Date: 2022-12-23Category: Extra OrdinaryState: Union GovernmentCountry: India
Whereas by the notification of the Rail Vikas Nigam Limited Notification No 2022 CPM RVNL Patna 3rd line SEB PTRU Work correspondence New Delhi Dated 14 August 2022 published in gazette of India
## Policy Analysis Report: Land Acquisition for Sonnagar to Garhwa Road Third Railway Line Project
**1. Executive Summary:**
This report analyzes a government notification regarding land acquisition in the Aurangabad district of Bihar, India, for the construction of a third railway line from Sonnagar to Garhwa Road. The notification declares the Central Government's intention to acquire specified land parcels for this special railway project, following due process including consideration of objections. The report details the land acquisition process, identifies affected parties, and infers the intended outcome of facilitating infrastructure development. This is a **new policy** regarding land acquisition for this specific railway project.
**2. Introduction:**
This report provides an analysis of the provided government policy text concerning land acquisition for the construction of a third railway line between Sonnagar and Garhwa Road in the Aurangabad district of Bihar. The analysis is based solely on the information contained within the provided document.
**3. Policy Overview:**
* **Core Objective(s):** Based on the text, the core objective of this policy is to facilitate the execution, maintenance, management, and operation of a special Railway project: the construction of a third railway line from Sonnagar to Garhwa Road. This is achieved through the acquisition of land required for the project.
**4. Background and Rationale:**
As a new policy specifically addressing this railway line project, the text implies that the existing railway infrastructure is inadequate to meet current or projected transportation needs. The construction of a third railway line is likely intended to increase capacity, reduce congestion, and improve the efficiency of rail transport in the region. The policy provides the legal framework for acquiring the necessary land to realize this infrastructure improvement.
**5. Key Provisions / Changes:**
As this is a new policy, the key provisions outlined in the text are:
* **Declaration of Intent:** The notification declares the Central Government's intention to acquire specific land parcels in the Aurangabad district of Bihar for the stated railway project.
* **Land Identification:** The notification includes a schedule specifying the land to be acquired, including village names, Khata numbers, Plot numbers, area (in acres and hectares), nature of land (agriculture), and the names of the landowners.
* **Due Process:** The notification references previous publications (August 14, 2022) and news articles (Prabhat Khabar and Hindustan Times, August 25, 2022) indicating that the intention to acquire the land was previously announced and that public objections were solicited and considered. The text states that zero objections were received.
* **Land Vesting:** The notification declares that upon publication in the official Gazette, the land specified in the schedule will vest absolutely in the Central Government, free from all encumbrances. This transfers ownership and control of the land to the government for the project.
**6. Target Audience and Stakeholders:**
Based on the provided text, the directly affected parties include:
* **Landowners:** The individuals and entities listed in the schedule whose land is being acquired. Examples include Firangi, Shankar, Dudheshwar Singh, Rambadan Singh, Ganesh Singh, Awadhesh Singh, Kapildev Singh and Krishna Kumar Bhargava
* **Residents of Aurangabad District:** Residents and industries in the Aurangabad district of Bihar will be potentially affected by the disruption of construction and will also potentially benefit from the improved railway infrastructure.
* **Rail Vikas Nigam Limited (RVNL):** RVNL is identified as the executing agency for the railway project as implied by the notification number "CPMRVNLPATNA3rd LineSEBPTRUWork Correspondence".
* **Central Government:** The Central Government is the ultimate authority responsible for the land acquisition and the overall railway project.
**7. Implementation Aspects (Inferred):**
* **Responsible agency/bodies:** Rail Vikas Nigam Limited (RVNL) is likely responsible for managing the land acquisition process and construction of the railway line, under the authority of the Central Government.
* **Timelines or procedures:** The text mentions previous notifications (August 14, 2022) and newspaper publications (August 25, 2022), indicating that the initial steps of the land acquisition process have already been taken. The current notification initiates the final stage of land acquisition and transfer. The procedures are governed by the Railway Act, 1989 and Railway Amendment Act 2008, as referenced in the text.
**8. Expected Outcomes / Impact of Changes:**
The intended outcome of this policy is to secure the land necessary for the construction of the third railway line between Sonnagar and Garhwa Road. This is expected to:
* Improve rail transport capacity and efficiency in the region.
* Facilitate economic development by enabling better transportation of goods and passengers.
* Potentially cause displacement and economic disruption for landowners whose land is acquired, unless fair compensation and resettlement are provided.
**9. Conclusion:**
The government notification analyzed in this report details the acquisition of land in the Aurangabad district of Bihar for the construction of a third railway line. This policy facilitates a crucial infrastructure project by enabling the Central Government to acquire the necessary land. Affected landowners and industries involved should carefully review this notification and related documents to understand their rights and obligations and to ensure they follow the appropriate protocol. The successful implementation of this policy is vital for improving the railway infrastructure and promoting economic development in the region.
Key Entities Referenced
NEW DELHI: Place of publication of the notification.
Railway Act, 1989: Act of Indian Parliament.
Railway Amendment Act 2008: Amended version of Railway Act, 1989
Rail Vikas Nigam Limited: An organisation which published the notification.
Aurangabad: District in Bihar state, where land is being acquired for railway project.
Bihar: State in India where the land acquisition is taking place.
Prabhat Khabar: Daily newspaper in which the notification was published.
Hindustan Times: Daily newspaper in which the notification was published.
Sonnagar: Starting point of the 3rd railway line construction project in Bihar.
Garhwa Road: Ending point of the 3rd railway line construction project in Bihar.
Barun: Aanchal where land is being acquired
KRISHNA KUMAR BHARGAVA: Chief Project Manager
रजिस्ट्री स.ं डी.एल.- 33004/99 REGD. No. D. L.-33004/99
सी.जी.-डी.एल.-अ.-24122022-241392
xxxGIDHxxx
CG-DL-E-24122022-241392
xxxGIDExxx
असाधारण
EXTRAORDINARY
भाग III—खण् ड 4
PART III—Section 4
प्राजधकार स ेप्रकाजित
PUBLISHED BY AUTHORITY
स.ं 693] नई दिल्ली, िुक्रवार, दिसम्ब र 23, 2022/पौष 2, 1944
No. 693] NEW DELHI, FRIDAY, DECEMBER 23, 2022/PAUSHA 2, 1944
jsy fodkl fuxe fyfeVMs
vf/klwpuk
ubZ fnYyh] 16 fnlEcj 2022
la[;k% &CPM/RVNL/PATNA/3rd Line/SEB-PTRU/Work Correspondence.—dsna zh; ljdkj]
jys o s vf/kfu;e] 1989 ¼jys os la’kkfs/kr vf/kfu;e] 2008½ ¼ftls bles a blds i'pkr mDr vf/kfu;e dgk x;k gS½
dh /kkjk 20 d dh mi/kkjk ¼1½ ds v/khu Hkkjr ds jkti=] vlk/kj.k] Hkkx III [kMa esa izdkf’kr jsy fodkl fuxe
fyfeVsM dh vf/klwpuk la[;k 2022&CPM/RVNL/PATNA/3rdLINE/SEB-PTRU/Work Correspondence dh
vf/klwpuk ubZ fnYyh rkjh[k 14 vxLr 2022 ¼ftls bles a blds i'pkr mDr vf/klwpuk dgk x;k gSA½ ls
mikc) vuqlwph es a fofufnZ"V Hkwfe dk s fcgkj jkT; ds ftyk vkSjaxkckn rhljh jys o s ykbu ds fuekZ.k ds fo’ks"k jsy
ifj;kts uk ds fu"iknu] j[k j[kko] izca/ku vkSj izpkyu ds fy, yksd iz;kts u ds fy, vftZr dju s ds vius
vk’k; dh ?kks"k.kk dh FkhA
mDr vf/klwpuk dk lkjka’k mDr vf/kfu;e /kkjk 20 d dh mi/kkjk ¼4½ ds v/khu nSfud lekpkj i=
izHkkr [kcj es a rkjh[k 25 vxLr 2022 vkSj fgUnqLrku VkbEl 25 vxLr 2022 es a izdkf’kr fd;k x;k FkkA
vkSj] ’kUw ; vki{s k izkIr gq, vkSj l{ke izkf/kdkjh }kjk mu ij fopkj fd;k x;k rFkk vuuqKkr fd;k x;k
vkSj rnkuqlkj vkns’k ikfjr fd;k x;kA
mDr vf/kfu;e dh /kkjk 20 ¼M+½ dh mi/kkjk ¼1½ ds vuqlju] esa l{ke izkf/kdkjh us viuh fjikVs Z dsanzh;
ljdkj dks izLrqr dj nh gSA
8424 GI/2022 (1)2 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4]
vr% vc dsna zh; ljdkj] l{ke izkf/kdkjh ls mDr ररपोर्ट ds izkIr gkus s ij vkSj mDr vf/kfu;e dh /kkjk
20 ¼M+½ dh mi /kkjk ¼1½ }kjk iznr ’kfDr;k s dk iz;kxs djr s gq,] ;g ?kks"k.kk djrh gS fd blls mikc) vuqlwph
es a fofufnZ"V Hkwfe iwoksZDr iz;kstu ds fy, vftZr dh tk,xhA
vkSj ;g dh dsna zh; ljdkj] mDr vf/kfu;e dh /kkjk 20 ¼M+½ dh mi&/kkjk ¼2½ ds vuqlj.k es a ;g ?kks"k.kk
djrh gS fd jkti= esa bl vf/klwpuk ds izdkf’kr gkus s ij blls mikc) vuqlwph esa fofufnZ"V Hkwfe vuU; :Ik ls
lHkh foyaxeks ls eqDr gksdj dsna zh; ljdkj esa fufgr gk s tk,xhA
fcgkj jkT; esa fo'ks"k jsyos ifj;kstuk lksu uxj ls x<+ok jksM ds fcp rhljs jsyos ykbu fuekZ.k ds fy, vkSjaxkckn ftys eas vkus okyh lajpuk
lfgr ;k mlds fcuk Hkwfedk laf{kIr fooj.kA
1 2 3 4 5 6 7 8 9
dze vapy xzke dk [kkrk IykV {ks=Qy {ks=Qy tehu Hkwfe ds ekfyd
la[;k dk uke@Fkkuk la[;k la[;k ,dM+ gsDVs;j dh
uke la[;k es a es a izd`fr [kfr;ku ds vuqlkj orZeku losZ ds vuqlkj
1 ck:.k cxgk&178 28 106 0-085 0-0344 d`f"k fQjaxh oks ’kadj oks nw/ks’oj flag] firk&Lo0 tks[kq flag]
egjkt is’kjku ijuko lk0&cxgk
cfgLls cjkcj dkSe
vghj lk0&nsg
2 ck:.k cxgk&178 28 114 0-090 0-03642 d`f"k fQjaxh oks ’kadj oks nw/ks’oj flag] firk&Lo0 tks[kq flag]
egjkt is’kjku ijuko lk0&cxgk
cfgLls cjkcj dkSe
vghj lk0&nsg
3 ck:.k cxgk&178 32 118 0-2100 0-08499 d`f"k fcyV oks tkxk oks jkecnu flag] firk&pUnznso flag oks
fo’kqu/kkjh is’kjku /kuUt; dqekj] firk&Lo0 jktnso flag
Hkwdu cfgLls cjkcjd oks jatu dqekj] firk&Lo0 egsna z dqekj
dkSe vghj lk0&nsg flag lk0&cxgk
ck:.k cxgk&178 0-0600 0-02428 d`f"k x.ks’k flag firk & Lo0 /kqjk flag oks
fcfj{k oYn eaxy dkSe lqj’s k flag firk&Loa dke’s oj flag
4 31 119 vghj lk0&nsg lk0&cxgk
ck:.k cxgk&178 0-1450 0-05868 d`f"k vo/ks’k flag firk& Lo0 je.k flag oks
jkeVgy oYn lksek: lkSjHk dqekj firk&Lo0 e/ks’oj flag
5 33 120 dkSe vghj lk0&nsg lk0&cxgk
0-59 0-23877
VksVy
>kSjh tksYgk oYn dfiynso flag oks lw;Znso flag
vCnqy dkSe tksygk firk&Lok0 f’kockyd flag lk0&cxgk
1 ck:.k fc’kquiqj&206 7 139 0-2300 0-09307 d`f"k
lk0&nsg oks t; fd’kqu flag oks fc’kqu flag
firk& Lo0 uUgd flag lk0&fc’kqu
VksVy 0-2300 0-09307
xSj et:vk vke
1 ck:.k Rksna qvk&179 26 215 0-02 0-00809 d`f"k
VksVy 0-0200 0-00809
d`".kk dqekj HkkxZo] eq[; ifj;kts uk izca/kd
[जवज्ञापन-III/4/असा./510/2022-23]
RAIL VIKAS NIGAM LIMITED
NOTIFICATION
New Delhi, the 16th December, 2022
No: 2022-CPM/RVNL/PATNA/3rd Line/SEB-PTRU/Work Correspondence.—Whereas by the
notification of the Rail Vikas Nigam Limited Notification No. 2022 CPM/RVNL/Patna/3rd line/SEB-PTRU/Work
correspondence New Delhi Dated 14 August 2022 published in gazette of India, Extra Ordinary, PART III- Section 4
(hereafter referred to as the said notification) under sub-section (1) of section 20 (A) of the Railway Act,1989
(Railway Amendment Act 2008) (hereinafter referred to as the said Act), the Central Government, declared its[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 3
intension to acquire the land specified in the schedule annexed to the said notification for execution, maintenance,
management and operation of special Railway project construction of Third Railway Line in the District of
Aurangabad in the State of Bihar.
And, whereas, the substance of the said notification was published in daily newspaper Prabhat Khabar Dated
25 August 2022 and Hindustan Times 25 August 2022 under sub-section (4) of section 20 A of the said Act.
And, whereas, zero nos. of objections were received and the same have been considered/disallowed by the
competent authority accordingly orders have been passed.
And, whereas in pursuance of sub-section (1) of section 20 (E) of the said Act, the competent authority has
submitted its report to the Central Government.
Now, therefore, upon receipt of the said report of the competent authority, and in exercise of the powers
conferred by sub-section (1) of section 20 (E) of the Railway Act, the Central Government hereby declares that the
lands specified in the Schedule annexed hereto shall be acquired for the aforesaid purpose.
And, further, in pursuance of sub-section (2) of section 20(E) of the said Act, the Central Government
hereby declares that on publication of this notification in the official Gazette, the land specified in the Schedule
annexed hereto shall vest absolutely in the Central Government free from all encumbrances.
Brief description of the Land to be Acquired with or without structure falling within the Special Railway Project namely
for construction of 3rd Railway line from Sonnagar to Garhwa Road in the District of Aurangabad in the State of Bihar.
1 2 3 4 5 6 7 8 9
Sl. Name Name of Khata Plot Area Area in Nature of Name of Land Owner
No. of Village/ No. No. in Hect. Land
As per As per present Survey
Anchal Thana Acre
Khataiyan
No.
Firangi,
Shankar,
Dudheshwar Singh Father
Bagha - Maharaj Peshran
1 Barun 28 106 0.085 0.0344 Agriculture Late - Jokhu Singh Sa. -
178 Parnaw Bahisse
Bagaha
Barabar kaum
Ahir Sa - Deh
Firangi,
Shankar,
Dudheshwar Singh Father
Bagha - Maharaj Peshran
2 Barun 28 114 0.090 0.03642 Agriculture Late - Jokhu Singh Sa -
178 Parnaw Bahisse
Bagaha
Barabar kaum
Ahir Sa - Deh
Rambadan Singh,
Bilat, jaga,
Chandradev Singh,
vishundhari
Dhananjay Kumar Father -
Bagha - peshran, Bhukan
3 Barun 32 118 0.2100 0.08499 Agriculture Late Rajdev Singh, Ranjan
178 bahisse bararak
Kumar Father Late -
kaum ahir sa -
Mahendra Kumar Singh Sa.
Deh
- Bagaha
Biriksh Singh Ganesh Singh Father Late-
Bagha - wald Mangal Dhura Singh, Suresh Singh
4 Barun 31 119 0.0600 0.02428 Agriculture
178 kaum Ahir Sa. - Father Late - Kameshwar
Deh Singh Sa. - Bagaha
Awadhesh Singh Father
Ramtahal Wald Late - Raman Singh and
Bagha -
5 Barun 33 120 0.1450 0.05868 Agriculture Somaru kaum, Saurabh Kumar Father Late
178
Ahir Sa. - Deh - Madheshwar Singh Sa. -
Bagha
Total 0.59 0.23877
Kapildev Singh, Suryadev
Jhaori Jolha
Singh Father Late Shiv
Bishunpur- Vald Abdul
1 Barun 7 139 0.2300 0.09307 Agriculture Balak Singh sa - Bagha,
206 kaum Jolha sa -
Jay Kishun Singh, Bishun
Deh
singh Father Late Nanhak4 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4]
Singh sa – Bishun
Total 0.2300 0.09307
Tendua - Gair Majarua
1 Barun 26 215 0.02 0.00809 Agriculture -
179 Aam
Total 0.0200 0.00809
KRISHNA KUMAR BHARGAVA, Chief Project Manager
[ADVT.-III/4/Exty./510/2022-23]
Uploaded by Dte. of Printing at Government of India Press, Ring Road, Mayapuri, New Delhi-110064
and Published by the Controller of Publications, Delhi-110054.