Date: 2016-01-15Category: Extra OrdinaryState: Union GovernmentCountry: India
Whereas, it appears to the Central Government, that it is necessary in the public interest that for the transportation of Petroleum crude from Salaya in the State of Gujarat to Mathura in the state of Uttar Pradesh a pipeline should be laid for implementing De-Bottlenecking
Executive Summary:
This notification from the Ministry of Petroleum and Natural Gas declares the Central Government's intention to acquire the right of user for land in the Pali district of Rajasthan. This acquisition is for laying a pipeline by the Indian Oil Corporation Limited as part of the Salaya-Mathura Pipeline DeBottlenecking Project. Interested parties have 21 days from the date the notification is made available to the public to submit objections in writing.
Key Points / Main Content:
* **Project Purpose:** Implementation of the DeBottlenecking Project under the Salaya-Mathura Pipeline for transporting petroleum crude from Salaya, Gujarat, to Mathura, Uttar Pradesh.
* **Land Acquisition:** The Central Government intends to acquire the right of user for land required for laying the pipeline.
* **Affected Land:** The land is located in Tehsil Raipur, District Pali, State Rajasthan, as detailed in the attached schedule, specifically:
* Village Dholiya: Khasra numbers 56, 59, 60, and 61.
* Land Area: Hectare Are Square Metre as specified in the schedule.
* **Objection Mechanism:** Any person interested in the specified land may submit written objections to Shri Nitendra Pal Singh, Competent Authority, Rajasthan Indian Oil Corporation Limited, at the provided address.
* **Objection Deadline:** Objections must be submitted within 21 days from the date the notification copies are made available to the general public.
Impact Analysis:
**Landowners in Tehsil Raipur, District Pali, Rajasthan:**
* Impact: Potential loss of right of user of their land for the pipeline project.
* Action Required: Submit written objections to the Competent Authority within 21 days if they have concerns regarding the land acquisition.
**Indian Oil Corporation Limited:**
* Impact: Responsible for laying the pipeline for the Salaya-Mathura Pipeline DeBottlenecking Project.
* Action Required: Proceed with the pipeline laying project, address any objections received, and coordinate with the Competent Authority.
**Central Government:**
* Impact: Overseeing the land acquisition process and facilitating the pipeline project in the public interest.
* Action Required: Review and address any objections received, and ensure the project aligns with the Petroleum and Minerals Pipelines Act.
Key Entities Referenced
Ministry of Petroleum and Natural Gas: The Indian government ministry responsible for petroleum and natural gas.
Gujarat: State in India, origin point of the pipeline.
Uttar Pradesh: State in India, destination point of the pipeline.
Salaya: A city in Gujarat, India; the starting point of the Salaya-Mathura pipeline.
Mathura: A city in Uttar Pradesh, India; the end point of the Salaya-Mathura pipeline.
Salaya-Mathura Pipeline: A petroleum pipeline project between Salaya, Gujarat and Mathura, Uttar Pradesh.
Indian Oil Corporation Limited: The company responsible for laying the Salaya-Mathura pipeline.
Petroleum and Minerals Pipelines (Acquisition of Right of User in Land) Act, 1962: The law under which the Central Government declares its intention to acquire the right of user in the land for laying the pipeline.
jftLVªh laö Mhö ,yö&33004@99 REGD. NO. D. L.-33004/99
vlk/kj.k
EXTRAORDINARY
Hkkx II—[k.M 3—mi&[k.M (ii)
PART II—Section 3—Sub-section (ii)
izkf/dkj ls izdkf'kr
PUBLISHED BY AUTHORITY
la- 132] ubZ fnYyh] 'kqØokj] tuojh 15] 2016@ikS"k 25] 1937
No. 132] NEW DELHI, FRIDAY, JANUARY 15, 2016/PAUSA 25, 1937
isVªksfy;e vkSj izkd`frd xSl e=a ky;
vf/klwpuk
ubZ fnYyh] 14 tuojh] 2016
dk- vk- 148¼v½-& dsUnzh; ljdkj dks ,slk izrhr gksrk gS fd yksdfgr eas ;g vko’;d gS fd xqtjkr jkT; esa lyk;k
ls mÙkj izns’k jkT; esa eFkqjk rd isVªSfy;e ØwM ds ifjogu ds fy, ^^lyk;k&eFkqjk ikbi ykbu ds vUrxZr Mh&ckWVyusfdax
ifj;kstuk^^ ds fØ;kUo;u gsrq bafM;u vkW;y dkWiksZjs’ku fyfeVsM }kjk ,d ikbiykbu fcNkbZ tkuh pkfg, (
vkSj dsUnzh; ljdkj dks mDr ikbiykbu fcNkus ds iz;kstu ds fy, ;g vko’;d izrhr gksrk gS fd ,slh Hkwfe]
ftlds uhps mDr ikbiykbu fcNkbZ tkus dk izLrko gS vkSj tks bl vf/klwpuk ls layXu vuqlph esa of.kZr gS] mi;ksx ds
vf/kdkj dk vtZu fd;k tk, (
vr% vc] dsUnzh; ljdkj isVªksfy;e vkSj [kfut ikbiykbUl ¼Hkwfe esa mi;ksx ds vf/kdkj dk vtZu½ vf/kfu;e] 1962
¼1962 dk 50½ dh /kkjk 3 dh mi/kkjk ¼1½ }kjk iznÙk ’kfDr;ksa dk iz;ksx djrs gq,] mDr Hkwfe esa mi;ksx ds vf/kdkj dk vtZu
djus ds vius vk’k; dh ?kks"k.kk djrh gS(
dksbZ O;fDr] tks mDr vuqlwph esa of.kZr Hkwfe ls fgrc) gS] ml rkjh[k ls] ftldks Hkkjr ds jkti= esa ;Fkk
izdkf’kr bl vf/klwpuk dh izfr;k¡ tulk/kkj.k dks miyC/k djk nh tkrh gSa] bDdhl fnu ds Hkhrj Jh fursUnz iky flag]
Lk{ke izkf/kdkjh ¼jktLFkku½ bafM;u vkW;y dkWiksZjs’ku fyfeVsM ¼ikbiykbUl izHkkx½ fuekZ.k dk;kZy;] IykWV ua- 38&39] ,lMhlh
fou; CykWd f}rh;] pkSFkk ry] ekSth dkWyksuh] ekyoh; uxj] t;iqj jktLFkku&302017 dks fyf[kr :Ik esa vkifÙk;ka izLrqr
dj ldsxkA
vuqlwph
rglhy % jk;iqj ftyk % ikyh jkT; % jktLFkku
{k=s Qy
Øa- la- xzke dk uke [kljk la-
gsDVs;j ,;j oxZ ehVj
(cid:49) (cid:32)(cid:50) (cid:32)(cid:51) (cid:32)(cid:52) (cid:32)(cid:53) (cid:32)(cid:54)
56 00 02 10
/kkSfy;k 59 00 01 20
1
60 00 02 80
61 00 03 30
[Qk-la- vkj-&25011@7@2011&vks-vkj-I]
Ikou dqekj] voj lfpo
244 GI/2016 (1)2 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)]
Ministry of Petroleum and Natural Gas
Notification
New Delhi, the 14th January, 2016
S.O. 148 (E).—Whereas, it appears to the Central Government, that it is necessary in the
public interest that for the transportation of Petroleum crude from Salaya in the State of Gujarat to
Mathura in the state of Uttar Pradesh a pipeline should be laid for implementing De-Bottlenecking
Project under Salaya-Mathura Pipeline by the Indian Oil Corporation Limited;
And whereas, it appears to the Central Government that for the purpose of laying the said
pipeline, it is necessary to acquire the right of user in the land under which the said pipeline is
proposed to be laid, and which is described in the Schedule annexed to this notification;
Now, therefore, in exercise of the powers conferred by Sub section (1) of Section 3 of the
Petroleum and Minerals Pipelines (Acquisition of Right of User in land) Act, 1962 (50 of 1962), the
Central Government hereby declares its intention to acquire the right of user therein;
Any person who is interested in the land described in the said schedule, may submit objection
in writing to Shri Nitendra Pal Singh, Competent Authority (Rajasthan) Indian Oil Corporation
Limited (Pipelines Division) Construction Office, Plot No. 38-39, SDC Vinay Block II (4th floor),
Mauji Colony, Malviya Nagar Jaipur, Rajasthan-302017 within twenty one days from the date on
which the copies of this notification issued under sub-section (1) of Section 3 of the said Act, as
published in the Gazette of India, are made available to the general public.
SCHEDULE
Tehsil : Raipur District : Pali State : Rajasthan
Area
S.No. Name of Village Khasra No.
Hectare Are Square Metre
1 2 3 4 5 6
56 00 02 10
59 00 01 20
Dholiya
1
60 00 02 80
61 00 03 30
[F.No. R-25011/7/2011-OR.I]
PAWAN KUMAR, Under Secy
Printed by the Manager, Government of India Press, Ring Road, Mayapuri, New Delhi-110064
and Published by the Controller of Publications, Delhi-110054.