**Executive Summary**
The Ministry of Women and Child Development (WCD) is taking steps to improve infrastructure at Anganwadi Centres (AWCs) under Mission Saksham Anganwadi and Poshan 2.0. This includes increased funding for facilities, construction of new AWC buildings, and strengthening existing centers, as well as co-locating them within Government Primary Schools, in convergence with the Department of School Education and Literacy, Ministry of Education. The guidelines have been jointly launched on 3rd September, 2025. State Governments and UTs are responsible for implementing the scheme.
**Key Points / Main Content**
* **Increased Funding for Facilities:**
* Funding for drinking water facilities increased from Rs.10,000 to Rs.17,000.
* Funding for toilets increased from Rs.12,000 to Rs.36,000.
* **Construction of New AWC Buildings:**
* Provision for construction of 50,000 AWC buildings over five years (@10,000 AWCs per year).
* Rs.8.00 Lakh provided under MGNREGS, Rs.2.00 Lakh under 15th Finance Commission (FC), and Rs.2.00 Lakh by MWCD per AWC, shared between Centre and States/UTs.
* States/UTs advised to tap funds from other schemes like MPLADS, RIDF, Finance Commission Grants, MSDP, etc.
* **Strengthening Existing AWCs:**
* Two lakh AWCs in Government buildings (@40,000 AWCs per year) are strengthened as Saksham Anganwadis.
* Saksham Anganwadis are provided with infrastructure upgrades like LED screens, water filtration systems, Poshan Vatika, ECCE material, and BALA paintings.
* **Targeted Development for Specific Groups:**
* 2,500 AWCs sanctioned for construction for Particularly Vulnerable Tribal Groups (PVTGs) under PM JANMAN.
* 875 AWCs sanctioned for construction under Dharti Abha Janjati Gram Unnat Abhiyan.
* 101 AWCs sanctioned for construction in Northern border areas under VVP (Vibrant Village Programme) - Phase I.
* **Co-location with Primary Schools:**
* Guidelines for co-locating AWCs within Government Primary Schools jointly launched on September 3, 2025.
* AWCs to be mapped with the nearest primary school where physical co-location is not possible.
* **Implementation and Oversight:**
* Mission Saksham Anganwadi and Poshan 2.0 is a Centrally Sponsored scheme.
* Implementation falls under the ambit of State Governments and UTs administration.
* Filling vacant posts at various levels is regularly taken up with States/UTs.
* State and UT wise details of infrastructure and staff vacancies are available at https://www.poshantracker.in/statistics.
**Impact Analysis**
**State Governments and UTs**
*Impact*
Responsible for implementing Mission Saksham Anganwadi and Poshan 2.0, which includes the construction, strengthening, and co-location of Anganwadi Centers.
*Action Required*
Tap into various funding sources, ensure the filling of vacant posts, implement infrastructure improvements, and coordinate with schools for co-location initiatives.
**Anganwadi Centres (AWCs)**
*Impact*
Benefit from improved infrastructure, enhanced facilities, and better resources for providing nutrition and early childhood care and education.
*Action Required*
Utilize the new resources and infrastructure to enhance the quality of services provided to children.
**Children and Communities**
*Impact*
Will have access to better facilities, improved nutrition, and enhanced early childhood education, especially in vulnerable and tribal communities.
*Action Required*
Participate in Anganwadi programs and utilize the available resources for the benefit of children.
**Ministry of Education**
*Impact*
Collaboration to strenghten Foundational Literacy and Numeracy (FLN) services.
*Action Required*
Work with Anganwadi Centres for co-location initiatives.
Key Entities Referenced
Mission Saksham Anganwadi and Poshan 2.0: A centrally sponsored scheme aimed at improving infrastructure and services at Anganwadi Centres, focusing on nutrition and early childhood care.
Anganwadi Centres (AWCs): Childcare centers providing improved nutrition and early childhood care under Mission Saksham Anganwadi and Poshan 2.0.
Ministry of Women and Child Development: The ministry responsible for implementing the Saksham Anganwadi and Poshan 2.0 scheme.
MGNREGS: Mahatma Gandhi National Rural Employment Guarantee Scheme, a scheme used in convergence with Saksham Anganwadi and Poshan 2.0 to construct Anganwadi Centres.
Finance Commission: The 15th Finance Commission provides funds to be used along with MGNREGS funds to construct Anganwadi Centres.
Ministry of Women and Child Development
Various steps taken by WCD Ministry to improve
infrastructure facilities at Anganwadi Centres
under Mission Saksham Anganwadi and Poshan
2.0
Posted On: 04 FEB 2026 1:24PM by PIB Delhi
Under Mission Saksham Anganwadi and Poshan 2.0, in order to improve the infrastructure facilities at
Anganwadi Centres (AWCs) various steps have been taken by the Ministry that, inter alia, include
increasing the funding for drinking water facilities and toilets at Anganwadi Centres from Rs.10,000/- to
Rs.17,000/- and Rs.12,000/- to Rs.36,000/- respectively.
Also, there has been a provision of construction of 50000 AWCs buildings over a period of five years
@10000 AWCs per year in convergence with MGNREGS wherein Rs.8.00 Lakh is provided under
MGNREGS, Rs.2.00 Lakh under 15th Finance Commission (FC) (or any other untied funds) and Rs.2.00
Lakh by MWCD per AWC shared between Centre and States/UTs in the prescribed cost sharing ratio.
Further, States/UTs have also been advised to continue to tap funds for construction of AWC buildings
from various schemes such as Member of Parliament Local Area Development Scheme (MPLADS), Rural
Infrastructure Development Fund (RIDF), Finance Commission Grants to Panchayati Raj Institutions,
Multi- Sectoral Development Programme (MSDP) of Ministry of Minority Affairs, etc.
Under Mission Poshan 2.0, two lakh Anganwadi Centres located in Government buildings @40,000
AWCs per year are strengthened as Saksham Anganwadis for delivery of improved nutrition and for Early
Childhood Care and Education in the 15th Finance Commission cycle. Saksham Anganwadis are provided
with better infrastructure than the conventional Anganwadi centres with LED screens, water filtration
system, Poshan Vatika, ECCE material and BALA paintings.
Under PM JANMAN for the targeted development of 75 Particularly Vulnerable Tribal Groups (PVTGs),
a total of 2,500 Anganwadi Centres (AWCs) has been sanctioned for construction across the country.
Under Dharti Abha Janjati Gram Unnat Abhiyan, to improve the socio-economic conditions of tribal
communities, 875 AWCs have been sanctioned for construction across the country.
Under VVP (Vibrant Village Programme) - Phase I, focusing on Northern border areas, 101 AWCs have
also been sanctioned for construction in the relevant States and UTs.
In convergence with Department of School Education and Literacy, Ministry of Education Guidelines for
Co-locating Anganwadi Centres within Government Primary Schools have been jointly launched on 3rd
September, 2025 to strengthen ECCE and Foundational Literacy and Numeracy (FLN) services. In places
where physical co-location is not possible, AWCs are to be mapped with the nearest primary school.
Mission Saksham Anganwadi and Poshan 2.0 is a Centrally Sponsored scheme. The implementation of the
scheme falls under the ambit of State Governments and UTs administration. The matter regarding filling
up of vacant posts at various levels is regularly taken up with them through sustained engagements andvideo conferences so as to ensure uninterrupted delivery of services to the beneficiaries.
The State and UT wise details of infrastructure and staff vacancies are available at the link:
https://www.poshantracker.in/statistics.
This information was given by the Union Minister for Women and Child Development Smt. Annpurna
Devi in Rajya Sabha in reply to a question today.
****
SS
(Release ID: 2222996) Visitor Counter : 141
Read this release in: Urdu , ही , Bengali , Kannada