## Policy Analysis Report: Extension of Metro Railways Act to Mumbai Metro Alignments
**1. Executive Summary:**
This report analyzes a notification issued by the Ministry of Housing and Urban Affairs, Government of India, regarding the Mumbai Metro Rail Project. This notification amends the Schedule of the Metro Railways (Construction of Works) Act, 1978, by adding specific metro alignments in Mumbai. The amendment aims to facilitate the construction and operation of new metro lines within the Mumbai metropolitan area by extending the Act's provisions to these specific alignments. Key lines affected include Metro Line 4A, 7A, 9, 10, 11 and 12.
**2. Introduction:**
The purpose of this report is to provide an informative overview of a recent amendment to the Schedule of the Metro Railways (Construction of Works) Act, 1978, as it pertains to the Mumbai Metro Rail Project. This analysis is based solely on the official notification issued by the Ministry of Housing and Urban Affairs on March 16, 2022.
**3. Policy Overview:**
* **Amendment:** This notification represents an amendment to the Schedule of the Metro Railways (Construction of Works) Act, 1978.
* **Core Objective(s):** The core objective, as inferred from the text, is to extend the jurisdiction and applicability of the Metro Railways (Construction of Works) Act, 1978 to the specified metro alignments of the Mumbai Metro Rail Project. This extension likely aims to streamline the construction and operational processes for these lines by providing a legal framework for land acquisition, dispute resolution, and other related activities.
**4. Background and Rationale:**
The original Metro Railways (Construction of Works) Act, 1978 was extended to the metropolitan area of Mumbai in 2009. This specific amendment appears to be necessary to incorporate newly planned or under-construction metro lines into the Act's purview. Without this amendment, the provisions of the Act would not automatically apply to these new lines, potentially creating legal and administrative hurdles for their development. The rationale is to ensure that the construction and operation of these lines can proceed smoothly under the existing legal framework established by the Act.
**5. Key Provisions / Changes:**
This notification is an amendment that specifically adds the following metro alignments to the Schedule of the Metro Railways (Construction of Works) Act, 1978:
* **Mumbai Metro Line 4A:** Kasarvadavali - Gaimukh Metro Corridor (OCC or Depot Mogharpada)
* **Mumbai Metro Line 7A:** Andheri E - CSMIA Metro Corridor (OCC or Depot MiraBhayander Depot)
* **Mumbai Metro Line 9:** Dahisar E - Mira Bhayander Metro Corridor (Saibaba Nagar, Deepak Hospital, Shahid Bhagat Singh Garden, Subhash Chandra Bose Stadium, MiraBhayander Depot OCC or Depot MiraBhayander Depot)
* **Mumbai Metro Line 10:** Gaimukh - Shivaji ChowkMira road Metro Corridor (OCC or Depot Mogharpada)
* **Mumbai Metro Line 11:** Wadala RTO Bhakti park - C.S.MT. Metro Corridor (OCC or Depot MogharpadaAnik Nagar BEST DepotWadala Line 4 Depot will be utilised for this line)
* **Mumbai Metro Line 12:** Kalyan APMC - Taloja Metro Corridor (MIDC, Sagaon, Sonarpada, Manpada, Hedutane, Kolegaon, Nilje Gaon, Vadvli Khu., Bale, Waklan, Turbhe, Pisarve Depot, Pisarve, Taloja. OCC or Depot Pisarve Depot)
**Effect of the Change:** By adding these lines to the Schedule, the provisions of the Metro Railways (Construction of Works) Act, 1978, now directly apply to their construction, operation, and maintenance. This includes powers related to land acquisition, construction activities, and safety regulations.
**6. Target Audience and Stakeholders:**
The target audience and stakeholders directly affected by this amendment include:
* **Mumbai Metropolitan Region Development Authority (MMRDA):** As the primary implementing agency for the Mumbai Metro Rail Project.
* **Construction companies and contractors:** Involved in the construction of the specified metro lines.
* **Landowners and residents:** Along the specified metro alignments, who may be affected by land acquisition or construction activities.
* **Commuters:** Who will benefit from the enhanced metro connectivity provided by these new lines.
* **Maharashtra State Government:** Which has oversight responsibility for infrastructure projects within the state.
**7. Implementation Aspects (Inferred):**
* **Responsible agency/bodies:** The Central Government, through the Ministry of Housing and Urban Affairs, is responsible for issuing the notification. The MMRDA is likely responsible for implementing the Act's provisions for these newly included metro lines.
* **Timelines or procedures:** The text does not specify any specific timelines or procedures. However, it implies that the Act's standard procedures for construction, land acquisition, and related activities will now apply to these lines.
* **Specific to the changes:** The main implementation aspect is the need for the MMRDA to integrate these new alignments into their existing project management framework under the Metro Railways (Construction of Works) Act, 1978.
**8. Expected Outcomes / Impact of Changes:**
The likely intended outcome of this amendment is to:
* **Streamline the construction and operation** of the specified Mumbai Metro lines by providing a clear legal framework.
* **Facilitate land acquisition** and other necessary procedures for project implementation.
* **Ensure the safety and efficiency** of the metro system.
* **Improve urban mobility** within the Mumbai metropolitan area by expanding the metro network.
**9. Conclusion:**
The notification issued by the Ministry of Housing and Urban Affairs represents a significant step in the development of the Mumbai Metro Rail Project. By extending the provisions of the Metro Railways (Construction of Works) Act, 1978, to the specified metro alignments, this amendment provides a clear legal and regulatory framework for their construction and operation. This is expected to facilitate the timely completion of these projects and contribute to the overall improvement of urban transportation in Mumbai.
Key Entities Referenced
Metro Railways Construction of Works Act, 1978: An act of the Indian Parliament, referenced by its short name and year, as well as its act number (33 of 1978).
Central Government: The government of India, which is exercising powers conferred by the Metro Railways Construction of Works Act, 1978.
Mumbai: A metropolitan area in the State of Maharashtra, to which provisions of the Metro Railways Construction of Works Act, 1978 have been extended.
Maharashtra: The state in India where the metropolitan area of Mumbai is located.
Mumbai Metro Rail Project: The overall project encompassing various metro lines within the Mumbai metropolitan area.
Mumbai Metro Line 4A: A specific metro line within the Mumbai Metro Rail Project.
Mumbai Metro Line 7A: A specific metro line within the Mumbai Metro Rail Project.
Mumbai Metro Line 9: A specific metro line within the Mumbai Metro Rail Project.
Mumbai Metro Line 10: A specific metro line within the Mumbai Metro Rail Project.
Mumbai Metro Line 11: A specific metro line within the Mumbai Metro Rail Project.
Mumbai Metro Line 12: A specific metro line within the Mumbai Metro Rail Project.
रजिस्ट्री स.ं डी.एल.- 33004/99 REGD. No. D. L.-33004/99
सी.जी.-डी.एल.-अ.-16032022-234237
xxxGIDHxxx
CG-DL-E-16032022-234237
xxxGIDExxx
ऄसाधारण
EXTRAORDINARY
भाग II—खण् ड 3—ईप-खण्ड (ii)
PART II—Section 3—Sub-section (ii)
प्राजधकार स ेप्रकाजित
PUBLISHED BY AUTHORITY
स.ं 1129] नइ ददल्ली, ब धवार, माच य16, 2022/फाल्ग न 25, 1943
No. 1129] NEW DELHI, WEDNESDAY, MARCH 16, 2022/PHALGUNA 25, 1943
अवासन और िहरी काय यमत्रं ालय
ऄजधसचू ना
नइ ददल्ली, 16 माचय, 2022
का.अ. 1169(ऄ).—केन्द रीय सरकार भूजमगत रेल (संकमय संजनमायण) ऄजधजनयम, 1978 (1978 का 33) की
धारा 1 की ईप-धारा (3) द्वारा प्रदत्त िजियों का प्रयोग करते हुए ऄपनी ऄजधसूचना सख्ं या का.अ. 2625 (ऄ) तारीख
16 ऄिूबर 2009 द्वारा महाराष्ट्र राज्य में म ंबइ महानगरीय क्षेत्र के जलए ईि ऄजधजनयम के ईपबंधों का जवस्ट्तार दकया ह।ै
ऄतः ऄब केन्द रीय सरकार, भूजमगत रेल (संकमय संजनमायण) ऄजधजनयम, 1978 (1978 का 33) की धारा 32 की
ईप-धारा (1) के खंड (क) द्वारा प्रदत्त िजियों का प्रयोग करते हुए, म ंबइ महानगरीय क्षत्रे के संबंध में म ंबइ मेरो रेल
पररयोिना मेरो लाआन-4क, मेरो लाआन -7क मेरो लाआन -9 मेरो लाआन-10 मेरो लाआन-11 और मेरो लाआन 12 के मेरो
मागयरेखाओं को ईि ऄजधजनयम की ऄन सूची म ेंिोड़ती ह ैऄथातय ् : -
“मब ं इ के महानगरीय क्षत्रे
मब ं इ मरे ो रेल पररयोिना
म ंबइ मेरो लाआन - 4क कासरवडावली- कासरवडावली, गोवनीवाडा, गइम ख
गइम ख मेरो कॉररडोर
ओसीसी या जडपो मोघापाडा
म ंबइ मेरो लाआन - 7क ऄंधरे ी (इ) स े ऄंधेरी (इ) एऄरपोर्य कालोनी, सीएसएमअइए
सीएसएमअइए मेरो कॉररडोर
ओसीसी या जडपो मीरा-भायन्ददर जडपो
म ंबइ मेरो लाआन - 9 दहीसर(इ) मीरा- दहीसर(इ) पांड रंग वाडी, ऄमर पैलेस, जंकार कंपनी, साइबाबा नगर,
भायन्ददर मेरो कॉररडोर दीपक ऄस्ट्पताल, िहीद भगत ससह गाडयन, स भाष चंर बोस स्ट्र्ेजडयम,
मीरा-भायंदर जडपो
1804 GI/2022 (1)2 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)]
ओसीसी या जडपो मीरा- भायन्ददर जडपो
म ंबइ मेरो लाआन - 10 गायम ख से जिवािी गैम ख, गायम ख रेतीबंदर, वसोवा चार फार्ा, कािीमीरा, जिवािी चौक
चौक (मीरा रोड) मेरो कॉररडोर
ओसीसी या जडपो मोघरपाडा
म ंबइ मेरो लाआन - 11 वडाला अरर्ीओ वडाला अरर्ीओ (भजि पाकय), गणेि नगर, बीपीर्ी ऄस्ट्पताल, सेवरी मेरो,
(भजि पाकय) ह े बंदर, कोयला बंदर, दारुखाना, वाडी बंदर, क्लॉक र्ॉवर, कानैक बंदर,
सीएसएमर्ी मेरो कॉररडोर सीएसएमर्ी मेरो
ओसीसी या जडपो मोघरपाड़ा/ऄजनक नगर बेस्ट्र् जडपो-वडाला (आस लाआन के जलए लाआन 4
जडपो का ईपयोग दकया िाएगा)
म ंबइ मेरो लाआन - 12 कल्याण तलोिा एपीएमसी कल्याण, गणेि नगर, जपसावली गांव, गोलावली, डोंजबवली
मेरो कॉररडोर एमअइडीसी, सागांव, सोनारपाड़ा, मनपाड़ा, हडे र्ान,े कोलेगांव, जनलिे
गांव, वडवली (ख .), बाले, वकलां, त भ,े जपसावे जडपो, जपसावे, तलोिा
ओसीसी या जडपो जपसावे जडपो[भाग II—खण् ड 3(ii)] भारत का रािपत्र : ऄसाधारण 34 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)][भाग II—खण् ड 3(ii)] भारत का रािपत्र : ऄसाधारण 56 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)][भाग II—खण् ड 3(ii)] भारत का रािपत्र : ऄसाधारण 7
[फा. स.ं के-14011/34/2020-एमअरर्ीएस-II]
ियदीप, ओएसडी (यूर्ी) और पदेन संय ि सजचव8 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)]
MINISTRY OF HOUSING AND URBAN AFFAIRS
NOTIFICATION
New Delhi, the 16th March, 2022
S.O. 1169(E).—Whereas, in exercise of the powers conferred by sub-section (3) of section 1 of
the Metro Railways (Construction of Works) Act, 1978 (33 of 1978), the Central Government, vide its
notification number S.O. 2625 (E) dated 16th October, 2009 has extended the provisions of the said Act to
the metropolitan area of Mumbai in the State of Maharashtra.
Now, therefore, in exercise of the powers conferred by clause (a) of sub-section (1) of section 32 of
the Metro Railways (Construction of Works) Act, 1978 (33 of 1978), the Central Government hereby adds
to the Schedule of the said Act, the metro alignments of Mumbai Metro Rail Project Metro Line-4A, Metro
Line-7A, Metro Line-9, Metro Line-10, Metro Line-11 and Metro Line-12 in respect of the metropolitan
area of Mumbai, namely:-
“The Metropolitan Area of Mumbai
Mumbai Metro Rail Project
Mumbai Metro Line- 4A Kasarvadavali, Gowniwada, Gaimukh
Kasarvadavali- Gaimukh Metro
Corridor
OCC or Depot Mogharpada
Mumbai Metro Line- 7A Andheri Andheri (E), Airport Colony, CSMIA
(E) to CSMIA Metro Corridor
OCC or Depot Mira-Bhayander Depot
Mumbai Metro Line- 9 Dahisar(E) Dahisar (E), Pandurang Wadi, Amar Palace, Zankar Company,
Mira Bhayander Metro Corridor Saibaba Nagar, Deepak Hospital, Shahid Bhagat Singh Garden,
Subhash Chandra Bose Stadium, Mira-Bhayander Depot
OCC or Depot Mira-Bhayander Depot
Mumbai Metro Line- 10 Gaimukh Gaimukh, Gaimukh RetiBundar, Versova Char Phata, Kashimira,
to Shivaji Chowk(Mira road) Shivaji Chowk
Metro Corridor
OCC or Depot Mogharpada
Mumbai Metro Line- 11 Wadala Wadala RTO (Bhakti park), Ganesh Nagar, BPT Hospital, Sewri
RTO (Bhakti park) Metro , Hay Bunder, Coal Bunder, Darukhana, Wadi Bunder, Clock
Tower, Carnac Bunder, CSMT Metro
C.S.MT. Metro Corridor
OCC or Depot Mogharpada/Anik Nagar BEST Depot-Wadala (Line 4 Depot will be
utilised for this line)
Mumbai Metro Line- 12 Kalyan APMC Kalyan, Ganesh Nagar, Pisavali Gaon, Golavli, Dombivli
Taloja Metro Corridor MIDC, Sagaon, Sonarpada, Manpada, Hedutane, Kolegaon, Nilje
Gaon, Vadvli (Khu.), Bale, Waklan, Turbhe, Pisarve Depot, Pisarve,
Taloja.
OCC or Depot Pisarve Depot[भाग II—खण् ड 3(ii)] भारत का रािपत्र : ऄसाधारण 910 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)][भाग II—खण् ड 3(ii)] भारत का रािपत्र : ऄसाधारण 1112 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)][भाग II—खण् ड 3(ii)] भारत का रािपत्र : ऄसाधारण 1314 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)]
[F. No. K-14011/34/2020-MRTS-II]
JAIDEEP, OSD(UT) and Ex-Officio Jt. Secy.
Uploaded by Dte. of Printing at Government of India Press, Ring Road, Mayapuri, New Delhi-110064