Home India Ministry of Power Union Minister Shri Manohar Lal reviews Power and Urban Dev...
Date: 2025-06-12 Category: Not Applicable State: Union Government Country: India

Union Minister Shri Manohar Lal reviews Power and Urban Development Sector for Jammu & Kashmir

Issued by Ministry of Power · Not Applicable

Research with AI Agent Chat with Document Generate Summary Translate Helpful Share Add to Project Create Task

Executive Summary & Key Takeaways

Union Minister of Power and Housing Urban Affairs Shri Manohar Lal reviewed the power and urban development sectors in the Union Territory of Jammu and Kashmir (JK) in a meeting with JK's Chief Minister Shri Omar Abdullah and other officials. Key discussion points included the role of the Revamped Distribution Sector Scheme (RDSS) in improving power distribution, infrastructure strengthening, and addressing future demand. The UT requested support from the central government for upgrading power distribution and transmission. Shri Manohar Lal advised JK to implement RDSS works expeditiously, prioritize prepaid smart metering for government establishments by August 2025, and effectively utilize its hydropower potential through skill development and resolving pending issues with NHPC projects. He also suggested waiving water cess on hydro projects to reduce power costs. The Union Minister inaugurated several power infrastructure augmentation projects, including grid stations at Awantipora, Wanpoh, Amargarh and Magam and Kulgam Grid station.

Key Entities Referenced

Ministry of Power: Government ministry responsible for power-related matters. Shri Manohar Lal: Union Minister of Power and Housing Urban Affairs Power and Urban Development Sector: Sectors reviewed by Shri Manohar Lal for Jammu Kashmir UT. Jammu Kashmir UT: Union Territory of Jammu and Kashmir, the focus of the policy review. Hydro project: Hydropower projects in Jammu and Kashmir UT, subject to potential water cess waiver. August 2025: Deadline for saturating prepaid meters for Government establishments and Govt colonies. MoP: Abbreviation for Ministry of Power. Banking of power: Concept of power exchange between States based on demand complementarity, especially during winter. PIB Delhi: Press Information Bureau, Delhi, the source of the news release. Srinagar: Location of the meeting reviewing urban development and power sector in Jammu Kashmir UT. Shri Omar Abdullah: Honble Chief Minister, JK Shri Nasir Aslam Wani: Advisor to Honble CM, JK Chief Secretary of the UT of JK: Official who attended the meeting. Govt. of India: The government of India, also referenced as GoI. GoI: Government of India abbreviation. UT Administration: Administration of the Union Territory of Jammu and Kashmir. State power Utilities: Power utilities operating in the state of Jammu and Kashmir. CPSEs: Central Public Sector Enterprises, representatives of which attended the meeting. Revamped Distribution Sector Scheme RDSS: Central Government scheme that has played a role in bringing improvement in the power distribution sector. Central Government: The Government of India. NHPC: Organization with ongoing hydro projects in the UT. 13233 kV Grid Station Awantipora: Grid station that underwent augmentation. Grid Station Wanpoh: Grid station that underwent augmentation. Grid Station Kulgam: Grid station that underwent augmentation. Grid substation Amargarh: Grid substation that underwent augmentation. Grid Sub Station Magam: Grid substation that underwent augmentation.
Official Source Record View Original Source →
See Full Document Text
Ministry of Power Union Minister Shri Manohar Lal reviews Power and Urban Development Sector for Jammu & Kashmir UT should consider waiving off water cess levied on Hydro project to reduce cost of power for their consumers: Shri Manohar Lal Saturate prepaid meters for all Government establishments and Govt colonies by August 2025: Shri Manohar Lal MoP and UT should coordinate for skill development and capacity building of local workforce for hydro projects: Shri Manohar Lal Simplify connection charges to bring ease of living for the consumers: Shri Manohar Lal Banking of power based on complementarity of demand between States for meeting demand during winter: Shri Manohar Lal Posted On: 12 JUN 2025 5:33PM by PIB Delhi Union Minister of Power and Housing & Urban Affairs Shri Manohar Lal reviewed the urban development and power sector scenario for the UT of Jammu & Kashmir at Srinagar today. Shri Omar Abdullah, Hon’ble Chief Minister, J&K, and Shri Nasir Aslam Wani, Advisor to Hon’ble CM, J&K, were also present in the meeting. The meeting was also attended by Chief Secretary of the UT of J&K, senior officials from the Govt. of India (GoI), UT Administration, representatives of State power Utilities andCPSEs. During the meeting, power sector issues in the UT of J&K were deliberated. The UT also highlighted concerns and major achievements related to urban & power sector and the possible solutions so as to meet future demand. The UT highlighted the role that Revamped Distribution Sector Scheme (RDSS) of Central Government has played in bringing improvement in the power distribution sector and in strengthening electricity distribution infrastructure for the remote areas of the UT. UT also thanked Union Minister for approving the revised cost for RDSS works. Chief Minister, J&K, in his address, thanked Union Minister for his visit to Srinagar for review of UT of J&K in respect of issues related to the urban & power sector and also highlighted major concerns for the UT. The UT requested for support from GoI for upgradation of the Power distribution and transmission sector. It was remarked that the UT would make all out efforts for improvement in the sector. In his address, Shri Manohar Lal, Union Minister of Power and Housing & Urban Affairs welcomed all the dignitaries to the meeting. He mentioned that his visit to the UT would help in resolution of issues and in identification of new initiatives that may be taken up to further improve services to the citizens of the UT. He asked UT administration to plan for capacity augmentation as per the Resource Adequacy plan. He congratulated the UT for making concerted efforts for reducing power purchase costs and reducing the Gap between power purchase costs and revenue realised which would help improve finances of the Power Utilities and also facilitate reliable power supply in the UT.Hon’ble Minister advised the UT to expeditiously implement the works sanctioned under RDSS. He advised UT to take up prepaid smart metering works in a time bound manner, starting with Government establishments and subsequently for the commercial & industrial consumers. Based on experience and demonstration of benefits, the smart meters may be rolled out to other category of consumers. He mentioned UT should expedite payment of pending Govt dept dues and saturate prepaid meters for all Government establishments and Govt colonies by August 2025. He also emphasised that the UT has a huge hydro-power potential which should be effectively utilised. He mentioned that UT should work in coordination with the Central Govt for skill development and capacity building of local workforce for hydro projects. He also asked UT to resolve pending issues in the ongoing projects of NHPC so as to have their early completion. He also requested UT to consider waiving-off of water cess levied on hydro projects which would help reduce the power supply costs and ultimately tariffs for the consumers. Union Minister of Power assured for continued support and cooperation of the Government of India in the overall development of the UT and wished for the well being of the people of the UT. During the visit Union Minister Shri Manohar Lal inaugurated various projects which includes : 1. Augmentation of 132/33 kV Grid Station Awantipora from 145 MVA to 175 MVA 2. Augmentation of Grid Station Wanpoh by way of replacement of age old 20 MVA, 132/33 kV Power Transformer by 50 MVA, 132/33 kV power Transformer to be spared after Augmentation of Grid Station Kulgam along with construction of boundary wall for the Grid 3. Augmentation of Grid substation Amargarh from 135MVA to 195 MVA 4.Augmentation of Grid Sub Station Magam from 100MVA to 130 MVA 5. Replacement of 50 MVA transformer bank at Kulgam Grid station by 80 MVA/100MVA for load catering with allied works like as bus strengthening, equipment replacement/upgradation etc ***** SK(Release ID: 2135975)

Continue your research