Executive Summary:
This notification from the Ministry of Road Transport and Highways declares the acquisition of land in the state of Madhya Pradesh, specifically in the Indore district, for the purpose of building, widening (six-laning), maintaining, managing, and operating National Highway No. 3, on the stretch from Km. 581.500 to Km. 595.100 (Indore-Dewas Section). The declaration follows the consideration and disallowance of objections to the initial notification. Upon publication in the official Gazette, the specified land will vest absolutely in the Central Government, free from all encumbrances.
Key Points / Main Content:
* **Land Acquisition Declaration:**
* The Central Government declares the acquisition of land as specified in the schedule.
* The land is required for building, widening (six-laning), maintaining, managing, and operating National Highway No. 3 (Indore-Dewas Section).
* **Legal Basis and Process:**
* The declaration is made under subsection 1 of section 3D of the National Highways Act, 1956.
* The decision follows a notification (S.O. 2547E) issued on September 18, 2015.
* Objections to the acquisition have been received, considered, and disallowed.
* The competent authority has submitted its report to the Central Government.
* **Land Vesting:**
* Upon publication of this notification in the official Gazette, the land specified in the schedule will vest absolutely in the Central Government.
* The land will be free from all encumbrances.
* **Schedule Details:**
* The schedule provides a brief description of the land to be acquired, including survey numbers, area, type of land, nature of land, and names of landowners.
* The land is located in the Indore district, Sanver Taluk, and various villages including Budi Barlai and Raukhedi.
Impact Analysis:
* **Landowners/Interested Persons:**
* Impact: Loss of land as specified in the schedule; potential for compensation as per the National Highways Act, 1956.
* Action Required: To comply with the land acquisition process and potentially claim compensation.
* **Central Government:**
* Impact: Acquisition of land for highway development.
* Action Required: To ensure the land acquisition process adheres to legal requirements, manage the acquired land for the intended purpose.
* **General Public/Commuters:**
* Impact: Eventual improvement of National Highway No. 3, leading to better transportation infrastructure.
* Action Required: None specified in the document.
Key Entities Referenced
National Highways Act, 1956: A law enacted by the Indian government pertaining to national highways. This notification concerns land acquisition under this Act.
Ministry of Road Transport and Highways: The Indian government ministry responsible for road transport and highways. The notification was issued by this ministry.
Madhya Pradesh: A state in India where the land acquisition is taking place. Mentioned as the location of the National Highway section.
Indore, Madhya Pradesh: A district in Madhya Pradesh where land is being acquired for the National Highway project.
Sanver Tehsil: A tehsil (sub-district) within Indore district, Madhya Pradesh, where the land acquisition is occurring.
National Highway No. 3: The specific national highway for which land is being acquired; specifically, the Indore-Dewas section.
Indore-Dewas Section: A section of National Highway 3, between Indore and Dewas, where construction, widening, and maintenance are planned.
Nayi Duniya: A newspaper in which the notification regarding the land acquisition was published.