**Executive Summary**
This document provides an overview of the Vande Bharat Express initiative aimed at modernising inter-city rail mobility in India. It highlights key developments, including the upcoming launch of the Vande Bharat Sleeper in January 2026. The document outlines plans to expand the fleet to 800 trains by 2030 and 4,500 by 2047.
**Key Points / Main Content**
* **Vande Bharat Expansion:**
* 164 Vande Bharat trains are operational nationwide until December 2025.
* The Vande Bharat Sleeper will launch in January 2026 for long-distance overnight travel.
* Fleet expansion goals: 800 trains by 2030 and 4,500 trains by 2047.
* **Key Features:**
* Semi-permanent jerk-free couplers and improved suspension systems
* India's indigenous Automatic Train Protection (KAVACH) system.
* Centrally controlled automatic plug doors and fully sealed wider gangways.
* Modern air-conditioning with indigenous UV-C lamp-based disinfection.
* CCTV, emergency alarms, and passenger-crew talk-back in all coaches
* Bio-vacuum toilets and Divyangjan-friendly lavatories.
* GPS-based passenger information systems.
* **Vande Bharat Train Versions:**
* Vande Bharat 2.0: Upgraded version with enhanced performance, safety, and energy efficiency, operating at 160 kmph.
* Vande Bharat 3.0: Demonstrates enhanced acceleration and ride quality.
* Vande Bharat 4.0: Envisaged with Kavach 5.0, superior passenger experience, and aims for dedicated high-speed corridors supporting speeds up to 350 kmph, expected within 18 months from late 2025.
* **Vande Bharat Cuisine:**
* Since December 2025, regional cuisines have been introduced on select trains to enhance passenger experience.
* Onboard menus feature regional specialties, along with traditional dishes.
* **Vande Bharat Sleeper:**
* Scheduled for introduction in January 2026, starting with the Howrah-Guwahati route.
* Consists of 16 air-conditioned coaches and can accommodate around 823 passengers.
* Includes well-planned luggage spaces and improved facilities for staff.
**Impact Analysis**
**Stakeholder: Passengers**
* **Impact:** Enhanced inter-city travel with faster, safer, and more comfortable trains. Improved overnight travel options with sleeper trains and regional cuisine.
* **Action Required:** N/A
**Stakeholder: Indian Railways**
* **Impact:** Modernisation of rail services, increased efficiency, and improved passenger satisfaction.
* **Action Required:** Continue infrastructure upgradation, scaling up manufacturing, and maintaining service quality.
**Stakeholder: Railway Staff (Loco Pilots, TTEs, Pantry Personnel)**
* **Impact:** Improved working conditions with ergonomically designed cabins and dedicated compartments, contributing to higher alertness, improved efficiency, and enhanced overall service quality.
* **Action Required:** Use the enhanced facilities and contribute to a safer and more efficient operation.
Key Entities Referenced
Indian Railways: The organization responsible for implementing the Vande Bharat Express initiative and modernizing rail services in India.
Vande Bharat Express: A prominent initiative of the Indian Railways to provide faster, safer, and more reliable passenger-centric rail travel across India. It includes various versions (2.0, 3.0, 4.0) and sleeper variants.
Integral Coach Factory (ICF): The manufacturing unit where Vande Bharat trainsets are produced, emphasizing indigenous design and a 'Make in India' approach.
KAVACH: India's indigenously developed Automatic Train Protection (ATP) system, designed to prevent collisions and enhance safety in train operations, integrated into the Vande Bharat Express.
Howrah-Guwahati Corridor: The initial route planned for the Vande Bharat Sleeper Train, representing a key inter-regional connection in Eastern and North-Eastern India.
PIB Headquarters
Vande Bharat Express: Modernising Inter-City
Rail Mobility in India
प्रव तथ: 16 JAN 2026 3:01PM by PIB Delhi
Key Takeaways
164 Vande Bharat trains operational till December 2025, nation-wide, enhancing connectivity
across major corridors.
Vande Bharat Sleeper will be launched in January 2026, expanding services to long-distance
overnight travel.
Vision includes the goal of scaling the fleet to 800 by 2030 and 4,500 by 2047.
Introduction
As India advances towards its vision of becoming a developed nation by 2047, mobility has emerged as a
central pillar of national development. Modern transport systems today extend beyond basic connectivity
and serve as critical enablers of economic integration, regional development, and social inclusion. Vande
Bharat Express stands out as a prominent initiative of the Indian Railways providing faster, safer,
more reliable, and passenger-centric rail travel across the country. Vande Bharat Express, India’s first
indigenously designed and manufactured semi-high-speed trainset has been developed to strengthen
inter-city rail services by combining modern technology, improved passenger comfort, and reduced
journey times.
Vande Bharat Express: Reimagining Premium Train TravelVande Bharat represents a new phase in India’s premium passenger rail services. Introduced as an
indigenously developed, self-propelled semi-high-speed trainset, it marks a shift from conventional
locomotive-hauled trains to integrated train systems optimised for efficiency, safety, and reliability.
The requirement for Vande Bharat emerged from growing demand for reduced travel time and enhanced
onboard comfort on inter-city routes, particularly on medium-distance corridors. Earlier premium services
such as the Rajdhani Express (introduced in 1969) and the Shatabdi Express (introduced in 1988)
significantly upgraded rail travel in their time by providing high-quality overnight and daytime
connectivity. Vande Bharat trains are architecturally aligned with present and future mobility
requirements, forming the foundation for the next phase of passenger rail modernisation in India.
Key Features include:
Semi-permanent jerk-free couplers and improved suspension systems contribute to better ride
comfort, while regenerative braking systems enhance energy efficiency during operations.
KAVACH is India’s indigenously developed Automatic Train Protection (ATP) system, certified
to Safety Integrity Level-4 (SIL-4). Implemented through a combination of onboard and
trackside equipment, it continuously monitors train movement and signal status. The system
automatically applies brakes to prevent collisions, overspeeding, and signal passing at danger,
thereby strengthening preventive safety in train operations.
Provision for the indigenously developed Train Collision Avoidance System (KAVACH).
Centrally controlled automatic plug doors and fully sealed wider gangways.
Modern air-conditioning systems with indigenously developed UV-C lamp-based disinfection
systems.
CCTV cameras, emergency alarm push buttons, and passenger–crew talk-back units in all coaches
Coach condition monitoring System (CCMS) display with remote monitoring.
Bio-vacuum toilets and Divyangjan-friendly lavatories in the driving coaches at both ends of the
train.
GPS-based passenger information systems, ergonomically designed seating, and improved ride
comfort contribute to an enhanced overall travel experience on Vande Bharat trains.
The Vande Bharat trainsets, manufactured at the Integral Coach Factory (ICF) with around 90%
localisation, are in line with the Make in India initiative. Indigenous capability is reflected in the
domestic design and integration of key systems. In 2024, ICF received the National Energy
Conservation Award (NECA) for the manufacturing of Vande Bharat trainsets, underscoring the
emphasis on energy efficiency and sustainable manufacturing practices.Vande Bharat Cuisine:
From December 2025, Indian Railways has introduced regional cuisines on select Vande Bharat
trains to further enhance passenger experience by offering authentic local flavours reflective of
India’s diverse culinary heritage. This initiative enables passengers to enjoy traditional dishes
associated with the regions through which the trains operate, adding a cultural dimension to rail
travel.
Delicacies on Board:
The onboard menus feature a wide range of regional specialities, including Maharashtra’s Kanda
Poha and Masala Upma, Andhra Pradesh’s Kodi Kura, Gujarat’s Methi Thepla, Odisha’s Aloo
Phulkopi, and West Bengal’s Kosha Paneer and Murgir Jhol. Southern delicacies such as Kerala
meals with Appam and Palada Payasam, along with Bihar’s Champaran Paneer and Chicken, furthe
enrich the offering. Select services also feature Dogri and Kashmiri dishes, including Ambal Kaddu
and Kesar Phirni.
Seven Years of Vande Bharat Express
Launched on 15 February 2019, the Vande Bharat Express commenced service on the New Delhi–
Kanpur–Prayagraj–Varanasi corridor. The 16-coach, fully air-conditioned trainset is designed for a
maximum speed of 160 kmph. It incorporates modern passenger amenities such as automatic doors, GPS-
based passenger information systems, and onboard infotainment, along with regenerative braking to
improve energy efficiency and operational sustainability.
Vande Bharat services have expanded rapidly across the national rail network. By December 2025, 164
Vande Bharat services had been operationalised in 274 districts, carrying more than 7.5 crore
passengers.These trains are designed for faster acceleration and deceleration, enabling a reduction in journey time
up to 45 percent on several corridors. For reference, the scheduled travel time between New Delhi and
Varanasi is approximately eight hours, making it around 40 to 50 percent faster than earlier services on the
route.
High occupancy of Vande Bharat reflects strong passenger demand for these services. Occupancy stood at
102.01 percent in 2024-25 and increased further to 105.03 percent in 2025–26 (up to June 2025)
demonstrating that faster, cleaner, and more reliable rail travel is not confined to metropolitan corridors
but reflects a broader structural change in passenger preferences.Vande Bharat 2.0: The Vande Bharat Express 2.0 has been introduced as an upgraded version of the
original trainset to enhance performance, safety, and energy efficiency. The first Vande Bharat 2.0 trainset
was flagged off on 30 September 2022 on the Gandhinagar–Mumbai Central route. The new version is
lighter, with a reduced weight of about 392 tonnes compared to 430 tonnes in the earlier model, enabling
faster acceleration. It is equipped with the indigenously developed Train Collision Avoidance System
(KAVACH), improved regenerative braking, and air-conditioning systems that are approximately 15
percent more energy-efficient. All these trains have a design for a maximum speed of 180 kmph and an
operating speed of 160 kmph, subject to route readiness.
Vande Bharat 3.0: The semi-high-speed version 3.0 of the Vande Bharat trainset in operation
demonstrates enhanced performance parameters, including faster acceleration and improved ride
quality, contributing to smoother and more comfortable journeys. It is capable of accelerating from 0 to
100 kmph in about 52 seconds, a performance parameter that compares favourably with semi-high-speed
trains operating in countries such as Japan and several European nations, while running on existing rail
infrastructure. The current-generation trainsets also incorporate modern onboard systems aligned with
contemporary passenger service standards. Features include low noise and vibration levels, along with
onboard Wi-Fi and charging ports for passenger convenience.
Vande Bharat 4.0 is envisaged to incorporate Kavach 5.0, the next evolution of India’s indigenously
developed Automatic Train Protection system, as part of its advanced safety and technology
framework.
Vande Bharat 4.0 is the upcoming next-generation model of the Vande Bharat platform, aimed at
setting higher global benchmarks in performance, passenger comfort, and overall build quality. The
focus is on delivering a superior passenger experience, including improved seating, upgraded toilet
facilities, finer coach workmanship, and enhanced interior finish.
The next-generation trainsets are being positioned not only to meet India’s future mobility needs but
also to demonstrate export potential, reflecting the growing maturity of indigenous rail technology. In
terms of performance, Vande Bharat 4.0 aims to establish new benchmarks, with future plans linked to
dedicated high-speed corridors capable of supporting speeds of up to 350 kmph.
Vande Bharat 4.0 is expected within 18 months from late 2025, reinforcing continued efforts towards
future-ready, high-performance passenger rail systems.
Vande Bharat Sleeper: Expanding To Long Distance Travel
Further adding momentum to the expansion of the services, the Vande Bharat Sleeper Train is scheduled
for introduction in January 2026, extending the platform to long-distance overnight travel. The first
Vande Bharat Sleeper Train will operate between Howrah in West Bengal and Guwahati in Assam,
strengthening inter-regional connectivity. This corridor connects Eastern and North-Eastern India and is
used daily by thousands of passengers, including students, workers, traders, and families.
Travel Time Comparison: Howrah–Guwahati Corridor
Saraighat Express (12345/12346): ~17 hours
Vande Bharat Sleeper (expected): ~14 hours
Estimated Time Saving: Nearly 3 hoursThe sleeper trainset consists of 16 air-conditioned coaches, including one AC First Class, four AC
Two-Tier, and eleven AC Three-Tier. It is designed to provide safe and comfortable overnight travel,
with a total capacity of around 823 passengers.
The indigenously designed Vande Bharat Sleeper Trainset has completed trial runs, testing, and
certification, marking a significant milestone towards its operational deployment. High-speed trials
conducted on the Kota–Nagda section demonstrated stable operations at speeds of up to 180 kmph.
Long-distance performance trials carried out by the Research Designs and Standards Organisation
(RDSO) on the Mumbai–Ahmedabad corridor validated endurance, ride comfort, and system reliability.
The train also offers well-planned luggage spaces, including overhead racks, under-berth storage, and
dedicated areas near coach entrances for larger suitcases, ensuring uncluttered interiors during long
journeys.
Staff Support and Seamless Operations: The Vande Bharat Sleeper also introduces significant
improvements for railway staff, supporting safer and more efficient operations. Loco Pilots benefit from
ergonomically designed driver cabins that reduce strain and fatigue during long duty hours, along with
dedicated and well-equipped toilets to ensure hygiene and convenience.
For onboard staff, including TTEs and pantry personnel, the train provides dedicated cabins and
compartments, improved berths, and better onboard amenities. These provisions enable adequate rest
during duty hours, contributing to higher alertness, improved efficiency, and enhanced overall service
quality.
Looking Ahead: Scaling the Vande Bharat ExpressVande Bharat is envisioned as a key pillar of India’s passenger rail modernisation in the coming decades.
By 2047, the Vande Bharat fleet is envisioned to scale to around 4,500 trainsets, aligned with India’s
long-term development goals. In the medium term, the focus is on scaling up services, operating about
800 Vande Bharat trainsets by 2030, subject to infrastructure readiness and manufacturing capacity.
Conclusion
The Vande Bharat trains reflect Indian Railways’ strategic shift towards modern, efficient, and passenger-
centric rail services, supported by continuous infrastructure upgradation and indigenous manufacturing
capability. Through the expansion of new-generation trainsets, diversified variants, and improved onboard
services, Vande Bharat is strengthening regional connectivity and improving the quality of inter-city
travel. These trains underscore the role of rail infrastructure as a critical enabler of economic integration,
sustainable mobility, and inclusive national development.
References
Ministry of Railways:
https://www.pib.gov.in/PressReleasePage.aspx?PRID=2209199®=3&lang=1
https://www.pib.gov.in/PressReleasePage.aspx?PRID=2210517®=3&lang=1
https://www.pib.gov.in/PressNoteDetails.aspx?NoteId=152077&ModuleId=3%20®=3&lang=1
https://ncr.indianrailways.gov.in/uploads/files/1617860431968-QUESTION%20BANK%20GENERAL%
20AWARENESS%20RELATED%20TO%20RAILWAY.pdf
https://scr.indianrailways.gov.in/uploads/files/1665752971954-qb_InstructorComml.pdf
https://sansad.in/getFile/annex/267/AU603_maSfua.pdf?source=pqars
https://sansad.in/getFile/loksabhaquestions/annex/185/AU1789_4tXzwW.pdf?source=pqals
https://www.pib.gov.in/PressReleasePage.aspx?PRID=1945080®=3&lang=2#:~:text=Total%20funds%
20utilised%20for%20manufacture,question%20in%20Lok%20Sabha%20today.
https://www.pib.gov.in/PressReleasePage.aspx?PRID=1966347®=3&lang=2
https://www.pib.gov.in/PressReleasePage.aspx?PRID=2204799®=3&lang=2
https://static.pib.gov.in/WriteReadData/specificdocs/documents/2022/sep/doc2022929111101.pdf
https://nr.indianrailways.gov.in/uploads/files/1753876817265-KAVACH%20Press%20Note.pdf
https://www.pib.gov.in/PressReleasePage.aspx?PRID=1561592®=3&lang=2https://www.pib.gov.in/PressReleasePage.aspx?PRID=2210145®=3&lang=1
https://www.pib.gov.in/PressReleasePage.aspx?PRID=2214695®=3&lang=1
https://www.pib.gov.in/PressReleasePage.aspx?PRID=2205783®=3&lang=1
https://wr.indianrailways.gov.in/view_detail.jsp?lang=0&id=0,4,268&dcd=6691&did=1664546364987AE
828D7BB8098E3A13A801E3DD19EDB7
https://www.pib.gov.in/PressReleasePage.aspx?PRID=2210517®=3&lang=2
https://www.pib.gov.in/PressReleseDetailm.aspx?PRID=2205783®=3&lang=1
https://nr.indianrailways.gov.in/cris/view_section.jsp?lang=0&id=0,6,303,1721
https://static.pib.gov.in/WriteReadData/specificdocs/documents/2024/dec/doc20241210468801.pdf
https://www.pib.gov.in/PressReleasePage.aspx?PRID=1564577®=3&lang=2
https://www.pib.gov.in/PressReleasePage.aspx?PRID=1883511®=3&lang=2
https://www.pib.gov.in/PressReleasePage.aspx?PRID=1966347®=3&lang=2#:~:text=The%20Indian%
20Railways%20has%20introduced,new%20avatar%20include%20the%20following:
https://www.pib.gov.in/PressReleasePage.aspx?PRID=1858098®=3&lang=2
https://www.pib.gov.in/PressReleasePage.aspx?PRID=1910031®=3&lang=2
https://www.pib.gov.in/PressReleasePage.aspx?PRID=2179543®=3&lang=2
https://www.pib.gov.in/PressReleaseIframePage.aspx?PRID=2100409®=3&lang=2
Integral Coach Factory: https://icf.indianrailways.gov.in/view_section.jsp?lang=0&id=0,294#:~:text=Th
e%20Vande%20Bharat%20with%2090%25%20indigenous%20inputs,of%20trains%20in%20the%20Vand
e%20Bharat%20platform.
IBEF:
https://www.ibef.org/research/case-study/driving-progress-innovation-and-expansion-in-the-indian-railwa
ys-system
Youtube:
Vande Bharat 2.0 launch: https://www.youtube.com/watch?v=ijESLy2TLew
Twitter:
https://x.com/AshwiniVaishnaw/status/2006000165803680128?s=20
Click here for pdf file.
***
PIB Research
(रलीज़ आईडी: 2215265) आगंतुक पटल : 1395
इस वज्ञ को इन भाषाओ ंम पढ़: Urdu , Tamil