**Executive Summary:**
This notification announces the effective date of the remaining regulations of the Central Electricity Regulatory Commission's (CERC) Connectivity and General Network Access (GNA) Regulations, 2022, including the First Amendment Regulations, as October 1, 2023. It also specifies that the scheduling and dispatch of electricity from October 1, 2023, will be based on the quantum of GNA, TGNA of Designated ISTS Customers (DICs) and other RE users. It aligns with the Central Electricity Regulatory Commission Indian Electricity Grid Code Regulations, 2023.
**Key Points / Main Content:**
* **Effective Date:**
* The remaining regulations of the GNA Regulations, including the First Amendment Regulations, will come into effect on October 1, 2023.
* **Scheduling and Dispatch of Electricity:**
* Effective October 1, 2023, the scheduling and dispatch of electricity will be based on the quantum of GNA, TGNA of Designated ISTS Customers (DICs) and other RE users.
* This process will adhere to the provisions of the Central Electricity Regulatory Commission Indian Electricity Grid Code Regulations, 2023.
**Impact Analysis:**
* **Designated ISTS Customers (DICs):**
* *Impact:* DICs are affected by the new regulations of GNA, GNA , TGNA which determines how electricity is scheduled and dispatched to them.
* *Action Required:* DICs need to understand and comply with the GNA Regulations, including the First Amendment Regulations, and the Central Electricity Regulatory Commission Indian Electricity Grid Code Regulations, 2023, to ensure proper scheduling and dispatch of electricity.
* **Renewable Energy (RE) Users of the Grid:**
* *Impact:* RE users are affected by the new regulations of GNA, GNA , TGNA which determines how electricity is scheduled and dispatched to them.
* *Action Required:* RE users need to understand and comply with the GNA Regulations, including the First Amendment Regulations, and the Central Electricity Regulatory Commission Indian Electricity Grid Code Regulations, 2023, to ensure proper scheduling and dispatch of electricity.
* **Central Electricity Regulatory Commission (CERC):**
* *Impact:* Responsible for enforcing and overseeing the implementation of the GNA Regulations and the Indian Electricity Grid Code Regulations, 2023.
* *Action Required:* CERC needs to monitor compliance with the regulations and ensure the smooth transition to the new scheduling and dispatch process.
Key Entities Referenced
Central Electricity Regulatory Commission: A regulatory body that deals with the electricity sector. It is the primary authority issuing the notification.
New Delhi: The location where the notification was issued. New Delhi is the capital of India.
Connectivity and General Network Access to the interState Transmission System Regulations, 2022: Also referred to as GNA Regulations. It concerns regulations regarding connectivity and access to the interstate transmission system for electricity.
First Amendment Regulations, 2023: Refers to the Central Electricity Regulatory Commission Connectivity and General Network Access to the interState Transmission System First Amendment Regulations, 2023. It represents an amendment to the GNA Regulations.
Indian Electricity Grid Code Regulations, 2023: Regulations governing the Indian electricity grid code, referenced for scheduling and despatch of electricity.
Designated ISTS Customers DICs: Refers to Designated Inter-State Transmission System (ISTS) Customers, relevant to scheduling and dispatch of electricity.
01.10.2023: The date from which the remaining regulations of GNA Regulations including First Amendment Regulations shall come into effect.
HARPREET SINGH PRUTHI: Secretary of Central Electricity Regulatory Commission who is responsible for the notification
रजिस्ट्री स.ं डी.एल.- 33004/99 REGD. No. D. L.-33004/99
सी.जी.-डी.एल.-अ.-12082023-248064
xxxGIDHxxx
CG-DL-E-12082023-248064
xxxGIDExxx
असाधारण
EXTRAORDINARY
भाग III—खण् ड 4
PART III—Section 4
प्राजधकार स ेप्रकाजित
PUBLISHED BY AUTHORITY
स.ं 577] नई दिल्ली, िुक्रवार, अगस्ट्त 11, 2023/श्रावण 20, 1945
No. 577] NEW DELHI, FRIDAY, AUGUST 11, 2023/SHRAVANA 20, 1945
dsUnzh; fo|qr fofu;ked vk;ksx
vf/klwpuk
ubZ fnYyh] 3 vxLr] 2023
Qk- la- ,y&1@261@2021@dsfofovk.—pwfad] dsUæh; fo|qr fofu;ked vk;kxs ¼varj&jkfT;d ikj"sk.k
ç.kkyh esa la;kts drk vkSj lkekU; usVodZ igqap½ fofu;e] 2022 ¼blds ckn th,u, fofu;e½ dks Hkkjr ds
vlk/kkj.k jkti= ¼Hkkx&III] [kMa &4] la-364½ esa fnukad 19-07-2022 dk s çdkf'kr fd;k x;k Fkk(
pwfad] th,u, fofu;ekas ds fofu;e 1-2 es a mic/a k gS fd ;s fofu;e ml rkjh[k ls ço`Ùk gksxa s ftls vk;kxs
}kjk vf/klwfpr fd;k tk,xk vkSj fofHkUu fofu;eks a ds vkjHa k ds fy, i`Fkd rkjh[kas fu/kkZfjr dh tk ldrh gSa(
pwfad] th,u, fofu;ekas ds dqNsd mic/a k Hkkjr ds vlk/kkj.k jkti= ¼Hkkx-III [k.M&4] la[;k 520½ es a
fnukad 14-10-2022 dh vf/klwpuk ds vuqlkj 15-10-2022 ls izHkkoh gks x, Fks;
pwfad] dsUæh; fo|qr fofu;ked vk;ksx ¼vra j&jkfT;d ikj"sk.k ç.kkyh esa la;kts drk vkSj lkekU; usVodZ
igqap½ ¼izFke la'kks/ku½ fofu;e] 2023 ¼blds ckn *izFke la'kk/s ku fofu;e*½ dk s Hkkjr ds vlk/kkj.k jkti=
¼Hkkx&III] [kaM&4] la- 229½ es a fnukad 06-04-2023 dks çdkf'kr fd;k x;k Fkk(
pwfad] izFke la'kk/s ku fofu;e ds dqNsd mic/a k vkSj th,u, fofu;e ds dqNsd mic/a k Hkkjr ds vlk/kkj.k
jkti= ¼Hkkx-III [k.M&4] la[;k 230½ es a fnukad 06-04-2023 dh vf/klwpuk ds vuqlkj 05-04-2023 ls izHkkoh gks
x, Fks;
vkSj vc] blfy,] ;g vf/klwfpr fd;k tkrk gS fd%
¼d½ izFke la'kks/ku fofu;eks a lfgr th,u fofu;eks a ds 'k"sk fofu;e fnukad 01-10-2023 ls çHkkoh gkasxsA
5220 GI/2023 (1)2 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4]
¼[k½ fnukad 01-10-2023 ls fo|qr dk vuqlwphdj.k vkSj izs"k.k izR;ds fufnZ"V vkbZ,lVh,l xzkgdks a
¼MhvkbZlh½ ds th,u,] th,u, ] Vh&th,u, vkSj Vhth,u, vkSj dsUnzh; fo|qr fofu;ked
vkjbZ vkjbZ
vk;kxs ¼Hkkjrh; fo|qr fxzM dksM½ fofu;e] 2023 ds mica/kks a ds vuqlkj fxzM vU; mi;kxs drkZvks a
dh ek=k ij vk/kkfjr gksxkA
gjizhr flag izqFkh] lfpo
[जवज्ञापन III/4/असा./359/2023-24]
CENTRAL ELECTRICITY REGULATORY COMMISSION
NOTIFICATION
New Delhi, the 3rd August, 2023
F. No. L-1/261/2021/CERC.—Whereas, the Central Electricity Regulatory Commission (Connectivity and
General Network Access to the inter-State Transmission System) Regulations, 2022 (hereinafter GNA Regulations)
was published on 19.7.2022 in the Gazette of India Extraordinary (Part- III, Section-4, No. 364);
Whereas, the Regulation 1.2 of the GNA regulations provides that the regulations shall come into force from
the date to be notified by the Commission and different dates may be appointed for commencement of different
regulations;
Whereas certain provisions of GNA Regulations were made effective from 15.10.2022 as per Notification
dated 14.10.2022, published in the Gazette of India Extraordinary (Part-III, Section-4, No. 520);
Whereas, the Central Electricity Regulatory Commission (Connectivity and General Network Access to the
inter-State Transmission System) (First Amendment) Regulations, 2023 (hereinafter ‘First Amendment Regulations’)
was published on 06.04.2023 in the Gazette of India Extraordinary (Part- III, Section-4, No. 229);
Whereas certain provisions of the First Amendment Regulations and certain provisions of GNA Regulations
were made effective from 05.04.2023 as per Notification dated 06.04.2023, published in the Gazette of India
Extraordinary (Part-III, Section-4, No. 230);
And now, therefore, it is notified that:
(a) The remaining Regulations of GNA Regulations including First Amendment Regulations shall come
into effect from 01.10.2023;
(b) Scheduling and Despatch of electricity with effect from 01.10.2023 shall be based on quantum of
GNA, GNA , T-GNA and T-GNA of each of the Designated ISTS Customers (DICs) and other
RE RE
users of the grid in accordance with the provisions of the Central Electricity Regulatory Commission
(Indian Electricity Grid Code) Regulations, 2023.
HARPREET SINGH PRUTHI, Secy.
[ADVT.-III/4/Exty./359/2023-24]
Uploaded by Dte. of Printing at Government of India Press, Ring Road, Mayapuri, New Delhi-110064
and Published by the Controller of Publications, Delhi-110054.