण ह&गे।¹Hkkx IIµ[k.M 3 (ii)º Hkkjr dk jkti=k % vlk/kj.k 7 22. होटल& और लॉज के िव‘मान प रसर& म; लागू िविधय& के अधीन िविनयिमत ह&गे। बाङ लगाना व(cid:21)यजीव के मु% संचरण को अनुwात करने के िलए, पा रि+थितक संवेदी जोन के भीतर होटल& या अ(cid:21)य वािणिcयक (cid:15)ित_ ठान& क(cid:30) स(cid:8) पि#य& को कंटीले तार& से नहm घेरा जायेगा और कोई घेरा 1 मीटर से ऊंचा नहm होगा| इस अनुबंध का पालन न करने वाले (cid:1)कसी िव‘मान घेरे को आंचिलक महायोजना म; िविन@द_ ट समय-सीमा के भीतर उपा(cid:21)त रत (cid:1)कया जाएगा| 23. जन अिधकार लागू िविधय& के अधीन िविनयिमत ह&ग।े 24. लघु चारा संZहण लागू िविधय& के अधीन िविनयिमत ह&गे। 25. सभी रा+ते और िव‘मान सड़के | लागू िविधय& के अधीन िविनयिमत ह&ग।े 26. कृिष (cid:15)णाली म; मूलभूत प रवत(cid:24)न। लागू िविधय& के अधीन िविनयिमत ह&ग।े 27. (cid:15)ाकृितक जल }ोत िजसम; भूजल संचयन भी लागू िविधय& के अधीन िविनयिमत ह&गे। ह,ै का वािणिcयक उपयोग। 28. राि1 म; यानीय यातायात का संचलन। लागू िविधय& के अधीन िविनयिमत ह&ग।े 29. िवदेशी (cid:15)जाितय& को लाना। लागू िविधय& के अधीन िविनयिमत ह&ग।े 30. वािणिcयक साइन बोड (cid:24)और हो(cid:141)ड(cid:142)स। लागू िविधय& के अधीन िविनयिमत ह&ग|े 31. पहाड़ी ढाल& और नदी तट& का संर(cid:29)ण आंचिलक महायोजना के अधीन अ(cid:21)यथा अनुwात के िसवाए कोई सि{मा(cid:24)ण (cid:1)aयाकलाप एक से दस ढलान& वाली पहाड़ी पर और (cid:1)कसी नदी और (cid:15)ाकृितक नाले के (cid:1)कनारे से 100 मीटर तक नहm (cid:1)कया जाएगा| ससससंवंवंवंव%%%%धधधधतततत (cid:29)(cid:29)(cid:29)(cid:29)(cid:31)(cid:31)(cid:31)(cid:31)ययययााााककककललललाााापपपप 32 +थानीय समुदाय& "ारा चलायी जा रही स(cid:1)aय (cid:17)प से बढ़ावा (cid:1)दया जायेगा। कृिष और बागवानी (cid:15)था\ के साथ डेयरी- फा(cid:141)मग, एTव ाक(cid:3)च र और मछली पालन। 33. जैिवक खेती स(cid:1)a य (cid:17)प से बढावा (cid:1)दया जाए। 34. सभी गितिविधय& के िलए ह रत (cid:15)ौ‘ोिगक(cid:30) स(cid:1)a य (cid:17)प से बढावा (cid:1)दया जाए। को Zहण करना 35. (cid:15)दषू ण उIप{ न करने वाले लघु उ‘ोग पा रि+ थितक संवेदी जोन म; गैर (cid:15)दषू णकारी, गैर प रसंकटमय, लघु और सेवा उ‘ोग&, कृिष, उ‘ान, बागवानी या कृिष आधा रत उ‘ोग&, जो दशे ीय सामान से औ‘ोिगक उIपाद& का उIपादन करते ह 5 और जो पया(cid:24)वरण पर कोई िवपरीत (cid:15)भाव नहm डालते ह,5 को अनुwात (cid:1)कया जायेगा। 36. वषा(cid:24) जल संचयन स(cid:1)a य (cid:17)प से बढ़ावा (cid:1)दया जाए। 37. कुटीर उ‘ोग िजनके अंतग(cid:24)त Zामीण स(cid:1)a य (cid:17)प से बढ़ावा (cid:1)दया जाए। कारीगर आ(cid:1)द भी ह 5 38. नवीकरणीय ऊजा(cid:24) }ोत का उपयोग स(cid:1)aय (cid:17)प से बढ़ावा (cid:1)दया जाएगा| 5555.... ममममााााननननीीीीटटटटररररीीीी ससससििििममममिििितततत---- (1) क;(cid:22)ीय सरकार पा रि+थितक संवेदी जोन क(cid:30) (cid:15)भावी मानीटरी के िलए एक मानीटरी सिमित का गठन करेगी जो िन(cid:12)िलिखत से िमलकर बनेगी, अथा(cid:24)त् :- (क) उपायु%, कांगड़ा अrय(cid:29) (ख) प रि+थित िवwान और पया(cid:24)वरण के (cid:29)े1 म; काय(cid:24) करने वाले गैर सरकारी संगठन का सद+य िहमाचल (cid:15)दशे सरकार "ारा (cid:15)Iयेक मामले म; एक वष(cid:24) के िलए नािमत एक िवशेषw8 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] (ग) िवरासत संर(cid:29)ण सिहत पया(cid:24)वरण के (cid:29)े1 म;, काय(cid:24) करने वाले गैर सरकारी संगठन का सद+ य के(cid:21)(cid:22)ीय सरकार "ारा (cid:15)Iयेक मामले म; एक वष(cid:24) के िलए नािमत एक (cid:15)ितिनिध (घ) काय(cid:24)कारी अिभय(cid:21)ता, िहमाचल (cid:15)दशे (cid:15)दषू ण िनयं1ण बोड(cid:24) सद+य (ड.) सब-िडिवजनल मिज+~ ेट, दहे रा, जावली या उसका (cid:15)ितिनिध सद+य (च) संभागीय वन अिधकारी (भू-भागीय) सद+य (छ) संभागीय वन अिधकारी (व(cid:21)यजीव) सद+य-सिचव ििििननननदददद=श=श=श=श शशशशतततत>> >>- (2) मािनट री सिमित इस अिधसूचना के उपबंध& के अनुपालन को मानीटर करेगी। (3) पा रि+थितक संवेदी जोन म; भारत सरकार के तI कालीन पया(cid:24)वरण और वन मं1ालय क(cid:30) अिधसूचना सं. का.आ. 1533(अ) तारीख 14 िसतंबर, 2006 क(cid:30) अनुसूची म; के अधीन सि(cid:8)मिलत (cid:1)aयाकलाप& और इस अिधसूचना के पैरा 4 के अधीन (cid:15)ितिष? गितिविधय& के िसवाय आन ेवाले ऐसे (cid:1)aयाकलाप& क(cid:30) दशा म; वा+तिवक िविन@द= +थलीय दशा\ पर आधा रत मानीटरी सिमित "ारा संवी(cid:29)ा क(cid:30) जाएगी और उ% अिधसूचना के उपबंध& के अधीन पूव(cid:24) पया(cid:24)वरण िनकासी के िलए के(cid:21)(cid:22)ीय सरकार के पया(cid:24)वरण, वन और जलवायु प रवत(cid:24)न मं1ालय को िन@द= क(cid:30) जाएगी। (4) इस अिधसूचना के पैरा 4 के अधीन यथा िविन@द= (cid:15)ितिष? (cid:1)aयाकलाप& के िसवाय, भारत सरकार के पया(cid:24)वरण, वन और जलवायु प रवत(cid:24)न मं1ालय क(cid:30) अिधसूचना संPयांक का.आ. 1533(अ) तारीख 14 िसतंबर, 2006 क(cid:30) अिधसूचना के अनुसूची के अधीन ऐसे (cid:1)aयाकलाप&, िज(cid:21)ह ; सि(cid:8)मिलत नहm (cid:1)कया गया ह,ै परंतु पा रि+थितक संवेदी जोन म; आत े ह,5 ऐसे (cid:1)aयाकलाप& क(cid:30) वा+तिवक िविन@द= +थलीय दशा\ पर आधा रत मानीटरी सिमित "ारा संवी(cid:29)ा क(cid:30) जाएगी और उसे संब? िविनयामक (cid:15)ािधकरण& को िन@द= (cid:1)कया जाएगा। (5) मानीटरी सिमित का सद+य-सिचव या संब? कलTटर या संरि(cid:29)त (cid:29)े1 का (cid:15)भारी ऐसे :ि% के िव(cid:17)?, जो इस अिधसूचना के (cid:1)कसी उपबंध का उ(cid:3)लंघन करता ह,ै पया(cid:24)वरण (संर(cid:29)ण) अिधिनयम, 1986 क(cid:30) धारा 19 (1986 का 29) के अधीन प रवाद फाइल करने के िलए स(cid:29)म होगा। (6) मानीटरी सिमित मु(cid:144)& के आधार पर अपे(cid:29)ा\ पर िनभ(cid:24)र रहते )ए संब? िवभाग& के (cid:15)ितिनिधय& या िवशेषw&, औ‘ोिगक संगम& या संब? पणधा रय& के (cid:15)ितिनिधय& को अपने िवचार-िवमश(cid:24) म; सहायता के िलए आमंि1त कर सकेगी। (7) मानीटरी सिमित (cid:15)Iयेक वष(cid:24) क(cid:30) 31 माच(cid:24) तक क(cid:30) अपनी वा<षक कार(cid:24)वाई रपोट (cid:24) उउउउपपपपााााबबबबंधंधंधंध-IV म; उपबंिधत (cid:17)प िवधान के अनुसार राcय के मुPय व(cid:21)य जीव वाडन(cid:24) को उTत वष(cid:24) के 30 जून तक (cid:15)+तुत करेगी। (8) के(cid:21)(cid:22)ीय सरकार का पया(cid:24)वरण, वन और जलवायु प रवत(cid:24)न मं1ालय मानीटरी सिमित को अपने कृIय& के (cid:15)भावी िनव(cid:24)हन के िलए समय-समय पर ऐसे िनदेश द ेसकेगा, जो वह ठीक समझे। 6. इस अिधसूचना के उपबंध भारत के माननीय उ(cid:136)तम (cid:21)यायालय या उ(cid:136) (cid:21)यायालय या रा_ ~ीय ह रत (cid:15)ािधकरण "ारा पा रत कोई आदेश या पा रत होन ेवाले (cid:1)कसी आदशे , य(cid:1)द कोई ह&, के अधीन ह&गे। [फा.सं.25/124/2015-ईएसजेड-आरई] डॉ. टी. चांदनी, वैwािनक (जी)¹Hkkx IIµ[k.M 3 (ii)º Hkkjr dk jkti=k % vlk/kj.k 9 उउउउपपपपााााबबबबधधंंधधंं -I पपपप(cid:2)(cid:2)(cid:2)(cid:2)गगगग डडडडममैैममैै ललललककेेककेे वववव(cid:12)(cid:12)(cid:12)(cid:12)ययययजजजजीीीीवववव अअअअभभभभययययाााारररर(cid:20)(cid:20)(cid:20)(cid:20)यययय ककककेेेे पपपपाााा(cid:21)(cid:21)(cid:21)(cid:21)ररररिििि(cid:23)(cid:23)(cid:23)(cid:23)थथथथििििततततकककक(cid:25)(cid:25)(cid:25)(cid:25)यययय ससससववंंववंं ददेेददेे ीीीी जजजजोोोोनननन मममम (cid:31)(cid:31) (cid:31)(cid:31)आआआआनननन ेे ेेववववाााालललल ेे ेे!!!!ाााामममम(cid:2)(cid:2)(cid:2)(cid:2) कककक(cid:25)(cid:25)(cid:25)(cid:25) ससससचचूूचचूू ीीीी (cid:1).सं. ड(cid:6)(cid:8) य ू एलपीए कुल (cid:14)े(cid:16) वग(cid:19) (cid:23)ाम(cid:25) क(cid:26) (cid:23)ाम(cid:25)/वन(cid:25) के नाम हे(cid:31)ट . म! (cid:14)े(cid:16) अ(cid:14)ांश देशांतर के नाम (cid:20)कमी. सं(cid:27)य ा 1. प(cid:25)ग डैम झील 46.31 51 बधेला 40.95 76°1’46” 32° 7’25” ड(cid:6)(cid:8) य ूएलएस 2. बझेरा 278.56 76°4’30” 31° 4’5” 3. बलगत गुराला 11.04 76°4’54” 31° 56’10” 4. बालोहल (लोवर) 13.20 76°7’50” 31° 55’15” 5. (cid:6)ल ोहर सुखनारा 219.71 76°4’23” 32° 3’13” 6. बनारा 86.49 75°59’0” 32° 6’5” 7. बारा 10.23 76°12’16” 31° 52’12” 8. बरीयल 50.55 76°5’34” 31° 1’27” 9. भंगेर 52.28 76°8’4” 31° 55’12” 10. भटोली 23.56 76°7’46” 32° 58’21” 11. भेरता 150.25 75°57’13” 32° 6’40” 12. भायल 47.00 76°5’39” 31° 1’3” 13. च(cid:6) बर 50.40 76°8’34” 31°57’55” 14. चटवाल 22.34 76°4’36” 31° 56’14” 15. चू*नू धनोटू ब(cid:8)ल ा 34.87 76°11’58” 31° 51’58” 16. देहरा भारी राजगढ़ 122.26 76°11’55” 31° 54’15” 17. दखु ी बगलाहार 88.08 76°58’4” 32° 5’47” 18. गडोहाल 30.19 76°3’16” 31° 56’16” 19. घेवयोरी 63.43 76°10’11” 31° 52’27” 20. गुलेर 21.30 76°8’31” 31° 59’51” 21. हावल 37.21 76°1’58” 31° 6’57” 22. ह,रपुर 12.21 76°9’51” 31° 0’17” 23. हरसार 48.24 76°2’23” 31° 6’7” 24. जगनौल 199.11 75°57’49” 32° 2’48” 25. जाखारा ((cid:23)ाम पंचायत) 233.50 75°57’11” 32° 7’25” 26. जला,रयन 22.20 76°8’8” 31° 0’13” 27. ज0 बल बासी 147.35 76°9’38” 31° 54’6” 28. जारोट 124.26 76°5’24” 32° 4’30” 29. जवाली 56.57 76°0’58” 32° 8’27” 30. झ(cid:25)क रतीयाल छबुवन 128.67 75°59’24” 32° 5’7” 31. खा(cid:6)ब ल 185.55 76°5’19” 31° 2’37” 32. खारर 219.06 75°58’31” 32° 6’42” 33. कथेर 39.53 76°8’32” 31° 57’28” 34. लोहारा बतहरी तुतवान िसहल 179.64 75°57’37” 32° 5’10” 35. लोवर धरनेता मन समकद, हदवाल, बादी बरला 236.00 75°58’5” 32° 2’10” 36. लुदरेत 37.95 76°5’28” 31° 1’47” 37. माहेबा 17.10 76°9’7” 31°59’28” 38. मालेता 12.30 76°11’45” 31° 54’26” 39. नंदपुर रानेल 101.66 76°7’5” 31° 0’33” 40. नांगल 35.79 76°6’37” 31° 55’38” 41. पानलथा 50.68 76°2’47” 31° 5’55” 42. पापाहन गुगलारा 301.90 76°1’11” 32° 5’22” 43. रानेल 2.85 76°8’0” 31° 57’53” 44. रोड (cid:20)द(cid:6) बर 63.44 76°7’54” 31° 59’03” 45. समकेद 187.76 76°0’58” 31° 5’32” 46. समलेता 157.34 76°3’45” 31° 4’41” 47. संगोली 118.73 76°3’31” 31° 4’50” 48. िश(cid:3)ब ा दासीबा नांगल 36.49 76°5’30” 31° 56’2” 49. सोहारा 13.95 76°13’3” 31° 52’12” 50. तारा बातेक(cid:11) 86.94 75°58’4” 32° 2’57” 51. थांगर 119.85 76°0’34” 31° 7’57” ककककुुुुलललल 4444666633330000....5555222210 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] उउउउपपपपााााबबबबंधंधंधंध II पपपप::::गगगग डडडडैमैमैमैम ललललककेेककेे ववववAAAAययययजजजजीीीीवववव अअअअभभभभययययााााररररCCCCयययय कककक(cid:26)(cid:26)(cid:26)(cid:26) ससससीीीीममममाााा ककककेेेे ससससााााथथथथ जजजजीीीीपपपपीीीीएएएएसससस ििििननननदददद=श=श=श=शााााककंंककंं ििििबबबबAAAAदददद,ुुुु (cid:1).सं. जीपीएस दशे ांतर अ(cid:6)ांश 1 पू.01 75° 57.996' पू. 32° 8.869' उ. 2 पू.02 75° 58.819' पू. 32° 6.369' उ. 3 पू. 03 76° 0.538' पू. 32° 4.619' उ. 4 पू. 04 76° 1.211' पू. 32° 8.122' उ. 5 पू. 05 76° 3.638' पू. 32° 5.755' उ. 6 पू. 06 76° 5.459' पू. 32° 3.959' उ. 7 पू. 07 76° 3.653' पू. 32° 1.992' उ. 8 पू. 08 76° 5.988' पू. 32° 0.673' उ. 9 पू. 09 76° 8.789' पू. 31° 59.230' उ. 10 पू. 10 76° 8.518' पू. 31° 57.962' उ. 11 पू. 11 76° 9.984' पू. 31° 58.393' उ. 12 पू. 12 76° 9.532' पू. 31° 57.106' उ. 13 पू. 13 76° 11.599' पू. 31° 54.803' उ. 14 पू.14 76° 13.427' पू. 31° 52.585' उ. 15 पू. 15 76° 9.990' पू. 31° 53.986' उ. 16 पू. 16 76° 5.925' पू. 31° 55.922' उ. 17 पू. 17 76° 2.898' पू. 31° 56.178' उ. 18 प.ू 18 75° 59.635' पू. 31° 56.214' उ. 19 पू. 19 75° 56.768' पू. 31° 57.793' उ. 20 पू. 20 75° 57.209' पू. 31° 59.969' उ. 21 पू. 21 75° 56.624' पू. 32° 1.867' उ. 22 पू. 22 75° 56.595' पू. 32° 4.531' उ. 23 पू.23 75° 56.490' पू. 32° 6.044' उ. 24 पू. 24 75° 57.135' पू. 32° 7.741' उ. पपपप::::गगगग डडडडैमैमैमैम ललललककेेककेे ववववAAAAययययजजजजीीीीवववव अअअअभभभभययययााााररररCCCCयययय कककक(cid:26)(cid:26)(cid:26)(cid:26) ससससीीीीममममाााा ककककेेेे ससससााााथथथथ जजजजीीीीपपपपीीीीएएएएसससस ििििननननददददशश==शश== ााााककंंककंं ििििबबबबAAAAदददद,ुुुु (cid:1).सं. जीपीएस दशे ांतर अ(cid:6)ांश 1 पू.01 75° 57.867' पू. 32° 9.081' उ. 2 पू.02 75° 59.106' पू. 32° 6.832' उ. 3 पू.03 76° 0.989' पू. 32° 5.463' उ. 4 पू.04 76° 1.571' पू. 32° 9.004' उ. 5 पू.05 76° 3.952' पू. 32° 6.601' उ. 6 पू.06 76° 5.994' पू. 32° 4.569' उ. 7 पू.07 76° 5.966' पू. 32° 2.709' उ. 8 पू.08 76° 8.438' पू. 32° 0.366' उ. 9 पू.09 76° 9.487' पू. 32° 0.444' उ. 10 पू.10 76° 13.130' पू. 31° 53.259' उ. 11 पू.11 76° 10.687' पू. 31° 52.329' उ. 12 पू.12 76° 9.484' पू. 31° 54.091' उ. 13 पू.13 76° 6.396' पू. 31° 55.670' उ. 14 पू.14 76° 3.526' पू. 31° 55.966' उ. 15 पू.15 75° 57.256' पू. 32° 2.428' उ. 16 पू.16 75° 56.237' पू. 32° 4.592' उ. 17 पू.17 75° 56.225' पू. 32° 6.039' उ. 18 पू.18 75° 56.778' पू. 32° 7.785' उ.¹Hkkx IIµ[k.M 3 (ii)º Hkkjr dk jkti=k % vlk/kj.k 11 उउउउपपपपााााबबबबंधंधंधंध III पपपप::::गगगग डडडडैमैमैमैम ललललककेेककेे ववववAAAAययययजजजजीीीीवववव अअअअभभभभययययााााररररCCCCयययय ककककेेेे पपपपाााा(cid:8)(cid:8)(cid:8)(cid:8)ररररिििि(cid:21)(cid:21)(cid:21)(cid:21)थथथथििििततततकककक(cid:26)(cid:26)(cid:26)(cid:26)यययय ससससववंंववंं ददेेददेे ीीीी जजजजोोोोनननन ककककाााा ममममााााननननििििचचचच(cid:13)(cid:13)(cid:13)(cid:13) अअअअ(cid:17)(cid:17)(cid:17)(cid:17)ाााांशंशंशंश औऔऔऔरररर ददददशशेेशशेे ााााAAAAततततरररर ककककेेेे ससससााााथथथथ12 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] उउउउपपपपााााबबबबंधंधंधंध IIIIVVVV कककक(cid:26)(cid:26)(cid:26)(cid:26) गगगगईईईई ककककाााारररर(cid:4)(cid:4)(cid:4)(cid:4)ववववााााईईईई कककक(cid:26)(cid:26)(cid:26)(cid:26) (cid:8)(cid:8)(cid:8)(cid:8)ररररपपपपोोोोटटटट(cid:4) (cid:4) (cid:4) (cid:4) ककककाााा (cid:15)(cid:15)(cid:15)(cid:15)ोोोोफफफफााााममममाााा (cid:4)(cid:4) (cid:4)(cid:4)---- पपपपाााा(cid:8)(cid:8)(cid:8)(cid:8)ररररिििि(cid:21)(cid:21)(cid:21)(cid:21)थथथथििििततततकककक ससससंंववंंववेदेदेदेदीीीी जजजजोोोोनननन ममममााााननननीीीीटटटटररररीीीी ससससििििममममिििितततत 1. बैठक& क(cid:30) संPया और ितिथ। 2. बैठक& के काय(cid:24)वृ# : उ(cid:3)लेखनीय िब(cid:21)द\ु का उ(cid:3)लेख कर;। अलग उपाबंध पर बैठक& के काय(cid:24)वृ# संल(cid:145) कर;। 3. पय(cid:24)टन मा+ट र V लान सिहत जोनल मा+ टर V लान क(cid:30) तैयारी क(cid:30) ि+थित 4. भूिम अिभलेख (पा र-संवेदी जोन वार) के ऊपर +प= 1ु ट के संशोधन हते ु िन+ता रत मामल& का सारांश। उपाबंध के (cid:17)प म; िववरण संल(cid:145) (cid:1)कए जाएं। 5. पया(cid:24)वरण (cid:15)भाव िनधा(cid:24)रण अिध सूचना, 2006 के अंतग(cid:24)त शािमल काय(cid:24)कलाप& के िलए जांच (cid:1)कए गए मामल& का सारांश। उपाबंध के (cid:17)प म; अलग से िववरण संल(cid:142) न (cid:1)कए जाएं। 6. पया(cid:24)वरण (cid:15)भाव िनधा(cid:24)रण अिध सूचना, 2006 के अंतग(cid:24)त शािमल न (cid:1)कए गए काय(cid:24)कलाप& के िलए जांच (cid:1)कए गए मामल& का सारांश। उपाबंध के (cid:17)प म; अलग से िववरण संल(cid:145) (cid:1)कए जाएं । 7. पया(cid:24)वरण (संर(cid:29)ण) अिधिनयम, 1986 क(cid:30) धारा 19 के अंगत(cid:24)त दज(cid:24) क(cid:30) गई िशकायत& का सारांश । 8. कोई अ(cid:21)य महIवपूण(cid:24) मामला। MINISTRY OF ENVIRONMENT, FOREST AND CLIMATE CHANGE NOTIFICATION New Delhi, the 16th November, 2015 S.O.3099(E).—The following draft of the notification, which the Central Government proposes to issue in exercise of the powers conferred by sub-section (1), read with clause (v) and clause (xiv) of sub-section (2) and sub- section (3) of section 3 of the Environment (Protection) Act, 1986 (29 of 1986) is hereby published, as required under sub-rule (3) of rule 5 of the Environment (Protection) Rules, 1986, for the information of the public likely to be affected thereby; and notice is hereby given that the said draft notification shall be taken into consideration on or after the expiry of a period of sixty days from the date on which copies of the Gazette containing this notification are made available to the public; Any person interested in making any objections or suggestions on the proposals contained in the draft notification may forward the same in writing, for consideration of the Central Government within the period so specified to the Secretary, Ministry of Environment, Forest and Climate Change, Indira Paryavaran Bhawan, Jorbagh Road, Aliganj, New Delhi-110003, or send it to the e-mail address of the Ministry at: - esz-mef@nic.in. Draft Notification Whereas, the Pong Dam Lake Wildlife Sanctuary located in Kangra District, Himachal Pradesh and lying between latitude 31049’50” N to 32014’36” N and longitude 76053’31” E to 77017’53” E is spread over an area of 207.59 Square Kilometres. And whereas, the flora and fauna represent rich biological significance of this sanctuary. Birds: 230 species of the belonging to about 54 bird families out of 77 families of the birds recorded in India. Among the waterfowl’s main species are bar-headed geese, pintails, poachards, coots, grebes, cormorants and storks etc. Butterflies: Indian fritilary, striped tiger, orange oakleaf, yellow pansy, grey danid eggfly etc. Animals: nilgai, oorcupine, civets, mongoose, leopard etc. And whereas, it is necessary to conserve and protect the area the extent and boundaries of which is specified in paragraph 1 of this notification surrounding the protected area of Pong Dam Lake Wildlife Sanctuary as Eco-sensitive zone from ecological, environmental and biodiversity point of view and to prohibit industries or class of industries and their operations and processes in the said Eco-sensitive Zone. Now therefore, in exercise of the power conferred by sub section(1) and clauses (v) and (xiv) of sub-section (2) and sub-section (3) of section 3 of the Environment (Protection) Act 1986 (29 of 1986) read with sub-rule (3) of rule 5 of the Environment (Protection) Rules, 1986, the Central Government hereby notifies an area with an extent upto 1.5 kilo metre around the boundary of Pong Dam Lake Wildlife Sanctuary in the State of Himachal Pradesh as the Pong¹Hkkx IIµ[k.M 3 (ii)º Hkkjr dk jkti=k % vlk/kj.k 13 Dam Lake Wildlife Sanctuary Eco-sensitive Zone (herein after referred to as the Eco-sensitive Zone) details of which are as under, namely:- 1. Extent and boundaries of Eco-sensitive Zone.- (1) The Eco-sensitive Zone shall be of 46.31 Square Kilometre with an varying extent upto 1.5 km around the boundary of Pong Dam Lake Wildlife Sanctuary. (2) The list of villages falling in Eco-sensitive Zone are given at Annexure-I. (3) The Global Positioning System co-ordinates of points along the boundary of such zone are given at Annexure-II. (4) The map of the Eco-sensitive Zone along with boundary details and latitudes and longitudes is appended as Annexure-III. 2. Zonal Master Plan for the Eco-sensitive Zone.- (1) The State Government shall for the purpose of the Eco- sensitive Zone prepare a Zonal Master Plan within a period of two years from the date of publication of final notification in the Official Gazette, in consultation with local people and adhering to the stipulations given in this notification. (2) The said Plan shall be approved by the Competent Authority in the State Government. (3) The Zonal Master Plan for the Eco-sensitive Zone shall be prepared by the State Government in such a manner as is specified in this notification and also in consonance with the relevant Central and State laws and the guidelines issued by the Central Government, if any. (4) The Zonal Master Plan shall be prepared in consultation with all concerned State Departments, namely:- (i) Environment; (ii) Forest; (iii) Urban Development; (iv) Tourism; (v) Municipal; (vi) Revenue; (vii) Agriculture; (viii) Himachal Pradesh State Pollution Control Board; (ix) Irrigation; (x) Public Works Department; for integrating environment and ecological consideration into it. (5) The Zonal Master Plan shall not impose any restriction on the approved existing land use, infrastructure and activities, unless so specified in this notification and the said Master Plan shall factor in improvement of all infrastructure and activities to be more efficient and eco-friendly. (6) The Zonal Master plan shall provide for restoration of denuded areas, conservation of existing water bodies, management of catchment areas, watershed management, groundwater management, soil and moisture conservation, needs of local community and such other aspects of the ecology and environment that needs attention. (7) The Zonal Master Plan shall demarcate all the existing worshipping places, village and urban settlements, types and kinds of forests, tribal areas, agricultural areas, fertile lands, green area, such as, parks and like places, horticultural areas, orchards, lakes and other water bodies. (8) The Zonal Master Plan shall regulate development in Eco-sensitive Zone so as to ensure Eco-friendly development for livelihood security of local communities. 3. Measures to be taken by State Government.-The State Government shall take the following measures for giving effect to the provisions of this notification, namely:- (1) Land use.- Forests, horticulture areas, agricultural areas, parks and open spaces earmarked for recreational purposes in the Eco-sensitive Zone shall not be used or converted into areas for commercial or industrial related development activities: Provided that the conversion of agricultural lands within the Eco-sensitive Zone may be permitted on the recommendation of the Monitoring Committee, and with the prior approval of the State Government, to meet the residential needs of local residents, and for the activities listed against serial numbers 10,21,35,36 and 37 in column (2) of the Table in paragraph 4, namely:-14 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] (i) Eco-friendly cottages for temporary occupation of tourists, such as tents, wooden houses, etc. for Eco-friendly tourism activities, (ii) widening and strengthening of existing roads and construction of new roads. (iii) small scale industries not causing pollution, (iv) rainwater harvesting, and (v) cottage industries including village industries, convenience stores and local amenities: Provided further that no use of tribal land shall be permitted for commercial and industrial development activities without the prior approval of the State Government and without compliance of the provisions of article 244 of the Constitution of India or the law for the time being in force, including the Scheduled Tribes and other Traditional Forest Dwellers (Recognition of Forest Rights) Act, 2006 (2 of 2007): Provided also that any error appearing in the land records within the Eco-sensitive Zone shall be corrected by the State Government after obtaining the views of Monitoring Committee, once in each case and the correction of said error shall be intimated to the Central Government in the Ministry of Environment, Forest and Climate Change: Provided also that the above correction of error shall not include change of land use in any case except as provided under this sub-paragraph. Provided also that there shall be no consequential reduction in green area, such as forest area and agricultural area and efforts shall be made to reforest the unused or unproductive agricultural areas. (2) Natural springs.-The catchment areas of all natural springs shall be identified and plans for their conservation and rejuvenation shall be incorporated in the Zonal Master Plan and the guidelines shall be drawn up by the State Government in such a manner as to prohibit development activities at or near these areas which are detrimental to such areas. (3) Tourism.- (a) The activity relating to tourism within the Eco-sensitive Zone shall be as per Tourism Master Plan, which shall form part of the Zonal Master Plan. (b) The Tourism Master Plan shall be prepared by Department of Tourism, in consultation with Department of Forests and Environment of the State Government. (c) The activity of tourism shall be regulated as under, namely:- (i) all new tourism activities or expansion of existing tourism activities within the Eco-sensitive Zone shall be in accordance with the guidelines issued by the Central Government in the Ministry of Environment, Forests and Climate Change with emphasis on eco-tourism, eco-education and eco-development and based on carrying capacity study of the Eco-sensitive Zone; (ii) new construction of hotels and resorts shall not be permitted within one kilometer from the boundary of the Pong Dam Lake Wildlife Sanctuary except for accommodation for temporary occupation of tourists related to Eco- friendly tourism activities: Provided that beyond the distance of one kilometre from the boundary of the protected Areas till the extent of the Eco-sensitive Zone, the establishment of new hotels and resorts shall be permitted only in pre-defined and designated areas for Eco-tourism facilities as per tourism Master Plan; (iii) till the Zonal Master Plan is approved, development for tourism and expansion of existing tourism activities shall be permitted by the concerned regulatory authorities based on the actual site specific scrutiny and recommendation of the Monitoring Committee. (4) Natural heritage.- All sites of valuable natural heritage in the Eco-sensitive Zone, such as the gene pool reserve areas, rock formations, waterfalls, springs, gorges, groves, caves, points, walks, rides, cliffs, etc. shall be identified and preserved and plan shall be drawn up for their protection and conservation within six months from the date of publication of this notification and such plan shall form part of the Zonal Master Plan. (5) Man-made heritage sites.- Buildings, structures, artefacts, areas and precincts of historical, architectural, aesthetic, and cultural significance shall be indentified in the Eco-sensitive Zone and plans for their conservation shall be prepared within six months from the date of publication of this notification and incorporated in the Zonal Master Plan. (6) Noise pollution.- The Environment Department of the State Government or Himachal Pradesh State Pollution Control Board shall draw up guidelines and regulations for the control of noise pollution in the Eco-sensitive Zone in¹Hkkx IIµ[k.M 3 (ii)º Hkkjr dk jkti=k % vlk/kj.k 15 accordance with the provisions of the Air (Prevention and Control of Pollution) Act, 1981(14 of 1981) and the rules made thereunder. (7) Air pollution.- The Environment Department of the State Government or Himachal Pradesh State Pollution Control Board shall draw up guidelines and regulations for the control of air pollution in the Eco-sensitive Zone in accordance with the provisions of the Air (Prevention and Control of Pollution) Act, 1981 (14 of 1981) and the rules made thereunder. (8) Discharge of effluents.- The discharge of treated effluent in Eco-sensitive Zone shall be in accordance with the provisions of the Water (Prevention and Control of Pollution) Act, 1974 (6 of 1974)and the rules made thereunder. (9) Solid wastes. - Disposal of solid wastes shall be as under:- (i) the solid waste disposal in Eco-sensitive Zone shall be carried out as per the provisions of the Municipal Solid Waste (Management and Handling) Rules, 2000 published by the Government of India in the erstwhile Ministry of Environment and Forests vide notification number S.O. 908 (E), dated the 25th September, 2000 as amended from time to time; (ii) the local authorities shall draw up plans for the segregation of solid wastes into biodegradable and non-biodegradable components; (iii) the biodegradable material shall be recycled preferably through composting or vermiculture; (iv) the inorganic material may be disposed in an environmentally acceptable manner at site(s) identified outside the Eco-sensitive Zone and no burning or incineration of solid wastes shall be permitted in the Eco-sensitive Zone (10) Bio-medical waste.- The bio-medical waste disposal in the Eco-sensitive Zone shall be carried out as per the provisions of the Bio-Medical Waste (Management and Handling) Rules, 1998 published by the Government of India in the erstwhile Ministry of Environment and Forests vide notification number S.O. 630(E), dated the 20th July, 1998 as amended from time to time. (11) Vehicular traffic. - The vehicular movement of traffic shall be regulated in a habitat friendly manner and specific provisions in this regard shall be incorporated in the Zonal Master Plan and till such time as the Zonal Master Plan is prepared and approved by the competent authority in the State Government, Monitoring Committee shall monitor compliance of vehicular movement under the relevant Acts and the rules and regulations made thereunder. (12) Industrial units (a) No establishment of new wood based industries within the proposed Eco-sensitive zone shall be permitted except the existing wood based industries set up as per the law. (b) No establishment of any new industry causing water, air, soil, noise pollution within the proposed Eco- sensitive Zone shall be permitted. 4. List of activities prohibited or to be regulated within the Eco-sensitive Zone.- All activities in the Eco sensitive Zone shall be governed by the provisions of the Environment (Protection) Act, 1986 (29 of 1986) and the rules made thereunder, and be regulated in the manner specified in the Table below, namely:- TABLE S.No. Activity Remarks (1) (2) (3) Prohibited Activities 1. Commercial Mining, stone quarrying and (a) All new and existing mining (minor and major crushing units. minerals), stone quarrying and crushing units are prohibited except for the domestic needs of bona fide local residents including digging of earth for construction or repair of houses and for manufacture of country tiles or bricks for housing for personal use. (b) The mining operations shall strictly be in accordance with the orders of the Hon’ble Supreme Court dated 04.08.2006 in the matter of T.N. Godavarman16 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] Thirumulpad Vs. UOI in W.P.(C) No.202 of 1995 and order of the Hon’ble Supreme Court dated 21.04.2014 in the matter of Goa Foundation Vs. UOI in W.P.(C) No.435 of 2012. 2. Setting up of saw mills. No new or expansion of existing saw mills shall be permitted within the Eco-sensitive Zone. 3. Use or production of any hazardous Prohibited (except as otherwise provided) as per applicable substances. laws. 4. Setting up of industries causing water or No new or expansion of polluting industries in the Eco- air or soil or noise pollution. sensitive Zone shall be permitted. 5. Establishment of new major thermal and Prohibited (except as otherwise provided) as per applicable hydro-electric projects laws. 6. Commercial use of firewood. Prohibited (except as otherwise provided) as per applicable laws. 7. Use of plastic bags Prohibited (except as otherwise provided) as per applicable laws. 8. Undertaking activities related to tourism Prohibited (except as otherwise provided) as per applicable like over-flying the national park area by laws. aircraft, hot-air balloons. 9. Discharge of untreated effluents and Prohibited (except as otherwise provided) as per applicable solid waste in natural water bodies or laws. land area Regulated Activities 10. Establishment of hotels and resorts. No new commercial hotels and resorts shall be permitted within one kilometer of the boundary of the Protected Area except for accommodation for temporary occupation of tourists related to Eco-friendly tourism activities. However, beyond one kilometer and upto the extent of the Eco-sensitive Zone all new tourism activities or expansion of existing activities would be in conformity with the Tourism Master Plan 11. Construction activities. a) No new commercial construction of any kind shall be permitted within one kilometer from the boundary of the Protected Area: Provided that local people shall be permitted to undertake construction in land for their residential use including the activities listed in sub-paragraph (1) of paragraph 3: (b) the construction activity related to small scale industries not causing pollution shall be regulated and kept at the minimum with the prior permission from the Competent Authority as per applicable rules and regulations, if any. (c) Beyond one kilometer upto the extent of Eco-Sensitive Zone construction for bone fide local needs shall be allowed and other construction activities shall be regulated as per Zonal Master Plan. 12. Trenching ground. Establishing of new trenching ground is prohibited. Old trenching grounds are to be regulated under applicable laws. 13. Discharge of treated effluents and solid Recycling of treated effluents shall be encouraged and for waste in natural water bodies or land area. disposal of sludge or solid wastes, the existing regulation shall be followed. 14. Air and Vehicular Pollution. Regulated under applicable laws. 15. Noise pollution. Regulated under applicable laws. 16. Extraction of ground water. Regulated under applicable laws. 17. Felling of trees. (a) There shall be no felling of trees in the forest or Government or revenue or private lands without prior permission of the Competent Authority in the State Government; (b) the felling of trees shall be regulated in accordance with the provisions of the concerned Central or State Acts¹Hkkx IIµ[k.M 3 (ii)º Hkkjr dk jkti=k % vlk/kj.k 17 and the rules made thereunder. (c) in case of Reserve Forests and Protected Forests the Working Plan prescriptions shall be followed. 18. Migratory graziers. Regulated under applicable laws and as per Zonal Master Plan. 19. Existing establishments. Regulated under applicable laws 20. Insulation of electric lines. Promote underground cabling. All existing electric lines passing through the Eco-sensitive Zone shall be adequately insulated in the time frame prescribed under the Zonal Master Plan. 21. Widening and strengthening of existing Shall be done with proper Environment Impact roads. Assessment and mitigation measures, as applicable. 22. Fencing of existing premises of hotels Regulated under applicable laws. and lodges. In order to allow free movement of wildlife, hotels or other commercial establishments within the Eco-sensitive Zone shall not fence their properties with barbed wire and no fence shall be higher than 1 meter. Any existing fence not complying with this stipulation shall be modified as per the time lines mentioned in the Zonal Master Plan. 23. Public Rights. Regulated under applicable laws. 24. Collection of small fodder. Regulated under applicable laws. 25. All the ways and existing roads. Regulated under applicable laws. 26. Drastic change of Agriculture system. Regulated under applicable laws. 27. Commercial use of natural water resource Regulated under applicable laws. including ground water Harvesting. 28. Movement of vehicular traffic at night. Regulated under applicable laws. 29. Introduction of exotic species. Regulated under applicable laws. 30. Commercial sign boards and hoardings. Regulated under applicable laws. 31. Protection of hill slopes and river banks. No construction activity unless otherwise permitted by under the Zonal Master Plan shall be undertaken on the hill with slopes more than 1 to 10 and also upto 100 meters from the banks of any river, and natural nallah. Promoted Activities 32. Ongoing agriculture and horticulture Shall be actively promoted practices by local communities along with dairies, dairy farming, aquaculture and fisheries. 33. Organic farming. Shall be actively promoted. 34. Adoption of green technology for all Shall be actively promoted. activities. 35. Cottage industries including village Shall be actively promoted. artisans. 36. Rain water harvesting. Shall be actively promoted. 37. Small scale industries not causing Non polluting, non-hazardous, small-scale and service pollution. industry, agriculture, floriculture, horticulture or agro- based industry producing products from indigenous goods from the Eco-sensitive Zone which do not cause any adverse impact on environment, shall be permitted. 38. Use of renewable energy sources. Shall be actively promoted. 5. Monitoring Committee.- (1) The Central Government hereby constitutes a Monitoring Committee for effective monitoring of the Eco-sensitive Zone, which shall comprise of the following, namely:- a) Deputy Commissioner, Kangra - Chairman b) An expert in the field of ecology and environment - Member to be nominated by the Government of Himachal Pradesh for a term of one year in each case.18 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] c) One representatives of non-Governmental Organisation - Member (working in the field of environment including heritage conservation) to be nominated by the Government of Himachal Pradesh for a term of one year in each case. d) Executive Engineer, Himachal Pradesh Pollution Control Board - Member e) Sub-Divisional Magistrate, Dehra, Jawali or his representative - Member f) Divisional Forest Officer (Territorial) - Member g) Divisional Forest Officer (Wildlife) - Member-Secretary Terms of Reference: (2) The Monitoring Committee shall monitor the compliance of the provisions of this notification. (3) The activities that are covered in the Schedule to the notification of the Government of India in the erstwhile Ministry of Environment and Forest number S.O. 1533(E), dated the 14th September, 2006, and are falling in the Eco-sensitive Zone, except the prohibited activities as specified in column(3) of the Table under paragraph 4 thereof, shall be scrutinised by the Monitoring Committee based on the actual site-specific conditions and referred to the Central Government in the Ministry of Environment, Forest and Climate Change for prior environmental clearances under the provisions of the said notification. (4) The activities that are not covered in the Schedule to the notification of the Government of India in the erstwhile Ministry of Environment and Forest number S.O. 1533(E), dated the 14th September, 2006 and are falling in the Eco-sensitive Zone, except the prohibited activities as specified in column (3) of the Table under paragraph 4 thereof, shall be scrutinised by the Monitoring Committee based on the actual site-specific conditions and referred to the concerned Regulatory Authorities. (5) The Member Secretary of the Monitoring Committee or the concerned Collector or the concerned park in- charge shall be competent to file complaints under section 19 of the Environment (Protection) Act, 1986 against any person who contravenes the provisions of this notification. (6) The Monitoring Committee may invite representatives or experts from concerned Departments, representatives from industry associations or concerned stakeholders to assist in its deliberations depending on the requirements on issue to issue basis. (7) The Monitoring Committee shall submit the annual action taken report of its activities as on 31st March of every year by 30th June of that year to the Chief Wildlife Warden of the State as per proforma given in Annexure IV. (8) The Central Government in the Ministry of Environment, Forest and Climate Change may give such directions, as it deems fit, to the Monitoring Committee for effective discharge of its functions. 6. The provisions of this Notification are subject to the orders, if any, passed, or to be passed, by the Hon’ble Supreme Court of India or the High Court or National Green Tribunal (NGT). [F.No.25/124/2015-ESZ-RE] Dr. T. CHANDINI, Scientiest ‘G’¹Hkkx IIµ[k.M 3 (ii)º Hkkjr dk jkti=k % vlk/kj.k 19 ANNEXURE-I LIST OF VILLAGE FALLING IN ECO-SENSITIVE ZONE OF PONG DAM LAKE WILDLIFE SANCTUARY SN. Name WL Total Area No. of Name of Villages/Forests Area in Langitude Latitude PA Sq Km Villages Hac 1. PONG 46.31 51 Badhela 40.95 76°1’46” 32° 7’25” DAM LAKE WLS 2. Bajhera 278.56 76°4’30” 31° 4’5” 3. Balgat Guralla 11.04 76°4’54” 31° 56’10” 4. Balohal (Lower) 13.20 76°7’50” 31° 55’15” 5. Blohar Sukhanara 219.71 76°4’23” 32° 3’13” 6. Banara 86.49 75°59’0” 32° 6’5” 7. Bara 10.23 76°12’16” 31° 52’12” 8. Barial 50.55 76°5’34” 31° 1’27” 9. Bhanger 52.28 76°8’4” 31° 55’12” 10. Bhatoli 23.56 76°7’46” 32° 58’21” 11. Bherta 150.25 75°57’13” 32° 6’40” 12. Bhial 47.00 76°5’39” 31° 1’3” 13. Chabbar 50.40 76°8’34” 31°57’55” 14. Chatwal 22.34 76°4’36” 31° 56’14” 15. Churunu Dhanotu Balla 34.87 76°11’58” 31° 51’58” 16. Dehra Bari Rajgarh 122.26 76°11’55” 31° 54’15” 17. Dukhi Baglahar 88.08 76°58’4” 32° 5’47” 18. Gadohal 30.19 76°3’16” 31° 56’16” 19. Gheori 63.43 76°10’11” 31° 52’27” 20. Guler 21.30 76°8’31” 31° 59’51” 21. Hawal 37.21 76°1’58” 31° 6’57” 22. Haripur 12.21 76°9’51” 31° 0’17” 23. Harsar 48.24 76°2’23” 31° 6’7” 24. Jagnoll 199.11 75°57’49” 32° 2’48” 25. Jakhara (G.Panchayat) 233.50 75°57’11” 32° 7’25” 26. Jallarian 22.20 76°8’8” 31° 0’13” 27. Jambal Bassi 147.35 76°9’38” 31° 54’6” 28. Jarot 124.26 76°5’24” 32° 4’30” 29. Jawali 56.57 76°0’58” 32° 8’27” 30. Jhounk Ratial Chabbuan 128.67 75°59’24” 32° 5’7” 31. Khabbal 185.55 76°5’19” 31° 2’37” 32. Kharar 219.06 75°58’31” 32° 6’42” 33. Kather 39.53 76°8’32” 31° 57’28” 34. Lohara Batahri Tutwan Sihal 179.64 75°57’37” 32° 5’10” 35. Lower Dharneta Man Samkad, 236.00 75°58’5” 32° 2’10” Hadwal, Badi Barla 36. Ludret 37.95 76°5’28” 31° 1’47” 37. Maheba 17.10 76°9’7” 31°59’28” 38. Maleta 12.30 76°11’45” 31° 54’26” 39. Nandpur Ranial 101.66 76°7’5” 31° 0’33” 40. Nangal 35.79 76°6’37” 31° 55’38” 41. Panalath 50.68 76°2’47” 31° 5’55” 42. Papahan Guglara 301.90 76°1’11” 32° 5’22” 43. Ranial 2.85 76°8’0” 31° 57’53” 44. Rod Dibber 63.44 76°7’54” 31° 59’03” 45. Samked 187.76 76°0’58” 31° 5’32” 46. Samleta 157.34 76°3’45” 31° 4’41” 47. Sangoli 118.73 76°3’31” 31° 4’50” 48. Shibba Dadasiba Nangal 36.49 76°5’30” 31° 56’2” 49. Sohara 13.95 76°13’3” 31° 52’12” 50. Tara Bateki 86.94 75°58’4” 32° 2’57” 51. Thangar 119.85 76°0’34” 31° 7’57” Total 4630.5220 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] ANNEXURE-II GPS Co-ordinates of points along the boundary of Pong Dam WLS Sl_no. GPS Longitude Latitude 1 E01 75° 57.996' E 32° 8.869' N 2 E02 75° 58.819' E 32° 6.369' N 3 E03 76° 0.538' E 32° 4.619' N 4 E04 76° 1.211' E 32° 8.122' N 5 E05 76° 3.638' E 32° 5.755' N 6 E06 76° 5.459' E 32° 3.959' N 7 E07 76° 3.653' E 32° 1.992' N 8 E08 76° 5.988' E 32° 0.673' N 9 E09 76° 8.789' E 31° 59.230' N 10 E10 76° 8.518' E 31° 57.962' N 11 E11 76° 9.984' E 31° 58.393' N 12 E12 76° 9.532' E 31° 57.106' N 13 E13 76° 11.599' E 31° 54.803' N 14 E14 76° 13.427' E 31° 52.585' N 15 E15 76° 9.990' E 31° 53.986' N 16 E16 76° 5.925' E 31° 55.922' N 17 E17 76° 2.898' E 31° 56.178' N 18 E18 75° 59.635' E 31° 56.214' N 19 E19 75° 56.768' E 31° 57.793' N 20 E20 75° 57.209' E 31° 59.969' N 21 E21 75° 56.624' E 32° 1.867' N 22 E22 75° 56.595' E 32° 4.531' N 23 E23 75° 56.490' E 32° 6.044' N 24 E24 75° 57.135' E 32° 7.741' N GPS Co-ordinates of points along the boundary of Eco-Sensitive Zone of Pong Dam WLS Sl_no. GPS Longitude Latitude 1 E01 75° 57.867' E 32° 9.081' N 2 E02 75° 59.106' E 32° 6.832' N 3 E03 76° 0.989' E 32° 5.463' N 4 E04 76° 1.571' E 32° 9.004' N 5 E05 76° 3.952' E 32° 6.601' N 6 E06 76° 5.994' E 32° 4.569' N 7 E07 76° 5.966' E 32° 2.709' N 8 E08 76° 8.438' E 32° 0.366' N 9 E09 76° 9.487' E 32° 0.444' N 10 E10 76° 13.130' E 31° 53.259' N 11 E11 76° 10.687' E 31° 52.329' N 12 E12 76° 9.484' E 31° 54.091' N 13 E13 76° 6.396' E 31° 55.670' N 14 E14 76° 3.526' E 31° 55.966' N 15 E15 75° 57.256' E 32° 2.428' N 16 E16 75° 56.237' E 32° 4.592' N 17 E17 75° 56.225' E 32° 6.039' N 18 E18 75° 56.778' E 32° 7.785' N¹Hkkx IIµ[k.M 3 (ii)º Hkkjr dk jkti=k % vlk/kj.k 21 ANNEXURE-III MAP OF ECO-SENSITIVE ZONE OF PONG DAM LAKE WILDLIFE SANCTUARY WITH LATITUDES AND LONGITUDES22 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] ANNEXURE-IV Proforma of Action Taken Report: - Eco-sensitive Zone Monitoring Committee.- 1. Number and date of Meetings; 2. Minutes of the meetings: Mention main noteworthy points. Attach Minutes of the meeting as separate Annexure; 3. Status of preparation of Zonal master Plan including Tourism master Plan; 4. Summary of cases dealt for rectification of error apparent on face of land record (Eco-sensitive Zone wise); Details may be attached as Annexure 5. Summary of cases scrutinised for activities covered under the Environment Impact Assessment Notification, 2006; Details may be attached as separate Annexure; 6. Summary of cases scrutinised for activities not covered under the Environment Impact Assessment Notification, 2006; Details may be attached as separate Annexure; 7. Summary of complaints ledged under Section 19 of the Environment (Protection) Act, 1986; 8. Any other matter of importance. Printed by the Manager, Government of India Press, Ring Road, Mayapuri, New Delhi-110064 and Published by the Controller of Publications, Delhi-110054.

Continue your research