**Executive Summary**
This document is a notification from the Tamil Nadu Government Gazette regarding the sanctioning of transmission lines by TANTRANSCO to meet additional power demands. It announces the upcoming erection of transmission lines near Chennai, with a one-month period for interested parties to raise concerns as per the Electricity Act, 2003. The notification is dated May 27, 2015.
**Key Points / Main Content**
* **Transmission Line Sanction:** TANTRANSCO has sanctioned the erection of new transmission lines to transmit and distribute power.
* **Project Scope:** The work will be undertaken shortly.
* **Project Details:**
* **Erection of 400 KV DC Line:** A double circuit line will be erected from the existing Suguvarchatram Alamathy 400 KV DC line by making LILO for the proposed Guindy 400 KV SS (overhead portion only), passing through several villages with a route length of 13.273 KM.
* **Erection of 400 KV SC Line:** A single circuit line will be erected on DC Towers from the Ottiyambakkam 400 KVSS to Guindy 400 KVSS (overhead portion only), passing through several villages with a route length of 14.74 KM.
* **Administrative Approval:** Both projects received approval under CH TANTRANSCO Proceedings No. 55, dated 25-10-2012, with a scheme cost of ₹14860.00 Lakhs each.
* **Public Representation:** Interested parties can submit representations regarding the scheme within one month of the publication date to the Superintending Engineer, General Construction Circle-II.
**Impact Analysis**
**Stakeholder: General Public/Residents of Affected Villages**
* **Impact:** Potential impact due to the construction of the transmission lines, including visual impact and potential land use changes.
* **Action Required:** To submit any representations regarding the scheme to the Superintending Engineer, General Construction Circle-II within one month of the publication date.
**Stakeholder: TANTRANSCO**
* **Impact:** Responsible for implementing the sanctioned transmission line projects.
* **Action Required:** To proceed with the erection of transmission lines as approved and address any representations received from the public.
**Stakeholder: Superintending Engineer, General Construction Circle-II**
* **Impact:** Responsible for managing the implementation and addressing any public concerns regarding the projects.
* **Action Required:** To receive and address representations from the public within one month of the publication date and oversee project implementation.
Key Entities Referenced
Tamil Nadu Government Gazette: Official publication for notifications from the Tamil Nadu government and related bodies.
Tamil Nadu Transmission Corporation Limited (TANTRANSCO): Entity responsible for sanctioning transmission lines to distribute power in Tamil Nadu.
Electricity Act, 2003: Act under which representations regarding the scheme can be made.
Chennai: Location where General Construction Circle-II is located.