## Policy Analysis Report: Expansion of Metro Railway Network in Delhi
**1. Executive Summary:**
This report analyzes a notification (S.O. 1168(E)) issued by the Ministry of Housing and Urban Affairs on March 16, 2022, which amends the Schedule of the Metro Railways (Construction of Works) Act, 1978. The amendment adds three new metro line extensions to the existing Delhi metro network: Line 10 (Aerocity to Tughlakabad), Line 8 (Janakpuri West to R.K. Ashram Marg), and Line 7 (Mukundpur Majlis Park to Maujpur). This report details the changes introduced, their likely rationale, affected stakeholders, and expected outcomes based solely on the provided text.
**2. Introduction:**
The purpose of this report is to provide an informative overview of the amendment to the Metro Railways (Construction of Works) Act, 1978, as detailed in Notification S.O. 1168(E) issued by the Ministry of Housing and Urban Affairs. The analysis is based exclusively on the content of the provided policy text.
**3. Policy Overview:**
* This notification represents an *amendment* to the Schedule of the Metro Railways (Construction of Works) Act, 1978.
* **Core Objective:** Based on the text, the core objective is to expand the Delhi Metro network by adding new metro line extensions to the existing Schedule of the Act. The explicit intent, derived from the provided text, is to enhance connectivity across various locations within the National Capital Territory of Delhi.
**4. Background and Rationale:**
This is an amendment. The amendment likely aims to address the need for improved urban transportation and connectivity within Delhi and the National Capital Region. The inclusion of new routes suggests an attempt to serve previously underserved areas and alleviate congestion on existing lines, though the text doesn't explicitly state this. The specific areas named may have demonstrated a specific need, perhaps based on population density or existing transport infrastructure deficiencies.
**5. Key Provisions / Changes:**
This section details the changes introduced by the amendment:
* **Specific Part of Original Policy Changed:** The amendment modifies the "Schedule" of the Metro Railways (Construction of Works) Act, 1978.
* **New Rule/Provision:** The notification adds the following metro line extensions to the Schedule:
* Metro Line 10: Aerocity to Tughlakabad (Aerocity, Mahipalpur, Vasant Kunj, Kishangarh, Chattarpur, Chattarpur Mandir, IGNOU, Neb Sarai, Saket GBlock, Ambedkar Nagar, Khanpur, Sangam Vihar Tigri, Anandmayee Marg Jn, Tughlakabad Railway Colony, Tughlakabad)
* Metro Line 8: Janakpuri West to R.K. Ashram Marg (Krishna Park Extension, Keshopur, Paschim Vihar, Peeragarhi, Mangolpuri, West Enclave, Pushpanjali, Deepali Chowk, Madhuban Chowk, Prashant Vihar, North Pitampura, Haiderpur Badli Mor, Bhalsawa, Majlis Park, Azadpur, Ashok Vihar, Derawal Nagar, Ghanta Ghar, Pulbangash, Sadar Bazar, Nabi Karim, R.K. Ashram Marg)
* Metro Line 7: Mukundpur Majlis Park to Maujpur (Burari, Jharoda Majra, Jagatpur Village, Soorghat, Sonia Vihar, Khajuri Khas, Bhajanpura, Yamuna Vihar Maujpur)
* **Difference/Effect of Change:** The effect of this change is to formally include these new routes within the scope of the Metro Railways (Construction of Works) Act, 1978. This inclusion likely enables the Central Government to exercise its powers under the Act for the construction and operation of these extensions, including land acquisition and regulation of construction activities along these routes.
**6. Target Audience and Stakeholders:**
The target audience and stakeholders directly affected by this amendment include:
* **Residents and commuters:** Residents of Delhi and the National Capital Region who will benefit from improved metro connectivity along the extended routes.
* **Businesses and developers:** Businesses and developers operating in areas along the extended metro lines, potentially experiencing increased property values and economic activity.
* **Landowners:** Landowners whose property may be required for the construction of the metro extensions.
* **Construction companies:** Construction companies involved in the infrastructure development of the new metro lines.
* **Delhi Metro Rail Corporation (DMRC):** The agency responsible for the operation and maintenance of the Delhi Metro.
**7. Implementation Aspects (Inferred):**
* **Responsible Agency/Bodies:** The Central Government, specifically the Ministry of Housing and Urban Affairs, is responsible for issuing the notification. The Delhi Metro Rail Corporation (DMRC) is implicitly responsible for the construction and operation of the new metro lines.
* **Timelines/Procedures:** No specific timelines or procedures are mentioned in the provided text.
**8. Expected Outcomes / Impact of Changes:**
The likely intended outcomes of these changes are:
* Improved connectivity and accessibility within Delhi and the National Capital Region.
* Reduced traffic congestion and pollution along the routes served by the metro extensions.
* Increased economic activity and property values in areas surrounding the new metro stations.
* Enhanced public transportation infrastructure in Delhi.
**9. Conclusion:**
The amendment to the Metro Railways (Construction of Works) Act, 1978, represented by Notification S.O. 1168(E), marks a significant step towards expanding the Delhi Metro network. By adding three new metro line extensions, the amendment aims to improve urban transportation, enhance connectivity, and stimulate economic growth within the National Capital Territory of Delhi. The inclusion of these lines under the Act facilitates the necessary legal and regulatory framework for their construction and operation.
Key Entities Referenced
Metro Railways Construction of Works Act, 1978: An Act of the Central Government of India, referenced by its year (1978) and Act number (33 of 1978). The notification concerns amendments to the Schedule of this Act.
National Capital TerritoryDelhi: The Union Territory of Delhi, where the Metro Railways Construction of Works Act, 1978 has been extended.
Aerocity to Tughlakabad: A metro line (line 10) in Delhi, part of the Delhi Metro system. It is added to the Schedule of the Metro Railways Construction of Works Act, 1978.
Janakpuri West to R.K. Ashram Marg: An extension of metro line 8 in Delhi, part of the Delhi Metro system. It is added to the Schedule of the Metro Railways Construction of Works Act, 1978.
Mukundpur Majlis Park to Maujpur: An extension of metro line 7 in Delhi, part of the Delhi Metro system. It is added to the Schedule of the Metro Railways Construction of Works Act, 1978.
Ministry of Housing and Urban Affairs: The Indian government ministry that issued the notification.
New Delhi: Location where the notification was issued.
K14011312021MRTSII: File number associated with the notification from the Ministry of Housing and Urban Affairs.
रजजस्ट्री स.ं डी.एल.- 33004/99 REGD. No. D. L.-33004/99
सी.जी.-डी.एल.-अ.-16032022-234239
xxxGIDHxxx
CG-DL-E-16032022-234239
xxxGIDExxx
ऄसाधारण
EXTRAORDINARY
भाग II—खण् ड 3—ईप-खण्ड (ii)
PART II—Section 3—Sub-section (ii)
प्राजधकार स ेप्रकाजित
PUBLISHED BY AUTHORITY
स.ं 1128] नइ ददल्ली, बसधवार, माच य16, 2022/फाल्ग नस 25, 1943
No. 1128] NEW DELHI, WEDNESDAY, MARCH 16, 2022/PHALGUNA 25, 1943
अवासन और िहरी काय यमत्रं ालय
ऄजधसचू ना
नइ ददल्ली, 16 माचय, 2022
का.अ. 1168(ऄ).—केन्द रीय सरकार, भूजमगत रेल (संकम-य संजनमायण) ऄजधजनयम, 1978 (1978 का 33) की
धारा 1 की ईपधारा (3) द्वारा प्रदत् त िजतियय का प्रयगग करते ुए, ऄपनी ऄजधसूचना संखय ांक का.अ. 2 2 (ऄ) तारीख
1 ऄक् तूबर, 2009 द्वारा ईक्त ऄजधजनयम के ईपबंध कग रा्र ीय राजधानी रा य क्षेत्रे , ददल् ली तक जवस्ट् तारितरत दकया ह
ऄतः ऄब केन्द रीय सरकार, भूजमगत रेल (संकम-य संजनमायण) ऄजधजनयम, 1978 (1978 का 33) की धारा 32 की
ईपधारा (1) के खडं (क) द्वारा प्रदत् त िजतियय का प्रयगग करते ुए, ईक्त ऄजधजनयम की ऄनससूची मं, रा्र ीय राजधानी
रा य क्षेेत्र ददल्ल ी म ंरा्र ीय राजधानी क्षेेत्र के संबंध म,ं भूजमगत लाआन 10 एरगजसटी से तगस लकाबाद तक, भूजमगत लाआन 8
का जवस्ट् तार जनकपसरी पज म से अर.के. अरम म माग य तक, भूजमगत लाआन 7 का जवस्ट् तार मसकसंदपसर (मजजलस पाकय) स े
मौजपसर तक, भूजमगत मागय संरेखण कग जगड़ना ह, ऄथायत्: -
“ददल्ली िहर
भूजमगत लाआन 10 एरगजसटी से एरगजसटी, मजहपालपसर, वसंत कसंज, दकिनगढ़, छतरपरस , छतरपसर मंददर, आग्न,ू
तसगलकाबाद नेब सराय, साकेत जी-ब्लॉक, ऄंबेडकर नगर, खानपसर, संगम जवहार-जतगरी,
अनंदमयी मागय ज,ं तसगलकाबाद रेलवे कॉलगनी, तसगलकाबाद
भूजमगत लाआन 8 का जवस्ट्तार जनकपसरी कृ्णा पाकय एक्सटंिन, केिगपसर, पज म जवहार, पीरागढ़ी, मंगगलपरस ी, वेस्ट्ट
पज म से अर.के. अरम म माग यतक एन्दक्लेव, पस्पांजजल, दीपाली चौक, मधसबन चौक, प्रिांत जवहार, ईत्तरी
पीतमपसरा, हद रपसर-बादली मगड़, भलसावा, मजजलस पाकय, अजादपसर,
ऄिगक जवहार, डेरावल नगर, घंटा घर, पसलबगं ि, सदर बाजार, नबी करीम,
अरके अरम म माग य
1803 GI/2022 (1)2 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)]
भूजमगत लाआन 7 का जवस्ट्तार मसकसंदपसर बसराड़ी, झरगदा माजरा, जगतपसर गांव, सूरघाट, सगजनया जवहार, खजूरी
(मजजलस पाकय) से मौजपरस तक खास, भजनपसरा, यमसना जवहार
[फा. स.ं के-14011/31/2021-एमअरटीएस-II]
जयदीप, ओएसडी (यूटी) और पदेन सयं सतिय सजचव
MINISTRY OF HOUSING AND URBAN AFFAIRS
NOTIFICATION
New Delhi, the 16th March, 2022
S.O. 1168(E).—Whereas, in exercise of the powers conferred by sub-section (3) of
section 1 of the Metro Railways (Construction of Works) Act, 1978 (33 of 1978), the Central
Government, vide its notification number S.O. 2625(E), dated 16th October, 2009 has extended the
provisions of the said Act to the National Capital Territory-Delhi.
Now, therefore, in exercise of the powers conferred by clause (a) of sub-section (1) of
section 32 of the Metro Railways (Construction of Works) Act, 1978 (33 of 1978), the Central
Government hereby adds to the Schedule of the said Act, the metro alignment of metro line 10
Aerocity to Tughlakabad, metro line 8 extension from Janakpuri West to R.K. Ashram Marg,[भाग II—खण् ड 3(ii)] भारत का राजपत्र : ऄसाधारण 3
metro line 7 extension from Mukundpur (Majlis Park) to Maujpur in respect of the National
Capital Region in National Capital Territory-Delhi, namely:-
“City of Delhi
Metro line 10 Aerocity to Aerocity, Mahipalpur, Vasant Kunj,
Tughlakabad
Kishangarh, Chattarpur, Chattarpur Mandir, IGNOU, Neb Sarai,
Saket G-Block, Ambedkar Nagar, Khanpur, Sangam Vihar-
Tigri, Anandmayee Marg Jn, Tughlakabad Railway Colony,
Tughlakabad
Metro line 8 extension Krishna Park Extension, Keshopur, Paschim Vihar, Peeragarhi,
from Janakpuri West to R.K. Mangolpuri, West Enclave, Pushpanjali, Deepali Chowk,
Ashram Marg Madhuban Chowk, Prashant Vihar, North Pitampura, Haiderpur-
Badli Mor, Bhalsawa, Majlis Park, Azadpur, Ashok Vihar,
Derawal Nagar, Ghanta Ghar, Pulbangash, Sadar Bazar, Nabi
Karim, R.K. Ashram Marg
Metro line 7 extension from Burari, Jharoda Majra, Jagatpur Village, Soorghat, Sonia Vihar,
Mukundpur (Majlis Park) to Khajuri Khas, Bhajanpura, Yamuna Vihar
Maujpur
[F. No. K-14011/31/2021-MRTS-II]
JAIDEEP, OSD(UT) and Ex-Officio Jt. Secy.
Uploaded by Dte. of Printing at Government of India Press, Ring Road, Mayapuri, New Delhi-110064
and Published by the Controller of Publications, Delhi-110054.