Executive Summary & Key Takeaways

1.1 What it means

  • The gazette notification pertains to the Central Electricity Authority (Measures relating to Safety and Electric Supply) Regulations, 2023. These regulations aim to ensure safety in the generation, transmission, distribution, trading, supply, and use of electricity.
  • The regulations define the roles, responsibilities, and safety measures to be followed by various stakeholders in the electricity sector, including generating companies, transmission companies, distribution companies, suppliers, consumers, and electrical contractors.

1.2 Key Changes

  • The Central Electricity Authority (Measures relating to Safety and Electric Supply) Regulations, 2010 are superseded by this new regulation, except for actions already taken or omitted before the new regulations came into effect.
  • The regulations define various terms related to electrical safety and supply, providing clarity on their interpretation and application.
  • It specifies qualifications, training, and certification requirements for personnel involved in operating and maintaining electrical installations, including Electrical Safety Officers, Chartered Electrical Safety Engineers, and personnel at Load Despatch Centres.
  • The regulations outline safety measures for various aspects of electricity supply and usage, including construction, installation, protection, operation, and maintenance of electric supply lines and apparatus.
  • It includes specific safety requirements for different types of electrical installations, such as generating stations, transmission and distribution systems, multi-story buildings, mines, oil-fields, renewable energy generating stations, and electric vehicle charging stations.
  • The gazette specifies the requirements for periodic inspection and testing of electrical installations, including self-certification by owners, suppliers, or consumers for installations below a certain voltage threshold.
  • The gazette specifies the minimum safety clearances for overhead lines from buildings and other structures.
  • The gazette notification includes provisions for handling electric supply lines and apparatus, precautions against leakage, fire safety, and protection against electromagnetic interference.

Impact Analysis

Stakeholders

  • Power and Telecommunication Coordination Committee: Responsible for ensuring safety and coordination between power and telecommunication lines.

Suggested Action Items

  • Training Institutes: Develop training programs that meet the requirements of the regulations and obtain recognition from the Central Electricity Authority.

Key Entities Referenced

Electricity Act, 2003: The primary legislation governing the electricity sector in India. The gazette notification is issued under the powers conferred by this Act. Central Electricity Authority (CEA): The statutory body responsible for formulating technical standards and safety regulations for the electricity sector in India. Appropriate Government: The Central Government or the State Government, depending on the subject matter, as defined in the Electricity Act, 2003. Electrical Inspector: An officer appointed by the Appropriate Government to inspect electrical installations and enforce safety regulations. Mines Act, 1952: Legislation governing the safety and welfare of workers in mines. The gazette notification includes specific safety requirements for electrical installations in mines. Oil Mines Regulations, 2017: Regulations governing safety in oil mines. The gazette notification includes specific safety requirements for electrical installations in oil-fields. Power and Telecommunication Coordination Committee (PTCC): A committee responsible for ensuring safety and coordination between power and telecommunication lines. National Electrical Code: A set of guidelines for electrical installations in India. National Building Code: A set of guidelines for building construction in India, including electrical safety aspects. Indian Standards: Standards developed by the Bureau of Indian Standards (BIS) for various products and services, including electrical equipment and installations. International Electrotechnical Commission (IEC) Standards: International standards for electrical, electronics and related technologies. Institute of Electrical and Electronic Engineers (IEEE) Standards: Standards developed by the IEEE for electrical and electronic engineering. European Norms (EN) Standards: European standards for various products and services, including electrical equipment and installations.
Official Source Record View Original Source →
See Full Document Text
रजिस्ट्री स.ं डी.एल.- 33004/99 REGD. No. D. L.-33004/99 सी.जी.-डी.एxलxx.-GअID.-H1x5x0x 62023-246561 CG-DLxx-xEG-I1D5E0x6x2x0 23-246561 असाधारण EXTRAORDINARY भाग III—खण् ड 4 PART III—Section 4 प्राजधकार स ेप्रकाजित PUBLISHED BY AUTHORITY स.ं 377] नई दिल्ली, सोमिार, िनू 12, 2023/ज्य ष्े ि 22, 1945 No. 377] NEW DELHI, MONDAY, JUNE 12 2023/JYAISHTHA 22, 1945 केंद्रीय जिद्यतु प्राजधकरण अजधसचू ना नई दिल्ली, 8 िून, 2023 स.ं सीईए-पीएस-16/1/2021.—सीईआई जडिीज़न- जिद्युत (जपछले प्रकािन के जलए काययजिजध) जनयम 2005 के जनयम 3 के उपजनयम (2) के साथ पठित जिद्युत अजधजनयम, 2003 (2003 का 36) की धारा 177 की उपधारा (3) द्वारा यथापेजित केंद्रीय जिद्युत प्राजधकरण (जिद्युत आपूर्तय और सुरिा से संबंजधत उपाय) जिजनयम, 2022 का प्रारूप छह िैजनक समाचार पत्रों में प्रकाजित दकया गया था जिसमें उन व्यजियों से, जिनको इससे प्रभाजित होने की सम्भािना है, उस तारीख से, जिस दिन उि प्रारूप जिजनयम अन्तर्ियष्ट करने िाले समाचार पत्र की प्रजतयााँ िनता को उपलब्ध कराई गयीं थी, 45 दिनों की अिजध के अिसान से पूिय, आिेप और सुझाि मांगे गए थे; और िबदक, केंद्रीय जिद्युत प्राजधकरण की िेबसाइट पर साियिजनक सूचनाओं और उि प्रारूप जिजनयमों िाले उि समाचार पत्रों की प्रजतयां 14 िून, 2022 को िनता को उपलब्ध करा िी गयीं थी; और िबदक, उि प्रारूप से सम्बजन्धत िनता से प्राप्त आिेपों और सुझािों पर केंद्रीय जिद्युत प्राजधकरण द्वारा जिचार दकया गया था; अत: अब जिद्युत अजधजनयम, 2003 की धारा 53 के साथ पठित धारा 177 की उप-धारा (2) के खंड (ख) द्वारा प्रित्त िजियों का प्रयोग करते हुए और केंद्रीय जिद्युत प्राजधकरण (जिद्युत आपूर्तय और सुरिा से संबंजधत उपाय) जिजनयम, 2010 का उन बातों के जसिाय अजधक्ांत करते हुए जिन्ह ेंऐसे अजधजनयम से पूिय दकया गया ह ैया करने का लोप दकया, केंद्रीय जिद्युत प्राजधकरण जनम्नजलजखत जिजनयम बनाता ह,ै अथायत:- 3701 GI/2023 (1)2 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] अध्याय-1 प्रारजम्भक 1. सजं िप्त नाम और प्रारंभ- (1) इन जिजनयमों का सजं िप्त नाम केंद्रीय जिद्युत प्राजधकरण (जिद्युत आपूर्त य और सुरिा से संबंजधत उपाय) जिजनयम, 2023 है। (2) ये जिजनयम रािपत्र में प्रकािन की तारीख से प्रिृत होंगे। (3) ित्रे और जिस्ट्तार का लाग ू होना- ये जिजनयम जिद्युत संयंत्र और जिद्युत लाइन सजहत जिद्युत संस्ट्थापन और जिद्युत के उत्पािन या पारेषण या जितरण या व्यापार या आपूर्तय या उपयोग म ेंकाययरत व्यजि पर लागू होंगे। 2. पठरभाषाएं- (1) इन जिजनयमों में, िब तक दक संिभय में अन्यथा अपेजित न हो, (क) “अजधजनयम” से जिद्युत अजधजनयम, 2003 (2003 का 36) अजभप्रेत ह;ै (ख) “सुगम” से अजभप्रेत दकसी जििेष प्रयास अथिा उपसाधन के जबना ही उपकरण का िारीठरक पहुचं के भीतर होना; (ग) "एठरयल बंच्ड केबल" से अजभप्रेत ह ै पॉलीईथीलीन या क्ॉस ललंक्ड पॉलीईथीलीन इंसुलेटेड केबल जिनमें एल्यूमीजनयम कंडक्टर के तीन या चार कोर केंद्रीय अनािृत या इन्सुलेटेड एल्यूमीजनयम जमश्र धातु या स्ट्टील मेसेंिर तार पर बांधे गए ह;ैं (घ) “उपकरण” से अजभप्रेत है जिद्युत उपकरण और इसमें ऐसे सभी मिीनें, दिटटंग्स , सहायक उपकरण तथा उपकरण सजम्मजलत ह,ैं जिनमें सुचालकों का उपयोग दकया िाता है; (ड़) “अनािृत” से अजभप्रेत ह ैिो जिद्युत-रोधी पिाथय से आिृत न हो; (च) "बांलडंग कंडक्टर" से अजभप्रेत ह ैअंतसंयोजित कंडक्टर िो मुख्य अर्थंग के साथ इदिपोटेंजियल बॉलन्डंग के उद्देश्य से है; (छ) “केबल” से अजभप्रेत ह ैऐसा एकल सुचालक (िोस या तंतुरूपी) अथिा िो या िो से अजधक ऐसे सचु ालक जिन्ह ेंअलग-अलग जिद्युतरोधी पिाथय से आिृत दकया गया हो और साथ-साथ जबछाया गया हो; (ि) “चाटयडय जिद्युत सुरिा इंिीजनयर” से अजभप्रेत ऐसे व्यजि से ह ैजिसको समुजचत सरकार द्वारा जिजनयम 6 में संिर्भयत दकया गया ह;ै (झ) “पठरपथ (सर्कयट)” से अजभप्रेत ह ै जिद्युत प्रिाह के जलए सुचालक अथिा सुचालकों का एक व्यिजस्ट्थत क्म िो एक जिद्युत व्यिस्ट्था या इस व्यिस्ट्था का एक अंग जनर्मयत करते ह ैंऔर मूल में संरजित रहते हैं; (ञ) “पठरपथ भंिक (सर्कयट ब्रेकर)” से ऐसा यांजत्रक जस्ट्िलचंग उपकरण से अजभप्रेत ह,ै िो सामान्य सर्कयट पठरजस्ट्थजतयों के अधीन धाराओं का संयोिन कर सकता है, ले िा सकता ह ै या ब्रेक कर सकता है, और जनर्ियष्ट असामान्य सर्कयट जस्ट्थजत के अधीन एक जनर्ियष्ट अिजध और ब्रेककंग करंट को भी ले िाने में सिम ह;ै (ट) “सह–केंद्रीय केबल (कॉंसेजन्रक केबल)” से ऐसी केबल अजभप्रेत है, जिसमें केंद्र में एक इन्स्ट् यूलेटेड सुचालक (जिद्युतरोधी पिाथय से आिृत सुचालक) हो और लगभग उसके ऊपर या आसपास एक या एक से अजधक इन्स्ट् यूलेटेड सुचालक जलपटे हों; (ि) “सुचालक (कन् डक् टर)” से अजभप्रेत दकसी भी तार, केबल, छड़, नजलका, पटरी अथिा प् लेट से ह,ै जिसे जिद्युत प्रिाह के जलए उपयोग दकया िाता ह;ै (ड) “प्रिाह नजलका (कंडयूट)” से अजभप्रेत ऐसी नजलका है िो दकसी किोर अथिा लचीली धातु या धातु के अलािा दकसी अन्य पिाथय को मिीनी रूप से नजलका में ढाल कर बनाई गई है, और जिसके अंिर से केबल या कई केबलें गुिारी िा सकती ह ैंतादक इन्ह ेंसंभाजित यांजत्रक सुरिा प्रिान करने के जलए सुरजित दकया िा सके; (ढ़) “कनेक्टेड लोड” से अजभप्रेत उपभोिा के जिद्युत प्रजतष्ठापन में लगे उन उपकरणों की रेटटंग के दकलोिाट या दकलोिोल्ट- एंजपयर में योग से ह,ै जिन्हें स्रोत से एक साथ िोड़ा िा सके; (ण) ‘’सम्पकय जिभि’’ से अजभप्रेत जिद्युत धाराओं की अनुपजस्ट्थजत में िो जिजभन्न िस्ट्तुओं के िंक्िन के आरपार जिद्युत जिभिांतर से ह;ै (त) “जिद्युतरोधी पिाथय से आिृत” से अजभप्रेत है दक ऐसी गुणित्ता तथा मोटाई िाले जिद्युतरोधी पिाथय से पयायप्त रूप से आिृत करना तादक खतरे से बचा िा सके; (थ) “कट आउट” से अजभप्रेत ऐसे उपकरण से ह ै िो जिद्युत धारा (करंट) के पूिय जनधायठरत मान से िृजि होने पर सुचालक से प्रिाजहत होने िाले जिद्युत प्रिाह को स्ट्ि त: रोक िेता ह,ै और इसमें फ्यूि िाले कट आउट भी सजम्मजलत होंगे;[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 3 (ि) “खतरा” से अजभप्रेत जबिली के झटके से स्ट्िास्ट््य अथिा िीिन या िरीर के दकसी अंग को िोजखम या िलना अथिा िनरेिन, पारेषण, रांसिॉरमेिन, कनिियन, जितरण या जबिली के उपयोग से आग लगने या जिस्ट्िोट होने पर व्यजियों के घायल होने या संपजत्त को नुकसान पहुचं ने का िोजखम है; (ध) “डैड (अनािेजित)” से अजभप्रते भू-जिभि पर या इसके आसपास और दकसी भी जबिली की दकसी भी आिेजित प्रणाली स े िुड़ा न होने से ह ै और इसे केिल जिद्युत िहन करने िाले भागों के संिभय में उपयोग दकया िा सकता है, िब इनमें करंट न िौड़ रहा हो; (न) "अजभजहत व्यजि" से अजभप्रेत उस व्यजि से ह ै जिसका नाम आपूर्तयकताय या उपभोिा या खिान सजहत सभी जिद्यतु प्रजतष्ठापनों के स्ट्िामी, एिेंट या प्रबंधक, या तेल-िेत्र में काम करने िाली दकसी कंपनी के एिेंट या तले -िेत्र में जिल दकए गए कुएं के स्ट्िामी या िेकेिार द्वारा जिजनयम 3 के अधीन जनर्ियष्ट उप-जिजनयम (2) के तहत बनाए गए ठरकॉडय में रखा गया ह;ै (प) "अर्थंग" से अजभप्रेत दकसी संस्ट्थापन के अनािृत संचाजलत और बाहरी जहस्ट्सों का उस संस्ट्थापन के मुख्य अर्थंग टर्मयनल से संयोिन या रांसिामयर या िेनरेटर या उपकरण के न्यूरल अथय या संस्ट्थापन के अथय बांडेड बार के साथ संयोिन से ह;ै (ि) “अर्थंग व्यिस्ट्था या अर्थंग प्रणाली” से अजभप्रेत प्रणाली, संस्ट्थापन, उपकरण की अर्थंग में सजम्मजलत समस्ट्त जिद्युतीय संयोिन या उपकरण से ह;ै (ब) ‘’जिद्युत िाहन" से अजभप्रेत दकसी ठरचािेबल बैटरी अथिा दकसी अन्य पोटेबल ऊिाय भंडारण उपकरणों या अन्य स्ट्ि- उत्पािक जिद्युत स्रोत से करेन् ट लेते हुए दकसी जिद्युत मोटर द्वारा आंजिक रूप से या पूणयत: प्रचाजलत िाहन ह;ै (भ) "जिद्युत िाहन आपूर्तय उपकरण " से अजभप्रेत जिद्युत िाहन चार्िंग इंफ्रास्ट्रक्चर में उस तत्ि से ह ै िो जिद्युत िाहनों की बैटरी को ठरचािय करने के जलए जिद्युत ऊिाय की आपूर्तय करता ह;ै (म) “घेरबंि सबस्ट्टेिन” से अजभप्रेत दकसी भी ऐसे पठरसर या उसके घेरे अथिा भाग से है, जिसमें छ: सौ पचास िोल्ट (जस्ट्िचजगयर अथिा उपकरणों को मात्र चलाने के जलए रांसिामय करने या कनिटय करने से जभन्न) से ज्यािा के िोल्टेि से अथिा जिद्युत के पारेषण या कनिियन के जलए उपकरणों की स्ट्थापना के बाि एक व्यजि प्रिेि कर सके। ये उपकरण जस्ट्िलचंग, जनयंत्रण अथिा अन्यथा जबिली के रेग्य ूलेिन िाले कल-पुिों सजहत अथिा रजहत भी हो सकते हैं; (य) “घेरबंि जस्ट्िलचंग स्ट् टेिन” से अजभप्रेत दकसी भी ऐसे पठरसर या उसके घेरे अथिा भाग से ह ैिो इतना बड़ा हो दक इसमें छ: सौ पचास िोल्ट पर या इससे ज्यािा की जबिली की जस्ट्िलचंग, जनयंत्रण अथिा अन्यथा रेग्य ूलेिन के जलए यंत्रों, जिनमें उपकरण सजम्मजलत ह,ै को स्ट्थाजपत करने के बाि एक व्यजि प्रिेि कर सके, ककंतु इन यंत्रों में जिद्युत पारेषण या कन्िियन के यंत्र (केिल जस्ट्िचजगयर अथिा उपकरणों को चलाने के जलए रांसिामय अथिा कनिियन के प्रयोिन को छोड़कर) सजम्मजलत नहीं है; (यक) "इदिपोटेंजियल बॉलन्डंग" से अजभप्रेत एक ऐसा जिद्युत संयोिन िो जिजभन्न अनािृत कंडजक्टि भागों और बाहरी कंडजक्टि भागों को पयायप्त रूप से एक समान जिभि पर कायम रखता है; (यख) "अनािृत कंडजक्टि भाग" से एक ऐसा कंडजक्टि भाग अजभप्रेत ह ैजिसे आसानी से छुआ िा सकता ह ैऔर िो सामान्य रूप से आिेजित नहीं ह,ै लेदकन िो िोष की जस्ट्थजत में आिेजित हो सकता ह;ै (यग) "बाह्य कंडजक्टि भाग" से एक ऐसा कंडजक्टि भाग अजभप्रेत ह ै िो जिद्युत स्ट्थापना का जहस्ट्सा नहीं है और एक जिद्युत िमता, सामान्यत: एक स्ट्थानीय अर्थंग के जिद्युत जिभि की उत्पजत्त के जलए उत्तरिायी ह;ै (यघ) “ज्ि लनरोधी पठरसर” से ऐसा पठरसर अजभप्रेत ह ैजिसमें उसके भाग में रखे िाने िाले जिस्ट् िोटक िो िातािरण को िला सकते ह ैं और िो दकसी संजमश्र जिस्ट् िोटक के आंतठरक जिस्ट्ि ोट के िौरान िबाि के साथ बने रहते ह ैं तथा िो पठरसर के आस- पास के िातािरण में जिस्ट्ि ोट के िैलाि को रोकता ह;ै (यङ) “लचीली (िलेजक्िबल) केबल” से अजभप्रेत ऐसी केबल से ह ै जिसमें एक या एक से अजधक कोर ह,ैं प्रत्येक कोर तारों के समूह से बना होता ह ैतथा तारों का व्यास और जिद्युतरोधी पिाथय के भौजतक गुण इसे लचीला बनाते हैं; (यच) “सुरजित” से अजभप्रेत ह ैआिृत, पठररजित, बाड़ लगाकर अथिा अन्यथा, समुजचत खोल, अिरोधक, पटठरयां या धातु की िाली के िठरए सुरजित करना तादक दकसी भी व्यजि या िस्ट्तु के इसके संपकय में आकर खतरे में पड़ने की संभािनाओं को िरू दकया िा सके; (यछ) “हडैं हल्े ड पोटेबल उपकरण” से अजभप्रेत ऐसे जडिाइन दकए गए उपकरणों से है जिन्ह ेंजिद्युत आपूर्तय से कनेक्ट रहते समय हाथ से पकड़ कर इधर-उधर ले िाया िा सकता हो;4 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] (यि) “हाई िोल्टेि डायरेक्ट करंट” से अजभप्रेत जिद्युत पारेषण के जलए उपयोग होने िाले एक सौ दकलोिोल्ट एिं अजधक का डायरेक्ट करंट (डीसी) है; (यझ) “खान जनरीिक” से अजभप्रेत खान अजधजनयम 1952 (1952 का 35) के अधीन जनयुि जनरीिक से है; (यञ) “प्रजतष् िापन” स े अजभप्रेत जिद्युत उत्पािन, पठरगमन, पारेषण, पठरितयन, जितरण, अथिा उपयोग के प्रयोिन से उपयोग होने िाली संयुि जिद्युत इकाई है; (यट) "संस्ट्थापन प्रबंधक" से िही अजभप्रेत ह ैिो तेल खान जिजनयम, 2017 में पठरभाजषत ह;ै (यि) “सुरजित आंतठरक पठरपथ” से अजभप्रेत ऐसे पठरपथ से ह ैिो दक सामान् य प्रचालन और िोष की उन जस्ट्थजतयों में िैसा दक सुसंगत मानकों में जिजनर्ियष् ट ह,ै दकसी लचंगारी, ज् िलन या दकसी तापीय प्रभाि के प्रकट होने के पर दकसी गैसीय जिस्ट्ि ोटक िातािरण में प्रज्ि लन करने के योग् य नहीं ह;ै (यड) “आंतठरक रूप से सुरजित यंत्र” से ऐसे जिद्युत यंत्रों से अजभप्रेत ह ैजिनमें सभी पठरपथ आंतठरक रूप से सुरजित पठरपथ हैं; (यढ़) “तजड़त रोधी चालक” से अजभप्रेत ऐसे उपकरण से ह ै िो इसके टर्मयनल पर प्रिाजहत होने िाली अत्यजधक उच्च िोल्टेि को भूजम में समा िेने की िमता रखता हो और यदि जिद्युत धारा मौिूि ह ैतो उसे रोकने में सिम हो और इस संपूणय दक्या के बाि अपने कायय संचालन की मूल अिस्ट्था प्राप्त करने में सिम हो; (यण) “संयुि जस्ट्िच” से अजभप्रेत एक साथ काम करने के जलए यांजत्रक रूप से परस्ट्पर िुड़े सभी पोल के साथ एक जस्ट्िच से ह;ै (यत) “आिेजित” से अजभप्रेत ह ैजिसमें से जिद्युत प्रिाह हो रहा हो; (यथ) "लोड जडस्ट्पैचर" से अजभप्रेत लोड जडस्ट्पैच केन्द्र के संचालन में काययरत कर्मययों से है; (यि) “धातु आिरण” से अजभप्रेत एक या एक से अजधक सुचालको के चारों ओर मिबूत धातु के यांजत्रक आिरण से ह;ैं (यध) “खान” िब्ि का िही अथय होंगे िो खान अजधजनयम 1952, (1952 का 35) की धारा 2 के खंड (ञ) उप-धारा (1) म ेंयथा पठरभाजषत ह;ै (यन) “न्यूरल सुचालक” से अजभप्रेत मल्टीिायर प्रणाली के उस सुचालक से ह ैजिसका िोल्टेि आमतौर पर उस प्रणाली के अन्य सुचालकों के िोल्टेि के बीच मध्यिती रहता ह ै और साथ ही जिसमें एक लसंगल िेि प्रणाली का ठरटनय िायर भी सजम्मजलत होगा; (यप) “अजधसूजचत िोल्टेि” से अजभप्रेत समुजचत सरकार द्वारा, प्राजधकरण की िानकारी में, स्ट्ि:प्रमाणन के उद्देश्य से अजधसूजचत ऐसी िोल्टेि से ह ैजिस िोल्टेि तक के जिद्युत प्रजतष्ठापनों को जिजनयम 32 और जिजनयम 45 के अंतगयत स्ट्ि:प्रमाजणत दकया िा सकता ह;ै (यि) “कब्िाधारक” से अजभप्रेत उस पठरसर के स्ट्िामी या उस पठरसर में रहने िाले व्यजि से ह ै िहां जबिली के उपयोग का प्रस्ट्ताि ह ैया जबिली का उपयोग हो रहा है; (यब) “ओपन स्ट्पार्कंग” से अजभप्रेत उपकरण के बाहर की गैस को आग पकड़ने से बचाने के जलए पयायप्त प्रािधान न दकए िाने की ििह से ऐसी स्ट्पार्कंग से ज्िलनिील गैस प्रज्ि जलत होने से ह;ै (यभ) ‘’खान के स्ट्िामी, एिेंट या प्रबंधक” का िही अथय ह,ैं िो खान अजधजनयम, 1952 (1952 का 35) में ह;ै (यम) “पोटेबल उपकरण” से अजभप्रेत उस उपकरण से ह ैजिसे इस प्रकार जडिाइन दकया गया ह ैतादक कायय के िौरान इधर-उधर ले िाना आसान हो; (यय) “पोटेबल हैंड लैंप” से अजभप्रेत िहन योग्य लाइट दिटटंग से ह,ै जिसमें उपयुि हत् था, सुरिा आिरण तथा प् लग से िुड़ी फ्लेजक्सबल कॉडय लगी हो; (ययक) "सुरिात्मक कंडक्टर" से अजभप्रेत जबिली के झटके से सुरिा के जलए प्रयुि एक ऐसा कंडक्टर ह ै जिसे एक साथ संयोजित दकया िाता ह ै और जिसमें अनािृत कंडजक्टि भाग, बाहरी कंडजक्टि भाग, मुख्य अर्थंग टर्मयनल एिं स्रोत का अर्थंग लबंि ुया एक कृजत्रम न्यूरल िाजमल दकए िा सकते हैं; (ययख) “स्ट्ि:प्रमाणन” से अजभप्रेत आपूर्तयकताय या स्ट्िामी या उपभोिा द्वारा जिजनयम 32 और जिजनयम 45 के अधीन यथाअपेजित जिजहत प्रारूप में िारी दकया गया प्रमाण-पत्र से ह;ै[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 5 (ययग) " सॉकेट-आउटलेट" से दकसी ऐसे स्ट् थान पर स्ट् थाजपत दकए िाने िाला जिद्युत उपकरण अजभप्रेत ह ै िहां जबछाई गई िायटरंग समाप्त हो िाती है और यह प्लग के जपनों की सहायता से अलग दकए िा सकने योग्य कनेक्िन प्रिान करता है; और इसमें िो या िो से अजधक कान् टैक् ्स होते ह ैंतथा लचीली कॉडय से िुड़ा हुआ एक कॉडय एक्सटेंिन सॉकेट भी िाजमल होता है, िो स्ट्थायी रूप से इन् स्ट् टालेिन िायटरंग से िुड़ा होता है; (ययघ) “अंतराल” से अजभप्रेत ओिरहैड सुचालक के जनकटस्ट्थ िो अिलंब लबंिओंु के बीच की समानान्तर िरू ी से ह;ै (ययङ) "मानक" से अजभप्रेत ह ै भारतीय मानक, और भारतीय मानक के अभाि में अंतरायष्ट्रीय इलेक्रोटेदिकल कमीिन मानक, इंस्ट्टीट्यूट ऑि इलेजक्रकल एंड इलेक्रॉजनक इंिीजनयसय मानक, यूरोजपयन नॉम्सय मानक, िब तक दक अन्यथा न कहा गया हो, उनकी उपजस्ट्थजत के क्म में; (ययच) “स्ट्रीट बॉक्स” से अजभप्रेत िमीन के ऊपर या नीचे अिजस्ट्थत ऐसे बंि ढॉंचे हैं, जिसमें जबिली के जिजनयंत्रण के जलए रांसिॉर्मंग, जस्ट् िलचंग, जनयंत्रण के उपकरण लगे हों; (ययछ) “सप्लायर” से अजभप्रेत दकसी भी ऐसी जबिली उत्पािक कंपनी या लाइसेंसधारक है, जिसकी प्रणाली से अन्य उत्पािक कंपनी अथिा लाइसेंसधारक की प्रणाली को या उपभोिा को जबिली प्रिाजहत की िाती है; (ययि) "आपूर्तय लीड" से जिद्युत िाहन और दकसी सॉकेट-आउटलेट या चार्िंग पॉइंट के बीच कनेक्िन स्ट्थाजपत करने के जलए उपयोग दकए िाने िाले एक उपकरण से अजभप्रेत है; (ययझ) “जस्ट्िच” से अजभप्रेत सर्कयट खोलने और बंि करने या बिलने के जलए मानि संचाजलत उपकरण है; (ययञ) “जस्ट्िच बोडय” से अजभप्रेत ऐसी संरचना है, जिसमें जिद्युत पठरपथ, जिद्युत कनेक्िन के जनयंत्रण के जस्ट्िचजगयर और अिलंब फ्रेम लगा हो; (ययट) “जस्ट्िचजगयर” से अजभप्रेत पठरपथों के संचालन, रेगुलेिन और जनयंत्रण के जलए उपयोग होने बाले जस्ट्िच, सर्कयट ब्रेकर, कट आउट और अन्य उपकरण ह;ै (ययि) “प्रणाली” से अजभप्रेत जिद्युत प्रणाली है, जिसमें सभी सुचालक और उपकरण जिद्युत आपूर्तय के एक साझे स्रोत से िुड़े होते ह;ैं (ययड) "िरू संचार लाइन" से अजभप्रेत िरू संचार में उपयोग हते ु िांजछत कोई अजभकजल्पत उपस्ट्कर, संरचना और केबल से ह;ै (ययढ़) “रांसपोटेबल उपकरण” से अजभप्रेत ऐसा उपकरण ह ै जिसे दकसी िगह पर दिक्स करके चलाया िाता है; ककंतु यह इस प्रकार जडिाइन होता ह ैदक इसे आसानी से एक िगह से िसू री िगह ले िाया िा सकता है; (ययण) "िाट" जिद्युत खपत की एक इकाई है; और (ययत) “मे.िा.’’ से अजभप्रेत मेगािाट से ह ैऔर यह 106 िाट के बराबर होता है। (2) उन िब्िों और पिों के, िो इसमें प्रयुि हैं और इन जिजनयमों में पठरभाजषत नहीं ह,ैं ककंतु अजधजनयम में पठरभाजषत है, क्मिः िही अथय होंगे िो उस अजधजनयम में ह।ै अध्याय-2 अजभजहत व्यजि, चाटयडय जिद्यतु सरु िा इंिीजनयर, प्रजििण और प्रमाणन 3. जिद्यतु -लाइनों और उपकरणों के प्रचालन और उन पर काय य करन े के जलए अजभजहत व्यजि- (1) आपर्ू तयकताय अथिा उपभोिा, या जिद्युत संस्ट्थापन का स्ट्िामी, खान का स्ट्िामी अथिा अजभकताय अथिा प्रबंधक, या तेल-िेत्र में कायय करने िाली कंपनी का अजभकताय अथिा तेल-िेत्र में खोिे गए कुंए का स्ट्िामी या िेकेिार, जिसने आपूर्तयकताय या उपभोिा, अथिा जिद्युत संस्ट्थापन के स्ट्िामी, खान का स्ट्िामी अथिा अजभकताय अथिा प्रबंधक, या तेल-िेत्र में कायय करने िाली कंपनी के अजभकताय, या तेल-िेत्र में खोिे गए कुंए के स्ट्िामी से जबिली उत्पािन, रांसिॉमेिन, पारेषण, कनिियन, जितरण अथिा उपयोग हते ु सुसंगत कतयव्यों को पूरा करने के जलए करार दकया है, िह जिद्युत लाइनों और उपकरणों के प्रचालन और उन पर कायय करने के जलए व्यजि को अजभजहत करेगा। (2) आपूर्तयकताय या उपभोिा, अथिा खान का स्ट्िामी या अजभकताय या प्रबंधक, अथिा तेल-िेत्र में काम करने िाली कंपनी का अजभकताय अथिा तेल िेत्रों में खोिे गए कुंए का स्ट्िामी या उपजिजनयम (1) में जनर्ियष्ट िेकेिार, कागि या इलेक्रॉजनक रूप में एक रजिस्ट्टर रखेगा, जिसमें अजभजहत व्यजि के नाम और जिस उद्देश्य के जलए उन्ह ें अजभजहत दकया गया ह,ै की प्रजिजष्ट की िाएगी।6 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] (3) उप-जिजनयम (1) के अधीन दकसी भी व्यजि को तब तक अजभजहत नहीं दकया िाएगा, िब तक दक – (i) उसके पास सिमता का प्रमाण-पत्र अथिा यथोजचत सरकार द्वारा िारी इलेजक् रकल िकय परजमट न हो; (ii) उसका नाम, उप-जिजनयम (2) में जनर्ियष्ट रजिस्ट्टर में प्रजिष्ट न कर जलया गया हो। 4. अजभजहत व्यजि के ठरकाडय का जनरीिण- (1) जिजनयम 3 के उप-जिजनयम (2) के अधीन रखे गए ठरकाडय को आिश्यकतानुसार जिद्युत जनरीिक के समि प्रस्ट्तुत दकया िाएगा। (2) जनरीिण पर यदि, जिद्युत जनरीिक यह पाता ह ै दक अजभजहत व्यजि जिजनयम 3 के उप-जिजनयम (3) का अनुपालन नहीं करता ह,ै तो िह ऐसे व्यजि के नाम को ठरकॉडय से हटाने की जसिाठरि करेगा। 5. जिद्यतु सरु िा अजधकारी– (1) जिद्युत उत् पािन कंपजनयों, पारेषण कंपजनयों और जितरण कंपजनयों सजहत जिद्युत के सभी आपूर्तयकताय इन जिनयमों के अधीन जिजनर्ियष् ट सुरिा उपायों का पालन सुजनजश् चत करने के जलए अपने संगिन में, सभी उत्पािन केंद्रों, उपकेंद्रों, पारेषण लाइनों और जितरण प्रणाजलयों एिं आपूर्तय लाइनों के संजनमायण, प्रचालन और रखरखाि के जलए एक जिद्युत सुरिा अजधकारी को पिाजभजहत करेंगे। (2) जिद्युत सुरिा अजधकारी के पास इलेजक्रकल इंिीजनयटरंग में जडग्री के साथ-साथ जिद्युत प्रजतष्ठापनों के संचालन और रखरखाि में कम से कम पांच िषय का अनुभि अथिा इलेजक्रकल इंिीजनयटरंग में जडप्लोमा के साथ-साथ जिद्युत प्रजतष्ठापनों के संचालन और रखरखाि में कम से कम िस साल का अनुभि होना चाजहए: परन्तु यह दक खानों के जलए अजभजहत जिद्युत सुरिा अजधकारी के पास खानों से संबजं धत जिद्युत प्रजतष्ठापनों के संचालन और रखरखाि में कम से कम पांच साल के अनुभि के साथ उप-जिजनयम (2) में उजल्लजखत िैजिक योग्यता हो। (3) कारखाना अजधजनयम, 1948 (1952 का 63) के अधीन पंिीकृत कारखानों सजहत प्रत्येक जिद्यतु प्रजतष्ठापन िहां 250 दकलोिाट से ज्य ािा का लोड कनेक् ट हो और खान अजधजनयम, 1952 (1952 का 35) में यथा पठरभाजषत खानों और तेल िेत्रों, िहां 2000 दकलोिाट से ज्य ािा का लोड कनेक् ट हो, प्रजतष् िापन का स्ट् िामी अथिा कारखानों या खानों का प्रबंधमंडल, यथाजस्ट्थजत, अजधजनयम के अधीन जनधायठरत सुरिा प्रािधानों और उसके अधीन बनाए गए जिजनयमों का अनुपालन सुजनजित करने के जलए उप-जिजनयम (1) के अधीन और उप-जिजनयम (2) में जिजनर्ियष् ट अहतय ा और अनुभि रखने िाले जिद्युत सुरिा अजधकारी को अजभजहत करेगा: परन्तु यह दक जिद्युत सुरिा अजधकारी सुसंगत मानकों के अनुसार जसिाठरि दकए गए आिजधक परीिण करेगा और अजधकतम एक िषय के अंतराल पर ऐसे प्रजतष्ठापन का जनरीिण करेगा और इन जिजनयमों की अनुसूची ।। के यथाजस्ट् थजत, प्रारूप I या प्रारूप II या प्रारूप III या प्रारूप IV में उनका अजभलेख रखेगा; परीिण ठरपोटय और स्ट् िामी द्वारा भली भांजत स्ट् िीकृत सुरिा से संबंजधत जसिाठरिों; बाि में दकए गए उनके अनुपालनों; का एक रजिस्ट्ट र अनुरजित करेगा तथा िब भी आिश् यक होगा, ऐसे अजभलेखों को जिद्युत जनरीिक को उपलब्ध कराएगा। 6. चाटयडय जिद्यतु सुरिा इंिीजनयर- (1) समुजचत सरकार जिद्युत प्रजतष्ठापनों के स्ट्िामी या आपूर्तयकताय या उपभोिा द्वारा जिद्युत प्रजतष्ठापन को इन जिजनयमों के जिजनयम 32 एिं जिजनयम 45 के अंतगयत स्ट्ि:प्रमाजणत करने में सहायता प्रिान करने के जलए, प्राजधकरण द्वारा िारी दििाजनिेिों के अनुसार योग्यता एिं अनभु ि िाले व्यजियों में से चाटयडय जिद्युत सुरिा इंिीजनयर अजधकृत करेगी। (2) िैसे ही दकसी व्यजि को चाटयडय जिद्युत सुरिा इंिीजनयर के रूप में अजधकृत दकया िाएगा, समुजचत सरकार चाटयडय जिद्युत सुरिा इंिीजनयर का नाम, जिद्युत प्रजतष्ठापनों के स्ट्िामी या आपूर्तयकताय या उपभोिा की िानकारी के जलए सरकारी या जिद्युत प्रजतष्ठापनों के जनरीिण से सम्बजन्धत जिभाग के िेबपोटयल पर अपलोड करेगी। 7. उत्पािन केंन्द्र के संचालन और रखरखाि के सुरिा उपाय- (1) दकसी जिद्युत उत्पािन केंद्र के दकसी भाग या समस्ट्त भाग के संचालन या रखरखाि हते ु काययरत या जनयुि दकए गए अजभयंताओं और पययिेिकों के पास दकसी मान्यता प्राप्त संस्ट्थान या जिश्वजिद्यालय से जिद्युत संस्ट्थापन के जलए प्रासंजगक अजभयांजत्रकी में जडग्री या जडप्लोमा होना चाजहए। (2) उत्पािन केंद्र के संचालन और रखरखाि हते ु काययरत या जनयुि दकए गए अजभयंताओं और पययिेिकों को प्राजधकरण द्वारा उप- जिजनयम (4) के अधीन समय-समय पर िारी दकए गए दििाजनिेिों में जनर्ियष्ट प्रजििण को जनयुजि की जतजथ से िो िषय के भीतर सिलतापूियक प्राप्त करना होगा। (3) अजभयंताओं या पययिेिकों की सहायता करने िाले तकनीजियनों के पास उपयुि रेड में प्रमाण पत्र, अजधमानत: केंद्र सरकार या राज्य सरकार द्वारा मान्यता प्राप्त औद्योजगक प्रजििण संस्ट्थान से िो साल के पाठ्यक्म के साथ, होना चाजहए और जनयुजि की जतजथ से िो िषय के भीतर, उप-जिजनयम (4) में जनर्ियष्ट प्रजििण को सिलतापूियक प्राप्त करना होगा:[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 7 परन्तु यह दक इन जिजनयमों की अजधसूचना की जतजथ को, मौिूिा कमयचारी, िो अजभयंताओं या पययिेिकों को तकनीकी सहायता प्रिान कर रह े ह ैं और उनके पास इस जिजनयम में उजल्लजखत अपेजित योग्यता नहीं हैं, उन्ह ें प्राजधकरण द्वारा िारी दििा-जनिेिों के अनुसार रेड जिजिष्ट पाठ्यक्म को पूरा करने के जलए जिद्युत िेत्र कौिल पठरषि से या प्राजधकरण द्वारा मान्यता प्राप्त प्रजििण संस्ट्थान से प्रजििण प्राप्त करना होगा और इन जिजनयमों की अजधसूचना की जतजथ स े िो िषय के भीतर उपयुयि प्रमाण पत्र प्राप्त करना होगा। (4) प्राजधकरण इन जिजनयमों की अजधसूचना के छह महीने के भीतर उत्पािन केंद्र के संचालन और रखरखाि हते ु जनयुि कार्मयकों के प्रजििण के जलए दििाजनिेि िारी करेगा: परन्तु यह दक प्रजििण पाठ्यक्म की अिजध और जिषय-सूची दििाजनिेिों में जनर्िष्टय जनयमों के अनुरूप होगी। (5) प्रत्येक उत्पािन केंद्र का स्ट्िामी उत्पािन केंद्र के संचालन और रखरखाि हते ु काययरत या जनयुि कर्मययों के जलए दििा-जनिेिों के अनुसार अपने स्ट्ियं के संस्ट्थान या प्राजधकरण या राज्य सरकार द्वारा मान्यता प्राप्त दकसी अन्य संस्ट्थान से प्रजििण की व्यिस्ट्था करेगा और प्रजििण संस्ट्थान द्वारा िारी दकए गए इन कर्मययों के मूल्यांकन के ठरकॉडय को, दििाजनिेिों में जनधाठय रत प्रारूप में रखेगा और इस तरह के ठरकॉडय जिद्युत जनरीिक को, िब भी आिश्यक हो, उपलब्ध कराया िाएगा। (6) इन जिजनयमों के अधीन प्रजििण संस्ट्थान की मान्यता का प्रमाण पत्र, संस्ट्थान द्वारा अपनी िेबसाइट के होम पेि पर प्रिर्ियत दकया िाएगा। (7) उप-जिजनयम (4) में जनजहत दकसी बात के होते हुए भी, अपने कमयचाठरयों को अपने प्रजििण सस्ट्ं थान से प्रजििण िेने के उद्देश्य से 100 मेगािाट से कम िमता िाले उत्पािन केंद्र के स्ट्िामी द्वारा प्रजििण पाठ्यक्म को प्राजधकरण को सूजचत करते हुए अनुकूजलत दकया िा सकता ह।ै 8. पारेषण, जितरण प्रणाजलयों के सचं ालन और रखरखाि के सबं धं म ें सरु िा उपाय- (1) पारेषण और जितरण प्रणाजलयों के संचालन और रखरखाि के कायय में लगे या जनयुि दकए गए अजभयंताओं और पययिेिकों के पास दकसी मान्यता प्राप्त संस्ट्थान अथिा जिश्वजिद्यालय से इंिीजनयटरंग के उजचत रेड में जडग्री या जडप्लोमा होना चाजहए। (2) पारेषण और जितरण प्रणाजलयों के संचालन या रखरखाि के कायय में लगे या जनयुि दकए गए अजभयंताओं और पययिेिकों को उप-जिजनयम (4) के अनुसार दििाजनिेिों में जनर्ियष्ट प्रजििण को जनयुजि की जतजथ से िो िषय के भीतर ही सिलतापूियक प्राप्त करना होगा। (3) अजभयंताओं या पययिेिकों की सहायता करने िाले तकनीजियनों के पास उपयुि रेड में प्रमाण पत्र, अजधमानत: केंद्र सरकार या राज्य सरकार द्वारा मान्यता प्राप्त औद्योजगक प्रजििण संस्ट्थान से िो िषीय पाठ्यक्म के साथ, होना चाजहए और उप- जिजनयम (4) के अनुसार दििाजनिेिों में जनर्ियष्ट प्रजििण को जनयुजि की जतजथ से िो िषय के भीतर सिलतापूियक प्राप्त करना होगा: परन्तु यह दक इन जिजनयमों की अजधसूचना की जतजथ को, मौिूिा कमयचारी, िो अजभयंताओं या पययिेिकों को तकनीकी सहायता प्रिान कर रह े ह ैंऔर उनके पास इस जिजनयम म ेंउजल्लजखत अपेजित योग्यता नहीं हैं, उन्ह ेंप्राजधकरण द्वारा िारी दििा-जनिेिों के अनुसार रेड जिजिष्ट पाठ्यक्म को पूरा करने के जलए जिद्युत िेत्र कौिल पठरषि से या प्राजधकरण द्वारा मान्यता प्राप्त प्रजििण संस्ट्थान से प्रजििण प्राप्त करना होगा और इन जिजनयमों की अजधसूचना की जतजथ से िो िषय के भीतर उपयुयि प्रमाण पत्र प्राप्त करना होगा। (4) प्राजधकरण इन जिजनयमों की अजधसूचना के छह महीने के भीतर पारेषण और जितरण प्रणाजलयों के संचालन एिं रखरखाि हते ु जनयुि कार्मयकों के प्रजििण के जलए दििाजनिेि िारी करेगा: परन्तु यह दक प्रजििण पाठ्यक्म की अिजध और जिषय-सूची दििाजनिेिों में जनर्ियष्ट जनयमों के अनुरूप होगी। (5) प्रत्येक पारेषण एिं जितरण प्रणाली का स्ट्िामी, पारेषण एिं जितरण प्रणाली के संचालन और रखरखाि हते ु काययरत या जनयुि कर्मययों के जलए दििा-जनिेिों के अनुसार अपने स्ट्ियं के संस्ट्थान या प्राजधकरण या राज्य सरकार द्वारा मान्यता प्राप्त दकसी अन्य संस्ट्थान से प्रजििण की व्यिस्ट्था करेगा और प्रजििण संस्ट्थान द्वारा िारी दकए गए इन कर्मययों के मूल्यांकन के ठरकॉडय को दििाजनिेिों में जनधायठरत प्रारूप में रखेगा और इस तरह के ठरकॉडय जिद्युत जनरीिक को, िब भी आिश्यक हो, उपलब्ध कराया िाएगा। 9. भार प्रषे ण केन्द्रों म ेंसचं ालन एि ंरखरखाि के काय यम ेंलग ेकार्मकय ों का प्रजििण एि ंप्रमाणन- (1) जनयंत्रण कि में संचालन एिं रखरखाि के कायय में लगे कार्मयकों के पास मान्यता प्राप्त संस्ट्थान या जिश्वजिद्यालय से जिद्युत अजभयांजत्रकी या अजभयांजत्रकी के संबंजधत रेड में जडग्री या जडप्लोमा होना चाजहए।8 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] (2) प्राजधकरण इन जिजनयमों की अजधसूचना के छह महीने के भीतर जनयंत्रण कि में संचालन और रखरखाि के कायय में लगे कार्मयकों के प्रजििण और प्रमाणन के जलए दििाजनिेि िारी करेगा; परन्तु यह दक प्रमाणन एिेंसी की भूजमकाएं और जिम्मेिाठरयां, आधारभूत और उन्नत प्रमाणीकरण तथा प्रजििण पाठ्यक्म की अिजध और जिषय-सूची दििा-जनिेिों के अनुसार होगी। (3) प्रमाणन एिेंसी प्राजधकरण द्वारा मान्यता प्राप्त एक प्रजििण संस्ट्थान होगी: परन्तु यह दक भार प्रेषण केन्द्र इस जिजनयम के उप-जिजनयम (2) के अधीन िारी दििा-जनिेिों के अनुसार प्राजधकरण द्वारा मान्यता प्राप्त प्रमाणन एिेंसी से लोड जडस्ट्पैचर के प्रजििण और प्रमाणीकरण की व्यिस्ट्था उनकी जनयुजि के छ: महीने के भीतर करेगा: परन्तु यह और दक प्रमाणीकरण के जबना लोड जडस्ट्पैचर के रूप में दकसी कार्मयक की जनयुजि नहीं की िाएगी। परन्तु यह और भी दक भार प्रेषण केन्द्र में काययरत मौिूिा कमयचारी को इन जिजनयमों के लागू होने की जतजथ स ेिो िषय के भीतर इस जिजनयम के उप-जिजनयम (2) के अधीन जनर्ियष्ट दििाजनिेिों के अनुसार प्रजिजित दकया िाएगा। (4) प्रजििण संस्ट्थान इस जिजनयम के उप-जिजनयम (2) के अधीन जनर्ियष्ट दििाजनिेिों में जनधायठरत प्रारूप में लोड जडस्ट्पैचर के मूल्यांकन के ठरकॉडय को इलेक्रॉजनक रूप में रखेगा और इस तरह के ठरकॉडय को सजचि, केंद्रीय जिद्युत प्राजधकरण को िार्षयक आधार पर उपलब्ध कराया िाएगा। (5) भार प्रेषण केन्द्र में लगे लोड जडस्ट्पैचर के अलािा अन्य कार्मयक भार प्रेषण केन्द्र में अपने संबंजधत कायय में, छ: माह के भीतर अपेजित प्रजििण प्राप्त करेंगे। (6) भार प्रेषण केन्द्र प्रमाजणत लोड जडस्ट्पैचसय का जििरण और अन्य कर्मययों के प्रजििण का जििरण जनधायठरत प्रारूप में सजचि, केंद्रीय जिद्युत प्राजधकरण को िार्षयक आधार पर प्रस्ट्तुत करेगा: परन्तु यह दक लोड जडस्ट्पैचसय द्वारा प्रजििण सिलतापूियक पूरा दकए िाने पर समुजचत सरकार उन्ह ें उजचत प्रोत्साहन प्रिान कर सकती है। 10. अजभलेखों का रखरखाि और इनका जनरीिण– (1) जिद्युत उत्पािक कंपनी अथिा लाइसेंसधारक जिद्युत आपूर्तय अथिा पारेषण से संबंजधत मानजचत्रों, प्लान और सेक्िनों का अजभलेख भौजतक एिं जडजिटलप्रारूप में रखेगा तथा मागं े िाने पर इस अजभलेख को जिद्युत जनरीिक को प्रिान कराएगा। (2) जिद्युत जनरीिक उप-जिजनयम (1) में जनर्ियष्ट जनरीिण ठरपोटय की एक प्रजत जिद्युत उत्पािक कंपनी अथिा लाइसेंसधारक, को उपलब्ध कराएगा। 11. नक्ि े िमा कराना- िब भी उपयुि आयोग द्वारा लाइसेंस प्रिान दकया िाएगा, तो जििषे रूप से जिसके जलए लाइसेंस प्रिान दकया गया ह,ै जनर्ियष्ट करते हुए मानजचत्रों के िो सेट उपयुि आयोग द्वारा अजभजहत अजधकारी द्वारा लाइसेंस की अजधसूचना की जतजथ के अनुरूप हस्ट्तािठरत और दिनांदकत दकए िाएंगे: परन्तु यह दक ऐसे नक्िों का एक सेट अजभजहत अजधकारी के पास रहगे ा और िसू रा सेट लाइसेंसधारक को दिया िाएगा। 12. मदु द्रत प्रजतया ं िमा कराना- (1) प्रत्येक व्यजि जिसे लाइसेंस मिं ूर दकया गया है, लाइसेंस जमलने के तीस दिन के भीतर लाइसेंस और नक्िों की भौजतक एिं जडजिटल प्रजतयां, जिनमें लाइसेंस में जिजनर्ियष्ट आपूर्तय का िेत्र ििायया गया हो, और इन्ह ें अपने कायायलय, स्ट्थानीय कायायलय, यदि कोई हो, और आपूर्तय िेत्र के अंतगयत प्रत्येक स्ट्थानीय प्राजधकरण के कायायलय में उजचत स्ट्थानों पर साियिजनक जनरीिण के जलए प्रिर्ियत करेगा। (2) ऐसा हर लाइसेंसधारक, उपरोि तीस दिन की अिजध के भीतर आपूर्तय िेत्र के अंतगयत प्रत् येक स्ट् थानीय प्राजधकारी को लाइसेंस तथा तत् संबंधी नक्िों की एक प्रजत जन:िुल्क उपलब्ध कराएगा और इसके जलए आिेिन करने िाले सभी व्यजियों को लाइसेंस तथा नक्िों की भौजतक एिं जडजिटल प्रजतयों की जबक्ी की व्यिस्ट्था भी करेगा, जिनकी कीमत समुजचत सरकार द्वारा समय-समय पर अजधसूजचत की िाएगी। 13. आपर्ू त यित्रे का प्लान का बनाया िाना और जनरीिण के जलए उपलब्ध रहना– (1) लाइसेंसधारक, जिद्युत आपूर्तय आरंभ करने के बाि, जिद्युत आपूर्तय िेत्र का भौजतक एिं जडजिटल प्रारूप में एक प्लान तैयार करेगा, और इसमें एलाइनमेंट को जचजन्हत करेगा तथा िमीन के अंिर कराए गए कायों के मामलों में जिद्युत आपूर्तय की मौिूिा लाइनों की िमीन के नीचे अनुमाजनत गहराई, सड़कों के दकनारे लगे जितरण बॉक् सों तथा अन्य कायय को जचजन्हत करेगा और हर िषय एक बार इस प्लान को िीक करेगा तादक[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 9 जिद्युत आपूर्तय लाइनों, सड़क के दकनारे लगे जितरण बॉक् सों तथा अन्य कायों की निीनतम जस्ट्थजत ििायई िा सके और साथ ही सर्ियस लाइनों को छोड़कर िमीन के अंिर मौिूि सभी जिद्युत प्रणाजलयों का अनुमाजनत स्ट्तर ििायने िाला सेक्िन बनाएगा। (2) उपयुि आयोग की अपेिा के अनुसार प्रत्येक प्लान समानांतर और ऊध्ि यगत पैमाने पर आरेजखत होगा: परन्तु यह दक आम लोगों को यदि उसी पैमाने पर बने स्ट्थानीय नक्िे उपलब्ध ह ै तो दकसी अन्य पैमाने की आिश्यकता नहीं होगी। (3) इस प्रकार तैयार दकया गया अथिा िीक दकया गया प्रत्येक प्लान और सेक्िन अथिा इसकी प्रजत में इसे सुधारने और तैयार करने की तारीख िी िानी चाजहए और इसकी प्रजत लाइसेंसधारक के मुख्य कायायलय अथिा आपूर्तय ित्रे के अंतगयत कारोबार के स्ट्थल पर उपलब्ध होनी चाजहए, तथा जनरीिण के इच्छुक सभी आिेिकों को यह हमेिा उपलब्ध रहनी चाजहए तथा इसकी प्रजतयां उन्ह ेंआपूर्तय की िानी चाजहए। (4) लाइसेंसधारक यह सुजनजित करेगा दक सभी नए तथा पुराने प्लान और सेक्िन दकसी अन्य निीनतम प्रौद्योजगकी के माध्यम स े ग्लोबल पोजििलनंग जसस्ट्टम मानजचत्रण अथिा मानजचत्रण के सुसंगत होंगे। (5) जिद्युत जनरीिक के मांगने पर लाइसेंसधारक, और, िहां लाइसेंसधारक स्ट्थानीय प्राजधकरण नहीं है, िहां संबंजधत स्ट्थानीय प्राजधकरण, यदि कोई हो, जिद्युत जनरीिक अथिा स्ट्थानीय प्राजधकरण को प्रत्येक प्लान अथिा सेक्िन या सम्यक रूप से िीक कराए गए इसके भाग की डुप्लीकेट प्रजत जन:िुल्क उपलब्ध कराएगा। (6) लाइसेंसधारक द्वारा, उपयुि आयोग द्वारा जिजनयम के अधीन जनधायठरत िीस के भुगतान पर प्रत्येक आिेिक को प्लान तथा सेक्िन की प्रजतयां उपलब्ध कराया िाएगा। अध्य ाय-3 सरु िा संबधं ी सामान्य आिश्यकताएं 14. जिद्यतु आपर्ू त य लाइनों तथा यत्रं ों के जनमाणय , प्रजतस्ट्थापन, सरं िण, संचालन और अनरु िण स े सबं जं धत सामान्य सरु िा आिश्यकताएं– (1) जिद्युत आपूर्त यसे संबंजधत सभी लाइनें एिं उपकरण प्रजतस्ट्थान की पयायिरण संबंधी पठरजस्ट्थजतयों के अधीन जनष्पािन के अपेिानुसार ड्यूटी साइकल के उद्देश्य से जिद्युत, इंसुलेिन और अनुमाजनत िॉल्ट करंट के मामले में पयायप्त रेटटंग तथा पयायप्त मिीनी िजि के होंगे, और इन्ह ें इस तरीके से जनर्मयत, प्रजतस्ट्थाजपत, संरजित, कायय योग्य और अनुरजित बनाया िाएगा दक इनसे मनुष्यों, प्राजणयों और संपजत्त को कोई नुकसान न पहुचं े। (2) इन जिजनयमों में अन्यथा उपबंजधत के जसिाय, इन जिजनयमों के प्रयोिनों को पूरा करने के जलए राष्ट्रीय जिद्युत संजहता, राष्ट्रीय भिन जनमायण संजहता सजहत सुसंगत मानकों का पालन दकया िाएगा और िहां सुसंगत भारतीय मानक उपलब्ध नहीं ह,ैं िहां अंतरायष्ट्रीय मानक का पालन दकया िाएगा और दकसी भी जिसंगजत की जस्ट्थजत में, इन जिजनयमों के प्रािधान अजभभािी होंगे। (3) उपयोग की िाने िाली सामग्री और उपकरण सुसंगत मानकों के अनुरूप होंगे। (4) सभी जिद्युत उपकरण उच्चतम बाढ़ स्ट्तर से ऊपर स्ट्थाजपत दकए िाएंगे और िहां ऐसे उपकरण को उच्चतम बाढ़ स्ट्तर से ऊपर स्ट्थाजपत करना संभि नहीं है, तो, यह सुजनजित दकया िाना चाजहए दक िहां पानी के ठरसाि या लीकेि अथिा िमा होने की कोई गुंिाइि न हो। 15. उपभोिा के पठरसरों म ेंसिे ा लाइन ेंऔर उपस्ट्कर– (1) आपूर्तयकता ययह सुजनजित करेगा दक आपूर्तय िरूु होने के लबंि ुतक उसके स्ट्िाजमत्ि िाली या उसके जनयंत्रण के अधीन जिद्युत आपूर्तय की सभी लाइने, तार, दिटटंग और उपस्ट्कर, िो उपभोिा के पठरसरों में लगे ह,ैं सुरजित हालत में हों और हर-हालत में जिद्युत आपूर्तय के जलए दिट हों, साथ ही आपूर्तयकताय जिद्युत लाइनों, तारों, दिटटंग्स और उपस्ट् करों से ऐसे पठरसरों को खतरे से बचाने के जलए सभी सािधाजनयां बरतेगा। (2) आपूर्तयकताय द्वारा उपभोिा के पठरसरों में लगाई गई सर्ियस लाइनें चाह े िे िमीन के अंिर हों या बाहर हों, इस प्रकार इंसुलेटेड और सुरजित होनी चाजहए दक सामान्य हालातों में इंसुलेिन को जिद्युत, मैकेजनकल, रसायजनक अथिा अन्य दकसी प्रकार का नुकसान न पहुचं े। (3) उपभोिा, िहां तक संभि हो, आपूर्तयकताय द्वारा उसके पठरसर में लगाए गए उपकरणों की सुरिा के जलए सभी सािधाजनया ं बरतेगा। (4) उपभोिा यह भी सुजनजित करेगा दक उसके जनयंत्रणाधीन अनुज्ञजप्तधारी की स्ट्थापना सुरजित जस्ट्थजत में रह।े10 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] 16. उपभोिा के पठरसरों म ेंजस्ट्िचजगयर- (1) आपर्ू तयकताय, उपभोिा के पठरसरों के भीतर अथय दकए गए कंडक्टर अथिा अथय दकए गए न्यूरल कंडक्टर या कॉन् सेठरक केबल के अथय दकए गए बाहरी कंडक्टर के अलािा प्रत्येक सर्ियस लाइन के प्रत् येक कंडक्टर हते ु सुलभ पहुचं के उद्देश्य से एक उपयुि जस्ट्िचजगयर उपलब्ध कराएगा और यह जस्ट् िचजगयर अजिरोधी जडब्बे के अंिर पयायप्त रूप से बंि होना चाजहए: परन्तु यह दक िहां एक साझी सेिा लाइन से एक से ज्यािा उपभोिाओं को आपूर्तय की िाती है, िहां प्रत् येक उपभोिा को साझा सर्ियस के मिबूत िंक्िन स्ट्थल पर अलग-अलग जस्ट्िचजगयर उपलब्ध कराए िाएंगे। (2) दकसी भी प्रणाली के अथय दकए कंडक् टर या अथय दकए गए न् यूरल कंडक् टर अथिा कॉन् सेंठरक केबल के अथय दकए गए बाहरी कंडक् टर के अलािा जिद्युत आपूर्तय की प्रत् येक लाइन को इस के स्ट्ि ामी द्वारा उपयुक् त जस्ट् िचजगयर द्वारा सुरिा प्रिान की िाएगी। 17. अथ य दकए गए कंडक्ट र और अथ य दकए गए न्य ूरल कंडक्ट र की पहचान और इनके जस्ट्ि च तथा जस्ट् िचजगयरों की जस्ट्थजत- िहा ं सुचालकों में िो तारों िाली प्रणाली का अथय दकया गया सुचालक या बहुत से तारों िाली प्रणाली का अथय दकया गया न् यूरल सुचालक सजम् मजलत ह ैऔर जिसे कनेक् ट दकया िाना ह,ै जनम् नजलजखत पठरजस्ट् थजतयों का अनुपालन दकया िाएगा, अथायत्:- (i) अथय दकए गए कंडक् टर अथिा अथय दकए गए न् यूरल कंडक् टर अथिा ऐसा कंडक् टर जिसे उनसे कनेक् ट दकया िाना ह,ै के स्ट् िामी द्वारा इनकी चहचान के जलए एक स्ट् थाई संकेत उपलब् ध कराना होगा तादक ऐसे सुचालक को दकसी अन् य जिद्युत प्रिाजहत सुचालक से अलग रूप से पहचाना िा सके और ऐसे संकेत जनम् न स्ट्थ ानों पर सुसंगत मानकों के अनुसार उपलब् ध कराए िाएंगे, अथायत्:- (क) अथय दकए गए कंडक् टर अथिा अथय दकए गये न् यूरल कंडक्टर यदि आपूर्तयकताय की संपजत् त ह,ै यह संकेत आपूर्तय आरंभ होने के जबन् ि ुपर अथिा इसके नििीक लगे होने चाजहए; (ख) िहां उपभोक् ता की प्रणाली के भाग के रूप में लगे सुचालक को आपूर्तयकताय के अथय दकए गए कंडक्टर अथिा अथय दकए गए न् यूरल कंडक्टर से िोड़ा िाना है, यह संकेत ऐसे कनेक् िन लबंि ुपर लगाया िाएगा; और (ग) अन् य सभी मामलों में, जिद्युत आपूर्तय आरंभ होने के लबंि ुके अनुरूप दकसी लबंि ुपर। (ii) अथय दकए गए कंडक्टर अथिा अथय दकए गए न्यूरल कंडक्टर और जिद्युत प्रिाजहत कंडक्टर पर एक साथ ऑपरेट होने िाले परस्ट्पर िुड़े जस्ट्िचों को छोड़कर दकसी भी प्रकार के कट आउट, ललंक जस्ट्िच अथिा सर्कयट ब्रेकर िो तारों िाली प्रणाली के अथय दकए गए कंडक्टर या बहुत से तारों िाली प्रणाली के अथय दकए गए कंडक्टर अथिा अथय दकए गए न्यूरल कंडक्टर अथिा इन से िुड़े दकसी भी कंडक्टर में िोड़ें नहीं िाएंगे या िुड़े नहीं रहने दिए िाएंग:े परंतु यह दक उपरोि अपेिा, परीिण के प्रयोिन के जलए ललंक अथिा िनरेटर या रांसिामयर के जनयत्रं ण के जलए उपयोग होने िाले जस्ट्िच के मामलों में लागू नहीं होगी। 18. उपभोिा के पठरसरों म ेंअथ यदकया गया टर्मनय ल- (1) आपूर्तयकताय उपभोिा के उपयोग के जलए उसके पठरसर में सुसंगत मानकों के अनुसार आसानी से पहुचं योग्य जस्ट्थजत में एक उपयुि अथय दकया हुआ टर्मयनल उपलब्ध कराएगा और इसका अनुरिण करेगा। यह टर्मयनल आपूर्तय िुरू होने के लबंि ुके नििीक या इसी पर लगाया िाएगा: परन्तु यह दक 250 िोल् ट से अजधक िोल् ट िाले उपकरणों के स्ट्थापन के मामले में उपभोिा, उपरोि आर्थंग व्यिस्ट्था के अलािा, एक स्ट्ितंत्र इलेक्रोड के साथ अपने स्ट्ियं की अर्थंग व्यिस्ट्था उपलब्ध कराएगा और उसे एक उपयुि ललंक के माध्यम से उप-जिजनयम (1) में उजल्लजखत अथय दकए गए टर्मयनल से िोड़ा िाएगा। (2) उपभोिा, आपूर्तयकताय द्वारा उपलब्ध कराए गए अथय टर्मयनल और इसकी लीड को दकसी भी मकै ेजनकल नुकसान से बचाने के जलए सभी उजचत सािधाजनयां बरतेगा। 19. अनाितृ सचु ालकों तक पहुचं - िहां दकसी भिन म ें अनािृत सुचालकों का उपयोग दकया गया ह ै िहां ऐसे सुचालकों का स्ट्िामी यह सुजनजित करेगा दक,- (क) इन तक दकसी भी हालत में पहुचं ना सामान्य िनता के जलए आसान न हो; (ख) िब भी आिश्यक हो इन्हें जिद्युत प्रिाह रजहत करने के जलए जस्ट्िच इस प्रकार लगाए िाएं दक इन तक आसानी से पहुचं ा िा सके; और (ग) सुसंगत मानकों में जिजनधाठय रत अन्य सुरिा उपाय अपनाए गए ह।ैं[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 11 20. खतरे के नोठटस- 250 िोल्ट से अजधक िोल्टेि िाले प्रत्येक प्रजतष्ठापन का स्ट्िामी सुसंगत मानकों के अनुसार खतरे के जनिान के साथ इसका नोठटस लहिं ी अथिा अग्रं ेिी और स्ट्थानीय भाषा में ऐसे स्ट्थानों पर स्ट्थाई रूप से लगाएगा िहां इन्ह ेंआसानी से िेखा िा सके। यह जनिान इन िगहों पर लगाए िाएंगे,- (क) प्रत्येक मोटर, िेनरेटर, रांसिामयर तथा अन्य जिद्युत संयंत्र और उपकरण एिं जबिली की आपूर्तय के जनयंत्रण हते ु उपयोग होने िाले उपस्ट्कर; (ख) 650 िोल्ट से अजधक िोल् ट िाले ओिरहैड लाइनों के ऐसे खंभे जिन पर जनसेनी या दकसी जििेष उपकरण की सहायता के जबना चढ़ा िा सके; (ग) जबिली से चलने िाले ट्यूब साइन, एक्सरे तथा 650 िोल्ट से अजधक ककंतु 33 दकलोिोल्ट से अजधक नहीं, िोल्ट िाल े उच्च फ्रीक् िसें ी के प्रजतष्ठापन: परन्तु यह दक िहां कहीं भी िेनरेटर, मोटर, रांसिामयर अथिा अन्य जिद्युत उपकरणों पर ऐसे नोठटस लगाना संभि नहीं ह ैिहां यथासंभि ये नोठटस उनके के नििीक से नििीक लगाए िाएं या “खतरा” िब्ि और उपकरण के िोल् ट के बारे में िानकारी इन पर स्ट्थाई रूप से पेंट की िाएगी: परन्तु यह और दक िहां भी िेनरेटर, मोटर, रांसिामयर अथिा अन्य उपकरण दकसी पठरसर के अंिर लगाए गए ह ैं िहां पठरसर के बाहर एक नोठटस लगा िेना इस जिजनयमों के प्रयोिन को पूरा करेगा। स्ट्पष्टीकरण- खंड (ख) के प्रयोिनों के जलए, रेल, ट्यूबलर पोल, लकड़ी से बने अिलंब, प्रबजलत सीमेंट कंक्ीट के खंभे और पूिय तनाि िाले सीमेंट-कंक्ीट से बने जबना पायिान िाले खंभे, आई सेक् िन और चैनल ऐसे अिलंब समझे िाएंगे जिनपर आसानी से चढ़ा नहीं िा सकता ह।ै 21. जिद्यतु आपर्ू त य लाइनों और उपकरणों की हैंडललगं - (1) दकसी भी सुचालक अथिा उपकरण को हाथ लगाने से पहले पयायप्त सािधाजनयां बरती िाएंगी, इसके जलए उन्ह ें अथय दकया िा सकता ह ै या कोई अन्य उपयुि तरीके अपनाए िा सकते ह ैं तादक ऐसे सुचालकों अथिा उपकरणों, आसपास के अन्य सुचालक अथिा उपकरणों जिनसे खतरा हो सकता है, को जडस्ट्चािय दकया िा सके और लोगों के इन पर काम करते समय िघु यटनािि या अनिान े में इन सुचालकों अथिा उपकरणों को सुसंगत मानकों के अनुसार जिद्युत प्रभाि से बचाया िा सके। (2) जिद्युत आपूर्तय लाइनों अथिा उपकरणों या िोनों पर काम करने िाले प्रत्येक व्यजि को जनम्नजलजखत उपलब्ध कराया िाएगा:- (क) सुसंगत मानकों के अनुसार, व्यजिगत सुरिा उपकरण, औिार और जिजभन्न साधन िैसे दक रबर के िस्ट्ताने और काम करने िाले िोल्टेि के जलए उपयुि सुरिा िूते, ऊंचाई पर काम करने के जलए सुरिा बेल्ट, कुचालक सीढ़ी, उपयुि श्रेणी के अर्थंग उपकरण, हेलमेट, लाइन टेस्ट्टर, हैंड लाइन, िोल्टेि जडटेक्टर और हाथ से काम करने िाले औिार; और (ख) आकय फ्लैि के कारण व्यजि को यांजत्रक और जिद्युत चोट से बचाने के जलए कोई अन्य उपकरण और उनके जलए ऐसे व्यजिगत सुरिात्मक उपकरण, औिार और अन्य साधन, सुसंगत मानकों के अनुरूप होंगे और उन्ह ेंहमेिा अच्छी काययिील जस्ट्थजत में बनाए रखा िाएगा। (3) कोई भी व्यजि जिद्युत संयंत्र या जिद्युत आपूर्तय लाइन या उपकरण के दकसी भी जहस्ट्से या सम्पूणय भाग का पठरचालन एिं रखरखाि का काम नहीं करेगा और न ही कोई व्यजि ऐसे काम में ऐसे व्यजि की सहायता करेगा, िब तक दक उसे इस कायय के जलए अजभजहत न कर दिया गया हो और अनुसूची I के यथाजस्ट्थजत भाग- I, भाग- II, भाग- III और भाग- IV में िी गई सुरिा का पालन करता हो। (4) 650 िोल्ट से अजधक ककंतु 33 दकलोिोल्ट से ज्यािा नहीं, का जिद्युत प्रिाह िहन करने िाली जिद्युत आपूर्तय िाली ओिरहडै लाइन को अिलंब बनाकर खींची गई प्रत्येक संचार लाइन को कायय करने की िजृष्ट से 650 िोल् ट से ज्यािा िोल्ट िाली लाइन समझा िाएगा: परन्तु यह दक ओिरहडै लाइन के सपोटय पर िरू संचार लाइनें जबछाने से पहले संबंजधत लाइसेंसधारी से पूिय अनुमजत लेनी होगी। (5) ऑपरेटटंग कर्मययों की सुरिा के जलए, जस्ट्िचजगयर और कंरोल पैनल के जिद्युत िहन न करने िाले सभी धाजत्िक कल- पूिों को उजचत तरीके से अथय दकया िाएगा और संचालन, रखरखाि या परीिण कायय करने िाले लोगों के जलए सुसंगत मानकों के अनुरूप उजचत िोल्टेि स्ट्तर िाले इंसुलेटटंग फ्लोर या मैट पैनलों को सामने और पीछे उपलब्ध कराया िाएगा।12 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] (6) सभी पैनलों पर पृष्ठ भाग में और सामने िाले भाग में इनकी पहचान का जििरण जचजत्रत दकया िाएगा। 22. िाहनों तथा क्ेनों को आपर्ू तय- बाहरी स्रोत से उपलब्ध कराई गई जबिली से चलने िाले िाहन, गजतिील क्ेन या ऐसे ही अन्य िाहन का स्ट्िामी यह सुजनजित करेगा दक इन िाहनों पर कारगर जनयंत्रण के जलए उपयुि जस्ट्िच लगे होने चाजहए िो एक ही झटके में सारी जिद्युत आपूर्तय िप कर सकें और िहां ऐसे िाहन, गजतिील क्ेन धातु की पटरी पर चलते ह,ैं िाहनों के स्ट्िामी यह सुजनजित करेंगे दक पटठरयां जिद्युत जनरंतर रह े और कई लबंिओंु पर समजिभि सुजनजित करने के जलए यह हमेिा भू-संपकय में रहें। 23. हल्के तथा इधर-उधर ले िान े योग्य उपकरणों के केबल- (1) हल्की तथा इधर-उधर ले िाने िाली मोटरों, िेनरेटरों, रांसिॉमयरों, रेजक्टिायरों, इलेजक्रक जिल मिीनों, इलेजक्रक स्ट्प्रेयर, िले ल्डंग सेट अथिा ऐसे ही अन्य हल्के और इधर-उधर ले िाने योग्य उपकरणों में िलैजक् िबल केबल का तब तक उपयोग नहीं दकया िाएगा िब तक दक इन्ह ेंसुसंगत मानकों के अनुसार आिश्यक िोल्टेि के जलए इंसुलेट न कर दिया गया हो और मिीनी िजत से होने िाले नुकसान से पयाप्तय तौर पर सुरजित न कर जलया गया हो। (2) जिन मामलों में धातु के बने खोल से संरिण प्रिान दकया गया है, ऐसे मामलों में ऐसे दकसी उपकरण के फ्रेम के साथ धातु का कनेक्िन होगा और इसे अथय दकया िाएगा। (3) हल्के तथा इधर-उधर ले िाने योग्य और क्मि: लसंगल िेि तथा थ्री िेि जिद्युत आपूर्तय पर काम करने िाले उपकरणों में थ्री कोर टाइप तथा िोर कोर टाइप केबल का उपयोग दकया िाएगा और अथय कनेक्िन में उपयोग होने िाले कोर ऐसे होंगे जिन्ह ेंआसानी से पहचाना िा सके। 24. जबटुजमनस पिाथों द्वारा सरं जित केबल- (1) ऐसे मामलों में िहां आपूर्तयकताय अथिा स्ट्िामी ओिरहैड लाइनों के अलािा ऐसी जिद्युत आपूर्तय लाइन का उपयोग कर रहा है, िो पूरी तरह से धातु से आिठरत नहीं ह ै तथा अथय नहीं दकया गया ह ै और जबटुजमनस खूजबयों िाले पिाथय अथिा जमश्रण के द्वारा इंसुलेटेड या संरजित दकया गया है- (i) िब तक दक दकसी जििषे मामले में जिद्युत जनरीिक द्वारा अन्य व्यिस्ट्थाओं को मंिूरी न िे िी िाए, कोई भी पाइप, कुचालक पाइप या ऐसी ही कोई अन्य व्यिस्ट्था जिसमें होकर जिद्युत आपूर्तय लाइनें जबछाई गई हों, अथिा रखी गई हों, को दकसी भी स्ट्रीट बॉक्स से िोड़ने के इसके प्रिेि लबंि ु पर कारगर ढंग से सील दकया िाएगा तादक स्ट्रीट बॉक्स से अथिा स्ट्रीट बॉक्स में गैस के ठरसाि को रोका िा सके; और (ii) ऐसी जिद्युत आपूर्तय लाइनों की समय-समय पर िांच की िाएगी, िहां भी संभािना हो परीिण दकया िाएगा तथा प्रत्येक िांच और परीिण का पठरणाम आपूर्तयकताय अथिा स्ट्िामी द्वारा सम्यक रूप से अजभजलजखत दकया िाएगा। (2) आपूर्तयकता य अथिा स्ट्िामी, उि प्रकार की कोई अन्य जिद्युत आपूर्तय लाइन उपयोग म ें नहीं लाएगा, िो ऐसे पिाथों से संरजित की गई ह,ैं जिनके अत्यजधक गमय हो िाने पर िहरीली अथिा जिस्ट्िोटक गैसें उत्सर्ियत होने की संभािना हो। 25. स्ट्रीट बॉक्स- (1) स्ट्रीट बॉक्स में गैस पाइप उपयोग में नहीं लाई िाएगी और पानी या गैस के ठरसाि से बचने के जलए पयायप्त सािधाजनयां बरती िाएंगी। (2) अलग-अलग प्रणाजलयों को जिद्युत आपूर्तय करने िाली ऐसी लाइनें िो एक ही स्ट्रीट बॉक्स से होकर गुिर रही ह,ैं ऐसी होनी चाजहए जिन्ह ेंएक-िसू रे से अलग दकया िा सके और आसानी से पहचाना िा सके तथा सभी जिद्युत आपूर्तय लाइनों अथिा स्ट्रीट बॉक्स से िुड़ी जिद्युत लाइनों को पयायप्त अिलंब उपलब्ध होना चाजहए और इन्ह ेंसुरजित बनाया िाना चाजहए तादक आसपास की जिद्युत आपूर्तय लाइनों से होने िाले संभाजित खतरों अथिा नुकसान का िोजखम िरू दकया िा सके। (3) गैस की उपजस्ट्थजत का पता लगाने के उद्देश्य से सभी स्ट्रीट बॉक्स की जनयजमत िांच की िाएगी और गैस के ठरसाि अथिा िमा होने के संकेत जमलते ह ैंतो एिेंसी के स्ट्िामी को चाजहए दक िह उन एिेंसी या कम्पनी जिनकी गैस पाइप लाइन स्ट् रीट बॉक् स के आस-पास ह,ै को इसकी सूचना िें और ऐसे मामलों में िहां स्ट् रीट बॉक् स में इतनी पयायप्त िगह हो दक इसमें एक व्यजि आसानी से प्रिेि कर सके, जनम्नजलजखत प्रािधान दकए िाएंगे- (i) यह सुजनजित दकया िाए दक कोई व्यजि स्ट्रीट बॉक्स म ें प्रिेि करे, इससे पहले िघु यटनािि स्ट्रीट बॉक्स में िमा हो चुकी गैस पूरी तरह से बाहर जनकल गई है; और (ii) स्ट्पार्कंग से होने िाले खतरे की रोकथाम के उपाय। (4) जिद्युत पठरपथ अथिा उपकरणों िाले स्ट्रीट बॉक्स या जपलर बॉक्स के स्ट्िामी यह सुजनजित करेंगे दक इनके िरिािे और ढक्कन बंि रखे िाएं और इन पर ताला लगा रहे तथा ऐसी व्यिस्ट्था होनी चाजहए दक इन्हें केिल चाबी अथिा जििेष उपकरण के द्वारा ही खोला िा सके।[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 13 (5) स्ट्रीट या जपलर बॉक्स के आिेजित भाग, िमीन के स्ट्तर या स्ट्थानीय साईट के बाढ स्ट्तर से कम से कम 0.6 मीटर ऊपर, िो भी अजधक हो, के साथ खड़ा दकया िाएगा। 26. जिजभन्न पठरपथों की पहचान- प्रत्येक िेनरेटटंग स्ट्टेिन, सबस्ट्टेिन, िंक्िन बॉक्स अथिा जपलर बॉक्स जिन पर सर्कयट अथिा उपकरण लगे ह,ैं चाह ेइन्हें अलग-अलग िोल् ट अथिा एक समान िोल् ट पर चलाया िाना हो, का स्ट्िामी यह सुजनजित करेगा दक प्रत्येक पठरपथ को एक-िसू रे से स्ट्पष्ट रूप से पहचाना िा सके और इसके जलए स्ट्थाई प्रकृजत के पहचान जचन्ह लगाए िाएं। 27. एक स े ज्यािा िीड िाल े प्रजतष्ठापनों म ें अतं र- सबस्ट्टेिन, िो खंभे िाले ढांचे, चार खंभों िाले ढांचे अथिा एक से अजधक िीड िाले दकसी अन्य ढांचे सजहत प्रत् येक प्रजतष्ठापन का स्ट्िामी यह सुजनजित करेगा दक सभी प्रजतष्ठापनों को अलग-अलग रूप से पहचाना िा सके और इसके जलए िह स्ट्थायी प्रकृजत के पहचान जचन्ह लगाएगा। 28. िघु टय नािि चार्िगं - (1) सभी पठरपथों और उपकरणों को उनके स्ट्िामी इस प्रकार व्यिजस्ट्थत करेंगे दक इनके कल-पुिों के िघु यटनािि अजधक िोल्ट पर चािय होने का खतरा न रहे और ये उतने ही िोल्ट पर चािय रह,ें जितनें के जलए यह जनर्मयत ह।ैं (2) ऐसी जस्ट्थजत में, िहां अल्टरनेटटंग करंट और डायरेक्ट करंट सर्कयट एक ही बाक् स अथिा अिलंब पर स्ट्थाजपत हैं, उन्ह ें इस प्रकार व्यिजस्ट्थत और सुरजित दकया िाएगा दक िे जिद्युत प्रिाह के िौरान एक-िसू रे के संपकय में नहीं आएंगे। 29. सरु िा सबं धं ी उपकरणों पर लाग ू होने िाले उपबंध- (1) सभी िेनरेटटंग स्ट्टेिनों, घेरबंि सब-स्ट्टेिनों तथा जस्ट्िलचंग स्ट्टेिनों में आग बुझाने िाले उपयुि उपकरणों के अजतठरि आग बुझाने में उपयोग के जलए िुष् क तथा स्ट्िच्छ रेत से भरे िायर बकेट सुजिधािनक स्ट्थानों पर रखे िाएंगे और इन्ह ेंस्ट्पष्ट रूप से जचजन्हत दकया िाएगा। (2) सुसंगत मानकों के अनुरूप उपयुि प्रकार के अजििामकों को आग बुझाने और जनयंजत्रत करने के जलए सुसंगत मानकों के अनुसार ही लगाया िाएगा, उनका रखरखाि, समय-समय पर जनरीिण और परीिण दकया िाएगा तथा ऐसे परीिणों का ठरकॉडय रखा िाएगा। (3) पयायप्त मात्रा में िस्ट्टय-एड (प्राथजमक सहायता) बॉक्स अथिा स्ट्पष्ट रूप से जचजननत अलमाठरयां, प्रत् येक िेनरेटटंग स्ट्टेिन, घेरबंि सबस्ट्टेिन, घेरबंि जस्ट् िलचंग स्ट्टेिन और लाइनों के रखरखाि के जलए उपयोग होने िाले िाहनों में सुसंगत राज्य मानकों अथिा सुसंगत मानकों के अनुसार यथोजचत स्ट्थान पर इस प्रकार उपलब्ध कराए िाएंगे दक सभी कायय घंटों के िौरान ये आसानी से उपलब्ध हो सकें तथा ऐसे सभी बॉक् स और अलमाठरयां, केिल मानिरजहत सब-स्ट्टेिनों और जस्ट्िलचंग स्ट्टेिनों को छोड़कर ऐसे जिम्मेिार व्यजियों के िाजयत्ि में रखे िाएंगे िो दक िस्ट्ट य-एड उपचार में प्रजिजित हों और इन व्यजियों में से कोई एक कायय के घंटों के िौरान उपलब्ध रहगे ा। िस्ट्टय-एड बॉक्स और अलमाठरयां स्ट्पष्ट रूप से जचजन्हत होनी चाजहए और इनमें राज्य सरकार द्वारा जनधायठरत औषजध सामग्री तत्काल रूप से सभी समय में उपलब्ध रहनी चाजहए। (4) पााँच मेगािाट तथा इससे अजधक िमता िाले प्रत्येक िेनरेटटंग स्ट्टेिन और पााँच मेगा िोल्ट-एम्पीयर तथा इससे अजधक की िमता िाले रांसिामयरों से युि घेरबंि सबस्ट्टेिनों में िो या िो से अजधक मास्ट् क ऐसे स्ट्थानों पर उपलब्ध एिं संरजित रहेंगे िहां आसानी से पहुचं ा िा सके तादक आग अथिा धुंआ िैलने की जस्ट्थजत में इन्ह ेंउपयोग में लाया िा सके: परंतु यह दक िहां जिद्युत स्ट्टेिनों में पााँच मेगािाट या इससे अजधक की िमता िाले एक से अजधक िेनरेटर स्ट्थाजपत दकए गए ह,ैं िहां प्रत् येक िेरनेटर के जलए कम से कम िो गैस मास्ट् क आसानी से पहुचं िाले स्ट्थ ानों पर उपलब् ध रहगं े। (5) प्रत्येक उत्पािन स्ट्टेिन, सबस्ट्टेिन या जस्ट्िलचंग स्ट्टेिन में एक कृजत्रम श्वासयंत्र, अजििामक यंत्र, िस्ट्टय ऐड बाक्स और गैस मास्ट्क प्रिान दकए िाएंगे और इन्ह ें अच्छी काययिील जस्ट्थजत में रखा िाएगा तथा उनके स्ट्थान जनयंत्रण कि में और ऑपरेटर केजबन में प्रिर्ियत दकए िाएंगे। (6) जनकटतम डॉक्टर, अस्ट्पताल िहााँ जबिली के झटके और िलने के जलए प्राथजमक उपचार की सुजिधा हो, एम्बुलेंस सेिा और अजििमन सेिा का पता और संपकय नंबर, उपचार चाटय के पास जनयंत्रण कि और ऑपरेटर केजबन में प्रमुखता से प्रिर्ियत दकया िाएगा। 30. जबिली के झटके स े पीजड़त व्यजियों के पनु िीिन के सबं धं म ें अनिु िे ों का प्रििनय - (1) प्रत् येक िेनरेटटंग स्ट्टेिन, घेरबंि सबस्ट्टेिन, घेरबंि जस्ट् िलचंग स्ट्टेिन, खानों और कारखाना अजधजनयम 1948 (1952 का 63) में पठरभाजषत प्रत् येक कारखाना के स्ट्िामी तथा ऐसे पठरसरों में िहां जबिली का उपयोग हो रहा ह ैतथा इलेजक्रक इंस्ट्पेक्टर ने उन्ह ेंजलजखत में इन अनुिेिों के बारे में नोठटस दिए ह,ैं के स्ट्िामी जबिली के आघात से पीजड़त व्यजि में श् िांस िूंकने की प्रदक्या के संबंध में अनुिेिों को ऐसे स्ट्थानों पर प्रिर्ियत करेंगे िहां इन्ह ें आसानी से पढ़ा और समझा िा सके और यह अनुिेि अंग्रेिी अथिा लहिं ी और जिले की स्ट्थानीय भाषा तथा िहां स्ट्थानीय भाषा लहंिी है, िहां लहिं ी और अंग्रेिी में लगाए िाएंगे।14 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] (2) प्रत् येक िेनरेटटंग स्ट्टेिन, घेरबंि सबस्ट्टेिन, घेरबंि जस्ट् िलचंग स्ट्टेिन और प्रत् येक िैक्री अथिा अन्य पठरसर जिन पर यह जिजनयम लागू होते हैं, के स्ट्िामी यह सुजनजित करेंगे दक अजभजहत व्यजि या जिद्युत संयंत्र या पारेषण या जितरण प्रणाजलयों के संचालन और रखरखाि के जलए काययरत व्यजि उप-जिजनयम (1) में संिर्भयत अनुिेिों की िानकारी रखते हों और इन्ह ें लागू करने में सिम हों। 31. उपभोिाओं, स्ट्िाजमयों, कब्िाधारकों, इलजे क्रकल िेकेिारों, इलजे क्रकल कर्मयय ों और आपर्ू तकय ताओंय द्वारा बरती िान े िाली सािधाजनया–ं (1) कोई भी उपभोिा, आपूर्तयकताय, स्ट्िामी अथिा कब्िाधारक जबिली आपूर्तय के उद्देश्य से अपनी ओर से पठरसर में अजतठरि िोड़-तोड़, िेरबिल, मरम्मत तथा समायोिन सजहत दकसी भी प्रकार के जिद्युत प्रजतस्ट् थापन के कोई भी ऐसे कायय नहीं करने िेगा, जिनसे मौिूिा प्रजतष्ठापन की िमता और जििेषताओं में कोई बिलाि हो, इसमें लैम् प, पंखें, फ्यूि, जस्ट् िच, 250 िोल्ट तक के घरेलू जिद्युत उपकरण बिलने िैसे कायय सजम् मजलत नहीं ह।ैं ऐसे कायय, केिल राज्य सरकार द्वारा मान् यता प्राप्त जबिली के िेकेिार अथिा उसकी ओर से कौिल प्रमाण-पत्र धारक दकसी व् यजक् त के प्रत् यि पययिेिण में दकए िाएंगे और राज्य सरकार द्वारा मान् यताप्राप्त अथिा िारी परजमट धारक व् यजक् त द्वारा दकए िाएंगे: परंतु यह दक केंद्रीय सरकार के जलए अथिा उनकी तरि से दकए गये कायों के मामले में और खानों, तेल िेत्रों तथा रेलिे में प्रजतस्ट् थापन के मामले में, केंद्रीय सरकार और अन् य मामलों में राज्य सरकार, रािपत्र में अजधसूचना के द्वारा, अपनी ितों में आमतौर पर अथिा दकसी जििेष िगय के उपभोिाओं, आपूर्तयकत्तायओं, स्ट् िाजमयों अथिा कब् िा धारकों को िर्णयत कायों में ठरयायत िे सकती ह:ै परन्तु यह और दक केंद्र सरकार के जलए या उसकी ओर से जनष्पादित कायों के मामल ेमें और खानों, तले िेत्रों और रेलिे में प्रजतष्ठापन के मामले में, दकसी राज्य सरकार या केंद्र िाजसत प्रिेि प्रिासन द्वारा िारी दकए गए लाइसेंस िाले जिद्युत िेकेिार को अन्य राज्य सरकार से लाइसेंस की आिश्यकता नहीं होगी जिस राज्य में कायय जनष्पादित दकया िाना ह।ै (2) उप –जिजनयम (1) का उल्लंघन करने िाले दकसी भी जिद्युत प्रजतष्ठापन से संबंजधत कायय को जबिली की आपूर्तय नहीं की िाएगी अथिा इन्ह ेंदकसी भी आपूर्तयकताय के प्रजतष्ठापनों से नहीं िोड़ा िाएगा। 32. प्रजतष्ठापनों का आिजधक जनरीिण और परीिण- (1) स्ट्िामी या आपूर्तयकताय या उपभोिा, यथाजस्ट्थजत, से संबंजधत अजधसूजचत िोल्टेि से अजधक िोल्टेि की स्ट्थापना का आिजधक जनरीिण और परीिण जिद्युत जनरीिक द्वारा दकया िाएगा: परन्तु यह दक अजधसूजचत िोल्टेि के नीचे या उसके बराबर जिद्युत प्रजतष्ठापन, यथाजस्ट्थजत, स्ट्िामी या आपूर्तयकताय या उपभोिा द्वारा स्ट्ि-प्रमाजणत दकया िाएगा। (2) जिद्युत जनरीिण की आिजधकता जिद्युत जनरीिक द्वारा या आपूर्तयकताय, स्ट्िामी या उपभोिाओं द्वारा स्ट्ि-प्रमाणीकरण समुजचत सरकार द्वारा दिए गए जनिेिानुसार होगी: परन्तु यह दक जिद्युत जनरीिण और स्ट्ि:प्रमाणन की आिजधकता पांच िषय से अजधक नहीं होगी: परंतु यह और दक खानों, तेल िेत्रों और रेलिे से संबंजधत जिद्युत अजधष्ठापन के संबंध में ऐसा जनिेि केंद्र सरकार द्वारा िारी दकया िाएगा। (3) उपयुयि जिजनयमों के अतं गयत जनर्ियष्ट सुरिा उपायों का अनुपालन सुजनजित करने हते ु, अजधसूजचत िोल्टेि या उससे कम िोल्टेि िाले जिद्युत प्रजतष्ठापनों का आिजधक जनरीिण और परीिण स्ट्िामी या आपूर्तयकता य या उपभोिा, यथाजस्ट्थजत, द्वारा स्ट्ियं दकया िाएगा और ऐसे प्रजतष्ठापन स्ट्ि:प्रमाजणत दकये िायेंगे और स्ट्ि:प्रमाणन की ठरपोटय, प्राजधकरण द्वारा िारी दकये गए प्ररूपों में, स्ट्िामी या आपूर्तयकताय या उपभोिा, यथाजस्ट्थजत, जिद्युत जनरीिक को अनुसूची II के अनुसार प्ररूप I या प्ररूप II या प्ररूप III या प्ररूप IV मे यथाजस्ट्थजत, प्रस्ट्तुत करेगा: परन्तु यह दक स्ट्ि:प्रमाजणत दकया गया ऐसा जिद्युत प्रजतष्ठापन स्ट्ि:प्रमाणन की ठरपोटय जिद्युत जनरीिक के कायायलय में प्राप्त होने के उपरांत ही जिजधित जनरीिण और परीिण हुआ माना िाएगा; और यदि जिद्युत जनरीिक द्वारा तीन कायय दििसों के भीतर पािती नहीं िी िाती है, तो इसे प्राप्त माना िाएगा: परन्तु यह और दक स्ट्िामी या आपूर्तयकताय या उपभोिा के पास समुजचत सरकार के जिद्युत जनरीिक से अपने प्रजतष्ठापन का जनरीिण और परीिण कराने का जिकल्प होगा। (4) उपजिजनयम (1) की दकसी भी प्रािधान के बाििूि, अजधजनयम की धारा 54 के अंतगयत आने िाले प्रत्येक जिद्युत संस्ट्थापना, जिसमे खानों, तेल िेत्रों ि रेलिे के जिद्युत प्रजतष्ठापन भी िाजमल ह,ैं का आिजधक जनठरिण एिं परीिण समुजचत सरकार के जिद्युत जनरीिक द्वारा ही दकया िाएगा;[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 15 (5) िहां, यथाजस्ट्थजत, केंद्रीय अथिा राज्य सरकार, द्वारा आपूर्तयकताय को प्रजतष्ठापन का जनरीिण और परीिण करने का जनिेि दिया िाता ह,ै िहां ऐसा आपूर्तयकताय अनुसूची-II में जिजनर्ियष् ट प्रारूप I, II III और IV में संबंजधत उपभोक् ता को प्रजतष्ठापन की जस्ट्थजत से अिगत कराएगा और इस ठरपोटय की एक प्रजत जिद्युत जनरीिक को प्रस्ट् तुत करेगा। (6) जिद्युत जनरीिक, ऐसी ठरपोटय प्राप्त होने पर, आपूर्तयकताय द्वारा प्रस्ट् तुत ठरपोटय अथिा अजभलेख में जिजभन् नता, िो मामले में पठरजस्ट् थजतयों के अनुसार अपेजित हो, को स्ट् िीकार कर सकता ह ै और ठरपोटय के अनुसार बताई गई त्रुठटयों को िरू करने की जसिाठरि कर सकता है। (7) यदि दकसी भी प्रजतष्ठापन का स्ट् िामी, जिद्युत जनरीिक की ठरपोटय में उजल् लजखत त्रुठटयों को इसके जलए जनधायठरत समय- सीमा में िरू करने में असिल रहता ह ै तो ऐसे प्रजतष्ठापनों की जिद्युत जनरीिक के जनिेि पर जिद्युत आपूर्तय काट िी िाएगी। इसके जलए जिद्युत जनरीिक को कम से कम 48 घंटे का नोठटस प्रजतष्ठापन के स्ट्ि ामी को िेना होगा: परंतु यह दक उस मामले में प्रजतष्ठापनों की जिद्युत आपर्ू तय काटी नहीं िाएगी, यदि अजधजनयम की धारा 162 की उप धारा (2) के अधीन अपील की गई है और अपीलीय प्राजधकारी ने जबिली काटने के आिेिों पर रोक लगा िी ह।ै (8) सभी प्रजतष्ठापनों के स्ट् िाजमयों का यह उत् तरिाजयत् ि होगा दक िे प्रजतष्ठापनों को िोजखम मुक् त जस्ट् थजत में अनुरजित तथा संचाजलत करें और िैसा दक जिजनमायता द्वारा जसिाठरि की गई हो अथिा मानकों के अनुसार हो। 33. उपभोिा के प्रजतष्ठापन का परीिण– (1) जबिली की नई या अजतठरि आपूर्तय के जलए आिेिन प्राप्त होने पर और आपूर्तय िुरू होने से पहले या आपूर्त यरूकने के छ: महीने की अिजध के बाि दिर से िुरू करने के जलए आपूर्तयकताय या तो स्ट्िंय प्रजतष्ठापन का परीिण करेगा या उपभेिा द्वारा प्रस्ट्तुत िााँच पठरणामों को स्ट्िाकीर करेगा िब अनुज्ञजप्त प्राप्त जिद्युत िेकेिार द्वारा सम्यक रूप से उन पर हस्ट्तािर दकए गए हों: परन्तु यह दक अजधसूजचत िोल्टेि के बराबर या उससे कम िोल्टेि स्ट्तर के मामले में, चाटयडय जिद्युत् सुरिा इंिीजनयर भी स्ट्िामी के अनुरोध पर प्रजतष्ठापन का परीिण कर सकता है। (2) परीिण और सत्यापन सुसंगत मानकों के अनुसार दकए िाएंगे। (3) परीिण उपस्ट्करों को, सरकार द्वारा अजधकृत या राष्ट्रीय परीिण और अंििोधन प्रयोगिाला प्रत्यायन बोडय के द्वारा प्रत्याजयत प्रयोगिाला के द्वारा उनके जनर्ियष्ट आिजधकता के अनुसार आिजधक अंतराल में अंििोजधत दकया िाएगा। (4) आपूर्तयकताय उपभोिा के प्रत् येक सप्लाई पॉइंट के बारे में परीिण पठरणामों को, उपलब्ध अनुसूची III के उपलब्ध प्रारूप के अनुसार अजभलेख रखेगा। (5) ऐसे जनरीिण और परीिण के पठरणामस्ट्िरूप यदि आपूर्तयकताय इस जनष्कषय पर पहुचं ता है दक प्रजतष्ठापन खतरनाक हो सकता ह,ै िह आिेिक को जलजखत में नोठटस िेगा तथा उससे प्रजतष्ठापन को सुरजित बनाने के जलए आिश्यक बिलाि करने को कहेगा तथा िब तक अपेजित बिलाि नहीं कर जलए िाते, िह कनेक्िन िेने से इंकार कर सकता ह।ै 34. जिद्यतु उत्पािन इकाइयों का जिद्यतु जनरीिक द्वारा जनरीिण दकया िाना- ऊिाय के निीकरणीय स्रोतों सजहत, एक िमता से अजधक जिद्युत उत्पािन करने िाली ऐसी उत्पािन इकाईयां जिनका जनरीिण जिद्युत जनरीिक द्वारा दकया िाना आिश्यक होगा, इस सम्बन्ध में उनकी िमता समुजचत सरकार द्वारा िारी अजधसूचना के अनुसार होगी। अध्य ाय-4 जिद्यतु आपर्ू त यऔर उपयोग के सबं धं म ेंसामान्य ितें 35. कनेक्िन स े पहल े लीकेि से बचाि सबं ंधी सािधाजनयां- (1) आपूर्तयकताय दकसी भी आिेिक के पठरसर में लगे उपकरणों को आपूर्तय के जलए तब तक कनेक्िन नहीं िेगा िब तक दक िह इस बात से पूरी तरह से संतुष्ट न हो िाए दक कनेक्िन िेते समय प्रजतष्ठापन अथिा उपकरण से ऐसे लीकेि की कोई संभािना नहीं रहगे ी दक उससे सुरिा को खतरा पैिा हो, इसके जलए प्रजतष्ठापन या उपस्ट्करों के इन्सुलेिन प्रजतरोध की माप की िाएगी िो दक सुसंगत मानकों के अनुसार हो। (2) यदि आपूर्तयकताय उप-जिजनयम (1) के उपबंधों के अधीन कनेक्िन िेने से इंकार करता है तो ऐसी जस्ट्थजत में आपूर्तयकता य इंकार करने के कारणों से उपभोिा को जलजखत में अिगत कराएगा। 36. उपभोिा के पठरसर म ेंलीकेि – (1) यदि जिद्युत जनरीिक अथिा आपूर्तयकताय के पास यह कारण ह ैंदक उपभोिा की प्रणाली में लीकेि ह,ै जिससे उपभोिा द्वारा अथिा दकसी अन्य व्यजि द्वारा जिद्युत का हाजनकारक रूप से उपयोग हो सकता ह ै या इससे खतरे की संभािना है, तो िह उपभोिा को जलजखत में इस बात का नोठटस िेगा दक िह उपभोिा के प्रजतष्ठापन का जनरीिण और िांच करेगा।16 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] (2) इस प्रकार का नोठटस दिए िाने के बाि यदि उपभोिा प्रजतष्ठापन की िांच तथा परीिण के जलए पहुचं प्रिान करने में असिल हो िाता ह ै अथिा उपभोिा के प्रजतष्ठापन का इंसुलेिन रेजिस्ट्टेंस इतना कम ह ै दक जबिली का सुरजित उपयोग संभि नहीं ह,ै ऐसी जस्ट्थजत में आपूर्तयकताय जिद्युत जनरीिक के ऐसे जनिेि पर प्रजतष्ठापन को जिद्युत आपूर्तय रोक िेगा ककंतु यह किम उिाने से पहले उपभोिा को जिद्युत आपूर्तय रोकने के संबंध में जलजखत में 48 घंटे का नोठटस िेना होगा और आपूर्तयकताय अथिा जिद्युत जनरीिक िब तक इस बात से संतुष्ट नहीं हो िाते दक लीकेि का कारण िरू कर दिया गया है, जिद्युत आपूर्तय दिर से बहाल नहीं की िाएगी। 37. जिद्यतु आपर्ू त यतथा उपयोग- (1) उप–जिजनयम (2) से (8) में जिजहत ितों का अनुपालन सुजनजित होन ेतक जबिली की आपूर्तय, रांसिामेंिन, कनिियन, इनिियन अथिा उपयोग नहीं दकया िाएगा अथिा आपूर्तय, रांसिॉमेिन, कनिियन, इनिियन और उपयोग िारी नहीं रखा िाएगा। (2) जिद्युत आपूर्तय के प्रारंभ लबंि ु के तुरंत बाि करंट िारी रखने और सर्कयट ब्रेक करने के जलए अपेजित िमता िाले जनम्नजलजखत कंरोल अजधष्ठाजपत दकए िाएंगे तादक इन तक आसानी से पहुचं ा िा सके और प्रजतष्ठापन को की िा रही जिद्युत आपूर्तय को पूरी तरह से अलग करने के जलए इन्हें आसानी से पृथक दकया िा सके। ऐसे उपस्ट्कर, अलग-अलग सर्कयटों और उपस्ट्करों को जनयंजत्रत करने के जलए लगाए गए दकसी अन्य जनयंत्रक जस्ट्िच के अलािा होंगे, अथायत- िोल्टेि पर आपर्ू त्त य जनयत्रं ण 11 दकलोिोल्ट से कम उपभोिा द्वारा जस्ट्िच फ्यूि इकाई या सर्कयट ब्रेकर 11 दकलोिोल्ट से अजधक उपभोिा द्वारा सर्कयट ब्रेकर (3) प्रत्येक रांसिामयर के मामले में जनम्न जलजखत उपस्ट्कर उपलब्ध कराया िाएगा; अथायत:- (i) रांसिामयर के प्राइमरी साइड में पयायप्त िमता िाले फ्यूि सजहत गेंग प्रचाजलत एयर ब्रेक जस्ट्िच अथिा सर्कयट ब्रेकर अथिा फ्यूि सजहत ललंक्ड जस्ट्िच: परंतु यह की रांसिामयर के प्राइमरी साइड पर लगा फ्यूि सजहत ललंक् ड जस्ट्िच पयायप्त िमता का होना चाजहए तादक िह िुल लोड करंट िहन कर सके और केिल रांसिामयर के चुंबकीय करंट को ब्रेक कर सके: परंतु यह और दक उन सभी रांसिामयरों में जिनकी िमता 1000 केिीए और इससे अजधक ह ैउनमें एक सर्कयट ब्रेकर उपलब्ध कराया िाएगा: परंतु यह और भी दक यूजनट ऑजक् िजलयरी रांसिामयर तथा िेनरेटर रांसिामयर के जलए रांसिामयर के प्राइमरी साइड पर फ्यूि सजहत गेंग प्रचाजलत एयर ब्रेक जस्ट्िच अथिा सर्कयट ब्रेकर अथिा फ्यूि सजहत ललंक्ड जस्ट्िच की आिश्यकता नहीं होगी; (ii) सभी रांसिामयरों की सेकेंडरी साईड पर पयायप्त रेंटटंग का सर्कयट ब्रेकर लगाया िाएगा: परंतु 1000 केिीए से कम िमता िाले आपूर्तयकताय के रांसिामयरों की सेकेंडरी साईड में पयायप्त रेंटटंग िाले फ्यूि सजहत ललंक् ड जस्ट् िच अथिा सर्कयट ब्रेकर लगाया िाएगा। (4) एक यूजनट के रूप में संयुि कंरोल जगयर को छोड़कर अन्य मामलों में प्रत् येक सर्कयट को अत्यजधक जिद्युत ऊिाय से बचाने के जलए उजचत फ्यूि ललंक या उपयुि पयायप्त ब्रेंककंग िमता का सर्कयट ब्रेकर, उपयुि स्ट्थान पर लगाया िाएगा और यह इस प्रकार से जनर्मयत दकया िाएगा दक जिद्युत आपूर्तय चालू होने पर ओिर हीटटंग, आर्कंग अथिा गमय धातु के चटकने से होने िाले खतरे को रोका िा सके तथा इनमें फ्यूि ललंक को जबना दकसी खतरे के आसानी से बिला िा सके। (5) प्रत् येक मोटर अथिा मोटरों के समूह अथिा दकसी जििेष मिीन को चलाने के अन् य उपस्ट्कर को जिद्युत आपूर्तय एक उपयुि ललंक् ड जस्ट् िच अथिा सर्कयट ब्रेकर अथिा जनधायठरत िमता का आपात कालीन ठरलपंग जडिाइस, जिसको मैनुअल तौर पर रीसेट दकया िा सके, द्वारा जनयंजत्रत होनी चाजहए तथा यह उपकरण मोटर अथिा मोटरों के समूह अथिा अन्य उपकरणों के नििीक ऐसी िगह लगे होने चाजहए िहां आसानी से पहुंचा िा सके और प्रभारी व्यजि इन्ह ें आसानी से ऑपरेट कर सके। ये उपकरण सर्कयट में इस प्रकार कनेक् ट होने चाजहए दक इनके द्वारा मोटर अथिा मोटरों के समूह अथिा उपकरणों को हो रही जिद्युत आपूर्तय दकसी भी रेगुलेटटंग जस्ट् िच अथिा अन् य उपकरणों से िुड़े रेजिस्ट्ट ेंस के द्वारा काटी िा सके।[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 17 (6) सभी इंसुलेटटंग सामग्री उनके अनुप्रयोग के अनुसार होगी और उनकी यांजत्रक िजि इस उद्देश्य के जलए पयायप्त होगी तादक उनकी इंसुलेटटंग प्रॉपटी को सभी कायय जस्ट्थजतयों के अधीन, तापमान, नमी, लिणता और प्रिषू ण के संबंध में भी पयायप्त रूप से बनाए रखा िा सके। (7) यह सुजनजित दकया िाना चाजहए जिद्युत आिेजित कल-पुिें खुले न रह ेंतादक ये खतरे का कारण न बन सके और इसके जलए पयायप्त सािधाजनयां बरती िानी चाजहयें । (8) प्रत्येक उपभोिा यह सुजनजित करने के जलए सभी उपाय अपनाएगा तादक आपूर्तयकताय द्वारा उसके पठरसर में तथा उसके प्रजतष्ठापन को आपूर्तय करने िाली जबिली की सर्ियस लाइनों से आपूर्तयकताय के अलािा कोई अन्य व्यजि छेड़छाड़ न कर सके। 38. पन्द्रह मीटर से अजधक ऊंचाई िाली बहुमजं िला इमारतों में जिद्यतु आपर्ू त य और उपयोग के उपबंध– (1) जिद्युत जनरीिक द्वारा जिस कनेक्टेड लोड और सप्लाई िोल्टेि के ऊपर जनरीिण दकया िाना ह,ै पन्द्रह मीटर से अजधक ऊंचाई िाली बहुमंजिला इमारतों के जलए इसका जनधायरण समुजचत सरकार द्वारा अजधसूजचत दकया िाएगा। (2) जिद्युत आपूर्तय आरंभ करने अथिा जिद्युत आपूर्तय जडस्ट्कनेक्ट हो िाने के छ: माह बाि दकसी प्रजतष्ठापन में जिद्युत आपूर्त य दिर से आरंभ करने के जलए आिेिन करने से पहले, बहुमंजिला इमारत का स्ट्िामी अथिा कब् िाधारक जिद्युत जनरीिक को जलजखत में कम से कम 30 दिन का नोठटस िेगा जिसमें प्रजतष्ठापन का जििरण स्ट् पष् ट करना होगा तथा इस अिजध के िौरान जिद्युत जनरीिक के जलजखत अनुमोिन के जबना जिद्युत आपूर्तय आरंभ अथिा दिर से बहाल नहीं की िाएगी। (3) पन्द्रह मीटर से अजधक ऊंचाई िाले बहुमंजिला इमारतों तथा अन्य पठरसरों िैसे हिाई अड्डों, अस्ट्पतालों, होटलों, मनोरंिन स्ट्थलों, पूिा स्ट्थलों, सांस्ट्कृजतक केन्द्रों, स्ट्टेजडयमों, िैिजणक भिन, परीिण प्रयोगिालाओं, औद्योजगक प्रजतष्ठानों, जिस्ट्िोटक या ज्िलनिील सामग्री रखे िाने िाले प्रजतष्ठापन, रेलिे या मेरो स्ट्टेिनों और अन्य साियिजनक इमारतों में जनम्नजलजखत सुरिा उपाय उपलब्ध कराए िाएंगे:- (i) प्रजतष्ठापन का स्ट्िामी अथिा आपूर्तयकताय जिद्युत आपूर्तय के प्रारंभ लबंि ु पर कट आउट अथिा ब्रेकरयुि आइसोलेटटंग उपस्ट्कर उपलब्ध कराएगा िो थ्री िेि, िोर-िायर सर्कयट में न्यूरल को छोड़कर सभी िेिों को ऑपरेट कर सकता हो। यह उपकरण िमीन से अजधक से अजधक 1.70 मीटर की ऊंचाई पर आसानी से पहुंच िाले स्ट्थान पर लगा होगा तादक आपात जस्ट्थजत में संपूण यइमारत की पूरी जिद्युत आपूर्तय को आइसोलेट दकया िा सके; (ii) बहुमंजिला इमारत का स्ट्िामी अथिा अजधभोगी यह सुजनजित करेगा दक इमारत के अंिर जिद्युत प्रजतष्ठापन और कायय इस प्रकार कराया िाए और संरजित दकया िाए दक जिद्युतीय झटका अथिा आग से होने िाले खतरों को रोका िा सके तथा यह भी सुजनजित करेगा दक प्रजतष्ठापन का कायय सुसंगत मानकों के अनुरूप कराया गया है; (iii) जबिली के कोर जबछाने के जलए उपलब्ध कराए गए डक् ट के साथ कोई अन् य सर्ियस पाइप अथिा केबल नहीं लगाई िाएगी और जबिली के तारों के जलए उपलब्ध कराए गए तथा डक् ट तथा अन्य उपकरणों के जलए प्रत्येक फ्लोर क्ॉलसंग पर िायर बैठरयर उपलब्ध होंगे; (iv) सुसंगत मानकों के अनुसार पंद्रह मीटर से अजधक ऊंचाई के जनमायण म ेंिायर ठरटाडेंट लो स्ट्मोक और लो हैलोिन पािर केबल्स का उपयोग दकया िाएगा: परन्तु यह दक इमारत की ऊंचाई से असंबि, सुसंगत मानकों के अनुसार हलोिन फ्री फ्लेम ठरटाडेंट पािर केबल का उपयोग हिाई अड्डों, अस्ट्पतालों और होटलों में दकया िाएगा; (v) तलों पर जिद्युत का जितरण बस बार रंककंग प्रणाली का उपयोग करके दकया िाएगा; (vi) इमारत की तजड़त सुरिा सुसंगत मानकों के अनुसार होगी; (vii) भिन के जिद्युत तारों का सत्यापन सुसंगत मानकों के अनुसार दकया िाएगा; और (viii) जबिली मीटर को सीढ़ी के मागय में स्ट्थाजपत नहीं दकया िाएगा। 39. 250 िोल्ट स े अजधक िोल्ट िाल े प्रजतष्ठापनों म ें लाग ू होन े िाली ितें– जिन प्रजतष्ठापनों में 250 िोल्ट से अजधक िोल्ट की जबिली सप्लाई की िाती है, कनिटय की िाती है, रांसिॉमय की िाती ह ै अथिा उपयोग की िाती है, को जनम्नजलजखत ितों का पालन करना होगा, अथायत:- (i) ओिरहैड लाइनों को छोड़कर, सभी कंडक्टर मिीनी तौर पर मिबूत धातु के ऐसे जडब्बों में बंि होने चाजहए अथिा धातु के आिरण से ढके होने चाजहए, जिनसे होकर जिद्युत प्रिाह बना रह ेदकन्तु दकसी भी यांजत्रक नुकसान से ये कंडक्टर सुरजित रहें।18 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] ऐसे कंडक्टरों तक केिल अजभजहत व्यजियों की ही पहुचं होनी चाजहए और इन्हें इस प्रकार स्ट्थाजपत तथा सुरजित दकया िाना चाजहए दक इससे दकसी प्रकार का खतरा न रहे; परंतु यह दक 650 िोल्ट तक के िोल् ट िाले प्रजतष्ठापनों में तत् सबंधी मानकों पर खरे उतरने िाले गैर-धाजत्िक कंडयूट का ही उपयोग दकया िाए; (ii) कंडक्टर के रूप में काम करने के जलए बनाए गए उपकरणों को छोड़कर प्रजतष्ठापन से संबंि धातु संबंधी कायय, जडब्बे, अिलंबों को जनधायठरत मानिंडों और जिजनयम 43 के उपबंधों के अनुसार अर्थंग प्रणाली से िोड़ा िाए; और (iii) प्रत् येक जस्ट्िचबोडय के जलए जनम्नजलजखत का पालन दकया िाएगा:- (क) जस्ट्िचबोडय के सामने कम से कम एक मीटर चौड़ाई के स्ट्थान की उपलब्धता; (ख) यदि जस्ट्िचबोडय के पीछे कोई अन्य िोड़ अथिा खुले कनेक्िन है, तो इनके और जस्ट् िचबोडय के पीछे कम से कम 20 सेंटीमीटर अथिा 75 सेंटीमीटर से ज्यािा की िरू ी रखी िाएगी। यह िरू ी सुचालक के उभरे जहस्ट्से के िरू स्ट् थ जबन् ि ुसे नापी िाएगी; और (ग) यदि जस्ट् िचबोडय के पीछे चौड़ाई में 75 सेंटीमीटर से ज्य ािा का खाली स्ट् थान है तो िहां जस्ट् िचबोडय के िोनों तरि से 1.8 मीटर की स्ट् पष् ट ऊाँचाई का आने-िाने का रास्ट् ता होगा। (iv) यदि प्रजतष्ठापन ऐसे पठरसर में लगाया गया ह ै िहां गैस और रसायन सजहत ज्ि लनिील पिाथय उत्पादित दकए िाते हैं, हडैं ल दकए िाते हैं अथिा रखे िाते हैं, ऐसी जस्ट्थजत में जिद्युत प्रजतष्ठापन, उपकरण तथा उपस्ट् कर अजिरोधी, धूल-जमट्टी स े सुरजित, पूरी तरह से जडब्बों में बंि होने चाजहए अथिा सुसंगत मानकों में खतरनाक िेत्रों के बारे में दकए गए जिजनिेिों को पूरा करने िाली समुजचत जिद्युत दिटटंग कराई िानी चाजहए। (v) ऐसे मामलों में िहां, दकसी प्रजतष्ठापन के जलए जिद्युत आपूर्तय का आिेिन दकया गया है अथिा िहां छ: माह या इससे अजधक अिजध के जलए जिद्युत कनेक्िन काट दिया गया है, िहां आपूर्तयकताय तब तक आपूर्तय अथिा जिद्युत की पुनबयहाली आरंभ नहीं करेगा िब तक दक उपभोिा ने इन जिजनयमों के सुसंगत उपबंधों का सभी प्रकार से अनुपालन न कर जलया हो। (vi) ऐसे मामलों में िहां आपूर्तयकताय जिद्युत आपूर्तय आरंभ करना चाहता हो या जबिली का उपयोग करना चाहता हो अथिा जिद्युत कनेक्िन काटने के छ: माह बाि 250 िोल्ट से अजधक ककंतु 650 िोल्ट तक के िोल्ट की जिद्युत आपूर्तय दिर से बहाल करना चाहता हो, िह जिद्युत आपूर्तय कनेक्ट करने अथिा दिर से कनेक्ट करने से पहले जिद्युत जनरीिक को अपने इस आिय का जलजखत में नोठटस िेगा। (vii) जिद्युत आपूर्तय कनेक्ट करने के बाि, आपूर्तयकताय को कभी भी इस बात का पता लगता ह ै दक इन जिजनयमों के उपबंधों का अनुपालन नहीं दकया िा रहा है, िह उपभोिा और जिद्युत जनरीिक को इन उपबंधों के उल्लंघन का ब्यौरा तथा उपभोिा को ऐसी खाजमयों को एक जनजित समय में िरू करने की चेतािनी िेते हुए एक जलजखत नोठटस िेगा: परंतु यह दक यदि उपभोिा बताई गई खाजमयों को िरू करने में असिल रहता है, तो आपूर्तयकताय उपभोिा को सुनिाई और जलजखत में कारणों को ििय करने के जलए समुजचत समय िेने के बाि आपूर्तय काट िेगा ककंतु आपूर्तय तभी काटी िाएगी िब आपूर्तयकताय द्वारा सम्यक रूप से अजधसूजचत अजधकारी ने जलजखत में ऐसे आिेि िे दिए हो और आपूर्तयकताय की संतुजष्ट के अनुरूप कजमयों को िरू करने के पिात जिद्युत आपूर्तय िीघ्र से िीघ्र बहाल कर िी िाएगी। 40. कजमयों के सबं ंध म ेंजिद्यतु जनरीिक स ेअपील- (1) यदि कनेक्िन के जलए आिेिन करने िाला व्यजि प्रजतष्ठापन में खाजमयों अथिा इससे संभाजित खतरों के आधार पर जबिली िेने के संबंध में आपूर्तयकताय द्वारा इंकार दकए िाने से असंतुष्ट है, िह जिद्युत जनरीिक को प्रजतष्ठापन की िांच करने की अपील कर सकता ह।ै यदि जिद्युत जनरीिक यह सूचना िेता ह ैदक प्रजतष्ठापन में कोई कमी नहीं है अथिा इससे कोई खतरा नहीं है तो आपूर्तयकताय उपभोिा को उि कारणों के आधार पर जबिली िेने से इनकार नहीं कर सकता और जिद्युत जनरीिक से सूचना प्राप्त होने के चौबीस घंटे के अंिर जिद्युत आपूर्तय आरंभ हो िानी चाजहए, बनी रहनी चाजहए अथिा दिर से बहाल हो िानी चाजहए। (2) उप-जिजनयम (1) के अधीन दकसी भी परीिण के जलए आिेिन करने पर, आिेिन प्राप्त होने के सात दिन के अंिर यह परीिण दकया िाएगा। 41. सप्लाई िेल होन ेस ेबचने के जलए सािधाजनया ंऔर सप्लाई िेल होन ेकी सचू ना- (1) आपूर्तयकताय अपन ेआपूर्तय िेत्र में सामान्य कायय पठरजस्ट्थजतयों में जिद्युत आपूर्तय के जलए जबिली की लाइनें जबछाते समय इन्ह ें अलग-अलग खंडों में बांटेगा और इस प्रकार व्यिजस्ट्थत करेगा तथा जस्ट्िचजगयर अथिा सर्कयट ब्रेकर लगाएगा और इन्हें इस प्रकार ऐसी िगहों पर लगाएगा तादक सप्लाई िेल होने की जस्ट्थजत में इससे प्रणाली का एक सीजमत जहस्ट् सा ही प्रभाजित हो सके।[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 19 (2) आपूर्तयकताय िघु यटनािि आपर्ू तय िप होने से बचने, और साथ ही आम लोगों अथिा जबिली की लाइनें जबछाने, लाईनों का जिस्ट्तार करने, लाइनें बिलने, मरम् मत अथिा रखरखाि िैसे दकसी कायय के िौरान लाइनों पर काम करने िाले कमयचाठरयों को होने िाले खतरों से बचाने के जलए सभी यथोजचत सािधाजनयां बरतेगा। (3) आपूर्तयकताय आपूर्तय िेल होने की ऐसी घटना के बारे में जिद्युत जनरीिक को सूचना िेगा क्योंदक जिद्युत जनरीिक को समय–समय पर ऐसी िानकारी िने ा अपेजित हो सकेगा, और सप्लाई िेल हो िाने के बाि अथिा आपूर्तयकताय को सप्ल ाई िेल होने की िानकारी जमलने के बाि यह नोठटस संचार के तीव्रतम माध्यम द्वारा भेिा िाएगा और यह नोठटस अनुसूची-IV में दिए गए प्ररूप में होगा। (4) प्रजतष्ठापन के कुिल काययकरण की िांच अथिा दकसी अन्य प्रयोिन के जलए आपूर्तयकताय के प्रजतष्ठापन से कनेक्ट की गई जिद्युत आपूर्तय लाइन को िब भी िरूरी हो, जडस्ट्कनेक्ट दकया िा सकता है, परन्तु यह दक आपूर्तयकताय ने इस जडस्ट्कनेक्िन से प्रभाजित होने िाले उपभोिाओं को कम से कम चौबीस घंटे पहले अिगत करा दिया हो: परंतु यह दक आपातकालीन जस्ट्थजत में कोई भी ऐसा नोठटस नहीं दिया िाएगा। अध्य ाय-5 650 िोल्ट स ेअनजधक के िोल्ट िाले जिद्यतु प्रजतष्ठापनों तथा उपकरणों के जलए सरु िा सबं ंधी उपबधं 42. इंसुलिे न के रेजिस्ट्ट ेंस का परीिण– ऐसे मामलों में िहां 650 िोल्ट से अनजधक िोल् ट िाली जिद्युत आपूर्तय लाइन संयोिन, िेरबिल अथिा मरम् मत के उद्देश् य से प्रणाली से अलग कर िी गई हैं, ऐसी जिद्युत आपूर्त यलाइन को प्रणाली से तब तक दिर स े नहीं िोड़ा िाएगा िब तक आपूर्तयकताय अथिा स्ट्िामी ने परीिण नहीं कर जलया हो। 43. भ-ू सपं कय के जलए कनेक्िन– 50 िोल्ट से अजधक ककंतु 650 िोल्ट से अनजधक की िोल्ट िाली प्रत्येक प्रणाली के भू-संपकय कनेक्िन पर जनम्नजलजखत ितें लागू होंगी, अथायत:- (i) सुसंगत मानकों के अनुसार तीन िेज़, चार-तार प्रणाली के न्यूरल कंडक्टर और िो िेज़, तीन-तार प्रणाली के मध्य कंडक्टर को अथय दकया िाएगा; (ii) न्यूरल कंडक्टर को उपभोिा के पठरसर में अथय के साथ दकसी भी कनेक्िन के अलािा जितरण प्रणाली या सर्ियस लाइन के साथ एक या एक से अजधक लबंिओंु पर भी िोड़ा िाएगा; (iii) संकेंदद्रत केबल िाली जिद्युत आपूर्तय लाइनों िाली प्रणाली के मामले में, ऐसे केबलों के बाहरी कंडक्टर या किच को अर्थंग जसस्ट्टम के साथ िो पृथक और सुजभन्न कनेक्िनों द्वारा िोड़ा िाएगा; (iv) डायरेक्ट करंट जसस्ट्टम में, अर्थंग और सुरिा उपाय सुसंगत मानकों के अनुसार होंगे; (v) प्रत्येक भिन में सुसंगत मानकों के अनुसार अनािृत् त और बाहरी प्रिाहकीय भागों को आपस में िोड़कर सुरिात्मक समजिभि बंधन होगा; (vi) प्रत्यािती धारा प्रणाजलयााँ िो इस जिजनयम के अनुसार अथय से िुड़ी हैं, जिद्युत रूप से परस्ट्पर िुड़ी होंगी: परन्तु यह दक अथय के साथ प्रत्येक कनेक्िन जिद्युत आपूर्तय लाइनों की धातु िीलथंग और धातु किच, यदि कोई हो, से िुड़ा हो; (vii) प्रत्येक िनरेटर, जस्ट्थर मोटर, पोटेबल मोटर, और धातु के पुिों का फ्रेम, िो कंडक्टर के रूप में अजभप्रेत नहीं है, सभी रांसिामयर और जबिली को जिजनयजमत या जनयजं त्रत करने के जलए उपयोग दकए िाने िाले दकसी भी अन्य उपकरण, और तथा 250 िोल्ट से अजधक ककंतु 650 िोल्ट से अनजधक के िोल् ट के जबिली की खपत से संबंजधत सभी उपकरणों को उनका स्ट्िामी िो पृथक तथा सुजभन्न कनेक्िनों द्वारा भू-संपकय से िोड़ेगा िैसा दक सुसंगत मानकों में जनर्ियष्ट दकया गया है; (viii) दकसी भी जिद्युत आपूर्तय लाइन या उपकरण को रखने या उसकी रिा करने िाले धातु के सभी जडब्बे या धाजत्िक आिरण भू-संपकय से िुड़े रहगें े और इन्ह ें सभी िंक्िन बॉक्सों और अन्य प्रिेि लबंिओंु पर इस प्रकार कनेक्ट दकया िाएगा दक इनकी पूरी लंबाई पर मिीनी तथा जिद्युतीय कनेक्िन िीक से बना रहे; परंतु यह दक इस जिजनयम में उजल्लजखत ितें उन मामलों में लागू नहीं होंगी िहां आपूर्तय िोल् ट 250 िोल्ट से अजधक नहीं ह ै और उपकरणों में िाल टयूब अथिा ब्रेकेट, इलेक्रोलायसय, जस्ट् िच, जसललंग िैन, अन् य दिटटंग सजम्मजलत ह।ैं इनमें पोटेबल हैंड लैंप और पोटेबल और रांसपोटेबल उपकरण सजम्मजलत नहीं ह।ै परंतु इनमें अथय टर्मयनल न लगा हो और इनमें क्लास-।। उपकरण तथा सुसंगत मानकों के उपकरण भी सजम्मजलत नहीं है:20 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] परंतु यह और दक ऐसे मामलों में िहां सप्लाई िोल्टेि 250 िोल्ट से अजधक नहीं ह ै और िहां प्रजतष्ठापन या तो नए ह ैं या इनका पुनरोिार दकया गया है, में सभी प्लग िॉकेट थ्री-जपन टाइप के होंगे और तीसरी जपन को स्ट् थायी रूप से तथा प्रभािी ढंग से अथय दकया िाएगा; (ix) सभी भू-संपकय प्रणाजलयों में जनम्नजलजखत व्यिस्ट्था होंगी:– (क) सभी करंट न ले िाने िाले धात ु की िस्ट्तुओं को उजचत रूप से अथय जिभि पर बनाए रखने और इस तरह के धातु कायों पर खतरनाक सम्पकय जिभि से बचने के जलए सभी भूसम्पकय प्रणाजलयााँ ससु ंगत मानकों के अनुरूप समजिभि बोलन्डंग कंडक्टर से यिु होंगी िो स्ट्िीकायय तापमान सीमा को लांघे जबना भािी अथ य िाल्ट करंट को ल ेिाने म ेंसिम होंगी; (ख) सुसंगत मानकों में जनधाठय रत समय के भीतर सुरिा के संचालन हते ु पयायप्त िॉल्ट करंट की अनुमजत िेने के जलए अथय िॉल्ट लूप इजम्पडेन्स को पयायप्त रूप से कम रखा िाएगा; (ग) यांजत्रक रूप से मिबूत होना, संिारण का सामना करना और प्रजतष्ठापन काल के िौरान जिद्युत जनरंतरता बनाए रखना और जिद्युत आपूर्तय लाइनों या उपकरणों को सदक्य करने से पहले यह सुजनजित करने के जलए सभी अर्थंग जसस्ट्टम का परीिण दकया िाएगा; (x) आपूर्तयकताय से संबंजधत सभी अर्थंग जसस्ट्टम को िषय में कम से कम एक बार िुष्क मौसम के िौरान िुष्क दिन पर प्रजतरोध के जलए परीिण दकया िाएगा; (xi) सुरिात्मक उपकरण के स्ट्ित: संचालन को सुजनजित करने के जलए अथय िॉल्ट लूप इजम्पडेन्स का परीिण दकया िाएगा और प्रत्येक अथय परीिण का ठरकॉडय बनाया िाएगा और उसके पठरणाम को आपूर्तयकताय द्वारा परीिण के दिन के बाि कम से कम िो साल की अिजध के जलए रखा िाएगा और आिश्यकता पड़ने पर जिद्युत जनरीिक के जलए उपलब्ध रहेगा:- (xii) प्रत्येक सर्कयट का अथय िॉल्ट लूप इजम्पडेन्स सुरिात्मक उपकरण के प्रकार और करेन्ट रेटटंग द्वारा जनधायठरत मान तक इस तरह सीजमत होगा तादक अथ्य ि ाल् ट होने पर, संभाजित स्ट्पिय िोल्टेि के हाजनकारक मान तक पहुंचने से पहले आपूर्तय का जडस्ट्कनेक् िन हो िाएगा; और (xiii) प्रत्येक िेनरेटर और रांसिॉमयर के न्यूरल पॉइंट को िो पृथक और सुजभन्न कनेक्िनों द्वारा अर्थंग जसस्ट्टम से िोड़कर अथय दकया िाएगा। 44. अिजिष्ट करंट उपकरण- ससु ंगत मानक के अनुसार रेटेड अिजिष्ट करंट और अिजध िाली आपूर्तय को जडस्ट्कनेक्ट करने के जलए जिद्युत स्ट्थापना में जिद्युत का उपयोग एक अिजिष्ट करंट उपकरण द्वारा जनयंजत्रत दकया िाएगा; परंतु यह दक घरेलू प्रजतष्ठापन में 30 जमली-एजम्पयर से अनजधक अिजिष्ट ऑपरेटटंग करंट िाले अिजिष्ट करंट जडिाइस का उपयोग दकया िाएगा: परंतु यह और दक सुरिात्मक उपकरणों िाली आपूर्तय लाइनों के जलए ऐसे सुरिात्मक उपकरण की आिश्यकता नहीं होगी िो प्रभािी रूप से आपूर्तय रांसिामयर के न्यूरल से िुड़े होते ह ैंऔर जिजनयम 76 के अनुरूप होते ह।ैं अध्य ाय-6 650 िोल्ट स ेअजधक िोल्ट िाल ेजिद्यतु प्रजतष्ठापनों और उपकरणों के जलए सरु िा सबं ंधी उपबंध 45. जिद्यतु जनरीिक द्वारा अनमु ोिन और स्ट् ि:प्रमाणन- (1)(क) उपयुयि जिजनयमों के अंतगयत जनर्िष्टय सुरिा उपायों का अनुपालन सुजनजित करने हते ु, अजधसूजचत िोल्टेि या उससे कम िोल्टेि िाले जिद्युत प्रजतष्ठापन म ें आपूर्तय िरूु करने से पूिय अथिा छ: महीने या उससे अजधक समय से बंि जिद्युत प्रजतष्ठापन की आपूर्तय बहाल करने से पूिय, ऐसे प्रजतष्ठापन का जनरीिण, परीिण एिं स्ट्ि:प्रमाणन प्रजतष्ठापन के स्ट्िामी या आपर्ू तयकताय या उपभोिा, यथाजस्ट्थजत, द्वारा स्ट्ियं दकया िाएगा और स्ट्ि:प्रमाणन की ठरपोटय स्ट्िामी या आपूर्तयकताय या उपभोिा, यथाजस्ट्थजत, इन जनयमों की अनुसूची II के अधीन प्रिान दकए गए प्ररूपों में जिद्युत जनरीिक को प्रस्ट्तुत करेगा: परन्तु यह दक स्ट्ि:प्रमाजणत दकया गया ऐसा जिद्युत प्रजतष्ठापन आपूर्तय बहाल करने या छह महीने बंि रहने के पिात आपूर्तय पुनबयहाल करने हते ु उपयुि माना िाएगा यदि स्ट्ि:प्रमाणन की ठरपोटय जिद्युत जनरीिक के कायायलय में जिजधित प्राप्त हो िाती ह ैऔर यदि जिद्युत जनरीिक तीन काययदििस के भीतर इसकी प्रजत ग्रजहत नहीं करते तो तो इसे प्राप्त माना िाएगा: परन्तु यह और दक स्ट्िामी या आपूर्तयकताय या उपभोिा के पास समुजचत सरकार के जिद्युत जनरीिक से अपने प्रजतष्ठापन का जनरीिण और परीिण कराने का जिकल्प होगा;[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 21 (ख) खण् ड (क) के दकसी भी प्रािधान के बाििूि, अजधजनयम की धारा 54 के अंतगयत आने िाले प्रत्येक जिद्युत प्रजतष्ठापन, जिसमे रेलिे के प्रत् येक जिद्युत प्रजतष्ठापन िाजमल ह,ैं का जनरीिण एिं परीिण समुजचत सरकार के जिद्युत जनरीिक द्वारा ही दकया िाएगा िैसा दक उपजिजनयम (3) में जनर्ियष्ट ह।ै (2) िह िोल् टेि स्ट्तर जिसके ऊपर के जिद्युत प्रजतष्ठापनों की जिसमें दक आपूर्तयकताय या उपभोक् ता का प्रजतष्ठापन िाजमल ह,ै जिद्युत जनरीिक द्वारा जनरीिण और िांच की िाएगी, को समुजचत सरकार द्वारा अजधसूजचत दकया िायेगा। (3) अजधसूजचत िोल्टेि से अजधक िोल्टेि िाले जिद्युत प्रजतष्ठापनों और जिजनयम 34 में जनर्ियष्ट िमता से अजधक उत्पािक इकाइयों के सभी उपकरणों को आपूर्तय िुरू करने अथिा छ: महीने या उससे अजधक समय से बंि जिद्युत प्रजतष्ठापन की आपूर्त य बहाल करने से पूिय, इन जिजनयमों के अंतगयत जनर्ियष्ट सुरिा उपायों का अनुपालन सुजनजित करने हते ु, ऐसे प्रजतष्ठापनों का जनरीिण और परीिण जिद्युत जनरीिक द्वारा दकया िाएगा। (4) छ: माह या इससे अजधक समय से काटी गई अजधसूजचत िोल् टेि से अजधक के संस्ट् थापन में आपूर्त य को िुरू अथिा पुन: िुरू करने के जलए जिद्युत जनरीिक को आिेिन करने से पहले आपूर्तयकताय यह सुजनजश् चत करेगा दक जिद्युत आपूर्तय की उसकी लाइनें या अजधसूजचत िोल् टेि से अजधक के उसके उपकरण सही स्ट् थान पर लगे हैं, िीक से िुड़े हुए ह ैं और ये पूरे ह ैं तथा इसकी िांच कर ली गई ह ै और आपूर्तयकताय द्वारा जिद्युत की आपूर्तय जनरीिण की आिश् यकता की िोल् टेि िाले प्रजतष्ठापन में इन जिजनयमों के अंतगयत तब तक िुरू नहीं की िाएगी िब तक दक जिजनयमों 14 से 31, जिजनयम 35 से 37, जिजनयम 46 से 53 और जिजनयम 57 से 80 के उपबंधों का पालन न कर जलया गया हो और उसने जिद्युत जनरीिक से जलजखत में अनुमोिन प्राप्त न कर जलया हो: परंतु यह दक आपूर्तयकताय जिजनयम 48 में जिजनर्ियष् ट परीिणों के प्रयोिन के जलए उपयुयक् त जिद्युत आपूर्तय लाइनों या उपकरणों को ऊर्ियत कर सकता है। (5) अजधसूजचत िोल् टेि से अजधक के दकसी संस्ट् थापन का स्ट् िामी अपन ेसस्ट्ं थापन या उनमें अजतठरक् त िुड़ाि हते ु अनुमोिन के जलए जिद्युत जनरीिक को आिेिन करने से पहले ओिरहडै लाईन के अजतठरक् त, प्रत् येक सर्कयट या अजतठरक् त िुड़ाि की िांच करेगा और अपनी संतुजष् ट करेगा दक िे जिजनयम 48 में जनधायठरत परीिण िोल् टेि का सामना कर सकता ह ैंऔर इस प्रकार दकए गए परीिणों को पूणयतया ििय करेगा और इन् हें जिद्युत जनरीिक को अग्रेजषत करेगा: परंतु यह दक जिद्युत जनरीिक ऐसे स्ट् िामी को इस प्रकार के परीिण जिन् हें िह िरूरी समझता हो, करने हते ु जनिेि िे सकता है या दकसी जििेष उपकरण के संबंध में जिजनमायता के प्रमाजणत परीिणों को इस जिजनयम में अपेजित परीिणों के स्ट् थान पर स्ट्ि ीकार कर सकता है। (6) दकसी भी प्रजतष्ठापन का स्ट् िामी िो अपने प्रजतष्ठापन में कोई पठरिधयन अथिा िेरबिल करता ह ै तो िह उक् त िेरबिल या पठरिधयन को िाजमल करते हुए अपने उपकरणों या जिद्युत आपूर्तय लाइनों को आपूर्तय से तब तक नहीं िोड़ेगा, िब तक दक इस पठरिधयन या िेरबिल को, यथाजस्ट् थजत, जिद्युत जनरीिक द्वारा जलजखत में अनुमोदित नहीं दकया गया हो या यह संस्ट् थापन के स्ट् िामी द्वारा स्ट्ि -प्रमाजणत नहीं दकया गया हो। (7) खानों और तेल िेत्रों की स्ट्थापना के मामले में, िोल्टेि 650 िोल्ट और उससे ऊपर की जिद्युत स्ट्थापना आपूर्तय से िुड़ी नहीं िाएगी, िब तक दक छह महीने के जलए िटडाउन के बाि पठरितयन या पठरिधयन या दिर से िुरू करने सजहत इस तरह के स्ट्थापना कायय को खान के जिद्युत जनरीिक द्वारा जलजखत रूप में अनुमोदित नहीं दकया िाता ह:ै परंतु यह दक खानों और तेल िेत्रों में 650 िोल्ट से कम िोल्टेि की जिद्युत स्ट्थापना उप-जिजनयम (1) में जिजनर्ियष्ट तरीके से आपूर्तय िुरू करने अथिा छह महीने या उससे अजधक के जलए बंि होने के बाि आपूर्तय दिर से िुरू करने से पहले खिान के स्ट्िामी या एिेंट या प्रबंधक द्वारा स्ट्ि-प्रमाजणत की िाएगी। 46. 650 िोल्ट स ेअजधक की िोल्ट ेि पर जिद्यतु का प्रयोग- (1) जिद्युत जनरीिक िहां आपूर्तय िोल्टेि अजधसूजचत िोल्टेि से अजधक ह,ै आपूर्तय िुरू करने या िहां आपूर्तय छह महीने या उससे अजधक की अिजध के जलए बंि कर िी गई है, आपूर्तय दिर से िुरू करने के जलए आपूर्तयकताय को अजधकृत नहीं करेगा या आपूर्तयकताय, िहां आपूर्तय िोल्टेि अजधसूजचत िोल्टेि के बराबर या उससे कम ह,ै लेदकन 650 िोल्ट से अजधक है, आपूर्तय िुरू नहीं करेगा या िहां आपूर्तय छह महीने या उससे अजधक की अिजध के जलए बंि कर िी गई ह ैआपूर्तय दिर से िुरू नहीं करेगा, िब तक दक उपभोिा- (क) सभी सुचालक और यंत्र उपभोक् ता के पठरसर में इस प्रकार लगाए गए हों दक िे अजभजहत व् यजक् त को छोड़कर सभी की पहुचं से बाहर हों;22 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] (ख) उपभोक् ता ने अनुरिण की सहमजत के साथ एक अलग भिन अथिा जडिाईन और स्ट्थान पर बनी सहमजत के अनुसार एक मौसमानुकूल और अजग्न रोधक बंि भिन उपलब्ध कराया ह,ै िो दक आपूर्तयकताय के उसके उपकरण और मीटर संबंजधत उपस्ट् कर रखने के जलए हर समय पहुचं गम् य हो, या दिर िहां अलग से भिन या चारिीिारी का प्रािधान न हो, उपभोक् ता ने आपूर्तयकताय के उपयुयक् त उपकरणों को दकसी अन् य भाग में अपने उपकरणों से अलग न कर जलया हो: परन्तु यह दक पृथक् कीकरण अजग्न रोधक िीिारों द्वारा दकया िाएगा, यदि जिद्युत जनरीिक इसे आिश् यक समझे तो; परन्तु यह और दक आउटडोर प्रजतष्ठापन के मामले में, उपभोक् ता स्ट् ियं ही आपूर्तयकताय से संबंजधत उक् त उपकरण को उपयुक् त रूप से पृथक करेगा; (ग) खंभों पर ठटकने िाले सभी प्रकार के सबस्ट्टेिन जिजनयम 52 के अनुसार बनाए िाएंगे और अनुरजित दकए िाएंगे। (2) ऐसे मामलों में िहां 650 िोल्ट से अजधक की िोल् ट की जबिली की आपूर्तय की िाती है, कन्िटय, रांसिॉमय की िाती है अथिा उपयोग की िाती ह,ै प्रजतष्ठापन का स्ट्िामी जनम्नजलजखत ितों का पालन करेगा,- (i) सुसंगत मापिंडों के जिजनिेि अनुसार जिद्युत उपकरणों के जलए सुरिा संबंधी अंतराल बनाए रखेगा तादक उपकरण के पास काम करने िाले संचालन और रखरखाि कर्मययों को जबना दकसी खतरे के आसान संचालन और रखरखाि और पयायप्त िेंठटलेिन सुजनजित करने के जलए पयायप्त िगह उपलब्ध हो: परन्तु यह दक खानों के मामले में, जिद्युत उपकरण के जलए सुरिा सम्बन्धी अंतराल सुसंगत खनन जिजनयमों के अनुसार हो; (ii) इस प्रकार के प्रजतष्ठापन के नीचे दकसी भी अजतक्मण की अनुमजत नहीं िेगा; परंतु यदि जिद्युत जनरीिक को ऐसे दकसी भी अिैध कब्िे की िानकारी जमलती ह ै तो िह स्ट्िामी को इन अिैध कब्िों को हटाने का जनिेि िेगा; (iii) यह सुजनजित करेगा दक 650 िोल्ट से अजधक िोल्ट िाले प्रजतष्ठापनों की ओिरहैड लाइनों को छोड़कर आउटडोर उप-स्ट्टेिनों में खुले सुचालकों अथिा दकसी भी उपकरण के जिद्युत आिेजित कल-पूिों पर कायय करने के बारे में अनुसूची V में जनर्ियष्ट न्यूनतम सुरिा संबंधी िठूरयों को बनाए रखेगा; (iv) यह सुजनजित करेगा दक सभी उपकरणों का लाइि जहस्ट् सा िहााँ दकसी भी अिस्ट्था में व्यजि की आिश्यक पहुाँच हो सकती ह,ै उपयुि रूप से संरजित रखे तादक दकसी भी प्रकार का खतरा न रह;े (v) यह सुजनजित करेगा दक िहां रांसिामयर उपयोग में लाए िा रह े ह ैं िहां सर्कयट के एक लबंि ु को कम िोल्टेि पर िोड़ दिया िाए अथिा अन् यथा भ-ू संपकय से िोड़ दिया िाए तादक िघु यटनािि अथिा उच्च िोल्टेि पर सर्कयट में लीकेि होने पर उि सर्कयट के सामान्य िोल्टेि से ज्यािा पर आिेजित हो िाने से होने िाले खतरे को टाला िा सके; (vi) 2000 लीटर से ज्यािा तेल िाले उपकरण युि सबस्ट्टेिन अथिा जस्ट्िलचंग स्ट्टेिन ऐसे बेसमेंट में नहीं लगाएगा िहां िेनेि की उजचत व्यिस्ट्था न हो; (vii) िहां 2000 लीटर से अजधक तेल िाले रांसिॉमयर, स्ट्टेठटक कंडेंसर, जस्ट्िचजगयर या ऑयल सर्कयट ब्रेकर िैसे तेल से भरे उपकरण के साथ एक सबस्ट्टेिन या जस्ट्िलचंग स्ट्टेिन स्ट्थाजपत दकया गया है, चाह े िह अंिर हो या बाहर, जनम्नजलजखत उपाय सुजनजित करेगा:- (क) सुसंगत मानकों में जिजनर्ियष्ट मोटाई और आयामों की सेपरेिन िाल या अजि अिरोधक िीिारें उपकरणों के बीच, उपकरण और आसन्न इमारत के बीच प्रिान की िाएंगी यदि उपकरण इकाइयों के जनकट इमारत की िीिार को चार घंटे की अजि प्रजतरोध रेटटंग के जलए रेट नहीं दकया गया है; (ख) उपयुक् त ऑयल सोकजपट उपलब्ध कराई िाएंगी और िहां दकसी भी एक टैंक, ठरसेजप्टकल अथिा चेंबर में 9000 लीटर से ज्यािा तेल का उपयोग होता है, िहां टैंक, ठरसेजप्टकल अथिा चैंबर से ठरसाि होने िाले अथिा बच जनकलने िाले तेल की जनकासी के जलए िेनेि व्यिस्ट्था की िाएगी और दकसी भी कारणिि तेल के आग पकड़ने और उसके ििह से आग को िैलने से रोकने के जलए जििेष सािधाजनयां बरती िाएंगी और आग बुझाने के जलए पयायप्त उपबंध दकए िाएंगे; (ग) दकसी भी सबस्ट्टेिन अथिा जस्ट्िलचंग स्ट्टेिन में बचे हुए तेल का भंडारण नहीं दकया िाएगा और इनके पठरसर में तेल से भरे उपकरण नहीं रखे िाएंगे;[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 23 (घ) सुसंगत मानकों के अनुसार तैयार की गई अनुरिण अनुसूची के आधार पर सभी रांसिामयरों और जस्ट् िचजगयरों का रखरखाि दकया िाएगा; (viii) उपरोि उपायों की अनिेखी दकए जबना िह उपकरणों में लगी आग को बुझाने के जलए आग का पता लगाने और उससे सुरिा संबंधी पयायप्त व्यिस्ट्था करेगा; (ix) यह सुजनजित करेगा दक 10 एमिीए का प्रत् येक रांसिामयर या 10 एमिीएआर का प्रत्येक ठरएक्टर और उससे ऊपर की रेटटंग के प्रत्येक रांसिॉमयर या ठरएक्टर को सुसंगत मानकों के अनुसार स्ट्िचाजलत अजििमन प्रणाली प्रिान की िाएगी; (x) िहां बेसमेंट में सबस्ट्टेिन, या जस्ट्िलचंग स्ट्टेिन का लगाना आिश्यक है, उसके जलये जनम्नजलजखत उपाय करेगा, अथायत्:- (क) रांसिॉमयर रूम पहले बेसमेंट की पठरजध पर हो; (ख) बाहर से रांसिॉमयर कि में सीधी पहुचाँ प्रिान की िानी चाजहए और प्रासंजगक मानकों के अनुसार चार घंटे की आग सहने की रेटटंग िाली आसपास की िीिारें प्रिान करने चाजहए; (ग) रांसिॉमयर कि के प्रिेि द्वारों पर िो घंटे की अजि रेटटंग के अजि प्रजतरोधी िरिािे उपलब्ध कराए िाने चाजहए और िरिािे हमेिा बंि रखे िाने चाजहए और इस आिय की सूचना िरिािे के बाहर जचपका िी िानी चाजहए; (घ) बेसमेंट के अन्य भागों में टूटे रांसिॉमयर से तेल के प्रिाह को रोकने के जलए प्रिेि द्वार पर एक उपयुि ऊंचाई का िहलीि प्रिान दकया िाना चाजहए; (ङ) प्राइमरी साइड और सेकेंडरी साइड की केबलों में सभी तलों पर सीललंग होनी चाजहए और िॉल ओपलनंग कम से कम िो घंटे की आग सहने िाली रेटटंग की होनी चाजहए; (च) सुसंगत मानकों के अनुसार लो स्ट्मोक लो हलै ोिन केबल का उपयोग दकया िाना चाजहए। (xi) यह सुजनजित करेगा दक आिासीय या व्यािसाजयक भिनों के अलािा अन्य भिनों के अंिर स्ट्थाजपत, तेल से भरे रांसिामयर भूतल पर रखे िाएंगे या पहले बेसमेंट के नीचे नहीं रखे िाएंगे; (xii) यह सुजनजित करेगा दक आिासीय और िाजणजज्यक भिनों के अंिर केिल िुष्क प्रकार के रांसिॉमयर का ही उपयोग हो; (xiii) यह सुजनजित करेगा दक सबस्ट्टेिनों और केबल िाले जस्ट्िलचंग स्ट्टेिनों के अंिर केबल खाइयां रेत, कंकड़ या इसी तरह की गैर-ज्िलनिील सामग्री से भरी हुई हैं या पूरी तरह से गैर-ज्िलनिील स्ट्लैब से ढकी हुई हैं; और (xiv) यह सुजनजित करेगा दक िब तक पठरजस्ट्थजत ऐसी न हों दक साि-सिाई अथिा अन्य कायय के जलए सभी सुचालकों और उपकरणों को एक साथ आिेि रजहत दकया िाए, उि सुचालकों अथिा उपकरणों को इस प्रकार व्यिजस्ट्थत दकया िाए दक इन्ह ेंखंडों में आिेिरजहत दकया िा सके, और ऐसे दकसी खंड में जबना दकसी खतरे के कोई भी व्यजि, इन जिजनयमों के तहत अजभजहत या जनयुि या प्रिृत् त या अनमु त कायय कर सके; (3) उच्च िोल्टेि डायरेक्ट करंट मामलों में, खुले सुचालकों अथिा पठरसर से बाहर सब-स्ट्टेिनों में लगे उपकरणों, ओिरहैड लाइनों को छोड़कर, लाइि भागों के जलए अनुसूची VI में जनर्ियष्ट न्यूनतम िरू ी बनाए रखी िाएगी; (4) 66 दकलोिोल्ट और इससे अजधक क्लास के लाइनों के जलए मेन लाइन से कोई टैलपंग नहीं की िाएगी: परन्तु यह दक प्राकृजतक आपिाओं के िौरान सामान्य जस्ट्थजत बहाल होने तक प्रभाजित िेत्रों में आपातकालीन जबिली आपूर्तय सुजनजित करने के जलए टैलपंग की अनुमजत िी िा सकती है। 47. 650 िोल्ट स ेअजधक िोल्ट पर जबिली के उपयोग के जलए इंटरलॉक तथा सरं िण:- (1) स्ट्िामी जनम्नजलजखत व्यिस्ट्था सुजनजित करेगा, अथायत:- (क) आइसोलेटसय तथा कंरोललंग सर्कयट ब्रेकसय को इंटर-लॉक दकया िाएगा तादक आइसोलेटसय को तब तक चालू नहीं दकया िा सके िब तक की इनसे िुड़े ब्रेकर खुली अिस्ट्था में न हों; (ख) आइसोलेटसय तथा इससे िुड़े अर्थगं जस्ट्िच इंटर-लॉक होने चाजहए तादक कोई भी अर्थंग जस्ट्िच तब तक बंि न दकया िा सके िब तक दक इससे िुड़े आइसोलेटसय खुली अिस्ट्था में न हों;24 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] (ग) ऐसे मामलों में िहां िो या अजधक आपूर्तययों को समानांतर में संचाजलत करने का इरािा नहीं है, आपूर्तय को जनयंजत्रत करने िाले संबंजधत सर्कयट ब्रेकर या िुड़े जस्ट्िच दकसी भी अजिष्ट समानांतर या बैकिीड की संभािना को रोकने के जलए इंटरलॉक दकए िाएंगे; (घ) िब िो या अजधक रांसिामयरों को समानांतर ऑपरेट दकया िाता है, प्रणाली को इस प्रकार व्यिजस्ट्थत दकया िाएगा दक रांसिामयर का प्राइमरी ब्रेकर ठरप होने पर उसका सेकेंण् िी ब्रेकर स्ट्ित: ठरप हो िाए; (ङ) प्रजतष्ठापन के आिेजित कल-पूिों तक पहुंच प्रिान करने िाले सभी गेट और िरिािे इस प्रकार इंटर-लॉक होने चाजहए दक इन्हें तब तक न खोला िा सके िब तक दक आिेजित कल-पुिों को आिेि रजहत न बना दिया िाए और ऐसे कल-पुिों के नििीक दकसी व्यजि के पहुचं ने से पहले इन कल-पुिों की समुजचत जडस्ट्चार्िंग और अर्थंग सुजनजित की िानी चाजहए; (च) ऐसे मामलों में िहां िो या अजधक िेनेरेटर समांनांतर ऑपरेटर दकए िाते ह ैं और न्यूरल जस्ट्िलचंग की प्रदक्या अपनाई िाती ह,ै इंटरलॉक की सुजिधा उपलब्ध होनी चाजहए तादक िेनरेटर ब्रेकर तब तक बंि न दकया िा सके िब तक दक इनमें से एक न्यूरल अर्थंग प्रणाली से िुड़ा न हो। (2) असाधारण पठरजस्ट्थजतयों में आपूर्तय स्ट्ित: जडस्ट्कनेक्ट करने के जलए सभी प्रणाजलयों और सर्कयटों में जनम्नजलजखत सुरिा व्यिस्ट्था उपलब्ध कराई िाएगी, अथायत:- (क) यदि उपकरण, केबल और सप्लाई लाइन में दकसी भी समय करंट का प्रिाह इतना अजधक होता ह ै जिसे िह सहन नहीं कर सकता है, इसे रोकने के जलए स्ट्ि त: आपूर्तय को जडस्ट्कनेक्ट करने हते ु ओिर करंट प्रोटेक्िन की व्यिस्ट्था; (ख) अथय िॉल्ट करंट के सीमा से अजधक हो िाने पर संपकय जिभि को उजचत अजधमान के अंतगयत बनाए रखने के जलए जिद्युत आपूर्तय को स्ट्ितः जडस्ट्कनेक्ट करने के प्रयोिन से अथय िॉल्ट अथिा अथय लीकेि संरिण व्यिस्ट्था; (ग) 1000 केिीए और उससे अजधक रेटटंग के सभी रांसिॉमयर पर बुखोल्ज़ ठरले, प्रेिर ठरलीि जडिाइस और अलामय और ठरप कॉन्टैक््स के साथ िाइंलडंग और ऑयल तापमान संरिण व्यिस्ट्था; (घ) 10 एमिीए और इससे अजधक की िमता िाले सभी रांसिामयरों को जिभेिी संरिण व्यिस्ट्था के द्वारा इजन्सजपएंट िॉल्ट से सुरजित रखा िाएगा; (ङ) 100 केिीए और उससे अजधक रेटटंग िाले सभी िनरेटरों को रेजस्ट्रक्टेड अथय िॉल् ट अथिा लीकेि से सरु जित रखा िाएगा; (च) 1000 केिीए और उससे अजधक की रेटटंग िाले सभी िनरेटरों को रेजस्ट्रक्टेड अथय िॉल् ट संरजित अथिा जिभेिी संरिण अथिा िोनों व् यिस्ट् थाओं के उपयोग द्वारा िनरेटर िाइंलडंग के अंिर िॉल् ट से सुरजित रखा िाएगा; (छ) 132 दकलोिोल्ट और इससे अजधक के िोल्टेि सबस्ट्टेिन और जस्ट्िलचंग स्ट्टेिन तथा जग्रड से िुड़े िनरेटटंग स्ट्टेिनों में हाई स्ट्पीड बस बार जिभेिी रिण के साथ-साथ स्ट्थानीय ब्रेकर बैकअप रिण व्यिस्ट्था चालू की िाएगी और हमेिा उपलब्ध रहगे ी: परंतु यह दक एक से ज्यािा इनकलमंग िीडर िाले 132 दकलोिोल्ट के मौिूिा सबस्ट्टेिनों और जस्ट्िलचंग स्ट्टेिनों में हाई स्ट्पीड बस बार जिभेिी रिण के साथ-साथ स्ट्थानीय ब्रेकर बैकअप रिण व्यिस्ट्था चालू की िाएगी और हमेिा उपलब्ध रहगे ी; (ि) उपरोि के अलािा, उत्पािन स्ट्टेिनों, सबस्ट्टेिनों और रांसजमिन लाइनों के जलए सभी जिद्युत सुरिा प्रणाली अजधजनयम की धारा 177 की उप-धारा (2) के खंड (ङ) के अधीन प्राजधकरण द्वारा अजधसूजचत जिजनयमों के अनुसार होगी। 48. परीिण, सचं ालन तथा अनरु िण- (1) जिजनयम 45 के अधीन जिद्युत जनरीिक द्वारा अनुमोिन दिए िाने से पहले, जनमातय ा के परीिण प्रमाण पत्र, यदि आिश्यक हो, सुसंगत मानकों के अधीन आिश्यक सभी टाइप, एक्सेप्टेंस और रूटीन परीिणों के जलए प्रस्ट्तुत दकए िाएंगे। (2) िब तक दक उपकरण, केबल अथिा सप्लाई लाइन का सुसंगत मानकों के अनुसार साईट परीिण नहीं कर जलया िाता, 650 िोल्ट से अजधक की िोल्ट िाला कोई भी नया उपकरण, केबल अथिा सप्लाई लाइन चालू नहीं की िाएगी। (3) िब तक उपकरण, केबल अथिा सप्लाई लाइन का सुसंगत मानकों के अनुसार परीिण नहीं कर जलया िाता, मरम्मत[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 25 अथिा िेरबिल के उद्देश्य से छ: माह अथिा इससे अजधक अिजध के जलए जसस्ट्टम से जडस्ट्कनेक्ट करके रखी गई 650 िोल्ट स े अजधक के िोल्ट िाले कोई भी उपकरण, केबल अथिा सप्लाई लाइन चालू नहीं की िाएगी। (4) इस जिजनयम के उपबंधों के होते हुए भी, जिद्युत जनरीिक प्रजतष्ठापन को आिेजित करने से पहले अथिा बाि में कुछ परीिण करिाने के जलए जनिेि िे सकता ह।ै (5) सभी उपकरणों, केबलों और आपूर्तय लाइनों को बेहतर हालत में रखी िाएगी और सुसंगत मानकों के अनुसार समय- समय पर इनके परीिण दकए िाएंगे । (6) सभी उपकरणों, केबल और आपूर्तय लाइनों के सभी परीिणों, ठरलपंग, अनुरिण कायों तथा मरम्मत के ठरकाडय इस प्रकार रखे िाएंगे दक इन ठरकाडों की जपछले ठरकाडों से तुलना की िा सके। (7) 650 िोल्ट से अजधक के िोल्ट िाले सभी प्रजतष्ठापनों के स्ट्िाजमयों का यह िाजयत्ि होगा दक िे प्रजतष्ठापनों को खतरे स े मुि हालात में और जनमायता द्वारा सुझाई गई पठरजस्ट्थजतयों अथिा ससु ंगत मानकों के अनुसार संचाजलत करेंगे। (8) दकसी भी 220 दकलोिोल्ट और ऊपर के िोल्टेि स्ट्तर के रांसिामयर, ठरएक्टर और रांसजमिन लाइन टािरों की जििलता की सूचना जिद्युत संस्ट्थापन के स्ट्िामी द्वारा, जििलता की घटना के अड़तालीस घंटे के भीतर, प्राजधकरण को िी िाएगी और जििलता के कारणों और जििलता की पुनरािृजत्त से बचने के जलए दकए िाने िाले उपायों को घटना के एक महीने के भीतर अनुसूची VII में प्रिान दकए गए िामय में प्राजधकरण को भेिा िाएगा: परन्तु यह दक खानों और तेल िेत्रों के मामले में, 10 एमिीए या उससे ऊपर के रांसिामयर की जििलता की सूचना खानों के जिद्युत जनरीिक को िी िाएगी। 49. धात ुआिरण स ेढकी जिद्यतु आपर्ूत यलाइनों के मामलों म ेंअजधक लीकेि स ेबचन ेके जलए बरती िान े िाली सािधाजनया–ं 650 िोल्ट से अजधक िोल् ट की जिद्युत आपूर्तय लाइनों, ओिरहडै लाइनों को छोड़कर, के मामले में जनम्नजलजखत सािधाजनयां बरती िाएंगी:- (i) जबना दकसी धाजत्िक िाली अथिा किर िाली केबल के सुचालकों को, थमोप्लाजस्ट्टक या क्ॉस ललंक्ड पॉलीथीन, इंसुलेिन िाली केबलों को छोड़कर धाजत्िक आिरण में चढ़ाकर रखा िाएगा। ये आिरण जिद्युत जनरंतरता को बनाए रखने िाल े होने चाजहए तथा भू-संपकय से िुड़े रहगें े और धाजत्िक आिरण की सुचालकता बनाए रखी िाएंगी और िहां आिश्यक हो आिरण को संिठरत होने से बचाने के जलए यथोजचत उपाय दकए िाने चाजहए; (ii) धाजत्िक किर िाले अथय कनेक्िन का रजिस्ट्टेंस पयायप्त तौर पर नीचे रखा िाना चाजहए तादक सुचालक और धाजत्िक किर के बीच इंसुलेिन खत्म हो िाने की अिस्ट्था में कंरोललंग सर्कयट ब्रेकर अथिा कट आउट काम कर सकें। स्ट्पष्टीकरण – इस जिजनयम के प्रयोिन के जलए; (क) थमोप्लाजस्ट्टक इंसुलेिन और धाजत्िक किर से आिठरत केबल के मामले में धाजत्िक िाली अथिा टेप किर को धाजत्िक आिरण माना िाएगा; (ख) िैसा दक ऊपर कहा गया ह ै ऐसे मामले में िहां जिद्युत आपूर्तय लाइन में कॉन् सेंठरक केबल ह ैं और बाहरी सुचालक एक बाहृय धाजत्िक किर से इंसुलेटेड है तथा भू-संपकय से कनेक्टेड हैं, बाहरी सुचालक को इस जिजनयम के प्रयोिन के जलए धाजत्िक किर के रूप में माना िाएगा परंतु सुचालकता के मामले में पूिोि उपबंधों का अनुपालन दकया गया हो। 50. 650 िोल्ट स े अजधक के िोल्ट िाले उपकरणों के भू-सपं कय कनक्े िन- (1) पूरे जस्ट्िचयाडय या सबस्ट्टेिन उपकरण और इमारतों सजहत सभी न ान-करंट िाहक िाले धातु के पुिों को एक संस्ट्थापना से िुड़े प्रभािी ढंग से िमीनी प्रणाली अथिा मैट के साथ िोड़ा िाएगा, िो जनम्नजलजखत कायय करेंगे:- (क) सुसंगत मानकों के अनुसार स्ट्पिय और स्ट्टेप जिभि को सहनीय अजधमान तक सीजमत रखेंगे; (ख) सुसंगत मानकों के अनुसार अथय जिभि को सहनीय अजधमान तक सीजमत रखेंगे तादक िमीन, अथय िायर, केबल किर, तार िाजलयों, पाइप लाइनों तथा अन् य ऐसे उपकरणों के िठरए जिभि के अंतरण से होने िाले खतरे को िरू दकया िा सके; और (ग) अथय कनेक्िन के रेजिस्ट्टेंस को ऐसे अजधमान तक बनाए रखेंगे की सुरिा संबंधी उपकरणों का कारगर संचालन हो सके। (2) अथय दकए गए न्यूरलों िाली स्ट्टार कनेक्टेड प्रणाली अथिा अथय दकए गए कृजत्रम न्यूरल पॉइंट िाली डेल्टा कनेक्टेड प्रणाली के मामले में-26 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] (i) प्रत्येक िेनरेटर और रांसिामयर का न्यूरल प्िाइंट अर्थंग प्रणाली से िोड़कर अथय दकया िाएगा और इसके जलए कम से कम िो पृथक और सुजभन्न कनेक्िन दिए िाएंगे: परंतु िेनरेटर के न्यूरल पॉइंट को इंजपडेंस के माध्यम से अर्थंग प्रणाली के साथ कनेक्ट दकया िाए तादक िाल्ट करंट को सीजमत रखा िा सके: परंतु यह और दक मल्टी मिीन प्रणाली के मामले में, प्रणाली में हामोजनक जिद्युत पठरचालन के नुकसानिायक प्रभाि को कम करने के जलए न्यूरल जस्ट्िलचंग प्रणाली अपनाई िाए; (ii) ऐसे मामलों में िहां न्यूरल कनेक्िन में िृजिगत हारमोजनक करंट के प्रभाि से संचार पठरपथों में इंटरदियरेंस होता ह,ै िेनरेटर अथिा रांसिामयर के न्यूरल को उपयुि इंजपडेंस के िठरए अथय दकया िाएगा; और (iii) डेल्टा कनेक्टेड प्रणाजलयों के मामले में, ऐसी प्रणाली को आरंभ करने पर िहां कहीं भी िरूरी समझा िाए, अर्थंग रांसिॉमयर और करंट सीजमत करने िाले रेजिस्ट्टेंस अथिा इंजपडेंस को प्रजिष्ट कराके न्यूरल प् िाइंट प्राप्त दकया िाए। (3) िेनरेटटंग स्ट्टेिन, सब स्ट्टेिन और 33 दकलोिोल्ट से अजधक की िोल् ट िाले अन्य प्रजतष्ठापनों के मामले में यदि जसस्ट्टम की जडिाइन में अपेिा की गई है तो जसस्ट्टम न्यूरल अर्थंग तथा प्रोटेजक्टि फ्रेम अर्थंग को कॉमन अर्थंग जग्रड से िोड़ा िा सकता है परंतु परस्ट्पर िुड़ी मैट के अथय का रजिस्ट्टेंस स्ट्टेप तथा स्ट्पिय जिभि को जनधायठरत अजधमान से बढ़ाने का कारण न बने। (4) 650 िोल्ट से अजधक की िोल् ट िाली लसंगल िेि प्रणाजलयों को कारगर रूप से अथय दकया िाएगा। (5) कंसेंठरक केबल िाली जिद्युत आपूर्तय िाली लाइनों से युि प्रणाली के मामले में बाहरी सुचालक को अथय के साथ कनेक्ट दकया िाएगा। (6) ऐसे मामलों में िहां आपूर्तयकताय मौिूिा प्रणाली को, जिसे अभी तक अथय के साथ कनेक्ट नहीं दकया गया है, को 650 िोल्ट से अजधक की िोल् ट के उपयोग के जलए अथय से कनेक्ट करने का प्रस्ट्ताि करता है, िह भारतीय टेलीग्राि अजधजनयम 1885 (1885 का 13) के अधीन स्ट्थाजपत टेलीग्राि प्राजधकरण को अथय के साथ प्रस्ट्ताजित कनेक्िन के जििरण सजहत कम से कम 14 दिन का जलजखत नोठटस िेगा। (7) ऐसे मामलों में िहां अर्थंग लीड और अथय कनेक्िन का केिल 650 िोल्ट से अजधक लेदकन 33 दकलोिोल्ट से अनजधक िोल्टेि की ओिरहैड लाइनों के अधीन लगाए गए अर्थंग गाडय के संबंध में उपयोग दकया िाता है, िहां ये लाइनें िरू संचार लाइनों अथिा रेलिे लाइनों को क्ॉस कर रही हों, और िहां ऐसी लाइनें अथय लीकेि संरिण उपकरण से सुसजज्ि त ह,ै अथय रेजिस्ट्ट ेंस 25 ओह्म से अजधक नहीं होगा और पठरयोिना प्रजधकारी इन साधनों में जिद्युत प्रिाह आरंभ करने से पहले रेलिे प्राजधकाठरयों तथा जिद्युत एिं िरू संचार समन् िय सजमजत से अनापजत् त प्रमाण—पत्र (एनओसी) प्राप्त करेगा। (8) आपूर्तयकताय अथिा उपभोिा की प्रत् येक अर्थंग प्रणाली के अथय रेजिस्ट् टेंस की िषय में कम से कम एक बार िुष् क मौसम के िौरान दकसी िुष् क दिन में िांच की िाएगी और ऐसे परीिण के ठरकॉडय सुरजित रखे िाएंगें तथा आिश् यकता होने पर जिद्युत जनरीिक के समि प्रस्ट् तुत दकए िाएंगे। 51. जबिली के रासं िारमिे न और जनयत्रं ण के जलए सामान्य ित–ें (1) ऐसे मामलों में िहां आउटडोर सब –स्ट् टेिनों अथिा आउटडोर जस्ट् िलचंग स्ट् टेिनों अथिा िमीन के अंिर बने स्ट् रीट बॉक् स सजहत सब –स्ट् टेिनों अथिा जस्ट् िलचगं स्ट् टेिनों में 650 िोल्ट से अजधक की िोल् ट िाली जबिली रांसिॉमय, कनिटय, रेगुलेट की िाती ह ै अथिा जनयंजत्रत की िानी है, जनन् नजलजखत उपबंध सुजनजित दकए िाएंगे:- (i) सबस्ट्टेिन और जस्ट् िलचंग स्ट्टेिनों को िमीन के ऊपर स्ट्थाजपत करने को िरीयता िी िाएगी, ककंतु ऐसे मामलों में िहां िमीन के अंिर इनका जनमाणय करना िरूरी हो िहां िायु के आने-िाने तथा िेनेि की व्यिस्ट्था की िाएगी और जिन स्ट्थानों पर जस्ट्िचजगयर लगाए गए हैं, उन स्ट्थानों में दकसी भी प्रकार की सामग्री जििेषकर ज्िलनिील तथा िाहक सामग्री अथिा अपजिष्ट एकत्र नहीं दकया िाएगा; (ii) (क) पोल टाइप सब-स्ट्टेिनों और आउटडोर जस्ट् िलचंग स्ट्टेिनों को छोड़कर अन्य सभी आउटडोर सबस्ट्टेिन, यदि इनके उपकरण पूरी तरह से धातु के आिरण में बंि न हों और अथय के साथ कनेक्ट न दकए हों, और ये उपकरण आिठरत केबलों के द्वारा जसस्ट्टम के साथ िोड़े गए हों, को कम से कम 1.8 मीटर ऊंची तारबंिी अथिा अन्य दकसी िठरए के द्वारा कारगर ढंग से सुरजित दकया िाएगा तादक कोई भी अनाजधकृत व्यजि पठरसर में आपूर्तय लाइनों और उपकरणों तक न पहुचं सके। इन पठरसरों की तारबंिी को कारगर ढंग से अथय दकया िाएगा; (ख) रांसिामयर माउंटटंग संरचना अजधजनयम की धारा 177 की उप-धारा (2) के खंड (ङ) के अधीन प्राजधकरण द्वारा अजधसूजचत जिजनयमों के अनुसार होगी।[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 27 52. पोल टाइप सबस्ट्टेिन- ऐसे मामलों में िहां पोल टाइप सबस्ट्टेिन के जलए प्लेटिामय का जनमायण दकया गया ह ैऔर प्लेटिामय पर एक व्यजि के खड़े होने लायक स्ट्थान उपलब्ध कराया गया है, एक यथोजचत हैंड रेललंग इस प्लेटिामय पर सभी तरि बनाई िाएगी और यदि हैंड रेललंग धातु की ह ैतो इसे अथय से कनेक्ट दकया िाएगा: परंतु यह दक लकड़ी के अिलम्बों तथा लकड़ी के प्लेटिामय पर बने पोल टाइप सबस्ट्टेिन के मामले में धातु से बनी हडैं रेललंग अथय से कनेक्ट नहीं की िाएगी। 53. कंडेंसर- जिद्युत आपूर्तय जडस्ट्कनेक्ट होने पर प्रत्येक स्ट्टैठटक कंडेंसर तत्काल स्ट्ित: अथिा मैनुअल तरीके से जडस्ट्चािय हो िाए, इसके जलए समुजचत व्यिस्ट्था की िाएगी। 54. 650 िोल्ट स ेअजधक ककंत ु33 दकलोिोल्ट तक िोल्ट िाल ेल्यजू मजनअस ट्यबू साइन प्रजतष्ठापनों को आपर्ू तय– (1) कोई भी व्यजि िो ल्यूजमजनअस ट्यूब साइन प्रजतष्ठापन को संचाजलत करने के प्रयोिन से जबिली का उपयोग करना चाहता है अथिा जबिली का उपयोग कर रहा ह,ै या कोई व्यजि िो 650 िोल्ट से अजधक ककंतु 33 दकलोिोल्ट तक िोल्ट पर जबिली को रांसिॉमय करना चाहता ह ैया रांसिामय कर रहा ह ैऐसे सभी कायों में जनम्नजलजखत ितों का अनुपालन दकया िाएगा:- (i) सभी उपकरणों सजहत प्रजतष्ठापन के सभी जिद्युत आिेजित पाटय और जद्वतीय पठरपथ में आिेजित सूचालकों तक, अनाजधकृत व्यजियों की पहुचं सुलभ नहीं कराई िाएगी और ऐसे पा्सय को कारगर ढंग से स्ट्क्ीन दकया िाएगा। इनमें उनके टर्मयनलों के आसपास लगे ट्यूबें सजम्मजलत नहीं है; (ii) ल्यूजमजनअस जडसचािय ट्यूब साइन को िीड करने िाले सर्कयट का िोल्ट प्राप्त करने का तरीका चाहे कुछ भी हो, ऐसे सर्कयट के अथय कनेक्िन को छोड़कर उसके दकसी भी सुचालक का कोई भी जहस्ट्सा आपूर्तय प्रणाली के दकसी भी सुचालक अथिा रांसिामयर की प्राइमरी िाइंलडंग के साथ धाजत्िक कनेक्िन में नहीं होगा; (iii) बाहरी प्रजतष्ठापन के सभी आिेजित पाटय इस प्रकार लगाए िाएंगे दक उन पर मौसम का प्रभाि न पड़े और ऐसे प्रजतष्ठापन अपने आस-पास के स्ट्थानों से इस प्रकार स्ट्थाजपत दकए िाएंगे और इस प्रकार व्यिजस्ट्थत दकए िाएंगे दक आग िैलने की संभािना न रह िाए; (iv) जद्वतीयक पठरपथ को रांसिामयर पर स्ट्थाई रूप से अथय दकया िाएगा और साथ ही प्रत्येक रांसिामयर के कोर को भी अथय दकया िाएगा; (v) ऐसे मामलों में िहां प्राथजमक सर्कयट के सुचालक आपूर्तय सुचालकों के साथ धाजत्िक कनेक्िन से नहीं िोड़े गए हैं, ऐसे प्राथजमक सर्कयट का एक िेि मोटर िेनरेटर अथिा कनिटयर या रासं िामयर पर स्ट्थाई रूप से अथय दकया िाएगा और पयायप्त रेंटटंग का एक अथय लीकेि सर्कयट ब्रेकर 250 िोल्ट तक के िोल् ट पर उपलब्ध कराया िाएगा तादक ऐसे ल्यूजमजनअस टयूब साइन िाले प्रजतष्ठापनों में लीकेि का पता लगाया िा सके; (vi) दिक् स्ट् ड ल्यूजमजनअस जडस्ट्चािय ट्यूब साइन प्रजतष्ठापनों के प्राथजमक पठरपथ के सब सर्कयट केिल इस प्रयोिन के जलए आरजित रखें िाएंगे; (vii) दिक् स्ट् ड ल् यूजमजनअस जडस्ट् चािय टयूिब साइन प्रजतष्ठापनों के 1000 िोल्ट-एम्पीयर तक के समाहाठरत इनपुट िाले रांसिामयर अथिा रांसिामयरों के समूह के जलए अलग से एक प्राथजमक िाइनल सब-सर्कयट उपलब् ध कराया िाएगा; (viii) आंतठरक प्रजतष्ठापन में तीन-िेि, चार-तार सर्कयट में न् यूरल के जसिाय सभी िेिों की आपूर्तय काटने के जलए समुजचत व् यिस्ट्थ ा उपलब् ध करायी िाएगी; (ix) भिन के बाहर लगे प्रजतष्ठापन के जलए तीन-िेि, चार-तार सर्कयट में न्यूरल के जसिाय सभी िेिों को चलाने के जलए एक समुजचत आपात अजि अभेि ललंक्ड जस्ट् िच उपलब्ध कराया िाएगा तथा इसे भूजम के ऊपर अजधक से अजधक 1.70 मीटर की ऊंचाई पर दकसी खुले स्ट्थान पर लगाया िाएगा; (x) 650 िोल्ट से अजधक और 33 दकलोिोल्ट तक के िोल्ट िाले पठरसर के प्रत्येक द्वार के सहि िश्ृ य स्ट्थान पर ‘चेतािनी” िने े िाला इस आिय का एक जििेष नोठटस लगाया िाएगा दक पठरसर को खोलने से पहले आपूर्तय बंि कर िी िाए; (xi) ऐसे मामलों में िहां स्ट्टैठटक कंडेंसर उपयोग में लाए िाते हैं, इन्ह ें फ्यूि के लोड साइड और रांसिामयर के प्राइमरी साइड पर लगाया िाएगा िहां िोल्टेि 250 िोल्ट से अजधक नहीं होता; (xii) ऐसे मामलों में िहां स्ट्टैठटक कंडेंसर प्राइमरी साइड पर उपयोग दकए िाते हैं, की आपूर्तय कटने पर कंडेसरों की स्ट् ित: अथिा मैनुअल जडस्ट्चार्िंग का उपबंध दकया िाएगा; और28 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] (xiii) 650 िोल्ट से अजधक िोल् ट पर स्ट्टैठटक कंडेंसर या दकसी भी इन्र लप्टंग जडिाइस का उपयोग करने से पहले जनष्पािन एिेंसी परीिण करके यह सुजनजित करेगी दक स्ट्ित: जडस्ट्चार्िंग जडिाइस भलीभांजत कायय कर रहा है। (2) ल् यूजमजनयस ट्यूब साइन या 650 िोल्ट से अजधक ककंतु 33 दकलोिोल्ट तक के िोल्ट िाले ऐसे ही प्रजतष्ठापन का स्ट्िामी या उपयोगकताय इन्ह ें उपयोग में लाने से पहले जिद्युत जनरीिक को ऐसा करने के आिय के बारे में कम से कम 14 दिन का जलजखत नोठटस िेगा। 55. 650 िोल्ट स ेअजधक ककंतु 33 दकलोिोल्ट तक के इलक्े रोड बायलरों को जिद्यतु आपर्ू तय- (1) ऐसे मामलों में िहां प्रणाली का 1 पॉइंट अथय से कनेक्टेड है और इसे 650 िोल्ट से अजधक िोल् ट िाले इलेक्रोड बॉयलर को जिद्युत आपूर्तय के जलए उपयोग दकया िाता ह,ै िो अथय से कनेक्टेड है, इलेक्रोड बायलर का स्ट्िामी या उपयोगकताय जनम्नजलजखत ितों का पालन करेगा:- (i) इलेक्रोड बॉयलर जिसे जिद्युत आपूर्तय की िा रही है, का धाजत्िक पाटय 650 िोल्ट से अजधक ककंतु 33 दकलोिोल्ट तक िाली जिद्युत आपूर्तय लाइन के धाजत्िक आिरण और धाजत्िक किर, यदि कोई हो, के साथ कारगर ढंग से िुड़ा रहगे ा; (ii) इलेक्रोड बॉयलर को 650 िोल्ट से अजधक की िोल्ट पर जिद्युत आपूर्तय एक उपयुि सर्कयट ब्रेकर द्वारा जनयंजत्रत की िाएगी और इसे इस प्रकार सेट दकया िाएगा दक संचालन की सामान्य जस्ट्थजतयों में िह इलेक्रोड बॉयलर की खपत के जलए तय दकए गए करंट की तुलना में िेि करंट में 10 प्रजतित का असंतुलन होने पर काम करेगा: परंतु यह दक इलेक्रोड बॉयलर के संचालन को जस्ट्थर बनाने के जलए प्रत्येक ििा में उच् च सेटटंग अजनिायय ह,ै सेटटंग को बढ़ाया िा सकता ह,ै ककंतु िह संचालन की सामान्य जस्ट्थजतयों में इलेक्रोड बॉयलर की खपत के जलए तय दकए गए करंट का 15 प्रजतित से अजधक नहीं होगी; (iii) िजणक अथिा अत्यंत कम अिजध के जलए िेि करंट में अनािश्यक रूप से असंतुलन पैिा होने की जस्ट्थजत म ें संचालन रोकने के जलए उि सर्कयट ब्रेकर के संयोिन में एक इनिसय टाइम एजलमेंट जडिाइस उपयोग दकया िाएगा; (iv) आपूर्तयकताय या स्ट्िामी जिद्युत उपलब्ध कराने की तारीख से कम स े कम 7 दिन पहले टेलीग्राि प्राजधकारी को जलजखत में नोठटस िेगा, जिसमें इलेक्रोड बॉयलर के अथय कनेक्िन प्ि ाइंट सजहत प्रत्येक प्ि ाइंट की अिजस्ट्थजत का स्ट्पष्ट जििरण दिया िाएगा। (2) 650 िोल्ट से अजधक िोल्ट िाले इलेक्रोड बॉयलर का स्ट्िामी अथिा उपयोगकताय जिद्युत जनरीिक को कम से कम 14 दिन का नोठटस िेने से पहले इलेक्रोड बायलर का उपयोग नहीं करेगा। 56. उच्च फ्रीिेंसी िाल ेप्रजतष्ठापनों तथा एक्स-रे के जलए जिद्यतु आपर्ू तय- (1) कोई भी ऐसा व्यजि, िो एक्स-रे या ऐसे ही दकसी उच् च फ्रीिेंसी िाले प्रजतष्ठापन को चलाने के जलए जिद्युत का उपयोग करना चाहता ह ै या कर रहा है, पोटेबल इकाइयां या िॉक प्रूि स्ट् ि-जनजहत और अचल इकाइयां सम्मजलत नहीं ह,ैं जनम्नजलजखत ितों का पालन करेगा:- (i) एक्स-रे ट्यूब और उसके लीड्स को छोड़कर, 650 िोल्ट से अजधक और 33 दकलोिोल्ट से अनजधक िोल्ट पर चलने िाले एक्स-रे उपकरणों के दकसी भी पुिें के अजत जनकट पहुचं को रोकने के जलए यांजत्रक बैठरयर लगाए िाएंगे परन्तु 650 िोल्ट से अजधक और 33 दकलोिोल्ट से अनजधक िोल्ट पर चलने िाले एक्स-रे उपकरण, जिन्ह ेंअथय दकए गए कनेक्िन अथिा पयायप्त इंसुलेटटंग पिाथय के िठरए आिठरत करके िॉक प्रूि बनाया गया है, के जलए उि बैठरयर अजनिायय नहीं ह;ै (ii) ऐसे मामलों में िहां िेनरेटर पीक 300 दकलोिोल्ट पर और इससे अजधक पर चलाए िाते हैं, ये िेनरेटर अन्य उपकरणों िाले कमरों में अलग कमरे में स्ट्थाजपत दकए िाएंगे और लगाया गया कोई भी स्ट्टेप अप रांसिॉमयर इस प्रकार स्ट्थाजपत दकया िाएगा और सुरजित दकया िाएगा दक खतरा न रह;े (iii) िनरेटर को आपूर्तय करने िाले सर्कयट को कंरोल करने के जलए एक उपयुि जस्ट्िच इस प्रकार लगाया िाएगा दक िह, तब को छोड़कर िब उस कि का द्वार बाहर से बंि हो जिसमें िनरेटर लगा हुआ है, खुला रह;े (iv) इलाि में उपयोग होने िाली एक्स-रे ट्यूब भू-संपकय से िुड़े हुए धाजत्िक बॉक्स में रखी िाएगी; (v) प्रत्येक एक्स-रे मिीन में जमजलएमीटर या नापन े का कोई अन्य उपकरण उपलब्ध कराया िाएगा, यह उपकरण कंरोल पोिीिन से स्ट्पष्ट िश्ृ य होना चाजहए और यदि यथा साध्य हो तो अथय की गई लीड से िुड़ा होना चाजहए। ककंतु यदि 650 िोल्ट से अजधक दकन् तु 33 दकलोिोल्ट से कम िोल्ट के लोड से िोड़ा गया ह ै तो इसकी सुरिा की व्यिस्ट्था होनी चाजहए:[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 29 परंतु यह दक पयायप्त रेंटटंग िाला अथय लीकेि सर्कयट ब्रेकर उस साइड पर उपलब्ध होगा िहां िोल्टेि 250 िोल्ट से अजधक न िाता हो तादक ऐसे एक्स-रे प्रजतष्ठापनों में लीकेि का पता लगाया िा सके। स्ट्पष्टीकरण:- इस जिजनयम में िैसा दक एक्स-रे और उच्च फ्रीिेंसी िाले उपकरणों के जलए “िॉक प्रूि” िब्ि का उपयोग दकया गया ह।ै इसका तात्पयय यह ह ैदक ऐसे उपकरणों को अथय मेटल के साथ सुरजित दकया गया ह ैतादक कोई व्यजि आिेजित कल- पुिों के संपकय में न आ सकें। (2) नााँनिॉक प्रूि उपकरण के मामले में:– (i) 650 िोल्ट से अजधक लेदकन 33 दकलोिोल्ट से कम िोल् ट के ओिरहडै सुचालकों को यदि व्यजिगत संपकय से बचाने के जलए पूरी तरह सुरजित नहीं दकया गया ह ै तो इन के मामले में पयायप्त स्ट्थान की व्यिस्ट्था की िाएगी और ठटलल्टंग टेबल पर उच्च िोल्ट िाली लीड और फ्लूरोस्ट् कोप को पयायप्त रूप से जिद्युत-रोधक दकया िाएगा अथिा इसे बाधाएं खड़ी करके सुरजित बनाया िाएगा तादक कोई व्यजि अनिाने में इनके संपकय में न आ सके; (ii) स्ट्टेप अप रांसिॉमयर के 250 िोल्ट से अनजधक िाले सर्कयट में मैनुअली ऑपरेटेड कंरोल जडिाइस लगाए िाएंगे िो ओिरलोड से सुरजित होंगे और ये सर्कयट रिण के जलए ओिर करंट जडिाइस के अजतठरि होंगे और इनमें कोई भी आिेजित कल-पुिाय खुला नहीं रहेगा तथा जनिान कायय के जलए उक् त सर्कयट में एक अजतठरि जस्ट्िच होगा िो जनम्न में स े दकसी एक प्रकार का होगा; (क) लस्ट्प्रंग अथिा अन्य मेकैजनज्म िाला जस्ट् िच िो स्ट् ित: खुलेगा ककंतु ऑपरेटर के जनकट रखा होने पर स्ट् ित: नहीं खुलेगा; या (ख) एक ऐसा टाइम जस्ट्िच िो तय तथा जनधायठरत दकए गए समय के पिात स्ट्ि त: चालू हो िाएगा; (iii) 650 िोल्ट से अजधक िोल्ट के एक ही स्रोत से यदि एक से अजधक उपकरण चलाए िाने हैं, प्रत्येक उपकरण को अपना जनिी जनयंत्रण प्रिान करने के जलए 650 िोल्ट से अजधक िोल्ट का एक जस्ट्िच उपलब्ध कराया िाएगा; (iv) बंि अंतराल अथिा खुले अंतराल टाइप की मिीनों के लो दफ्रकिेंसी करंट ले िाने िाले पाटय जिद्युत रोधी होंगे अथिा इस प्रकार सुरजित बनाए िाएंगे दक इन्ह ेंसंचालन के िौरान छुआ ना िा सके ककंतु उपचार के जलए सामान्य तौर पर हाई दफ्रकिेंसी करंट िेने िाले हाई दफ्रकिेंसी सर्कयट-प्रॉपर के जलए इस प्रकार के रोधन की आिश्यकता नहीं होगी; (v) कैपेजसटर िाले एक् स-रे िेनरेटरों में कैपेजसटरों को मैनुअली जडसचािय करने के जलए उपयुि व्यिस्ट्था उपलब्ध होगी; और (vi) स्ट्ि:जनजहत इकाइयों के जसिाय, 200 दकलोिोल्ट पीक या उच्च एक्स-रे िेनरेटरों में 650 िोल्ट से अजधक ककंतु 33 दकलोिोल्ट अनजधक िोल् ट की प्रणाली में जस्ट् ियर गपै लगाया िाएगा और यह इस प्रकार समायोजित दकया िाएगा दक ज्यािा िोल्टेि सिय उत्पन्न होने पर ब्रेक डाउन हो िाए। (3) (i) ट्यूब स्ट्टैंड, फ्लोरोस्ट्कोप और अन्य उपकरणों के करंट न ले िाने िाले धाजत्िक पाटय यदि ि ाक प्रूि नहीं ह ैंतो उजचत रूप से अथय दकए िाएंगे तथा 650 िोल्ट से अजधक की िोल् ट पर काम करने िाले कल-पुिों के जनकट काम करने िाले ऑपरेटरों को जिद्युत रोधक ििय, मैट अथिा प्लेटिामय उपलब्ध कराए िाएंगे; और (ii) िहां िॉटय िेि थैरेपी मिीने उपयोग में लाई िाती है, उपचार टेबल तथा परीिण कुर्सययां पूरी तरह से गैर-धाजत्िक होंगी। (4) एक्स-रे प्रजतष्ठापन या ऐसे ही उच् च फ्रीिेंसी िाले उपकरणों के स्ट्िामी उन् हें तब तक उपयोग में नहीं लाएंगे िब तक दक उन्होंने इन्हें उपयोग में लाने के अपने आिय की जलजखत रूप में इलेजक्रकल इंस्ट्पेक्टर को कम से कम 14 दिन का जलजखत नोठटस के िठरए अिगत न करा दिया गया हो: परंतु यह दक ि ाक प्रुि पोटेबल एक्स-रे तथा उच्च फ्रीिेंसी उपकरण जिनका चालू करने से पहले परीिण हो चुका है और समय-समय पर इनका उपयोग होता रहा है, के मामले में उपरोि नोठटस अजनिायय नहीं ह।ै अध्य ाय 7 ओिरहैड लाइनों और भजू मगत केबलों के जलए सरु िा सबं ंधी अपिे ाएं 57. पिाथ यऔर बल- (1) जिजनयम 70 में उपबंजधत से जभन्न ओिरहडै लाइनों के सभी सुचालकों की ब्रेककंग स्ट्रेंथ 350 दकलोग्राम-बल से कम नहीं होगी।30 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] (2) ऐसे मामलों में िहां िोल् टि 250 िोल्ट से अजधक नहीं िाता ह ै और स्ट्पैन पंद्रह मीटर से कम ह ैतथा स्ट्िामी या उपभोिा के पठरसर में ह,ै कम से कम 150 दकलोग्राम-बल िास्ट्तजिक ब्रेककंग स्ट्रेंथ िाले सुचालक का प्रयोग दकया िाएगा। 58. िोड़- (1) ओिरहडै लाइन के दकसी भी कंडक्टर या अथय िायर में एक स्ट्पैन में एक से अजधक िोड़ नहीं होंगे:- परंतु यह दक रािमागों, एक्सप्रेसिे और रेलिे लाइनों को पार करने िाले स्ट्पैन में कंडक्टर या अथयिायर में कोई िोड़ नहीं होगा। (2) ओिरहैड लाइनों के कंडक्टर या अथयिायर के बीच का िोड़ यांजत्रक और जिद्युत रूप से संचालन की ितों के अधीन सुरजित होगा और िोड़ की जिद्युत सुचालकता तथा चरम बल प्रासंजगक मानकों के अनुसार होगा। 59. अजधकतम बलाघात तथा सरु िा के कारक- (1) ओिरहैड रांसजमिन लाइनों के जलए स्ट्ि-सहायक स्ट्टील िाली टािरों या स्ट्टील मोनोपोल टािरों के ढांचागत अंगों, कंडक्टरों और अथय िायर पर लोड और अनुमेय तनाि प्रासंजगक मानकों के अनुसार होगा (2) ओिरहैड लाइनें जिन्हें उप-जिजनयम (1) में सजम्मजलत नहीं दकया गया है, में नीचे िी गई सारणी के अनुसार सुरिा के न्यूनतम कारक होंगे:- जििरण सरु िा के न्यनू तम गणु ाकं धाजत्िक अिलंब 1.5 यांजत्रक रूप से पठरष्कृत कंक्ीट अिलंब 2.0 हाथ से ढले कंक्ीट अिलंब 2.5 लकड़ी से बने अिलंब 3.0 (3) सुरिा के न्यूनतम कारक ऐसे भार पर आधाठरत होंगे जिसके कारण अिलंब अपना कायय करने में असिल हो िाता है, भले ही ढांचे की नींि और अन्य घटक सही सलामत हो। (4) अिलंब के संिभय में ििन, सहन लबंि ुपर पड़ने िाले बल अथिा िरार मापांक, यथाजस्ट्थजत, के बराबर होगा, िो अिलंब पर ऐंि के रूप में लगाए गए सकेंदद्रत और लंबित बल तथा असहनीय बल पर जनभयर करेगा। (5) ओिरहैड लाइनों के अिलंब का लाइन की दििा में बल इस लाइन के लंबित दििा में अपेजित बल के एक चौथाई से कम नहीं होगा। (6) स्ट्टे-िायसय, गाडय िायसय अथिा जबयरर-िायसय का न्यूनतम सुरिा गुणांक िायर के चरम तन्यता बल के आधार पर 2.5 होगा। (7) कंडक्टर और अथय िायर के जलए टेंिन जलजमट प्रासंजगक मानकों के अनुसार होगी। (8) उप-जिजनयम (2) में सुरिा कारकों की गणना के जलए जनम्नजलजखत ितों का पालन दकया िाएगा, अथायत:- (i) अजधकतम िायु िबाि िैसा सुसंगत मानकों में यथा जिजनर्ियष् ट ह,ै के अनुसार होगा; (ii) बेलनाकार ढांचे के मामले में, िायु िबाि के संपकय में आने िाले संपूणय खुले िेत्रिल को प्रभाजित िेत्र िल के रूप में माना िाएगा; और (iii) अजधकतम तथा न्यूनतम तापमान िैसा सुसंगत मानकों में यथा जिजनर्ियष् ट ह,ै के अनुसार होगा। (9) उप-जिजनयम (2) से (8) के जनजहत उपबंध के होते हुए, भी ऐसे स्ट्थानों में िहां ओिरहडै लाइनों पर बिय अथिा जहमकण िमा होने की संभािना हो, ढांचागत अंगों, सुचालकों तथा ओिरहैड रांसजमिन लाइनों के जलए सेल्ि सपोर्टंग स्ट्टील लैठटस टािसय और स्ट्टील मोनोपोल टािसय के अथय िायर प्रासंजगक मानकों के अनुसार और समय-समय पर समुजचत सरकार द्वारा िारी जलजखत आिेिों के माध्य म से जनधाठय रत जिजनिेिों के अनुसार होगी। 60. ओिरहैड लाइनों के सबस े जनचले कंडक्टर की हिा म ें िमीन स े ऊाँचाई- (1) राष्ट्रीय रािमागय की िमीन के ऊपर और सड़क की सतह के पार या एक्सप्रेसिे या राज्य रािमागय या अन्य सड़क या रेलिे कॉठरडोर के उच्चतम कषयण कंडक्टर या एक प्रत्यािती धारा ओिरहैड लाइन के जनम्नतम कंडक्टर के नेजिगेिनल या नेजिगेिनल निी, सेिा लाइनों सजहत, नाजमनल िोल्टेि की न्यूनतम िमीन से ऊाँचाई अनुसूची VIII क में जिजनर्ियष्ट अजधमान के अनुसार होंगी।[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 31 (2) हाई िोल्टेि डायरेक्ट करंट लाइन के संबंध में न्यूनतम िमीन से ऊाँचाई अनुसूची VIII ख के अनुसार होगी। (3) संरजित िेत्र (राष्ट्रीय उद्यान, िन्यिीि अभ्यारण्य, संरिण आरजिजत, सामुिाजयक आरजिजत), संरजित िेत्रों और िन्यिीि कॉठरडोर के आसपास पाठरजस्ट्थजतक संिेिनिील िेत्रों से गुिरने िाली 33 दकलोिोल्ट और नीचे की जिद्युत लाइनों के मामले में, केिल भूजमगत केबल का उपयोग दकया िाएगा। (4) 33 दकलोिोल्ट या उससे अजधक िोल्टेि या हाई िोल्टेि डायरेक्ट करंट की ओिरहैड लाइन की कोई टािर िुटटंग या संरचना, पेरोजलयम या प्राकृजतक गैस पाइपलाइन के रास्ट्ते के दकनारे से पच्चीस मीटर के करीब नहीं होगी। (5) िहां भी 33 दकलोिोल्ट या उससे अजधक िोल्टेि की ओिरहडै लाइन या उच्च िोल्टेि डायरेक्ट करंट, पेरोजलयम या प्राकृजतक गैस पाइपलाइन के रास्ट्ते को पार करने का आिय रखता है, पाइपलाइनों के संबंध में ओिरहैड लाइन के क्ॉलसंग का कोण अजधमानतः समकोण पर होगा और दकसी भी जस्ट्थजत में, क्ॉलसंग कोण पचहत्तर जडग्री से कम नहीं होना चाजहए। 61. सचु ालकों तथा रॉली िायरों के बीच अतं राल- (1) रॉली िायर का उपयोग करने िाली रॉली अथिा राम-िे को पार करने िाली ओिरहैड लाइनों के सुचालक रॉली िायर के ऊपर में कम से कम जनम्नजलजखत ऊंचाई पर रहेंगे- (क) 650 िोल्ट तक िोल् ट िाली लाइनें - 1.2 मीटर परंतु यह दक ऐसे मामलों में िहां जियरर िायर से लटकने िाले इंसुलेटेड सुचालक रॉली िायर के ऊपर से गुिर रहा ह,ै ऐसे इंसुलेटेड सुचालक के जलए न् यूनतम अंतराल 0.6 मीटर होगा। (ख) 650 िोल्ट से अजधक और 11000 िोल्ट तक िाली लाइनें - 1.8 मीटर (ग) 11000 िोल्ट से अजधक दकन् तु 33000 िोल्ट तक िाली लाइनें - 2.5 मीटर (घ) 33 दकलोिोल्ट से अजधक िोल् ट िाली लाइनें - 3.0 मीटर (2) उप-जिजनयम (1) में जिजनर्ियष्ट दकसी भी मामले में, िो भी व्यजि बाि में लाइन जबछाता है, िह अपनी लाइन तथा कजथत उप-जिजनयम के अनुसार क्ास होने िाली लाइन के बीच अंतराल रखेगा: परंतु बाि में प्रिेि करने िाला जनचली ओिरहडै लाइन का स्ट्िामी हो और पयायप्त जनकासी प्रिान करने में सिम नहीं ह,ै तो िह उप-जिजनयम (1) का अनुपालन करने के जलए ऊपरी लाइन के संिोधन की लागत िहन करेगा। 62. 650 िोल्ट स े अनजधक िोल्ट की लाइनों और सर्िसय लाइनों की भिनों स ेिरू ी– (1) ओिरहडै लाइन िहां तक संभि हो, दकसी जिद्यमान भिन के ऊपर से नहीं गुिरेगी और जिद्यमान ओिरहडै लाइन के नीचे कोई भी भिन नहीं बनाई िाएगी। (2) ऐसे मामले में िहां 650 िोल्ट से अनजधक िोल् ट की कोई ओिरहैड लाइन दकसी भिन के ऊपर या पास से गुिरती है अथिा समाप्त होती ह,ै दकसी भी पहुचं लबंि ु से अजधकतम झोल के आधार पर जनम्नजलजखत न्यूनतम अंतराल रखा िाएगा, अथायत:- (i) दकसी भी सपाट छत, खुली बालकनी, बारांडा, छत और झुकी हुई छत के जलए:- (क) लाइन िब भिन के ऊपर से गुिर रही हो, उच्चतम लबंि ुसे लंबित िरू ी 2.5 मीटर; और (ख) लाइन िब भिन के नििीक से गुिर रही हो, सबसे नििीक के लबंि ुसे समानांतर िरू ी 1.2 मीटर; और (ii) ढलिा छत के जलए:- (क) लाइन िब भिन के ऊपर से गुिर रही हो, लाइन के तत्काल नीचे से 2.5 मीटर की लंबित िरू ी; और (ख) लाइन िब भिन के नििीक से गुिर रही हो, 1.2 मीटर का अंतराल। (3) कोई भी कंडक्टर िो उप-जिजनयम (2) में जनर्ियष्ट से कम जनकासी के जलए जस्ट्थत ह ैएठरयल बंच केबल के साथ प्रजतस्ट्थाजपत दकया िाएगा और 350 दकलोग्राम से कम ब्रेककंग स्ट्रेंथ िाले नंगे अथय िाले जबयरर तार से उपयुि अंतराल पर िुड़ा होगा। (4) समानातं र िरू ी तब नापी िाएगी, िब लाइन िायु िाब के कारण लंबित से अजधकतम जिचलन पर हो। (5) लंबित तथा समानांतर िरू ी को अनुसूची-viii ग में दिए गए उिाहरण के अनुसार मापा िाएगा। स्ट्पष्टीकरण – इस जिजनयम के प्रयोिनाथय ‘भिन’ िब्ि में कोई भी अिसंरचना, चाह ेिह स्ट्थाई हो या अस्ट्थाई सजम्मजलत ह।ै32 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] 63. 650 िोल्ट स ेअजधक िोल्ट िाली लाइनों की भिनों स ेिरू ी- (1) ओिरहैड लाइन िहां तक संभि हो जिद्यमान भिन के ऊपर से नहीं गुिरेगी और जिद्यमान ओिरहडै लाइन के नीचे कोई भिन नहीं बनाया िाएगा। (2) ऐसे मामले में िहां 650 िोल्ट से अजधक िोल् ट िाली ओिरहैड लाइन दकसी भिन अथिा भिन के जहस्ट्से के ऊपर से अथिा नििीक से गुिरती है, ऐसे लाइन के जबलकुल नीचे बने भिन के सबसे ऊंचे जहस्ट्से से लाइन के अजधकतम झोल के आधार पर लंबित िरू ी जनम्नजलजखत से कम नहीं होगी:- (i) 650 िोल्ट से अजधक िोल्टेि और 33 दकलोिोल्ट सजहत की लाइनों के - 3.7 मीटर जलए (ii) 33 दकलोिोल्ट से अजधक िोल्टेि िाली लाइन के जलए - 3.7 मीटर + 0.30 मीटर प्रत्येक अजतठरि 33 दकलोिोल्ट या इसके भाग के जलए (3) सबसे नििीकी सुचालक और भिन के बीच की समानांतर िरू ी, िायु िबाि के कारण अजधकतम जिचलन के आधार, जनम्नजलजखत िरू ी से कम नहीं होगी:- (i) 650 िोल्ट से अजधक िोल्टेि िाली लाइन और 11 दकलोिोल्ट सजहत की - 1.2 मीटर लाइनों के जलए (ii) 11 दकलोिोल्ट से अजधक िोल्टेि िाली लाइन और 33 दकलोिोल्ट - 2.0 मीटर सजहत की लाइनों के जलए (iii) 33 दकलोिोल्ट से अजधक िोल् ट िाली लाइन के जलए - 2.0 मीटर + 0.30 मीटर प्रत्येक अजतठरि 33 दकलोिोल्ट या इसके भाग के जलए (4) हाई िोल् ट िाली डायरेक्ट करंट प्रणाली के जलए िायु िबाि के कारण अजधकतम जिचलन के आधार पर भिन से लंबित िरू ी और समानांतर िरू ी इस प्रकार रखी िाएगी:- क्.स.ं हाई िोल्ट िाली डायरेक्ट करंट लंबित िरू ी (मीटर) समानातं र िरू ी (मीटर) 1. 100 दकलोिोल्ट 4.6 2.9 2. 200 दकलोिोल्ट 5.8 4.1 3. 300 दकलोिोल्ट 7.0 5.3 4. 400 दकलोिोल्ट 7.9 6.2 5. 500 दकलोिोल्ट 9.1 7.4 6. 600 दकलोिोल्ट 10.3 8.6 7. 800 दकलोिोल्ट 12.4 10.7 (5) लंबित तथा समानांतर िरू ी को अनुसूची-VIII ग में ििायए अनुसार मापा िाएगा। स्ट्पष्टीकरण- इस जिजनयम के प्रयोिनाथय ‘’भिन’’ िब्ि में कोई भी अिसंरचना चाह े िह स्ट्थायी हो या अस्ट्थायी, को सजम्मजलत माना िाएगा। 64. एक ही अिलबं पर जभन्न-जभन्न िोल्ट िाल ेसुचालक– ऐसे मामले में िहां एक ही प्रणाली के जभन्न-जभन्न िोल्ट िाले सुचालक एक ही अिलंब पर लगाये गए ह,ैं इनका स्ट्िामी कम िोल् ट िाली प्रणाली के उसके नाजमनल िोल्टेि से ऊपर चािय होने की ििा में, उच्च िोल्टेि के सम्पकय और लीकेि एिं जनमायण के तरीकों से लाइनमैन और अन्य लोगों को होने िाले खतरे से बचाने के जलए पयायप्त व्यिस्ट्था करेगा और िो प्रणाजलयों के कंडक्टरों के बीच लागू न्यूनतम क्लीयरेंस जिजनयमन 71 के अनुसार होगा। 65. भिन अिसरं चनाओं, फ्लड बैंक (तटबधं ) और सड़कों के उिान का जनमाणय या इनम ें िेरबिल– (1) ओिरहैड लाइन के पठरजनमायण के पश् चात, चाह ेउस पर इंसुलैठटड पिाथय लगाया गया हो या नहीं या भूजमगत केबल पर, दकसी भी समय यदि कोई व् यजक् त एक नए भिन या संरचना या फ्लड बैंक का जनमायण या सड़क तल को ऊंचा करने या स्ट् थायी अथिा अस्ट् थायी दकसी अन् य प्रकार का कायय करने के जलए या अंिर अथिा ऊपर कोई भिन या संरचना या फ्लड बैंक या सड़क में कोई स्ट् थायी अथिा अस्ट् थायी संिधयन या बिलाि को प्रस्ट् ताजित करता ह,ै तो िह तथा िेकेिार जिसे उस उत् थापन, संिधयन या बिलाि के जलए[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 33 जनयुक्त दकया ह,ै अपने ऐसा करने के आिय की जलजखत िानकारी आपूर्तयकताय या स्ट् िामी और जिद्युत जनरीिक को जलजखत रूप में िेगा और साथ ही प्रस्ट् ताजित भिन, संरचना, फ्लड बैंक, सड़क या अन् य संिधयन या बिलाि और जनमायण के िौरान आिश् यक स्ट्कैफ्िोलल्डंग को ििायता हुआ एक माप रेखाजचत्र उपलब्ध कराएगा। (2) इस प्रकार की सूचना प्राप्त होने पर, आपूर्तयकताय या स्ट्ि ामी िांच करेगा दक:- (क) क् या ओिरहडै लाइन या भूजमगत केबल इन जिजनयमों के उपबंधों और तत्समय प्रिृत्त अन् य दकसी जिजध के अनुसार जबछाई गई थी; (ख) क् या यह तकनीकी रूप से व् यिहायय ह;ै (ग) क् या यह मागय के अजधकार (आरओडब् ल् यू) की अपेिाओं की पूर्तय करती है; और (घ) क् या ऐसा व् यजक् त ओिरहडै लाईन या भूजमगत केबल के िेरबिल की लागत का भुगतान करने के जलए उत् तरिायी था और यदि हां तो ऐसे व् यजक् त को ओिरहडै लाईन या भूजमगत केबल के िेरबिल में उपगत दकये िाने िाले व् यय की लागत के साथ तीस दिनों के भीतर नोठटस िारी करेगा और उसे सूचना प्राप्त होने के तीस दिन के भीतर प्राक् कजलत लागत की रकम आपूर्तयकताय या स्ट्ि ामी के पास िमा करिाना आिश् यक होगा। (3) यदि ऐसा व् यजक् त ओिरहैड लाइन अथिा भूजमगत केबल में िेरबिल की आपूर्तयकताय अथिा स्ट् िामी द्वारा आंकी गई लागत को और यहां तक दक इस लागत के भुगतान के संबंध में िाजयत् ि को चुनौती िेता ह ैतो जििाि इलैजक् रक इंस्ट् पेक् टर को भेि दिया िाएगा िो उप-जिजनयम (4) के अनुसरण में िोनों पिों की जििाि पर सुनिाई करने के पश् चात् जनजश् चय करेगा। (4) इलेजक् रकल इंस्ट् पेक् टर जनम् नजलजखत के आधार पर ओिरहडै लाइन अथिा भूजमगत केबल में िेरबिल की लागत का आकलन करेगा, अथायत्:- (क) जिद्यमान लाइन या भूजमगत केबल की सामग्री की मूल्यह्रास लागत के जलए लेखांकन के बाि पठरितयन के जलए उपयोग की िाने िाली सामग्री की लागत; (ख) िेरबिल करने में जनयोजित श्रजमकों की मििरू ी; और (ग) उपखंड (ख) में उजल्लजखत मििरू ी की पन्द्रह प्रजतित सीमा तक पययिेिण प्रभार और िेरबिल के सम्बन्ध में अजधजनयम की धारा 67 के उपबन्धों के अनुपालन में स्ट्िामी या आपूर्तयकताय या उपभोिा द्वारा िहन दकया गया प्रभार। (5) आपूर्तयकताय या स्ट्िामी के पास इस अनुमाजनत लागत को िमा कराने के बाि अिसंरचना में दकसी जिस्ट्तार अथिा िेरबिल की अनुमजत िी िाएगी। (6) ऐसे भिन, अिसंरचना, तटबंध, सड़क के ऊपर कोई कायय और कोई जिस्ट्त ार अथिा िेरबिल तब तक आरंभ नहीं होगा या िारी नहीं रहगे ा िब तक दक इलैजक् रक इंस्ट् पेक् टर यह प्रमाजणत न कर िे दक जनमायण के िौरान अथिा उसके पश् चात जिजनयम 60, 62, 63 तथा 66 और जिजनयम 79 के उपबंधों का उल् लंघन नहीं होना चाजहए: परंतु यह दक इलजै क् रक इंस्ट् पेक् टर, यदि इस बात से संतुष् ट ह ै दक ओिरहैड लाइन अथिा भूजमगत केबल को इस प्रकार सुरजित दकया गया ह ैदक इससे लोगों अथिा संपजत् त की सुरिा सुजनजश् चत होती ह,ै िह 15 दिन के भीतर प्माजणत कर सकता ह ै दक ओिरहैड लाइन अथिा भूजमगत केबल में िेरबिल से पहले अथिा अस्ट् थायी जिस्ट्त ार अथिा िेरबिल के मामले में, ओिरहैड लाइन अथिा भूजमगत केबल में िेरबिल के जबना कायय आरंभ दकया िा सकता है। (7) आपूर्तयकताय अथिा स्ट् िामी, ऐसी िमाराजि प्राप्त होने के िो माह के भीतर अथिा ऐसी लंबी अिजध के भीतर िैसा दक इलेजक् रक इंस्ट् पेक् टर उन कारणों के जलए िो लेखबि दकये िाए अनुज्ञा िे सकेगा, ओिरहैड लाइन अथिा भूजमगत केबल में इस प्रकार से िेरबिल करेगा दक जनमायण के िौरान या पश् चात जिजनयम 60,62,63 और जिजनयम 79 का उल् लंघन न हो। 66. इलजे क्र क लाइन के नििीक सामग्री की ढुलाई और भंडारण– (1) खुले ओिरहडै सुचालकों अथिा लाइनों के नीचे से या आसपास से दकसी भी प्रकार की छड़ें, पाइप या ऐसी ही सामग्री नहीं ले िाया िाएगा: परंतु यह दक यदि ये सामग्री जिजनयम 62 और 63 का उल्लंघन करती ह,ै तो ऐसी सामजग्रयों को इन जिजनयमों के अधीन अजभजहत या जनयुि या प्रिृत् त या अनुमत व्यजि के प्रत्यि पययिेिण में ले िाया िाएगा। (2) दकसी भी प्रकार की छड़, पाइप अथिा ऐसी ही अन्य सामग्री जिद्युत प्रिाजहत खुले सुचालकों अथिा ओिरहैड लाइनों के इतनी नििीक नहीं लाई िाएंगी दक उनसे फ़्लैि ओिर ओिर िेत्र में आने की संभािना बने।34 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] (3) खुले सुचालकों अथिा लाइनों के नीचे या आसपास कोई सामग्री अथिा खुिाई की गई जमट्टी या कृजष उत्पाि िमा अथिा भंडाठरत नहीं दकया िाएगा, ना ही कोई िृि लगाया िाएगा। ऐसा कायय जिजनयम 62 और 63 का उल्लंघन माना िाएगा। जिद्युत लाइन के नीचे कोई भी ज्िलनिील सामग्री िमा नहीं की िाएगी। (5) सीमादं कत भूजमगत केबलों के आस पास और ओिरहैड लाइनों के नीचे आग िलाने की अनुमजत नहीं िी िाएगी। 67. सामान्य अतं राल- (1) ओिरहडै लाइन के लंबे अंतराल की गणना के जलए, दकसी सुचालक के अजधकतम झोल की गणना, जस्ट्थत िायु में अजधकतम झोल के आधार पर और अजधकतम तापमान की गणना जिजनयम 59 में जिजनर्ियष्ट तापमान के अनसु ार की िाएगी और ओिरहैड लाइन का समानातं र अंतराल िानने के प्रयोिन से दकसी सुचालक के अजधकतम जिचलन की गणना जिजनयम 59 के अधीन जिजनर्ियष्ट िायुिाब के आधार पर की िाएगी। (2) सबस्ट्टेिन की चारिीिारी अथिा 650 िोल्ट से अजधक िोल् ट की जिद्युत आपूर्तय लाइनों अथिा इनकी टािर अिसंरचना से तीन सौ मीटर के अंिर ऐसे सबस्ट्टेिन अथिा जिद्युत आपूर्तय लाइनों अथिा टािर अिसंरचना के स्ट् िामी की जलजखत अनमु जत के जबना और खनन पट्टा िेत्रों के मामले में; खानों के इलैजक्रकल इंस्ट्पेक्टर की जलजखत अनुमजत के जबना दकसी भी प्रयोिन के जलए ब् लालस्ट् टंग का कायय नहीं दकया िाएगा। (3) टािर अिसंरचना के स्ट्िामी की जलजखत अनुमजत के जबना 110 दकलोिोल्ट और अजधक िोल् ट िाली टािर अिसंरचना से 10 मीटर के िायरे में भूजम कटान के दकसी भी कायय की अनुमजत नहीं होगी। (4) 220 दकलोिोल्ट और ऊपर के प्रजतष्ठापनों अथिा पारेषण लाइनों से 500 मीटर के िायरे में कोई भी व्यजि ईंटों का भट्टा या अन्य कोई प्रिषू क इकाई नहीं लगाएगा। 68. रू्स की हिाई अड्डों या जिमान ित्रे स ेनििीकी- हिाई अड्डों तथा जिमान िेत्र के आसपास ओिरहडै लाइनें तब तक खड़ी नहीं की िाएंगी िब तक दक हिाई अड्डा प्राजधकरण अथिा संबंजधत रिा प्राजधकरणों से प्रस्ट्ताजित ओिरहैड लाइनों के रूट को प्रासंजगक मानकों के अनुसार जलजखत में अनुमोदित न कर दिया हो। 69. अिलबं ों के बीच अजधकतम अतं राल– सभी सुचालक सुरिा सीमा के आधार पर अंतराल में खड़े दकए गए अिलंबों पर लगाए िाएंगे। यह सुरिा सीमा सुचालक की चरम तन्यता बल तथा जिजनयम 59 में जिजनर्ियष्ट सुरिा कारको पर आधाठरत होगी: परन्तु यह दक 650 िोल्ट से अनजधक िोल्टेि के कंडक्टर ले िाने िाली ओिरहडै लाइनों के मामले में, िब दकसी गली के ऊपर, साथ में या उसके आर-पार जबछाया िाता है, तो अंतराल इलेजक्रकल इंस्ट्पेक्टर की जलजखत सहमजत के जबना पैंसि मीटर से अजधक नहीं होगा। 70. िरू सचं ार लाइनों तथा जिद्यतु लाइनों को समान अिलबं ों पर खींचे िान ेकी जस्ट्थजत में लाग ूितें- (1) जिद्युत लाइन के अिलम् बों पर खींची गई ओिरहडै िरू संचार लाइन के प्रत्येक सुचालक का भंगुरता बल 270 दकलोग्राम-बल से कम नहीं होगा। (2) जिद्युत लाइन िाले अिलंबों पर लगी िरू संचार लाइनों को सुसंगत मानकों के अनुसार उन पर जबिली जगरने से बचाया िाएगा। (3) ऐसे मामलों में िहां िरू संचार लाइन 650 िोल्ट से अजधक िोल् ट िाली जिद्युत लाइन के अिलंबों पर खींची गई है, जिद्युत तथा िरू संचार लाइनों के बीच संपकय, लीकेि अथिा प्रेरण के िलस्ट्िरुप होने िाली खतरे से व्यजि को सुरजित रखने के जलए समुजचत व्यिस्ट्था की िाएगी। 71. एक िसू रे को लाघं न ेिाली या एक-िसू रे की ओर आन ेिाली और गजलयों और सड़कों को पार करन ेिाली लाइनें- ऐसे मामले म ें िहां ओिरहैड लाइन, िरू संचार लाइन के ऊपर से या पास से गुिरती है, ओिरहैड लाइन अथिा िरू संचार लाइन का स्ट्िामी, िो भी अपनी लाइन बाि में जबछाता है, जिद्युत और िरू संचार समन्िय सजमजत द्वारा िारी काययप्रणाली आचार संजहता या दििाजनिेिों के अनुसार सुरिात्मक उपकरण या सुरिा व्यिस्ट्था प्रिान करने की व्यिस्ट्था करेगा और जनम्नजलजखत उपबंधों का पालन करेगा, अथायत्:- (i) िब ऐसी यथाजस्ट्थजत िरू संचार लाइन या ओिरहडै लाइन जबछाने का आिय हो, िो ओिरहैड लाइन अथिा िरू संचार लाइन को क्ॉस करेगी या उसके पास से गुिरेगी, ऐसी लाइन जबछाने का प्रस्ट्ताि करने िाला व्यजि, ऐसा करने के अपने इरािे के बारे में जिद्यमान लाइन के स्ट्िामी को एक माह का नोठटस िेगा, जिसमें सुरिा के बारे में प्रसांजगक ब् यौरा और नक्िा दिया िाएगा; (ii) 33 दकलोिोल्ट से अनजधक िोल् ट िाली लाइन िहां भी सड़क या गली अथिा िरू संचार लाइन को क्ॉस करेगी, गौर्डंग व्यिस्ट्था की िाएगी;[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 35 (iii) ऐसे मामले में िहां ओिरहैड लाइन िसू री ओिरहैड लाइन को क्ॉस करती ह ै या जनकट से गुिरती है, गार्डंग व् यिस्ट्थ ा की िाएगी तादक उनके एक-िसू रे के संपकय में आने की संभािना से बचने के जलए सािधानी बरती िा सके; और (iv) ऐसे मामले में िहां एक ओिरहैड लाइन, िसू री ओिरहडै लाइन को क्ॉस करती है, जनम्नजलजखत सारणी के अनुसार न्यूनतम अंतराल बनाए रखना होगा: (एक-िसू रे को क्ॉस करन ेिाली लाइनों के बीच न्य ूनतम अतं राल मीटर म)ें क्.स.ं नाजमनल जसस्ट्ट म िोल्टेि 11-66 110-132 220 400 760 1200 (दकलोिोल्ट) दकलोिोल्ट दकलोिोल्ट दकलोिोल्ट दकलोिोल्ट दकलोिोल्ट दकलोिोल्ट 1. 11 से नीचे 2.44 3.05 4.58 5.49 7.94 10.11 2. 11-66 2.44 3.05 4.58 5.49 7.94 10.44 3. 110-132 3.05 3.05 4.58 5.49 7.94 10.44 4. 220 4.58 4.58 4.58 5.49 7.94 10.44 5. 400 5.49 5.49 5.49 5.49 7.94 10.44 6. 765 7.94 7.94 7.94 7.94 7.94 10.44 7. 1200 10.44 10.44 10.44 10.44 10.44 10.44 परंतु यह दक 33 दकलोिोल्ट से अजधक िोल् ट िाली लाइन के 250 िोल्ट और उससे अजधक िोल् ट िाली लाइन अथिा सड़क अथिा राम के ऊपर से होकर गुिरने पर गार्डंग व् यिस्ट् था की आिश्यकता नहीं होगी, ककंतु यह इस ितय पर जनभयर करेगा दक 33 दकलोिोल्ट से अजधक िोल् ट िाली लाइन के सबसे जनचले सुचालक और 33 दकलोिोल्ट से अजधक िोल् ट िाली लाइन के नीचे से गुिरने िाली ओिरहडै लाइन के सबसे ऊंचे सुचालक के बीच और सड़क की सतह के सिोच्च स्ट्थल से अंतराल को जिजनयम 60 में जनधायठरत अंतराल के अनुरूप बनाए रखा िाएगा; (v) ऐसे मामले में िहां ओिरहडै डायरेक्ट करंट लाइन िसू री ओिरहडै लाइन के ऊपर से गुिरती है, नीचे सारणी के अनुसार न् यूनतम अंतराल इस प्रकार होगा:- (एक िसू रे के ऊपर स ेगुिरन ेिाली एसी और डीसी लाइनों के बीच न्य नू तम अतं राल मीटर में) क्.स.ं प्रणाली के िोल्ट 100 200 300 400 500 600 800 एसी/डीसी के.िी. के.िी. के.िी. के.िी. के.िी. के.िी. के.िी. डीसी डीसी डीसी डीसी डीसी डीसी डीसी 1. 11 दकलोिोल्ट से नीचे 3.05 4.71 5.32 6.04 6.79 7.54 9.04 2. 11-66 दकलोिोल्ट एसी 3.05 4.71 5.32 6.04 6.79 7.54 9.04 3. 110-132 दकलोिोल्ट एसी 3.05 4.71 5.32 6.04 6.79 7.54 9.04 4. 220 दकलोिोल्ट एसी 4.58 4.71 5.32 6.04 6.79 7.54 9.04 5. 200 दकलोिोल्ट डीसी 4.71 4.71 5.32 6.04 6.79 7.54 9.04 6. 300 दकलोिोल्ट एसी 5.32 5.32 5.32 6.04 6.79 7.54 9.04 7. 400 दकलोिोल्ट एसी 5.49 5.49 5.49 6.04 6.79 7.54 9.0436 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] 8. 400 दकलोिोल्ट एसी 6.04 6.04 6.04 6.04 6.79 7.54 9.04 9. 500 दकलोिोल्ट डीसी 6.79 6.79 6.79 6.79 6.79 7.54 9.04 10. 600 दकलोिोल्ट डीसी 7.54 7.54 7.54 7.54 7.54 7.54 9.04 11. 765 दकलोिोल्ट एसी 7.94 7.94 7.94 7.94 7.94 7.94 9.04 12. 800 दकलोिोल्ट डीसी 7.94 7.94 7.94 7.94 7.94 9.04 9.04 13. 1200 दकलोिोल्ट एसी 10.44 10.44 10.44 10.44 10.44 10.44 10.44 (vi) जिद्यमान लाइन को क्ॉस करने अथिा नििीक से गुिरने िाली लाइन स्ट्थाजपत करने िाला या इसका प्रस्ट्ताि रखने िाला व्यजि अपनी लाइन पर स्ट्ियं अथिा िसू री ओिरहडै लाइन के स्ट्िामी से, उप-खंड (iii) और (iv) में दिए गए प्रािधान के अनुसार, गार्डंग व् यिस्ट् था करेगा या कराएगा; (vii) इस जिजनयम में जनर्ियष्ट सभी मामलों में सुरिा संबंधी व्यिस्ट्थाएं अथिा संरिात् मक उपकरण उपलब्ध कराने का सारा व् यय िह व्यजि िहन करेगा जिसने बाि में लाइन स्ट्थाजपत की है; (viii) ऐसे मामले में िहां िो लाइने एक िसू रे को क्ॉस करती हैं, क्ॉलसंग लगभग समकोण पर कराई िाए िैसा दक मामले की स्ट् िाभाजिक स्ट् िीकृजत हो और िहां तक व्यिहाठरक हो, लाइन के अिलंब के नििीक कराई िाए, तथा जनचली लाइन का अिलंब, ऊपर िाली लाईन के आरओडब्ल्यू में नहीं रखा िाए; (ix) अिलंबों के स्ट्िामी द्वारा गार्डंग व् यिस्ट्थ ा की िाएगी और िही इनके रखरखाि के जलए जिम्मेिार होगा। 72. गार्डंग- (1) इन जिजनयमों के अधीन िहां गार्डंग व्यिस्ट्था की आिश्यकता होगी, जनम्नजलजखत का अनुपालन दकया िाएगा, अथायत:- (i) प्रत्येक लबंि ुपर िहां जिद्युत प्रिाह को ब्रेक दकया गया है, हर एक गाडय िायर को अथय से कनेक् ट दकया िाएगा; (ii) प्रत्येक गाडय िायर का िास्ट्तजिक भंगुरता बल 635 दकलोग्राम-बल से कम नहीं होगा और यदि गाडय िायर लोह े अथिा इस्ट्पात का बना ह ैतो यह गेलिनाइज् ड भी होगा; (iii) प्रत् येक गाडय िायर और गाडय िायर का क्ॉस-कनेक्टेड जसस्ट्टम की करंट िहन िमता इतनी पयायप्त होगी जिससे दक उसका जिद्युतमय तार से संपकय हटाए िाने तक गाडय िायरों के फ्यूि होने के िोजखम के जबना जनजष्क्य दकया िाना सुजनजित हो िाए। (2) रॉली िायर के ऊपर से गुिरने िाली लाइन के मामले में गार्डंग व्यिस्ट्था जनम्नजलजखत ितों पर जनभयर करेगी, अथायत:- (i) िहां केिल एक रॉली िायर है, डायग्राम-क में दिए गए अनुसार िो गाडय िायर लगाए िाएंगे; (ii) िहां िो रॉली िायर हैं और उनके बीच चालीस सेंटीमीटर से ज्यािा का अंतराल नहीं है, डायग्राम-ख में दिए गए अनुसार िो गाडय िायर लगाए िाएंगे; (iii) िहां िहां िो रॉली िायर ह ैं और उनके बीच चालीस सेंटीमीटर से अजधक ककंतु 1.2 मीटर से कम का अंतराल है, डायग्राम-ग में दिए गए अनुसार तीन गाडय िायर लगाए िाएंगे; (iv) िहां िो रॉली िायर हैं और उनके बीच 1.2 मीटर से अजधक का अंतराल है, डायग्राम-घ में दिए गए अनुसार प्रत्येक रॉली बायर को अलग-अलग गाडय दकया िाएगा; (v) रॉली का ऊपर की ओर उिान इस प्रकार सीजमत रखा िाएगा दक रॉली िायर गाडय िायर को खराब न करे; और (vi) िब टेलीग्राि लाइन नीचे की ओर जगरने या एक भुिा स्ट्टे-िायर अथिा स्ट्पैन-िायर पर नीचे जगरने और इस तरह रॉली िायर पर नीचे की ओर लुढ़ कने की संभािना हो तो इसे रोकने के जलए गाडय हुक लगाए िाएंगे।[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 37 73. ओिरहैड लाइन स े सर्िसय लाइन– ओिरहडै लाइन के अिलंब के अजतठरि दकसी अन्य लबंि ु से सर्ियस लाइन नहीं ली िाएगी अथिा टैलपंग नहीं की िाएगी: परंतु यह दक 650 िोल्ट तक के मामले में प्रजत सुचालक छ: से ज्यािा टैलपंग नहीं होगी। 74. अर्थगं - (1) 33 दकलोिोल्ट तक ओिरहैड लाइनों के अिलंब की अर्थंग जनम्नानुसार प्रिान की िाएगी, अथायत्:- (क) ओिरहैड लाइनों के धातु से बने सभी अिलंब और रीइन्िोस्ट्डय और प्री-स्ट्रेस्ट्ड सीमेंट कंक्ीट से बने सभी अिलंब और उनसे िुड़ी मैटेजलक दिटटंग्स, एक सतत अथय िायर प्रिान करके स्ट्थायी रूप से और प्रभािी ढंग से अथय दकया िाएगा और प्रत्येक खंभे से सुरजित रूप से बांधा िाएगा और प्रत्येक अिलंब पर अथय से िोड़ा िाएगा और धातु से बनी दिटटंग स्ट्थायी रूप से और कुिलता से अथय की िाएगी; (ख) सािा सीमटें कंक्ीट और प्री-स्ट्रेस्ट्ड सीमेंट कंक्ीट के खंभों को एक साथ बांधा िाएगा और सामान्य रूप से प्रत्येक खंभे पर अथय दकया िाएगा; (ग) रेलिे, इलेजक्रक लाइन क्ॉलसंग और जििेष संरचनाओं िाले स्ट्थानों के जलए, पाइप या रॉड टाइप अर्थंग प्रिान की िाएगी; (घ) सभी स्ट्टील के खंभे, जिन पर जस्ट्िच, रांसिामयर, फ़्यूज़ लगे ह,ैं को अथय दकया िाएगा; (ङ) 650 िोल्ट से नीचे की जिद्युत लाइनों के खंभों के जलए जनरंतर अथय िायर या मैसेंिर िायर के साथ एठरयल बंच केबल के मामले में सुरिा व्यिस्ट्था प्रिान की िाएगी और प्रत्येक दकलोमीटर में तीन समतुल्य लबंिओंु पर अथय से िुड़ी होगी; और38 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] (च) प्रत्येक स्ट्टे-िायर को समान रूप से अथय दकया िाएगा िब तक दक उसी िोल्टेि श्रेणी के इंसुलेटर को िमीन से 3.0 मीटर से कम ऊंचाई पर नहीं रखा िाता ह ैऔर िमीन से तीन मीटर की ऊंचाई तक इंसुलेटेड ट्यूब प्रिान दकया िाएगा। (2) 66 दकलोिोल्ट और उससे अजधक िोल्टेि की ओिरहैड लाइन के जलए, अर्थंग और अथय िायर की व्यिस्ट्था अजधजनयम की धारा 177 की उप-धारा (2) के खंड (ङ) के अधीन प्राजधकरण द्वारा अजधसूजचत जिजनयमों के अनुसार होगी। 75. चढ़ाई रोधक उपकरण- 650 िोल्ट से अजधक िोल्टेि की प्रत्येक ओिरहैड लाइन के स्ट्िामी अनाजधकृत व्यजियों को ऐसी ओिरहैड लाइनों के दकसी भी अिलंब पर चढ़ने से रोकने के जलए प्रासंजगक मानकों के अनुसार पयायप्त व्यिस्ट्था करेंगे, जिस पर सीढ़ी या जििेष उपकरणों की सहायता के जबना आसानी से चढ़ा िा सकता है: परन्तु यह दक 3.5 से 4 मीटर की ऊंचाई पर 30 से 40 सेमी की ऊध्िायधर िरू ी के जलए प्रासंजगक मानकों के अनुरूप कंटीले तार 11 दकलोिोल्ट लाइन और उससे ऊपर के प्रत्येक पोल या टॉिर पर प्रिान दकए िाएंगे। स्ट्पष्टीकरण.- इस जिजनयम के प्रयोिनों के जलए, रेल, प्रबजलत सीमेंट कंक्ीट के खंभे और सीदढ़यों के जबना प्री-स्ट्रेस्ट्ड सीमटें कंक्ीट के खंभे, ट्यूबलर के खंभे, जबना सीढ़ी लकड़ी के अिलंब, आई-सेक्िन और चैनल को ऐसे अिलंब के रूप में माना िाएगा जिस पर आसानी से चढ़ा नहीं िा सकता। . 76. सरु िा तथा सरं िा सबं धं ी उपकरण– (1) प्रत्येक ओिरहडै लाइन जिसे आिेि रजहत बीयरर िायर से नहीं लटकाया गया है, इंसुलेटटंग पिाथय से अिठरत नहीं दकया गया है और रॉली िायर नहीं है तथा सड़क या अन् य साियिजनक स्ट्थल के दकसी जहस्ट्से अथिा दकसी िैक्री या खान या दकसी उपभोिा के पठरसर में लगाया गया है, को इसके टूटने की जस्ट् थजत में जिद्युतीय तौर पर नुकसान रजहत बनाने के जलए अथय गार्डंग द्वारा सुरजित दकया िाएगा। (2) इलेजक्रकल इंस्ट्पेक्टर, जलजखत नोठटस द्वारा, कहीं पर भी स्ट्थाजपत की िाने िाली ओिरहडै लाइन के स्ट्िामी को इस उप- जिजनयम (1) में जिजनर्ियष्ट तरीके से सुरजित बनाने के जलए कह सकता ह।ै (3) सस्ट्पेंिन इंसुलेटर लस्ट्रंग्स पर पिी के मल को जगरने से रोकने के जलए, प्रासंजगक मानकों के अनुसार उपयुि बडय गाडय, सस्ट्पेंिन इंसुलेटर लस्ट्रंग्स के ऊपर सस्ट्पेंिन टॉिर या सस्ट्पेंिन पोल स्ट्रक्चर के क्ॉस आम्सय पर उपलब्ध कराए िाएंगे। 77. आकािीय जबिली स े सरु िा- (1) प्रत्येक ओिरहैड लाइन, सबस्ट्टेिन अथिा िेनरेटटंग स्ट्टेिन, जिस पर जबिली जगरने की संभािना हो, में, जबिली जगरने के कारण बढ़े जिद्युत आिेि जिसकी ििह से नुकसान हो सकता है, को िमीन में भेिने के जलए कारगर उपाय प्रासंजगक मानकों के अनुसार अपनाए िाएंगे। (2) दकसी भी तजड़त चालक की भू-संपकय लीड दकसी लोह े अथिा इस्ट्पात के पाइप से नहीं गुिारी िाएगी बजल्क िहां तक संभि हो, इसे तजड़त चालक से 650 िोल्ट से अजधक िोल् ट िाले सबस्ट्टेिन के जलए पहले से उपलब्ध कराए गए अथय मैट के िंक्िन अथिा एक अजतठरि लंबित भू-इलेक्रोड से सीधे कनेक्ट कर दिया िाएगा और इसके बीच में इसे दकसी भी धातु से बन े पाटय के संपकय में नहीं आने दिया िाएगा तथा िहां कहीं व्यािहाठरक हो, इसमें मोड़ भी नहीं आने दिया िाएगा: परन्तु यह दक एक लंबित भू-इलेक्रोड को अथय मैट के िंक्िन से िोड़ा िाएगा। 78. अप्रयुि ओिरहडै लाइन-ें ऐसे मामले में िहां जिद्युत आपर्ू तय लाइन के रूप में ओिरहैड लाइन का उपयोग बिं कर दिया गया ह,ै अथायत:- (i) स्ट्िामी जिजनयम 59 के अनुसार इन्ह ेंयांजत्रक तौर पर सुरजित हालात में रखेगा या हटा िेगा; और (ii) इलेजक्रकल इंस्ट्पेक्टर, स्ट्िामी को जलजखत नोठटस भेिकर इन्ह ें यांजत्रक तौर पर सुरजित हालात में रखने या नोठटस प्राप्त होने के 30 दिन के अंिर हटा िेने को कहगे ा। 79. केबल जबछाना- (1) प्रासंजगक मानकों के अनुसार भूजम की सतह से केबल के िीषय तक न्यूनतम भूजमगत गहराई के जबना 33 दकलोिोल्ट तक के िोल्टेि स्ट्तर का कोई भूजमगत जिद्युत केबल नहीं लगाया िाएगा; परन्तु यह दक 33 दकलोिोल्ट से अजधक उपयोग के जलए भूजमगत जबिली केबल को 1.2 मीटर की न्यूनतम भूजमगत गहराई के साथ रखा िाएगा। (2) िरू संचार की कोई भी भूजमगत केबल क्मिः 33 दकलोिोल्ट तक और 33 दकलोिोल्ट से अजधक िोल्टेि के भूजमगत जिद्युत केबल से 0.3 मीटर और 0.6 मीटर की न्यूनतम पृथक्करण िरू ी के जबना नहीं जबछाई िाएगी। 80. जिद्यतु चबुं कीय व्यिधान से बचाि– िोल्टेि स्ट्तर 11 दकलोिोल्ट अथिा अजधक की प्रत्येक जिद्युत सप्लाई लाइन का स्ट्िामी अजधजनयम की धारा 160 की आिश्यकता के अनुसार कर्मययों और िरू संचार लाइनों की सुरिा सुजनजित करने के जलए जिद्युत िरू संचार समन् िय सजमजत की मंिूरी प्राप्त करेगा।[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 39 अध्याय VIII जिद्यतु कषणय के जलए सरु िा सबं ंधी अजतठरि अपिे ाएं 81. अध्याय का प्रितनय – (1) इस अध्याय के जिजनयम केिल िहीं लागू होंगे, िहां जिद्युत का उपयोग कषयण के प्रयोिनाथय दकया िाता ह:ै परंतु यह दक याजत्रयों, पिुओं अथिा माल ढुलाई के साियिजनक िाहनों, अथिा दकसी रेलिे या राम-िे के सचल िाहनों में प्रकाि व्यिस्ट्था अथिा िातायन के जलए उपयोग होने िाली जिद्युत पर रेल अजधजनयम 1989 (1989 का 24) के उपबंधों के अधीन रहते हुए इस अध्याय के कोई भी जिजनयम लागू नहीं होंगे। (2) िाहन में जिद्युत पारेषण के जलए उपयोग होने िाले सुचालक को ‘‘लाइन’’ और अन्य सुचालकों को ‘’ठरटनय’’ के रूप में जनर्ियष्ट दकया गया ह।ै (3) लाइन, ठरटनय, रेल अथिा रॉली िायर, यथाजस्ट्थजत, का स्ट्िामी जिजनयम 82 से 95 के अनुपालन के जलए जिम्मेिार होगा। (4) ऐसे दकसी प्रजतष्ठापन के जलए जिद्युत आपूर्तय आरंभ करने अथिा 6 माह या इससे अजधक की अिजध तक जडस्ट्कनेक्िन के बाि प्रजतष्ठापन को आपूर्तय दिर से बहाल करने के बारे में 650 िोल् ट से अजधक िोल् ट िाले प्रजतष्ठापन के स्ट्िामी द्वारा इलेजक्रकल इंस्ट्पेक्टर को आिेिन करने से पहले, आपूर्तयकताय यह सुजनजित करेगा दक उसकी 650 िोल्ट से अजधक िोल् ट िाली जिद्युत आपूर्तय लाइनें अथिा उपकरण, यथा स्ट्थान अिजस्ट्थत ह,ैं उजचत रूप से कनेक्ट ह ैऔर जिजधित पूणय ह।ैं (5) िब तक जिद्युत जनरीिक इस बात से संतुष् ट नहीं हो िाता ह ै दक जिजनयम 46 से 52 और जिजनयम 82 से 95 का अनुपालन हो गया ह ैऔर उसने इलेजक्रकल इंस्ट्पेक्टर का जलजखत अनुमोिन प्राप्त कर जलया ह,ै आपूर्तकय ताय द्वारा जिद्युत आपूर्त य आरंभ नहीं की िाएगी। 82. िाहन को आपर्ू त य के िोल्ट - केंद्रीय सरकार अथिा राज्य सरकार, यथाजस्ट्थजत, के जलजखत अनुमोिन के जबना और ऐसी ितों, जिन्ह ेंराज्य सरकार लागू करना अथिा उजचत समझती ह ैपर जनभयर करते हुए दकसी भी व्यजि कोई भी िाहन के सीधे जिद्युतीय तथा यांजत्रक कनेक्िन में उपयोग होने िाली 650 िोल् ट से अजधक िोल् ट िाली दकसी रॉली िायर अथिा सुचालक को सप्लाई नहीं करेगा। 83. लाइनों का इंसुलिे न– प्रत्येक लाइन अपनी पूरी लंबाई में इंसुलेटेड रहगे ी और लाइन में या तो इंसुलेटर के माध्यम से अिलंजबत खुले सुचालक अथिा इंसुलेटेड केबल हो सकते हैं। 84. ठरटनों का इंसुलिे न– (1) ऐसी कोई भी पटठरयां, जिन पर जडब्बे िौड़ते ह ैंअथिा ठरटनय के दकसी भाग से इन पटठरयों के बीच या इन पटठरयों के 0.9 मीटर के अंिर जबछाया गया सुचालक, यदि जिजनयम 85 के उप-जिजनयम (2) और (3) के अंतगयत ितों के पूरा करने में सिम सुचालकता िाला नहीं है, को इंसुलेटेड दकया िाएगा। (2) ऐसे मामले में, िहां ठरटनय का कोई पाटय इंसुलेटेड नहीं ह,ै उसे प्रणाली के नेगेठटि अथिा न्यूरल से िोड़ा िाएगा। 85. धात ु से बन े पाइपों स े समीपता– (1) ऐसे मामले में िहां इंसुलेिन रजहत ठरटनय उन धाजत्िक पाइपों, ढांचों अथिा पिाथों के समीप अिजस्ट्थत ह,ैं िो उस ठरटनय के स्ट्िामी के नहीं हैं, इन पाइपों, ढाचं ों अथिा पिाथों का स्ट्िामी यदि चाहता ह ैतो इंसुलेिन रजहत ठरटनय का स्ट्िामी अपने ठरटनय को िहां अपने व् यय पर कनेक्ट करेगा। (2) ऐसे मामले में िहां ठरटनय आंजिक तौर पर अथिा पूरी तरह से इंसुलेिन रजहत है, ठरटनय का स्ट्िामी अपनी प्रणाली के जनमाणय अथिा रखरखाि में, दकसी भी लबंि ुपर इंसुलेिन रजहत ठरटनय के जिभि और ठरटनय के दकसी अन्य लबंि ुपर इंसुलेिन रजहत ठरटनय के जिभि के बीच करंट द्वारा पैिा अंतर को कम करने के जलए ऐसे तरीके अपनाएगा, जिससे यह सुजनजित हो सके दक ठरटनय के अपेिाकृत धनात्मक होन े पर इंसुलेिन रजहत ठरटनय और आसपास मौिूि दकसी अन्य धातु से बन े पाइप, ढांचे अथिा पिाथय के बीच जिभि का अंतर चार िोल्ट से अजधक नहीं होगा और ठरटनय के अपेिाकृत नकरात्मक होने पर यह अंतर 1 िोल्ट से अजधक नहीं होगा। (3) ऐसे पाइप, ढांचे अथिा पिाथय का स्ट्िामी इंसुलेिन रजहत ठरटनय के स्ट्िामी से उसके प्रजतजनजध की उपजस्ट्थजत में उजचत समय तथा अंतराल पर यह सुजनजित कराने के जलए परीिण करिा सकता ह ै दक उप-जिजनयम (2) में जिजनर्ियष्ट ितों का अनुपालन हो रहा ह ै या नहीं, और यदि यह पाया िाता ह ै दक ितें पूरी की िा रही ह,ै तो परीिण कराने में हुआ उजचत खचय तथा आकजस्ट्मक खचय, पाइप, ढांचे अथिा पिाथय के स्ट्िामी द्वारा िहन दकया िाएगा।40 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] (4) अथय के संबंध में दकसी भी लबंि ु पर इंसुलेिन रजहत ठरटनय का जिभि सामान् य ितों के अधीन 50 िोल्ट से अजधक नहीं होगा। (5) पेरोजलयम साइलडंग्स के प्रजतष्ठापन में अथय को इंसुलेिन रजहत ठरटनय से संबि दकया िाएगा तादक इसे सामान जिभि िाला बनाया िा सके और रैक के आस-पास की पाइप लाइनों को समुजचत रूप से अथय दकया िाएगा। 86. ठरटन य पर जिभिातं र– ऐस े मामले में िहां ठरटनय आंजिक तौर पर अथिा पूरी तरह से इंसुलेिन रजहत है, स्ट्िामी प्रणाली के काययकाल के िौरान इंसुलेिन रजहत ठरटनय तथा इंसुलेटेड ठरटनय के प्रत् येक िंक्िन के बीच और उस िंक्िन से सिायजधक िरू स्ट्थ रूट के लबंि ुपर जिभिांतर का ठरकॉडय जनयजमत रूप से रखेगा, तथा सामान्य रलनंग पठरजस्ट्थजतयों में जिभिांतर, सिोच्च मूिमेंरी पीक और उस जििेष घंटे के िौरान अजधकतम लोड के औसत के बीच सात िोल्ट के औसत अजधमान से अजधक नहीं होगा। 87. कंड्यटू प्रणाली म ेंलीकेि- ऐस ेमामले में िहां लाइन तथा ठरटन यिोनों को ही एक कंड्यूट में रखा गया ह,ै िहााँ प्रणाली के जनमायण तथा अनुरिण में जनम्नजलजखत ितों को पूरा दकया िाएगा, अथायत्:- (i) ऐसे मामले में िहां ठरटनय के दकसी भाग के रूप में पटठरयों का उपयोग दकया गया है, उन्हें कम से कम 0.40 िगय मीटर की अनुप्रस्ट्थ काट िाली तांबे की पठटट्यों के कंड्यूट अथिा समान सुचालकता िाले अन्य िठरयों से आपस में अजधक से अजधक तीस मीटर की िरू ी पर जिद्युतीय रूप से संबि दकया िाएगा और ऐसे मामलों म ेंिहां ठरटनय पूरी तरह से इंसुलेटेड ह ैऔर इसे कंड्यूट में रखा गया ह,ै को कंड्यूट का ठरटनय अथिा लाइन के साथ संपकय या आंजिक संपकय का संकेत िेने िाले एक उजचत उपकरण के माध्यम से िेनरेटटंग स्ट्टेिन अथिा सबस्ट्टेिन पर लगे अथय से कनेक्ट दकया िाएगा; और (ii) पहले अथिा कुछ घंटों तक चलने के बाि, िब लाइन पूरी तरह आिेजित हो िाती है, लीकेि करंट की प्रजतदिन िांच की िाएगी और यदि दकसी भी समय यह लसंगल राम-िे रैक के प्रजत दकलो मीटर पर 0.6 एजम् पयर से ज्यािा पाया िाता ह ैतथा चौबीस घंटे के अंिर लीकेि बंि नहीं दकया िाता ह ैतो जबिली का पारेषण और उपयोग बंि कर दिया िाएगा। 88. कंड्यटू प्रणाली को छोड़कर अन्य प्रणाली म ें लीकेि– ऐसे मामले में िहां लाइन तथा ठरटनय िोनों ही एक कंड्यूट में नहीं रखे गए ह,ैं पहले अथिा कुछ घंटों तक चलने के बाि, िब लाइन पूरी तरह आिेजित हो िाती है, लीकेि करंट की प्रजतदिन िांच की िाएगी और यदि दकसी भी समय यह लसंगल रांम-िे रेक के प्रजत दकलोमीटर पर 0.3 एंजपयर से ज्यािा पाया िाता ह ैतथा 24 घंटे के अंिर लीकेि बंि नहीं दकया िाता ह ैतो जबिली का पारेषण और उपयोग बंि कर दिया िाएगा। 89. जिद्यतु पठरपथ तक याजत्रयों की पहुंच नहीं होनी चाजहए– प्रत् येक िाहन का स्ट् िामी इलेजक्रकल इंस्ट्पेक्टर की संतुजष्ट के अनुरूप सािधाजनयां बरतेंगा तादक:– (i) जिनसे जबिली का झटका लगने का खतरा हो, उन जिद्युत पठरपथों तक यात्री न पहुचं सके; (ii) ऐसी कोई भी धातु, हडैं -रेल अथिा अन् य धाजत्िक पिाथय जिन् ह ेंयात्री छू सकते ह,ैं को आिेजित होने से बचाया िाए। 90. खंडो का पृथक्करण- प्रत् येक र ाली िायर को अलग-अलग खंडों में जनर्मयत दकया िाए, इन खंडों की लंबाई 1.6 दकलोमीटर से ज्यािा नहीं होनी चाजहए और प्रत् येक खंड को अलग करने का प्रािधान उपलब्ध कराया िाए। 91. रॉली िायर का न्यनू तम आकार और बल- कोई भी रॉली िायर 0.5 िगय सेंटीमीटर से कम अनुप्रस्ट्थ काट िाली नहीं होगी और इनका िास्ट्तजिक भंगुरता लोड 2000 दकलोग्राम से कम नहीं होगा। 92. रॉली िायर की ऊंचाई और लबं ाई– एक ही अिलंब पर लगे रॉली िायर अथिा रॉली िायर के रूप में रेक् िन िीडर, दकसी भी स्ट्थान पर, सड़क की सतह के ऊपर 5.2 मीटर की ऊंचाई से कम पर अिजस्ट्थत नहीं होंगे। उन्हीं स्ट्थानों पर यह ऊंचाई लागू नहीं होगी िहां रॉली िायर दकसी सेतु अथिा अचल ढांचे से, अथिा दकसी सुरंग अथिा माइनिाफ्ट के िठरए अथिा दकनारे या ऐसे ही दकसी स्ट्थान से गुिर रही हो। ऐसे मामलों में, इसे इलेजक्रकल इंस्ट्पेक्टर की संतुजष्ट के अनुसार लटकाया िाएगा। 93. गाडय िायर को अथ य करना- प्रत्येक गाडय िायर प्रत्येक ऐसे स्ट्थल पर अथय से कनेक्ट दकया िाएगा िहां जिद्युत का प्रभाि ब्रेक दकया गया ह ैऔर साथ ही इसे ज्यािा से ज्यािा पांच खंडों के अंतराल पर रेलों के साथ भी िोड़ा िाएगा। 94. चुंबकीय िेधिालाओं तथा प्रयोगिालाओं के साथ समीपता- केंद्रीय सरकार अथिा इसके द्वारा अजभजहत दकसी अजधकारी की सहमजत के जबना भू-चुंबकीय िेधिालाओं तथा प्रयोगिालाओं के आसपास कषयण का कायय नहीं दकया िाएगा। 95. ठरकॉडय- (1) स्ट्िामी जनम्नजलजखत ठरकॉडय रखेगा, अथायत्:- (i) जनम्नजलजखत जििरण ििायने िाला िैजनक ठरकॉडय:– (क) आपूर्तय के स्रोत से अजधकतम िर्कंग करंट;[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 41 (ख) आपूर्तय के स्रोत पर अजधकतम िर्कंग िोल्टेि; (ग) जिजनयम 86 के अधीन अपेजित जिभिांतर; और (घ) िैसा की जिजनयम 87 और 88 के अंतगयत अपेजित ह,ै लीकेि करंट, यदि कोई हो। (ii) जनम्नजलजखत जििरण ििायने िाला सामजयक ठरकॉडय:- (क) जिजनयम 85 के उप-जिजनयम (2) और (3) के अंतगयत दकया िाने िाला प्रत्येक परीिण; (ख) प्रत्येक लीकेि को बंि करने, तथा इसमें लगने िाला समय; और (ग) प्रणाली के जिद्युतीय कायय को प्रभाजित करने िाली दकसी भी असामान्य घटना का जििरण। (2) उप-जिजनयम (1) के अधीन इस प्रकार रखे गए ठरकाडय को इलेजक्रकल इंस्ट्पेक्टर द्वारा िांच के जलए प्रस्ट्तुत दकया िाएगा I अध्याय-IX खानों तथा तले ित्रे ों के जलए सुरिा सबं ंधी अजतठरि अपिे ाएाँ 96. अध्याय का लाग ूहोना- इस अध्याय के जिजनयम केिल िहीं लागू होंगे िहां जिद्युत, खान अजधजनयम, 1952 (1952 का 35) में िी गई पठरभाषा के अनुसार खानों में और तेल िेत्रों में उपयोग की िाती हैI 97. अनपु ालन की जिम्मिे ारी- स्ट्िामी, एिेंट, प्रबंधक, अजभयंता एिं संस्ट्थापन प्रबंधक तथा खान एिं तेल िेत्रों के इंिीजनयर का यह कतयव्य होगा दक दिए गए जिजनयमों का अनुपालन दकया िाए और इन्ह ेंलागू दकया िाए तथा सभी जनयुि कमयचाठरयों का यह कतयव्य होगा दक िे इन जिजनयमों के अनुसार अपना कायय करें: परन्तु यह दक केिल एिं मुख्यतः खान अथिा खानों के जबिली आपूर्तय के जलए जबिली स्ट्टेिनों, रांसिॉमयर सबस्ट्टेिनों, कन्िटयर सबस्ट्टेिनों, रेक्टीिायर सबस्ट्टेिनों और संचायक, भंडारण स्ट्टेिनों, िो दकसी एक खान के पठरसर में नहीं आते ह,ैं के मामले में, उस संस्ट्थापन के प्रबंधक के रूप में जिश्वजिद्यालय से इलेजक्रकल इंिीजनयटरंग में जडग्री प्राप्त एिं पयायप्त अनुभि िाले अजभयंता को जनयुि दकया िा सकता ह।ै स्ट्पष्टीकरण – इस जिजनयम के प्रयोिनाथय ‘’अजभयंता’’ िब्ि जनम्नजलजखत अथों में जलया गया है:- (i) कोयला खान के मामले में, इसका िही अथय होगा िो कोयला खान जिजनयम, 2017 में ह;ै (ii) लौहधातु खान के मामले में, इसका िही अथय होगा िो लोहा धातु खान जिजनयम, 1961 यथासंिोजधत में ह;ै और (iii) तेल-िेत्र के मामले में, इसका अथय ‘संस्ट्थापन प्रबंधक’’ होगा िो तेल खान जिजनयम, 2017 में है। 98. नोठटस– (1) प्रत् येक िषय की िरिरी के पहले दिन अथिा इससे पहले, प्रत् येक खान अथिा तेल-िेत्र के संबंध में, उपकरणों का साइि तथा प्रकार के साथ इनके उपयोग की पठरजस्ट् थजतयों के बारे में जििरण ििायने िाला ठरटनय, खान जिद्युत जनरीिक को, िैसी भी आिश् यकता हो, जिजनयम 97 में जिजनर्ियष् ट व् यजक् तयों द्वारा अनुसूची IX अथिा यथाजस्ट्थजत, अनुसूची X, में उपबंजधत प्रारूप, िो भी लागू हो, में भेिा िाएगा। (2) जिजनयम 97 में जिजनर्ियष् ट व् यजक् त, नये स्ट्थाजपत उपकरणों तथा इनके स्ट्थान का जििरण िेते हुए, इन्ह ेंखानों म ेंउपयोग करने के अपने इरािे के बारे में कम से कम 7 दिन पहले जलजखत नोठटस खान के जिद्युत जनरीिक को िेंगे; परंतु यह दक 650 िोल् ट अनजधक तक िाले जिद्यमान प्रजतष्ठापन में दकसी भी प्रकार के जिस्ट्त ार अथिा िेरबिल के मामले में, दकसी भी ऐसे जिस्ट्त ार अथिा िेरबिल को उपयोग में लाने से पहले, खान के जिद्युत जनरीिक को तत् काल जलजखत नोठटस भेिा िाएगा: परंतु यह और दक यह जिजनयम िरू संचार अथिा जसग्न ललंग उपकरणों पर लागू नहीं होगाः परन्तु यह भी दक ऐसे आपातकाल के मामले में जिसके कारण िीिन या मिीनरी को िजत हो सकती ह ै और खान की सुरिा के जलए भी हाजनकारक है, तो इसकी सूचना, चौबीस घंटे के अंिर खान के जिद्युत जनरीिक को, उपकरण के सही हालत में होने के साथ-साथ दकए गए दकसी पठरिधयन या पठरितयन की स्ट्ि:प्रमाणन ठरपोटय, के साथ िी िाएगी। 99. प् लान- (1) खान अजधजनयम, 1952 (1952 का 35) की अपेिाओं के अधीन सही स्ट्केल पर बना प्लान िो खान में रखा गया ह,ै ऐसा ही एक अन्य प्लान एिं आपर्ू त्तय िुरू होने के स्ट्थान से जिद्युत प्रजतष्ठापनों का लसंगल लाइन आरेख, खान के कायायलय म ें42 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] उपलब्ध होगा, जिसमें सभी दिक्स उपकरणों और उनके सुचालकों की अिजस्ट्थजत ििायई गई ह।ै इनमें लाइट िरू संचार अथिा लसंगनललंग उपकरण अथिा इनकी केबलें सजम्मजलत नहीं है। (2) कम से कम 25 सेंटीमीटर से एक दकलो मीटर तक के पैमाने (1:4000) पर बना ऐसा ही प्लान दकसी भी तेल-िेत्र के एक अथिा इससे अजधक कुंओं के प्रबंधक या स्ट्िामी के पास उपलब्ध रहगे ा। (3) केंद्रीय सरकार द्वारा जनिेजित पैमाने पर ऐसा ही एक प्लान एिं लसंगल लाइन आरेख जिसमें जिद्युत आपूर्तय लाइनों की अिजस्ट्थजत को ििायया गया ह,ै एकल लसंगल लाइन आरेख लाइसेंस धारक अथिा खानों या तेल िेत्रों में जिद्युत पारेषण या जितरण करने िाले स्ट्िामी ि अन्य व्यजि के कायायलय में रखा िाएगा। (4) इस जिजनयम में जिजनर्ियष्ट प्लानों की आिश्यकतानुसार िांच की िाएगी और इन्ह ें अद्यतन रखा िाएगा तथा खान अथिा कुओं के प्रबंधक अथिा स्ट्िामी द्वारा ऐसे परीिणों के तारीख की प्रजिजष्ट की िाएगी और य े प्लान इलैजक्रक खान के इंस्ट्पेक्टर अथिा खान इंस्ट्पेक्टर के जनरीिण के जलए दकसी भी समय उपलब्ध रहगें े और यदि खतरनाक िेत्र की सीमा को संिोजधत दकया िाता ह,ै तो ऐसे िेत्र के अंतगयत आने िाले उपकरण की समीिा प्रासंजगक मानकों या िायुमंडलीय जिस्ट्िोटकों के अनुसार की िाएगी। 100. लाइटटंग, ओिरहैड लाइन,ें सचं ार तथा अजि स े बचाि हते ु सािधाजनयां- (1) प्रासजं गक मानकों के अनुसार खानों में जबिली से पयायप्त रोिनी प्रिान की िाएगी: परन्तु यह दक भूजमगत कोयला खिान में इस तरह की लाइट की दिटटंग होनी चाजहए िो दक खान के मख्ु य जनरीिक द्वारा टाइप स्ट्िीकृत की गई हो; परन्तु यह और दक खान के मुख्य जनरीिक द्वारा अनमु ोदित तीव्र लौ िाले एक या अजधक सुरिा लैंप, या ऐसी प्रकाि व्यिस्ट्था अथिा अन्य रोिनी, उन सभी स्ट्थानों पर जनरंतर प्रिान की िाती रहेगी िहां दकसी भी समय रोिनी की अनुपजस्ट्थजत सुरिा के प्रजतकूल होगी; परन्तु यह भी दक िमीन के नीचे की धातु की खान या दकसी खुली खिान या तेल-िेत्र में, ऐसी लाइट की दिटटंग प्रासंजगक मानकों या सुसंगत मानकों के अनुरूप दिए गए आिेिन के अनुसार उपयुि होंगे, और उन सभी स्ट्थानों पर पयायप्त आपातकालीन प्रकाि व्यिस्ट्था बनाए रखी िाएगी िहां दकसी भी समय रोिनी की अनुलप्ब्धता सुरिा कारणों से प्रजतकूल होगी। (2) प्रत्येक खान में उन िो लबंिओंु िहां जिजनयम 107 के उप-जिजनयम (1) के अधीन जस्ट्िचजगयर लगाए गए हैं, तथा खान में अन्य जितरण केंद्रीय और िॉफ्ट बाटम के बीच संचार के कारगर माध्यम उपलब्ध कराए िाएंगे। (3) पयायप्त िमता और यथासंिोजधत प्रासंजगक मानकों के अनुसार अनमु ोदित प्रकार के अजििमन उपकरण खान के उन सभी स्ट्थानों पर लगाए िाएंगे तथा समुजचत रूप से अनुरजित दकए िाएंगे िहां केबल, िरू संचार तथा जसगनललंग उपकरण के अजतठरि अन्य उपकरण मौिूि हैं। (4) खानों के मामले में, ओिरहडै लाइनों के सबसे नीचे के सुचालक अथिा ओिरहैड केबल िहां डंपर अथिा रेक रजहत िाहन चलते ह ैंकी िमीन से ऊंचाई उन सड़कों की पूरी लंबाई पर िहां डंपर अथिा रेक रजहत िाहन क्ॉस करते ह,ैं बारह मीटर से कम नहीं होगी; परंतु यह दक िहां डम्पर बकेट उिी हुई जस्ट्थजत म ें हो, डम्पर बॉडी के िीषय और ओिरहडै लाइनों या ओिरहैड केबल के सबसे नीचे के सुचालक के बीच की अंतराल 1.00 मीटर से कम नहीं होगी। 101. रासं िामरय और जस्ट्िचजगयरों का पथृ क्करण और दिलक्सगं - (1) रांसिामयरों और जस्ट्िचजगयर को मैकेजनकल नुकसान तथा आग लगने के खतरे से बचाने के जलए अलग कमरे, कि अथिा बॉक्स में सही तरीके से लगाया िाएगा। (2) िब तक उपकरण को इस प्रकार जनर्मयत, सुरजित और तैयार न दकया गया हो दक इनमें आग लगने का िोजखम न रह,े उपकरणों से युक्त कमरे, कि अथिा बॉक् स के जनमायण अथिा इनके अंिर दकसी भी दिटटंग के जनमायण में ज्िलनिील सामग्री का उपयोग नहीं दकया िाएगा और ऐसे कमरे, कि अथिा बॉक् स की बनािट पयायप्त मिबूत होगी और इन्ह ें िुष्क तथा प्रकाजित रखा िाएगा एिं इनमें लगाए गए सभी उपकरणों के जलए हिा के आने िाने की कारगर व्यिस्ट्था की िाएगी। (3) सभी उपकरणों जिन पर काम दकया िाना है, जिनकी िेखभाल की िानी ह ै और सभी हत् थे जिन् ह ें चलाया िाना ह,ै जिस्ट्तृत काययस्ट्थल में रखे िाएंगे, यह स्ट्थल आसानी से पहुचं योग्य, बाधा रजहत तथा िहां तक संभि हो, खतरे से मुि होने चाजहए।[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 43 102. अथ यकरन ेका तरीका- (1) दकसी खान में िहां अथय करना आिश् यक हो, यह कायय खान के सतह उपकेन्द्र की भू-संपकय प्रणाली से कनेक् ट करके दकया िाएगा। (2) सभी धाजत्िक किच, आिरण, हत्थे, ज्ि ाइंट बाक् स, जस्ट्िच जगयर फ्रेम, इंस्ट्ूमेंट आिरण, बक्सों के जस्ट्िच और फ्यूि किर, सभी लैंप होल्डर, िब तक दक इन्ह ें अजिरोधी सामग्री से बने इंसुलेटेड आिरण से कारगर ढंग से सुरजित नहीं दकया गया है, िनरेटरों, रांसफ़ॉमयरों, पोटेबल मोटर सजहत मोटरों के फ्रेम्स और बेडप्लेटस को उपजिजनयम (1) में जिजनर्ियष्ट तरीके से आर्थंग प्रणाली से कनेक्िन के िठरए अथय दकया िाएगा। (3) ऐसे मामले म ेंिहां केबलों को जिजनयम 108 के खंड (IV)(घ) के अनुसार जनर्मयत तथा स्ट्थाजपत धाजत्िक आिरण से किर दकया गया ह,ै ऐसे धाजत्िक किर को अर्थंग प्रणाली से कनेक्ट करने के िठरए के रूप में उपयोग दकया िा सकता ह।ै (4) अर्थंग प्रणाली के सभी सुचालकों के सभी जहस्ट्सों और िोड़ों की सुचालकता, उपकरण को केिल जिद्युत आपूर्तय के जलए उपयोग दकए िाने िाले उस सबस े बड़े सुचालक की सुचालकता के कम से कम 50 प्रजतित के बराबर होगी जिसके एक जहस्ट्से को अथय दकया िाना अपेजित है: परंतु यह दक अर्थंग प्रणाली के दकसी भी सुचालक का अनुप्रस्ट्थ काट िेत्रिल 0.15 िगय सेंटीमीटर से कम नहीं होगा, इनमें पोटेबल उपकरण में उपयोग होने िाली फ्लेजक्सबल केबल का अथय सुचालक सजम्मजलत नहीं है, जिनकी िोल्टेि 125 िोल्ट से अजधक नहीं होती है और अथय सुचालक का अनुप्रस्ट्थ काट िेत्रिल तथा सुचालकता केबल में सबसे बड़े आिेजित सुचालक की अनुप्रस्ट् थ काट तथा सुचालकता से कम नहीं होती। (5) अथय सुचालक में सभी िोड़ तथा केिल के धाजत्िक आिरण में सभी िोड़ भली-भांजत सोल्डर होंगे या अन्यथा कारगरता से बने होंगे। (6) जस्ट्िच, फ्यूि अथिा सर्कयट ब्रेकर, दकसी भी अथय सुचालक में प्रजिष्ट नहीं कराया िाएगा। (7) यह जिजनयम, पोटेबल उपकरणों को छोड़कर खान की दकसी भी अन्य प्रणाली जिनकी िोल् ट 30 िोल्ट से अजधक न हो, पर लागू नहीं होंगे। 103. सरु िा उपकरण- (1) सुरिा के जहत में, भूजमतगत खानों और तेल िेत्रों के जलए 250 िोल्ट से अजधक और 1100 िोल्ट तक िोल्टेि िाले प्रजतष्ठापनों में, अथय िॉल्ट करंट, 750 जमलीऐम्पीयर से अजधक नहीं होना चाजहए और खुली खानों के 1100 िोल्ट से अजधक िोल्टेि और 11 दकलोिोल्ट तक िोल्टेि िाले प्रजतष्ठापनों में 50 एजम्पयर से अजधक नहीं होना चाजहए और जिद्यतु आपूर्तय की समजु चत रूप से जडिाइन, प्रजतबंजधत न्यूरल प्रणाली की सहायता से अथय िाल्ट करंट को इन जनधायठरत स्ट्तरों तक सीजमत दकया िाएगा: परन्तु यह दक इन जिजनयमों को अजधसूजचत दकए िाने के िौरान अथिा अजधसूजचत दकए िाने के पिात्, 1100 िोल्ट से अजधक और 11 दकलोिोल्ट तक की िोल्टेि िाली भूजमगत खिानों, खुली खिानों और तेल खिानों या तेल-िेत्र के जलए, जिद्युत आपूर्तय की समजु चत रूप स े जडिाइन, प्रजतबंजधत न्यूरल प्रणाली की सहायता से अथय िॉल्ट करंट का मान 10 एम्पीयर तक सीजमत दकया िाएगा: परन्तु यह और दक उपयुि समय जिलंब संरिण के साथ 1100 िोल्ट तक िोल्टेि के प्रत्येक उपकरण के जलए संरिण ठरले की सेटटंग 200 से 400 जमलीएम्पीयर के बीच सेट की िाएगी। (2) िनरेटटंग स्ट्टेिन, सबस्ट्टेिन अथिा जस्ट्िच स्ट्टेिन में लगे जस्ट्िचजगयर और ठरले के संचालन का िैजनक ठरकॉडय रजिस्ट्टर एिं इलैक्रौजनक रूप में रखा िाएगा। (3) जस्ट्िचजगयर और संरिात्मक प्रणाली की कारगरता हमेिा चालू हालत में रखी िाएगी और िषय में कम से कम एक बार अंििोधन और परीिण करके इनकी कारगरता की िांच की िाएगी और उसके पठरणाम को इस उद्देश्य के जलए रखे गए अलग रजिस्ट्टर में और इलेक्रॉजनक रूप में ििय दकया िाएगा: परन्तु यह दक िहां भी संख्यात्मक ठरले का उपयोग दकया िा रहा है, उन्हें मूल उपकरण जनमायता के दििाजनिेिों या सुसंगत मानकों के अनुसार परीिण प्रदक्या द्वारा िांचा िाएगा और ऐसी िांच की आिजधकता िषय में कम से कम एक बार होगी। 104. िोल्ट ेि की सीमा– भूजमगत खान में 11000 िोल् ट से अजधक िोल् ट पर जिद्युत पारेजषत नहीं की िाएगी और 6600 िोल्ट स े अजधक िोल् ट पर खान में जबिली का उपयोग नहीं दकया िाएगा; परंतु यह दक–44 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] (i) िहां हाथ से पकड़े िाने िाले पोटेबल उपकरण उपयोग दकए िाते हैं, िोल् टेि 125 िोल् ट से अजधक नहीं होंगे; (ii) िहां जबिली का उपयोग प्रकाि के जलए दकया िाता है:– (क) भूजमगत खानों में, प्रकाि संबंधी प्रणाली में मध्य अथिा न्यूरल लबंि ु को अथय के साथ िोड़ा िाएगा और िो िेिों के बीच िोल् टेि 125 िोल्ट से अजधक नहीं होंगे; और (ख) खान की सतह पर अथिा खुली खानों या तेल खिानों अथिा तेल िेत्रों में, िोल् टेि 250 िोल्ट तक बढ़ाए िा सकेंगे, यदि प्रणाली के न्यूरल अथिा मध्य प्िाइंट को अथय के साथ कनेक्ट दकया गया हो और िेिों के बीच िोल् ट 250 िोल्ट से अजधक न हो; (iii) िहां भूजमगत खानों और तेल खानों या तेल िेत्रों के खतरनाक िेत्रों में पोटेबल हडैं -लैंप उपयोग में लाए िात े ह,ैं िोल् टेि 30 िोल्ट से अजधक नहीं होंगा; (iv) तेल खानों या तेल िेत्रों के खतरनाक िेत्रों के मामलों में िहां सर्कयट का उपयोग ठरमोट कंरोल अथिा उपकरणों के इलेजक्रक इंटरलॉककंग के जलए दकया िाता है, सर्कयट िोल् टेि 30 िोल्ट से अजधक नहीं होगा: परन्तु यह दक तेल खिानों या तेल िेत्रों के खतरनाक िेत्रों में, उि िोल्टेि 250 िोल्ट तक हो सकती ह ै और यदि ऑन-ऑि कंरोल पुि-बटन स्ट्टेिन या ठरमोट कंरोल, उपयुि पठरसर में रखे िाते ह ैंिैसे: (i) फ्लेम प्रूि एनक्लोिर टाइप 'डी'; (ii) िबाियुि एनक्लोिर टाइप ‘पी’; (iii) रेत से भरा उपकरण टाइप ‘क्यू’; (iv) िर्धयत सुरिा एनक्लोिर टाइप ‘ई’, ‘एन’ और ‘ओ’: परंतु यह भी दक जनयंत्रण सर्कयट में झटके के खतरों के जखलाि उपयुि सुरिा होगी, और िॉल्ट के कारण ठरलपंग का पठरचालन सुरिा पर प्रजतकूल प्रभाि नहीं होगा: परंतु यह भी दक खानों या खुली खिानों की सतह पर जस्ट्थर संयंत्रों में, ठरमोट कंरोल या इलेजक्रक इंटर- लॉककंग के जलए उि िोल्टेि के जलए 250 िोल्ट तक की अनुमजत िी िा सकती ह।ै 105. रासं िामरय – खानों या तेल िेत्रों में, जनयंत्रण सर्कयट या ठरमोट कंरोल या इंटरलॉककंग या हैंड हल्े ड उपकरण के जलए िोल्टेि प्रिान करने के जलए उपयोग दकए िाने िाले रांसिामयर में उच्च िोल्टेि उपकरण से लीकेि या संपकय से जनम्न िोल्टेि उपकरण के गलती से सामान्य िोल्टेि से ऊपर चािय होने के कारण उत्पन्न खतरे से बचाि के जलए उपयुि प्रािधान होगा। 106. जस्ट्िचजगयर और टर्मनय ल- जस्ट्िचजगयर और सभी टर्मयनल, केबल एण्ड्स, केबल ज् िाइंट और उपकरणों के कनेक्िन पूरी तरह से जडब्बों में बंि होंगे और इन्ह ें इस प्रकार जनर्मयत, स्ट्थाजपत और अनुरजित दकया िाएगा दक यह जनम्नजलजखत आिश्यकताओं के अनुरूप हो अथायत:- (i) सभी कलपुिो की मैकेजनकल िमता पयायप्त हो दक रि उपयोग सहन करने में सिम हो; (ii) सभी सुचालक तथा संपकय िेत्र करंट िहन करने की पयायप्त िमता रखेंगे और सुचालकों के सभी िोड़ समुजचत रूप से सोल्डर अथिा अन्यथा कारगरता से जनर्मयत होंगे; (iii) यदि दकसी पिाथय के िमा होने के कारण इंसुलेिन समाप्त होने अथिा दकसी जस्ट्िचजगयर की काययिमता प्रभाजित होन े की संभािना हो, तो इसे िरू दकया िाएगा; (iv) सभी आिेजित जहस्ट्से पुिो को इस तरह संरजित अथिा आिठरत दकया िाएगा दक कोई भी व्यजि िघु यटनािि इनके संपकय में न आ सके और आकय, िाटय सर्कयट, आग, पानी, गैस अथिा तेल के खतरों से ये पाटय सुरजित रहें; (v) ऐसे मामलें में िहां गैस, कोयले का चूरा, तेल अथिा अन्य ज्िलनिील सामग्री के आग पकड़ने का िोजखम हो, सभी कलपुिों को खुली स्ट्पार्कंग से संरजित दकया िाएगा; और (vi) प्रत् येक जस्ट्िच और सर्कयट ब्रेकर इस प्रकार बना होगा दक िह जबना दकसी खतरे के अपने कंरोल िाले सर्कयटों को खोलन े और दकसी प्रकार के िॉटय सर्कयट से जनपटने में सिम हो।[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 45 107. सप्लाई काटना- (1) खान अथिा तेल-िेत्र की सप्ल ाई काटने के जलए खान के इलेजक्रकल इंस्ट्पेक्टर द्वारा अनुसंजित दकसी स्ट्थान पर एक उजचत रूप से बना जस्ट्िचजगयर लगाया िाएगा। (2) उक् त जस्ट्िचजगयर से खान को जबिली की आपूर्तय करने िाली ओिरहैड लाइन अथिा दकसी केबल में दकसी भी समय जिद्युत प्रिाह रहने पर, उि जस्ट्िच को ऑपरेट करने के जलए अजभजहत व्यजि आसानी से उपलब्ध रहना चाजहए: परंतु िसू रे ििे के गैसी कोल सीम और तीसरे ििे की गैसीनेस के मामले में जबिली से चलने िाले मख्ु य मैकेजनकल िेंटीलेटर को जस्ट्िचजगयर के साथ इंटरलॉक दकया िाएगा तादक मुख्य मैकेजनकल िेंठटलेटर के बंि होने पर यह स्ट्ित: जिद्युत आपूर्तय काट िे। (3) सुरिा के जहत में िब भी अिश्यक हो, प्रणाली के प्रत्येक जहस्ट्से से जिद्युत आपूर्तय काटने के जलए उजचत स्ट्थान पर एक उपकरण उपलब्ध कराया िाएगा। (4) यदि खान का इलेजक् रकल इंस्ट् पेक् टर, सुरिा के जहत में आिश् यक मानता ह ै तो िह उप-जिजनयम (3) में जिजनर्ियष् ट उपकरण को इस प्रकार व् यिजस्ट् थत करने के जनिेि िे सकता ह ै दक प्रणाली के दकसी भी खंड में िाल् ट होने पर उसे स्ट्ितः जडस्ट्कनेक्ट दकया िा सकता हो। (5) प्रत् येक मोटर को जस्ट्िचजगयर द्वारा कंरोल दकया िाएगा और इस प्रकार व्यिजस्ट्थत दकया िाएगा दक िह मोटर तथा उससे कनेक्ट सभी उपकरणों से जिद्युत आपूर्तय काट िे और ऐसे जस्ट्िचजगयर को ऐसे स्ट्थान पर लगाया िाएगा दक इसे मोटर को चलाने के जलए अजभजहत व्यजि आसानी से ऑपरेट कर सके। (6) ओिर-करंट, अथय िॉल्ट या लीकेि, कम िोल्टेि और लसंगल िेलिंग की जस्ट्थजत में स्ट्िचाजलत रूप से आपूर्तय को जडस्ट्कनेक्ट करने के जलए सुरिात्मक तंत्र के साथ एक उपयुि रेटेड जस्ट्िचजगयर उपलब्ध दकया िाएगा। (7) ऑजक्िलरी िैन को भूजमगत खानों के इन-बाय िेस उपकरणों को जिद्युत आपूर्तय जनयंजत्रत करने िाले जस्ट्िचजगयर के साथ इंटरलॉक दकया िाएगा और यह जस्ट्िचजगयर ऑजक्िलरी िैन के बंि होने पर जिद्युत आपूर्तय को स्ट्ितः काट िेगा। (8) खान के प्रत्येक िीडर को ओिर करंट, अथय िॉल्ट या लीकेि, कम िोल्टेि या जबना िोल्टेि और लसंगल िेलिंग की जस्ट्थजत में स्ट्िचाजलत रूप से आपूर्तय को जडस्ट्कनेक्ट करने के जलए सुरिात्मक तंत्र के साथ िाजमल एक उपयुि रेटेड जस्ट्िचजगयर द्वारा जनयंजत्रत दकया िाएगा। 108. केबल– पोटेबल तथा पठरिहनीय उपकरणों के फ्लैजक्िबल केबल को छोड़कर सभी केबलें जनम्नजलजखत आिश्यकता के अनुरूप होंगी, अथायत:- (i) कॉन्सेंठरक केबल के बाहरी सुचालक को छोड़कर, सभी केबल इंसुलेटटंग पिाथय से आिठरत होंगी और मैकेजनकल नुकसान से बचाि के जलए कारगरता के साथ संरजित होंगी और इस तरीके के जनजित अतं रालों पर अिलंजबत होंगी दक इन केबलों को कोई खतरा न रह;े (ii) (क) खंड (iii) में यथा उपबंजधत के जसिाय कॉन्सेंठरक केबल अथिा धाजत्िक आिरण से संरजित लसंगल कोर अथिा टू कोर अथिा मल् टी कोर केबलें जिनमें सर्कयट के सभी सुचालक मौिूि हैं, से जभन्न दकसी भी केबल का उपयोग िहां नहीं दकया िाएगा िहां िोल्टेि 125 िोल्ट से अजधक हो अथिा इंस्ट्पेक्टर यह मानता ह ै और इस बारे में जनिेि िेता ह ै दक गैस अथिा कोयले का चूरा अथिा अन्य ज्िलनिील सामग्री के आग पकड़ने की संभािना है; (ख) धातु से ढकी केबलों के आिरण तथा आिठरत केबलों के धाजत्िक आिरण की मोटाई भारतीय मानक ब्यूरो के तत्संबंधी मानकों में समय-समय पर की गई की गई जसिाठरिों से कम नहीं होगी; (iii) ऐसे मामले में िहां 250 िोल्ट स े अजधक ककंतु 650 िोल्ट तक िोल् ट िाली डायरेक्ट करंट प्रणाली का उपयोग दकया िाता ह,ै दकसी भी उपलब्ध सर्कयट के जलए लसंगल कोर िाली िो केबलों का उपयोग दकया िाएगा और इनके धाजत्िक आिरण को अथय सुचालक के द्वारा आपस म ेंलपेट कर रखा िाएगा और इन् हें इस प्रकार ऐसे स्ट्थान पर रखा िाएगा दक िो क्जमक बांड्स के बीच तीस मीटर से ज्यािा की िरू ी न हो और यह लंबाई िोनों में से दकसी भी केबल के दकनारे-दकनारे नापी िाएगी; (iv) प्रत् येक केबल का धातु से बना आिरण:– (क) जिद्युतीय तथा मिीनी रूप से अपनी पूरी लंबाई में सतत् होगा; (ख) यदि यह अपेिा की गई ह ै दक सुचालकता की अर्थंग प्रणाली के साथ इसे कनेक्ट दकया िाए तो इसका अनुपालन दकया िाएगा; (ग) िहां कहीं आिश्यक हो, िरण से बचाने के जलए कारगर उपाय दकए िाएंगे;46 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] (घ) िहां तक सुचालकता का संबंध है, सभी पाटय और सभी िोड़ों की सुचालकता धातु से बने उक् त आिरण द्वारा घेरबंि सबसे बड़े सुचालक की सुचालकता के कम से कम पचास प्रजतित के बराबर होगी; (ङ) िहां भी इगनाइटटंग गैस, कोयले का चूरा अथिा ज्िलनिील सामग्री के आग पकड़ने का िोजखम हो, यह केबलें इस प्रकार की होंगी दक िहां तक संभि हो, आिेजित सुचालकों से लीकेि अथिा इनमें दकसी प्रकार के िॉल्ट के कारण होने िाली स्ट्पार्कंग रोकी िा सके। (v) ऐसे मामले में िहां केबलों तथा सचु ालकों को मोटर, रांसिामयर, जस्ट्िचजगयर अथिा उपकरणों से कनेक्ट दकया गया ह,ै इन्ह ेंइस प्रकार स्ट्थाजपत दकया िाएगा दक:- (क) ये मिीनी तौर पर सुरजित रह,ें इसके जलए इन्ह ेंउपकरण के धाजत्िक आिरण से मिबूती से िोड़ा िाएगा; और (ख) प्रत्येक केबल एण्ड पर इंसुलेटटंग पिाथय को मिबूती से सील दकया िाएगा तादक इसकी इंसुलेिन संबंजधत जििेषताओं में कमी न आए। (vi) िहां कहीं आिश्यक हो, अपकषयण से बचने अथिा गैस-टाइटनेस हाजसल करने के जलए समुजचत रूप से बने ग्लैंड और बुि उपलब्ध कराए िाएंगे; (vii) सुचालक अथिा अनआरमडय केबलें धातु से बनी पाइपों अथिा धातु से बने जडब्बों से होकर गुिारी िाएंगी अथिा कुचालक पिाथों द्वारा मिबूती से इंसुलेट दकए गए तारों द्वारा बांध कर जबछाई िाएगी। यह तार ऐसे होने चाजहए िो केबलों के आिरण को नुकसान न पहुंचाए और साथ ही धातु से बने अन्य कल-पुिों से संपकय भी न होने िे और यदि इंसुलेटेड सुचालक उपयोग में लाए िाते हैं, इन्हें एक-िसू रे से कम से कम 3.75 सेंटीमीटर की िरू ी पर स्ट्थाजपत दकया िाए और लैंप, जस्ट्िच तथा दिटटंग्स को छोड़कर अन्य सभी मामलों में इन्ह ेंपरस्ट्पर संपकय में न आने दिया िाए। 109. फ्लजै क्िबल केबल– (1) पोटेबल अथिा रांसपोटेबल उपकरणों की फ्लैजक्िबल केबलें यदि इलेजक्रक िेलल्डंग के उपयोग में नहीं आ रही ह,ैं तो िो कोर अथिा मल्टी कोर िाली होनी चाजहए और इंसुलेटटंग पिाथय से आिठरत होनी चाजहए जिससे यह मिीनी नुकसान से पूरी तरह से सुरजित रह।े (2) यदि धातु से बनी िलैजक् िबल मैटल किटरंग को कॉनसेंठरक केबल के बाहरी सुचालक के रूप में अथिा मिीनी नुकसान से संरिण के माध्यम के रूप में उपयोग दकया िाता ह,ै इसे स्ट्ियं ही उस उपकरण के एक अथय सुचालक के रूप में उपयोग में नहीं लाया िाएगा ककंतु इसका अर्थंग कोर के साथ िोड़ के उद्देश्य से उपयोग दकया िा सकता ह।ै (3) पोटेबल अथिा रांसपोटेबल उपकरण के साथ फ्लैजक्िबल केबल का उपयोग दकया िाना ह ैतो इसे उपकरण और प्रणाली के साथ समुजचत रूप से बने सुचालक के द्वारा कनेक्ट दकया िाएगा। परंतु यह दक 650 िोल्ट से अजधक तथा 11 दकलोिोल्ट से कम िोल् ट िाली मिीनों के जलए एक बोल्टेड टाइप कनेक्टर का उपयोग दकया िाएगा और रेललंग केबल को उजचत रूप से मिीन के अंत में िोड़ा िाएगा। (4) हर उस लबंि ुपर िहां फ्लैक्सजिबल केबल को मेन केबल से िोड़ा गया है, एक सर्कयट ब्रेकर उपलब्ध कराया िाएगा िो इस फ्लैजक्िबल केबल से जिद्युत आपूर्तय स्ट्ि त: जडस्ट्कनेक्ट करने में सिम होगा। (5) पोटेबल अथिा रांसपोटेबल मिीन से िुड़ी प्रत्येक फ्लैजक्िबल केबल की समय-समय पर िांच की िाएगी एिं मिीन को चलाने के जलए अजभजहत व्यजि यह िांच करेगा, और यदि िमीन के अंिर केबल का उपयोग दकया िा रहा ह,ै प्रत्येक पाली में कम से कम एक बार इसकी िांच इसी प्रकार के व्यजि द्वारा की िाएगी और यदि केबल डैमेि अथिा जडिेजक्टि पाई िाती है तो इसे तत्काल अच्छी हालत िाली केबल से बिल दिया िाएगा। (6) यदि सर्कयट की िोल् टेि 250 िोल्ट से अजधक है, दकसी भी रांसपोटेबल उपकरण से िुड़ी सभी फ्लैजक्िबल केबलों में फ्लेजक्िबल धाजत्िक िाली अथिा मोड़ा िा सकने िाला आिरण उपलब्ध कराया िाएगा और पोटेबल उपकरण की केबलों के सभी पािर तथा पायलट कासय पर धातु से बनी फ्लैजक्सबल िाली लगाई िाएगी। परंतु यह दक इस जिजनयम के प्रािधान, खुली खानों अथिा भूजमगत खानों, िहां उपकरण की जडिाइन तथा स्ट् िरूप के अनुसार इन केबलों की रीललंग और अनरीललंग आिश्यक ह,ै में उपयोग होने िाले पोटेबल अथिा रांसपोटेबल उपकरणों से िुड़ी केबलों पर लागू नहीं होंगे। (7) उपजिजनयम (6) में जिजनर्ियष्ट धातु की फ्लैजक्सबल िाली अथिा आिरण जिजनयम 108 के खंड (iV) में जिजनर्ियष्ट अपेिाओं के अनुरूप होंगे:[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 47 परंतु यह दक अलग से िालीिार फ्लैजक्सबल केबलों के मामले में प्रत् येक िाली का सुचालक जिद्युत सुचालक के 25 प्रजतित से कम नहीं होगा और इन सभी िाजलयों की संयुि सुचालकता दकसी भी हालत में 0.15 िगय सेंटीमीटर के तांबे की सुचालकता से कम नहीं होगी। (8) सौ मीटर से ज्यािा लंबाई की फ्लैजक्सबल केबल दकसी भी पोटेबल अथिा रांसपोटेबल उपकरण में उपयोग नहीं की िाएगी: परंतु यह दक ऐसी फ्लेजक्सबल केबल को जिकास और डी जपलटरंग ऑपरेिन के जलए िब कोयला काटने की मिीन अथिा कटर लोडर अथिा लोडर अथिा आरम्डय िेस कनिेयर लांग िाल ऑपरेिन अथिा िटल कार अथिा हॉल िम्पर अथिा कटर लोडर के साथ प्रयोग दकया िाता ह ैतो इसकी ऊंचाई िौ सौ पचास मीटर से अजधक नहीं होनी चाजहए: परंतु यह और दक खुली खान में उक् त केबल यदि जबिली से चलने िाली हिै ी अथय मूलिंग मिीनरी में उपयोग की िाती ह ैतो इसकी लंबाई छ: सौ मीटर से अजधक नहीं होगी और 11 दकलोिोल्ट पर बक्ड व्हील एक्सकैिेटर के जलए यह लंबाई एक हिार मीटर से अजधक नहीं होगी: परंतु यह और भी दक िैगलाइन या 42 क्यूजबक मीटर िमता के िोिेल के मामले में, फ्लेजक्सबल केबल की लंबाई छः सौ मीटर तक बढ़ाई िा सकती ह;ै (9) खान में लगाई गई फ्लेजक्सबल केबल को मिीनी नुकसान से बचान े के जलए भलीभांजत अिलंजबत और सुरजित दकया िाएगा। (10) फ्लेजक्सबल केबल, पोटेबल अथिा रांसपोटेबल उपकरणों के अलािा अन्य उपकरणों में उपयोग नहीं की िानी चाजहए: परंतु यह दक, खिानों में स्ट्थाजपत सबमर्सयबल पंप, और जस्ट्कड माउंटेड पंप िैसे अनुप्रयोगों के मामले म,ें केबलों की यांजत्रक िजत को रोकने के उपायों के पालन के अधीन फ्लेजक्सबल केबल के उपयोग की अनुमजत ह।ै (11) िहां फ्लेजक्सबल केबलें उपयोग की िाती ह,ैं उपयोग में न हो, उन्ह ें जिद्युत आपूर्तय से या तो िोड़कर न रखा िाए या अलग से रखा िाए और अनाजधकृत व्यजि इन्ह ेंऊिायजन्ित न कर सके, ऐसी व्यिस्ट्था की िाए। 110. पोटेबल अथिा रासं पोटेबल मिीनें– जबिली से चलने िाले कोल कटर अथिा अन्य पोटेबल या रांसपोटेबल मिीनों को चलाने के जलए अजभजहत व्यजि, िब यह मिीन चल रही हों, इन्ह ेंछोड़ेगा नहीं और उस िेत्र को िहां यह मिीनें चल रही ह,ैं छोड़ने से पहले, सुजनजित करेगा दक मिीन को जबिली पहुंचाने िाली फ्लैजक्सबल केबल की जबिली काट िी गई ह ै और इन मिीनों के चलते समय यह सुजनजित करने के जलए किम उिाए िाएंगे दक मिीनों द्वारा केबल को अपने साथ घसीटा न िाए: परंतु यह दक भूजमगत खानों में उपयोग होने िाली पोटेबल और रांसपोटेबल मिीनें पायलट कोर प्रोटेक्िन के साथ संबंजधत जस्ट्िचजगयर से ठरमोट कंरोल पर चलाई िाएंगी: परंतु यह और दक ओपन कास्ट्ट खानों में उपयोग की िाने िाली पोटेबल और रांसपोटेबल मिीनों में यह प्रािधान होगा दक संबंजधत जस्ट्िचजगयर से मिीन के जलए जिद्युत आपूर्तय, िरू स्ट्थ रूप से जनयंजत्रत की िाए: परंतु यह भी दक ओपन कास्ट्ट खिान में उपयोग की िाने िाली पोटेबल या रांसपोटेबल मिीन के जलए, ऑपरेटर केजबन से ठरलपंग जडिाइस या जस्ट्िच जडिाइस के प्रािधान से ऐसी मिीन की िील्ड जस्ट्िचजगयर से आपूर्तय रोकने का प्रबंध दकया िाना चाजहए। 111. अन्य सािधाजनया-ं (1) सभी उपकरणों को िहां तक हो सके, धूल, जमट्टी और नमी से बचाकर और बाधारजहत रखा िाएगा। (2) पोटेबल और रांसपोटेबल उपकरणों के अलािा अन्य उपकरण एक कमरे, कि अथिा बॉक्स में रखे िाएंगे, िो इस प्रकार बने होंगे दक दकसी जगरने िाली िस्ट्तु अथिा गुिरने िाले िाहनों से इनमें रखे सामान को सुरजित रख सकें। (3) इन उपकरणों िाले कमरों, कि अथिा बॉक् स में या इन उपकरणों के आसपास कोई ज्ि लनिील या जिस्ट्ि ोटक सामग्री एकत्र नहीं की िाएगी। (4) दकसी भी सर्कयट में खराबी आने पर, प्रभाजित जहस्ट्से को अजिलम्ब तब तक के जलए आिेि रजहत कर दिया िाएगा, िब तक खराबी िरू न कर िी िाए। (5) लैम् पों को बिलते समय आपूर्तय जडस्ट्कनेक्ट रहेगी। (6) दकसी भी लैंप होल् डर का पोटेबल हण्ै ड लैंप के गाडय अथिा धातु के जहस्ट्से से कनेक्िन नहीं होगा।48 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] (7) नीचे दिए गए स्ट्थानों पर, लहिं ी और जिले की स्ट्थानीय भाषा में जनम्नजलजखत नोठटस हमेिा इस प्रकार जडिाइन्ड, सुरजित और उपलब्ध रहेंगे दक इन्ह ेंआसानी से पढ़ा िा सके, अथायत:- (i) जिद्युत उपकरणों के उपयोग के मामले में, अनाजधकृत व्यजियों को इन्ह ें चलाने अथिा अन्यथा इन उपकरणों के साथ छेड़छाड़ करने से जनजषि करने संबंधी सूचना; और (ii) खान के अंिरूनी जहस्ट् सों या सतह पर, िहां टेलीिोन अथिा संचार का कोई अन्य माध्यम उपलब्ध हो, एक नोठटस लगाया िाएगा, जिसमें खान की सतह पर व् यजि, िो खान की जिद्युत आपूर्तय जडस्ट्कनेक्ट करने के जलए अजभजहत ह,ै के जलए पूरे जनिेि दिए गए होंगे। (8) पोटेबल तथा रांसपोटेबल उपकरणों सजहत सभी उपकरणों को केिल िही व्यजि चलाएगा, जिसे इस कायय के जलए अजभजहत दकया गया ह।ै (9) िहां बोल्टेड टाइप के बिाय कोई अन् य प्ल ग तथा सॉदकट कपललंग िलेजक् सबल केबल के साथ उपयोग दकया िाता है, िहां सुचालकों के आिेजित रहते समय कपललंग को खुलने से रोकने के जलए एक इलेजक्रकल इंटर-लॉक या कोई अन्य अनुमोदित उपकरण उपलब्ध कराया िाएगा। 112. गसै की उपजस्ट्थजत िाल ेस्ट्थानों म ेंसािधाजनयां– (1) पहली श्रेणी की गैसीनेस के कोल-सीम के दकसी भी भाग में:- (i) सभी केबलों को इस प्रकार जनर्मयत, स्ट्थाजपत, सुरजित, संचाजलत और अनुरजित दकया िाएगा दक ओपन स्ट्पार्कंग का िोजखम न रह;े (ii) सभी जसिललंग, िरू संचार, ठरमोट कंरोल और इंसुलेिन टेस्ट्टर सर्कयट इस प्रकार जनर्मयत, स्ट्थाजपत, संचाजलत और अनुरजित दकए िाएंगे दक ये ताजत्िक रूप से सुरजित रहें; (iii) पोटेबल और रांसपोटेबल उपकरणों और अंजतम िेंठटलेिन कनैक्िन के पास दकसी भी स्ट्थान पर उपयोग होने िाली लाइट सजहत सभी उपकरण फ्लेम प्रूि होंग:े परंतु जबिली अथिा बैटरी से चलने िाले पोटेबल अथिा रांसपोटेबल उपकरण, िैसे िटल कार, याजत्रयों अथिा सामान को लाने–ले िाने िाले ‘’ई’’ टाइप की अजभिृजध सुरिा िाले िाहनों को उपयुक् त जनगरानी उपकरणों के िठरए गैसों, यदि कोई हों, की मौिूिगी का पता लगाने के जलए दकसी भी िगह आने-िाने की अनुमजत होगी; और (iv) अंजतम िेंठटलेिन कनेक्िन के पास दकसी भी स्ट्थान पर उपयोग मे आने िाले जिद्युत लैंप और ठरटनय एयरिेि फ्लेम प्रूि अहातों में रखे िाएंगे तथा अन् य स्ट्थ ानों पर ये उपकरण अजभिृजित सुरिा िाले ‘ई’ टाइप के अहातों में रखे िाएंगे। (2) दकसी भी ऐसे स्ट्थ ान पर, िो िसू रे और तीसरे ििे की गैसीनेस के कोल-सीम के दकसी भाग में पड़ता है:– (i) सभी जसगनललंग, िरू संचार, ठरमोट कंरोल और इंसुलेिन टेस्ट्टर सर्कयट इस प्रकार जनर्मयत, स्ट्थाजपत, सुरजित, संचाजलत और अनुरजित दकए िाएंगे दक ये ताजत्िक रुप से सुरजित रहें; (ii) सभी केबलें इस तरीके से जनर्मयत, स्ट् थाजपत, सुरजित, संचाजलत और अनुरजित की िाएंगी दक इनमें ओपन स्ट्प ार्कंग का िोजखम न रह;े (iii) िसू रे ििे की गैस युि खानों के मामले में दकसी भी काययस्ट्थल या गोि से 90 मीटर के अन् िर उपयोग होने िाले पोटेबल और रांसपोटेबल उपकरणों सजहत सभी उपकरण तथा तीसरे ििे की गैस युक् त खान के मामले में दकसी भी काययस्ट् थल या गोि से िो सौ सत् तर मीटर के अंिर या आजखरी िेंठटलेिन कनेक् िन अथिा दकसी ठरटनय एयरिेि के पास पड़ने िाले दकसी भी स्ट्थ ान पर उपयोग होने िाले उपकरण फ्लेम प्रूि होंगे; और (iv) सभी जिद्युत लैम्पों को फ्लेम प्रूि घेरे में सुरजित रखा िाएगा। (3) तेल की दकसी खान या िेत्र में, िोन-2 में खतरनाक िेत्र में पड़ने िाले दकसी स्ट्थान पर:– (i) सभी जसिललंग, िरू संचार, ठरमोट कंरोल और इंसुलेिन टेस्ट्टर सर्कयट इस प्रकार जनर्मयत, स्ट्थाजपत, संचाजलत, सुरजित और अनुरजित होंगे दक ये ताजत्िक रूप से सुरजित रहें; (ii) सभी केबलें इस प्रकार जनर्मयत, स्ट्थाजपत, संचाजलत और अनुरजित की िाएंगी दक ओपन स्ट्पार्कंग का िोजखम न रह;े (iii) पोटेबल और रांसपोटेबल उपकरण सजहत सभी उपकरण तत्संबंधी मानकों के अनुरूप अहातों में रखे िाएंगे; और[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 49 (iv) सभी जिद्युत लैम्प अजभिृजित सुरिा िाले घेरे टाइप ‘ई’ में सुरजित रखे िाएंगे। (4) िोन-1 के खतरनाक िेत्रों के अंतगयत दकसी भी स्ट्थान पर सभी खानों अथिा तेल िेत्रों में:- (i) सभी जसिललंग और िूरसंचार, ठरमोट कंरोल और इंसुलेिन टेस्ट्टर सर्कयट इस प्रकार जनर्मयत, स्ट्थाजपत, संचाजलत, सुरजित और अनुरजित दकए िाएंगे दक ये ताजत्िक रूप से सुरजित रहें; (ii) सभी केबलें इस प्रकार जनर्मयत, स्ट्थाजपत, संचाजलत और अनुरजित की िाएंगी दक ओपन स्ट्पार्कंग का िोजखम न रह;े (iii) पोटेबल तथा रांसपोटेबल उपकरणों को तत्संबंधी मानकों के अनुरूप अहातों में रखा िाएगा; और (iv) सभी जिद्युत लैंप प्लेम प्रूि घेरे में सुरजित रखे िाएगें। (5) िोन-0 के खतरनाक िेत्र के भीतर दकसी भी स्ट्थान पर, दकसी भी तेल की खान में, दकसी भी प्रकार के जिद्युत उपकरण का उपयोग नहीं दकया िाएगा और िहां ऐसा व्यािहाठरक न हो, िहााँ पर सुसंगत मानकों के अनुरूप आंतठरक रूप से सुरजित उपकरणों का ही उपयोग दकया िाएगा और ऐसे उपकरणों की मानकों के अनुरूप स्ट्थाजपत दकया गया हो, इसके जलए प्रासंजगक मानकों और स्ट्थापना का जििरण, माजलक या एिेंट या प्रबंधक या संस्ट्थापन प्रबंधक द्वारा प्रमाजणत खानों के जिद्युत जनरीिक को प्रस्ट्तुत दकया िाएगा। (6) िसू री श्रेणी और तीसरी श्रेणी की गैसीनेस की कोल सीम (कोयला पट्टी) में अथिा खतरनाक िेत्रों में आपूर्तय रोक िी िाएगी:- (i) तत्काल, यदि ओपन स्ट्पार्कंग हो; (ii) उपकरणों की िांच अथिा समायोिन की अिजध के िौरान, क्योंदक इससे दकसी भी भाग में खुली स्ट्पार्कंग का खतरा हो सकता ह;ै (iii) िब तक जिद्युत पययिेिक अथिा उसके अधीन जिजधित जनयुि सहायक द्वारा उपकरण की िांच न कर ली िाए और यदि कोई खराबी हो तो इसे िीक न कर जलया िाए अथिा आिश्यक समायोिन न कर जलया िाए, आपूर्तय दिर स े कनेक्ट नहीं की िाएगी; और (iv) पोटेबल अथिा रांसपोटेबल उपकरणों सजहत सभी उपकरण जिनमें जिद्युत प्रिाह िारी रहता है, के नििीक एक फ्लेम सुरिा लैंप उपलब्ध कराया िाएगा और इसे हमेिा प्रकाजित रखा िाएगा तथा इस सुरिा लैंप की फ्लेम यदि इस प्रकार की निर आती ह ै दक जिससे ज्िलनिील गैस की उपजस्ट्थजत का संकेत जमले, सभी उपकरणों के आसपास के िेत्र की जिद्युत आपूर्तय काट िी िाएगी और खान के दकसी अजधकारी को इस घटना की सूचना िी िाएगी तथा ऐसे उपकरणों को कंरोललंग जस्ट्िच के साथ इस तरीके से इंटरलॉक दकया िाएगा दक उस िेत्र जििेष में ज्िलनिील गैस का प्रजतित एक और एक चौथाई से ज्यािा बढ़ने की जस्ट्थजत में जिद्युत आपर्ू तय स्ट्ित: जडस्ट्कनेक्ट हो िाए: परंतु यह दक ऐसे मामले में िहां ज्िलनिील गैस के प्रजतित का स्ट्ित: पता लगाने के जलए फ्लेम सुरिा लैंपों के अलािा अन्य उपकरण लगाए गए ह,ैं ये उपकरण खान इंस्ट्पेक्टर द्वारा अनुमोदित होगें और जबल्कुल िीक-िाक हालत में रखे िाएंगे। (7) दकसी भी श्रेणी की गैसीनेस िाल े कोल सीम के दकसी भी जहस्ट्से म ें अथिा तेल िेत्रों के दकसी भी खतरनाक िेत्र में, सामान्य हिा में दकसी भी समय एक और एक चौथाई प्रजतित से अजधक ज्िलनिील गैस की उपजस्ट्थजत पाई िाती है, उस िेत्र में सभी केबलों और उपकरणों की जिद्युत आपूर्तय तत्काल काट िी िाएगी और िब तक ज् िलनिील गैस का प्रजतित एक और एक चौथाई प्रजतित से अजधक बना रहगे ा, जिद्युत आपूर्तय दिर से आरंभ नहीं की िाएगी। (8) ऐसे तेल िेत्रों में, िहां ज्िलनिील गैस की सांद्रता इसकी न्यूनतम जिस्ट्िोटक सीमा के बीस प्रजतित से अजधक हो िाती ह,ै िहााँ उपयुि स्ट्थान पर एक ऑजडयो अलामय को सदक्य करने के जलए एक प्रणाली होनी चाजहए एिं इस तरह के अलामय के सदक्य होने पर तत्काल कारयिाई करते हुए संचालन को सुरजित बनाए रखने और मानि, उपकरण, ि पयायिरण की सुरिा की सुजनजितता के जलए अलामय के सदक्य होने के कारणों को पृथक दकया िाए और यदि जनचली जिस्ट्िोटक सीमा चालीस प्रजतित तक बढ़ िाती ह,ै तो प्रजतष्ठापन के तीस मीटर के अंिर के सभी केबलों और उपकरणों से तुरंत जिद्युत आपूर्तय रोक िी िाएगी और प्रज्िलन के सभी स्रोतों को भी उि िेत्र से हटा दिया िाएगा ि सामान्य कायय तब तक आरम्भ नहीं दकया िाएगा िब तक उस िेत्र को गैस मुि न बना दिया िाए: परंतु यह दक ताजत्िक रूप से सुरजित पयायिरणीय जनगरानी के िैज्ञाजनक उपकरणों पर जिद्युत आपूर्तय काटने संबंधी यह उपबंध लागू नहीं होगा।50 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] (9) दकसी ऐसी जिद्युत आपूर्तय को काटना या पुनयोिन लॉग िीट कागिी प्रजत और इलैक्रोजनक रूप में नोट दकया िाएगा जिसे अनुसूची XI में जनधायठरत प्ररूप में रखा िाएगा और खान के जिद्युत जनरीिक को यह ठरपोटय प्रस्ट् तुत की िाएगी। (10) खान इंस्ट्पेक्टर द्वारा अजधसूजचत लौह-धाजत्िक खानों में यदि ज्िलनिील गैस पाई िाती ह,ै यदि खान इंस्ट्पेक्टर यह मानता ह ैदक इन खानों में ज्िलनिील गैस होने की संभािना ह ैतो इस जिजनयम के उि उपबंध इन पर भी लागू होंगे। स्ट्पष्टीकरण – इस जिजनयम के प्रयोिनाथय:- (1) ‘पहली श्रेणी की गैसीनेस की कोल-सीम’ ‘िसू री श्रेणी की गैसीनेस की कोल-सीम’ ‘तीसरी श्रेणी की गैसीनेस की कोल-सीम’ और ‘फ्लेम प्रूि उपकरण’ िब्िों के िही अथय होंगे िो कोयला खान जिजनयम 2017 में हैं। (2) तेल खानों अथिा तेल-िेत्रों में जनम्नजलजखत िेत्रों को खतरनाक िेत्रों के रूप में िाना िाएगा, अथायत्: (i) तेल के कुएं के चारों ओर कम से कम 90 मीटर का िेत्र िहां जिस्ट्िोट हुआ ह ैअथिा होने की संभािना ह,ै िह िेत्र साइट पर मौिूि संस्ट्थापन प्रबधं क अथिा ज्येष्ठतम अजधकारी द्वारा नाम जनर्ियष्ट दकया िा सकता है; (ii) उत् पािन परीिण के अधीन एक कुएं से पेरोजल यम युक्त द्रि के खुले जन ियहन के 16 मीटर के भीतर का िेत्र; (iii) तेल कुओं के 15 मीटर के अंिर का िेत्र: (क) तेल उत्पािक कुंए का िीषय अथिा कच्चे तेल के खुले प्रभाि का कोई भी पॉइंट अथिा अन्य कोई पॉइंट िहां आमतौर पर िातािरण में खतरनाक ठरसाि की संभािना हो; अथिा (ख) उन िेत्रों में िहां प्राप्त िानकारी के अनुसार असाधारण िबाि के हालात मौिूि हो सकते ह,ैं में तेल की खोि के जलए की िाने िाली जिललंग अथिा िाइल्डकैट; (iv) तीन मीटर के अन् िर का कोई भी िेत्र: (क) तेल उत् पािन के ऐसे कुंओं िहां उत् पािन के जलए पठररजित प्रणाली अपनाई िा रही ह ैतादक खतरनाक िातािरण के सामान् य हालातों में गैस के ठरसाि अथिा िमाि को रोका िा सके; अथिा (ख) ऐसे िेत्रों में िहां िाब संबंधी हालात सामान् य ह ैं और खतरनाक िातािरण के सामान् य हालातों में गैस के ठरसाि अथिा िमाि को रोकने के जलए पयायप्त किम उिाने के उद्देश् य से सुरजित जिललंग प्रणाली अपनाई गई है, में तेल की खोि अथिा परस्ट् पर िरू ी पर तेल कुंओं की जिललंग। (3) “खतरनाक िातािरण” का तात्पयय “ऐसे िातािरण से ह ैजिसमें ज्िलनिील गैसों अथिा गैस कणों की सांद्रता इस सीमा तक ह ैदक ये आग पकड़ सकते हैं”। (4) “िोन 0 खतरनाक िेत्र” का तात्पयय “ऐसा िेत्र जिसमें खतरनाक िातािरण हमेिा मौिूि रहता है” से है। (5) “िोन 1 खतरनाक िेत्र” का तात्पयय “ऐसा िेत्र जिसमें सामान्य संचालन पठरजस्ट्थजतयों के अंतगयत खतरनाक िातािरण बंि होने की संभािना ह”ै से है। (6) “िोन 2 खतरनाक िेत्र” का तात्पयय “ऐसा िेत्र जिसमें असामान्य सचं ालन पठरजस्ट्थजतयों के अंतगयत खतरनाक िातािरण होने की संभािना ह”ै से है। 113. िॉट िायटरंग- (1) िॉट िायटरंग चलते समय, िॉट िायटरंग में उपयोग होने िाले उपकरणों को छोड़कर अन्य उपकरणों और सुचालकों को नुकसान से बचाने के जलए पयायप्त सािधाजनयां बरती िाएंगी। (2) िा्स िायर करने के जलए करंट लाइटटंग सर्कयट अथिा जिद्युत सर्कयट से न जलया िाए। (3) िॉट-िायटरंग केबल्स का जनमायण प्रासंजगक मानकों के अनुरूप होगा, और ऐसे केबल को अन्य केबलों और उपकरणों को छूने से रोकने के जलए पयायप्त सािधानी बरती िाएगी। 114. जसग्न ललगं - िहां इलेजक्रकल जसग्न ललंग का उपयोग दकया िाता है:-[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 51 (i) जसिल तथा टेलीिोन िायरों के अन् य केबलों और उपकरणों के साथ संपकय में आने से रोकने के जलए पयायप्त सािधाजनया ं बरती िाएंगी; (ii) दकसी भी सर्कयट में 30 िोल्ट से ज्यािा िोल्ट उपयोग में नहीं लाए िाएंगे; (iii) कॉनटेक्ट-मेकसय इस प्रकार जनर्मयत हों दक िघु यटनािि सर्कयटों के बीच संपकय को रोका िा सके; और (iv) िहां खुले सुचालकों का उपयोग दकया िाता है, इन्हें समुजचत इंसुलेटर में स्ट्थाजपत दकया िाएगा। 115. हॉउलिे - ओिरहडै रॉली िायर प्रणाली में 650 िोल्ट से कम या बराबर िोल् ट पर इलेजक्रक लोकोमोठटि द्वारा हॉउलेि और स्ट्टोरेि बैररी लोकोमोठटि द्वारा हॉउलेि को खिान के जिद्युत जनरीिक की जलजखत सहमजत से उपयोग दकया िा सकता है, और यह सुरिा के जहत में उसके द्वारा लगाई गई ितों पर जनभयर करेगी। 116. न्यरू ल पॉइं्स की अर्थगं - ऐसे मामले में िहां अल्टरनेटटंग प्रणाली की िोल् ट 30 िोल्ट से ज्यािा होती ह ै न्यूरल अथिा जमड- पॉइंट को जिजनयम 102 में जिजनर्ियष्ट तरीके से अर्थंग प्रणाली के साथ कनेक्िन के िठरए अथय दकया िाएगा: परंतु यह दक िब संबंजधत प्रणाली ब्लालस्ट्टंग और जसगनललंग कायय के जलए आिश्यक हो, इस जिजनयम के प्रािधान लागू नहीं होंगे: परंतु यह और दक अथय न की गई न्यूरल प्रणाली के मामले में खान के जिद्युत जनरीिक के अनुमोिन से पयायप्त ग्राउंड प्रोटेक्िन व्यिस्ट्था उपलब्ध कराई िाएगी। 117. पययििे ण– (1) खान के स्ट्िामी, एिेंट अथिा प्रबंधक या तेल-िेत्र में एक या एक से अजधक कुओं के स्ट्िामी या एिेंट द्वारा, प्रजतष्ठापन में पययिेिण करने के जलए, एक या एक से अजधक जिद्युत पययिेिकों की जनयुजि जलजखत तौर पर की िाएगी और ऐसे पययिेिक, समय-समय पर प्राजधकरण को सूजचत करते हुए खान सुरिा महाजनिेिालय द्वारा िारी दकए गए दििा-जनिेिों के अधीन अथिा खान के जिद्युत जनरीिक के जनिेिानुसार ड्यूटी पर रहेंगे। (2) इस प्रकार जनयुि जिद्युत पययिेिक िह व्यजि होगा जिसके पास समूजचत सरकार द्वारा िारी, खनन प्रजतष्ठापनों को भी समाजहत करने िाला, एक िैध जिद्युत पययिेिक सिमता प्रमाणपत्र होगा। (3) खान सुरिा महाजनिेिालय द्वारा, प्राजधकरण को सूजचत करते हुए, िारी दकए गए दििा-जनिेिों के अनुसार और खान के इलेजक्रकल इसंपेक्टर के जनिेि के द्वारा, खान के स्ट्िामी, एिेंट या प्रबंधक अथिा तेल-िेत्र के स्ट्िामी या एिेंट को जलजखत में कतयव्य िहन करने के जलए इलेक्रीजियन की पयायप्त संख्या में जनयुजि करनी है। (4) इलेक्रीजियन, िह व्यजि होगा िो जिजनयम 31 के उप –जिजनयम (1) के अंतगयत लाइसेंस-धारक है। (5) 650 िोल्ट तक की जिद्युत आपूर्तय प्राप्त करने िाली छोटी खुली खानों तथा भूजमगत खानों जिनमें पोटेबल अथिा रांसपोटेबल उपकरण नहीं ह,ै खान के जिद्युत जनरीिक के अनुमोिन के बाि एक से अजधक खानों के जलए जिद्युत पययिेिक तथा इलेक्रीजियन जनयुि दकए िाएंगे। (6) दकसी भी उपकरण को चलाने ,पययिेिण करने, िांच करने अथिा समायोजित करने के जलए जनयुि व्यजि अजभयंता द्वारा जनिेजित कायय को करने में सिम होगा। (7) जिद्युत पययिेिक स्ट्ियं तथा उप-जिजनयम (1) के अधीन जनयुि इलेजक्रजियनों द्वारा जनम्नजलजखत ड्यूठटयों के समुजचत जनष्पािन हते ु जिम्मेिार होगा:- (i) खतरों की रोकथाम के जलए िब भी आिश्यक हो अथय सुचालकों तथा जनरंतरता के जलए धातु के बने आिरणों की िांच सजहत सभी उपकरणों का गहराई से परीिण; तथा (ii) सभी नए उपकरणों, खान में नए स्ट्थानों में दिर से स्ट्थाजपत दकए गए उपकरणों को चालू करने से पहले इनकी िांच तथा परीिण। (8) जिद्युत पययिेिक की अनुपजस्ट्थजत में खान अथिा तेल-िेत्र का स्ट्िामी, एिेंट या प्रबंधक जलजखत में स्ट्थानापन्न जिद्युत पययिेिक जनयुि करेगा। (9) उप-जिजनयम (8) के अधीन जनयुि जिद्युत पययिेिक अथिा स्ट्थानापन्न जिद्युत पययिेिक खान अथिा ऑयल िील्ड में रखी गई िैजनक लॉगिीट िाली लॉग बुक को अनुरजित करने के जलए व्यजिगत रूप से जिम्मेिार होगा, लॉगिीटें अनुसूची XI में जनधायठरत प्ररूप में बनी होंगी और उप-जिजनयम (7) के उपबंधों के अनुसार दकए हुए सभी िांच के पठरणाम अनुसूची XI में जनधायठरत लॉग िीट में ििय की िाएगी।52 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] 118. खानों और तले िेत्रों म ें जिद्यतु प्रजतष्ठापनों के सचं ालन और रखरखाि के जलए लग े कर्मयकों का प्रजििण- (1) खानों में जिद्युत प्रजतष्ठापनों के संचालन और रखरखाि के जलए लगे व्यजियों का खान सुरिा महाजनिेिालय द्वारा, प्राजधकरण को सूजचत करते हुए, िारी दकए गए प्रजििण पाठ्यक्मों के अनुसार, कोयला या तेल या धातु के जििेष खनन प्रजतष्ठापनों हते ु प्रजििण स े गुिरना होगा। (2) खान के स्ट्िामी या प्रबंधक या एिेंट, जिद्युत प्रजतष्ठापनों के संचालन और रखरखाि में लगे अपने कार्मयकों के प्रजििण की व्यिस्ट्था अपने स्ट्ियं के संस्ट्थान या केन्द्रीय सरकार या राज्य सरकार द्वारा मान्यता प्राप्त दकसी अन्य संस्ट्थान में करेंगे। (3) पुनियाय प्रजििण, अजधकतम िो िषय के अंतराल की आिजधकता पर प्रिान दकया िाएगा और खान के स्ट्िामी, एिेंट या प्रबंधक अथिा तेल-िेत्र के एक या एक से अजधक कुएं के स्ट्िामी या एिेंट द्वारा रजिस्ट्टर या इलैक्रॉजनक रूप में प्रजिजित व्यजियों के नाम, पुनियाय की जनयत तारीख और अन्य समान िानकारी की प्रजिजष्ट की िाएगी और रखे गए रजिस्ट्टर को खान के जिद्युत जनरीिक के समि, िब भी उसकी आिश्यकता हो, प्रस्ट्तुत दकया िाएगा। अध्याय 10 निीकरणीय उत्पािन स्ट्टेिनों के जलए अजतठरि सुरिा अपिे ाएं 119. निीकरणीय उत्पािन स्ट्टेिनों के जलए अजतठरि सरु िा अपिे ाएं- अध्याय 1 से 7 तक उपबंध दकए गए जिजनयमों के अजतठरि इस अध्याय के अधीन जिजनयम निीकरणीय उत्पािन स्ट्टेिनों पर लागू होंगे। 120. बायोमास और अपजिष्ट स े ऊिा य प्रजतष्ठापनों के जलए सरु िा की अपिे ाएं- सभी बायोमास संयंत्र और अपजिष्ट से ऊिाय संयंत्र जिसमें नगरपाजलका िोस अपजिष्ट या कचरा व्युत्पन्न ईंधन सजम्मजल्लत हैं, अजधजनयम की धारा 177 की उप-धारा (2) के खंड (ङ) के अधीन प्राजधकरण द्वारा अजधसूजचत जिजनयमों में उजल्लजखत सुरिा मानकों का पालन करेंगे। 121. सौर सस्ट्ं थापनों के जलए सुरिा अपिे ाएं- (1) सौर संस्ट्थापनों के जलए जनम्नजलजखत साधारण सुरिा अपेिाएं सुजनजित की िाएाँगी, अथायत्:- (i) रूि टॉप जसस्ट्टम के जलए रूि एक्सेस और आपातकालीन जनकास के जलए हडैं रेललंग के साथ न्यूनतम पचहत्तर सेंटीमीटर चौड़े खुले रास्ट्ते उपलब्ध कराए िाएंगे; (ii) सिाई और रखरखाि के जलए आिश्यक सौर पैनलों की पंजियों या स्ट्तंभों के बीच खुले रास्ट्ते, पैिल मागय होंगे; (iii) िमीन आधाठरत िोटो-िोल्टाईक स्ट्थापना के जलए खाइयों में केबल जबछाई िाएंगी; (iv) ग्राउंड माउंटेड सोलर इंस्ट्टॉलेिन को बाड़ या अन्य माध्यमों से संरजित दकया िाएगा, जिसकी ऊंचाई 1.8 मीटर से कम नहीं होगी तादक अनजधकृत प्रिेि को रोका िा सके; (v) प्रणाली के अन्य सभी कंडक्टरों से िोटो-िोल्टाईक जसस्ट्टम को जडस्ट्कनेक्ट करने के जलए कंबाइनर बॉक्स में दिए गए जडस्ट्कनेक्िन जस्ट्िच या सर्कयट ब्रेकर सुलभ स्ट्थान पर जस्ट्थत होंगे; (vi) आल्टरनेटटंग करंट साईड के तीनों िेि और डायरेक्ट करंट साईड के धनात्मक और ऋणात्मक कंडक्टर को अलग- अलग रंगों से जचजननत दकया िाएगा और पहचान की िाएगी; (vii) सोलर िोटो-िोल्टाईक के जलए इन्िटयर यूजनट, भिन की पठरजध में और सौर पैनल के यथाजनकट स्ट्थाजपत की िाएगी: परन्तु यह दक डायरेक्ट करंट केबल पराबैंगनी दकरण से संरजित हो या पराबैंगनी दकरण से संरजित पाइप के माध्यम से जबछाई गई हो; (viii) प्रणाली को जग्रड से अलग करने के जलए मानि द्वारा संचाजलत एक जडस्ट्कनेक्िन जस्ट्िच होगा और जिसे अल्टरनेटटंग करंट कंबाइनर बॉक्स के बाहर जस्ट्थत दकया िाएगा; और (ix) ओिरलोड, सिय करंट, सिय िोल्टेि, िॉटय सर्कयट, उच्च तापमान, ओिर िोल्टेि, अंडर िोल्टेि, ओिर फ्रीिेंसी, अंडर फ्रीिेंसी, ठरिसय पोलठरटी और आकािीय जबिली के जलए साइट पर सुरिा (इनपुट और आउटपटु िोनों के जलए) प्रिान की िाएगी। (2) सौर प्रजतष्ठापनों के जलए जनम्नजलजखत अर्थंग अपेिाओं को सुजनजित दकया िाएगा, अथायत्:- (i) सोलर अर्थंग सुसंगत मानक के अनुरूप होगी;[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 53 (ii) इन्िटयर कैजबनेट के फ्रेम को लचीले िीते िाले तांबे के तार का उपयोग करके अर्थंग टर्मयनलों के माध्यम से अर्थंग बस बार से िोड़ा िाएगा; (iii) संयंत्र के सभी मेटल केलसंग या िीलल्डंग, िोटो-िोल्टाईक याडय, उपकरण, इनिटयर और जनयंत्रण प्रणाली की प्रत्येक सरणी संरचना को उजचत अर्थंग के माध्यम से अथय दकया िाएगा; (iv) अर्थंग प्रणाली जिद्युत िहन न करने िाले धातु के सभी पात्रों, जबिली के बक्से, उपकरण फ्रेम, चेजसस और िोटो-िोल्टाईक मॉड्यूल से युि ढांचों को एक लंबे रन में िोड़ेगा और अथय जस्ट्रप्स को बोल्ट नहीं दकया िाएगा तथा उजचत िेलल्डंग द्वारा आपस में िोड़ा िाएगा; (v) प्रत्येक स्ट्थान में पयायप्त संख्या में आपस में िुड़े अथय जपट उपलब्ध कराए िाएंगे और सुसंगत मानक के अनुसार अथय जपट के बीच आिश्यक न्यूनतम िरू ी रखी िाएगी। (3) सौर संस्ट्थापनों के जलए जनम्नजलजखत सुरिा, परीिण और इंटरलॉककंग अपेिाएं सुजनजित की िाएगी, अथायत्:- (i) सुसंगत मानकों के अनुसार आिश्यक संख्या में लाइटलनंग अरेस्ट्टर तैनात करके सोलर िोटो-िोल्टाईक जिद्युत संयंत्र को लाइटलनंग और ओिर िोल्टेि से संरिण प्रिान दकया िाएगा; (ii) आग के दकसी भी िोजखम स े बचने के जलए प्रत्येक कंबाइनर बॉक्स में आकय बुझाने की िमता के साथ सुसंगत मानकों के अनुसार उपयुि सिय प्रोटेजक्टि जडिाइस उपलब्ध कराया िाएगा; (iii) कंबाइनर बॉक्स के इनपुट सर्कयट को सुसंगत मानकों के अनुसार ओिर करंट से संरिण प्रिान दकया िाएगा; (iv) कंबाइनर बॉक्स के आउटपुट सर्कयट को आइसोलेिन संरिण प्रिान दकया िाएगा; (v) िोटो-िोल्टाईक सरणी और इन्िटयर के जलए अथय िॉल्ट से संरिण एिं इन्सुलेिन की जनगरानी प्रिान की िाएगी; और (vi) सभी िोटो-िोल्टाईक मॉड्यूल के सुरिा गुण सुसंगत मानकों के अनुरूप होंगे। (4) सौर प्रजतष्ठापनों के जलए आग की रोकथाम हते ु अपेिाएं- आग का पता लगाने िाली प्रणाली और स्ट्िचाजलत आग िमन प्रणाली सुसंगत मानकों के अनुरूप होगी। (5) फ्लोटटंग सोलर िोटो-िोल्टाईक ऊिाय प्रजतष्ठापनों के जलए अजतठरि सुरिा अपेिाएं- िोटो-िोल्टाईक मॉड्यूल और फ्लोटटंग सौर ऊिाय संयंत्र की संबंजधत संरचना, परीिणों के जलए सुसंगत मानकों िैसे नमक के धुंध, अमोजनया संिारण, उच्च घनत्ि पॉली एजथलीन का पयायिरणीय स्ट्रेस क्ैककंग, उच्च घनत्ि पॉली एजथलीन का स्ट्रेस क्ैककंग प्रजतरोध, प्लाजस्ट्टक के तन्य गुणों के जलए मानक परीिण पिजत, का अनपु ालन करेंग।े 122. पिन ऊिा यप्रजतष्ठापनों के जलए सरु िा अपिे ाएं- (1) पिन टबायइन, जग्रड से िुड़े तटिती और अपतटीय पिन ऊिाय संयंत्र सजहत सभी पिन ऊिाय उत्पािन प्रणाजलयां, सुसंगत मानकों के अनुरूप होंगी। (2) पिन टबायइन अनुप्रयोगों के जलए रांसिॉमयर, सुसंगत मानकों के अनुरूप होंगे। (3) आग लगने की जस्ट्थजत में तत्काल कारयिाई करने हते ु संयंत्रों में जिजभन्न स्ट्थानों पर पोटेबल अजििामक भी रखे िाएंगे। (4) यदि दकसी भी पिन टरबाइन कमयचारी के जगरने की संभाव्य जस्ट्थजत बनती हो तो उसे एक सर्टयिाइड िॉल अरेस्ट्ट प्रणाली, िैसे दक िुल बॉडी सेफ्टी हानेस, द्वारा समथयन दकया िाएगा। अध्याय 11 जिद्यतु िाहन चार्िगं स्ट्टेिनों के जलए अजतठरि सुरिा अपिे ाएं 123. जिद्यतु िाहन चार्िगं स्ट्टेिनों के जलए अजतठरि सरु िा अपिे ाएं- अध्याय 1 से 7 तक उपबंध कराए गए जिजनयमों के अजतठरि इस अध्याय के अधीन जिजनयम, जिद्युत िाहन चार्िंग स्ट्टेिनों पर लागू होंगे। 124. जिद्यतु िाहन चार्िगं स्ट्टेिनों के जलए सामान्य सुरिा आिश्यकता- (1) जिद्युत िाहन चार्िंग स्ट्टेिनों को सुसंगत मानकों के अनुसार इनपुट आपूर्तय और आउटपुट आपूर्तय के अजधभार के जिरूि अलग से सुरिा प्रिान की िाएगी। (2) जिद्युत िाहन चार्िंग पॉइं्स की आपूर्तय के सॉकेट आउटलेट को तयै ार िमीनी स्ट्तर से कम से कम 800 जमलीमीटर ऊपर स्ट्थाजपत दकया िाएगा।54 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] (3) जिद्युत िाहन को चार्िंग प्िाइंट से िोड़ने के जलए सप्लाई लीड के अजतठरि कॉडय एक्सटेंिन सेट या िसू री सप्लाई लीड का उपयोग नहीं दकया िाएगा और कॉडय एक्सटेंिन सेट के रूप में इसका उपयोग नहीं दकया िाएगा। (4) िाहन इनलेट को िाहन कनेक्टर से िोड़ने के जलए दकसी एडॉप्टर का उपयोग नहीं दकया िाएगा। (5) चार्िंग पॉइंट और जिद्युत िाहन पर कनेक्िन के बीच की िरू ी चार्िंग के िौरान पांच मीटर से अजधक नहीं होगी। (6) जिद्युत िाहन चार्िंग के जलए पोटेबल सॉकेट आउटलेट की अनुमजत नहीं िी िाएगी। (7) जिद्युत िाहनों के चार्िंग स्ट्टेिनों के जलए सुसंगत मानकों के अनुसार तजड़त सुरिा प्रणाली उपलब्ध कराई िाएगी। (8) जिद्युत िाहन से चार्िंग पॉइंट तक अजनयंजत्रत उल्टे जिद्युत प्रिाह को रोकने के जलए जिद्युत िाहन चार्िंग स्ट्टेिन सुरिात्मक उपकरण से लैस होंगे। (9) जिद्युत िाहन को जिद्युत आपूर्तय (मसें ) से जडस्ट्कनेक्ट करने के एक सेकंड बाि, सुलभ प्रिाहकीय भागों या दकसी भी सुलभ प्रिाहकीय भाग और अथय के बीच िोल्टेि 42.4 िोल्ट पीक (30 िोल्ट आरएमएस), या 60 िोल्ट डीसी से कम या बराबर होगा, और उपलब्ध संग्रहीत ऊिाय 20 िूल से कम होगी: परन्तु यह दक, यदि िोल्टेि 42.4 िोल्ट पीक (30 िोल्ट आरएमएस) या 60 िोल्ट डीसी से अजधक ह ैया ऊिाय 20 िूल या उससे अजधक ह,ै तो चार्िंग स्ट्टेिनों पर एक उजचत स्ट्थान पर एक चेतािनी लेबल लगाया िाएगा। (10) डायरेक्ट करंट चार्िंग के जलए उपयोग दकया िाने िाला िाहन कनेक्टर 60 िोल्ट डीसी से अजधक िोल्टेि होने पर िाहन इनलेट पर लॉक हो िाएगा और चार्िंग प्रणाली के खराब होने पर, सुरजित जडस्ट्कनेक्िन के जलए साधन उपलब्ध कराए िाएंगे। (11) यदि आउटपुट िोल्टेि, िाहन के जलए अनुमेय अजधकतम िोल्टेि सीमा से अजधक ह,ै तो बैटरी पर ओिरिोल्टेि को रोकने के जलए जिद्युत िाहन चार्िंग पॉइंट जिद्युत आपूर्तय को जडस्ट्कनेक्ट कर िेगा। (12) िाहन कनेक्टर अनलॉक होने पर जिद्युत िाहन चार्िंग पॉइंट, चार्िंग केबल को ऊिाय प्रिान नहीं करेगा। (13) यदि िाहन कनेक्टर और अथय के बीच िोल्टेि 60 िोल्ट से अजधक ह ैतो जिद्युत िाहन कनेक्टर अनलॉक नहीं होगा। (14) तेल या गैस जडस्ट्पेंसर और जिद्युत िाहन चार्िंग पॉइंट के बीच सुरिा सम्बन्धी अंतराल, प्राजधकरण द्वारा िारी आिेि के अनुसार होगी। (15) चार्िंग पॉइं्स, िहां तीन िेज़ में जिद्युत आपूर्तय की आिश्यकता होती ह,ै के जलए केिल चार कोर केबल का ही उपयोग दकया िाएगा। (16) भूजमगत केबल भूजमगत तेल टैंक या तेल पाइप लाइन को आर-पार नहीं करेंगे। (17) चार्िंग िेत्र या िाहनों के मागय में भूजमगत केबल नहीं जबछाए िाएंगे और यदि जबछाएं गए ह ै तो, तैयार सतह से एक मीटर की न्यूनतम गहराई पर होंगे। 125. चार्िगं स्ट्टेिनों के जलए अथ यसुरिा प्रणाली- (1) प्रत्येक जिद्युत िाहन चार्िंग पॉइं्स को एक समर्पयत उप-सर्कयट द्वारा व्यजिगत रूप से जिद्युत आपूर्तय की िाएगी िो सुसंगत मानकों का अनुपालन करते हुए एक ओिर करंट सुरिात्मक उपकरण द्वारा संरजित होगा और ओिर करंट सुरिात्मक उपकरण जस्ट्िच बोडय का जहस्ट्सा होगा। (2) चार्िंग स्ट्टेिनों में सभी सुरिात्मक उपकरणों का समन्िय सुजनजित दकया िाएगा। (3) सभी जिद्युत िाहन चार्िंग स्ट्टेिनों को अथय कंटीन्यूटी जनगरानी प्रणाली उपलब्ध कराई िाएगी, िो िाहन से अथय कनेक्िन अप्रभािी होने पर जिद्युत आपूर्तय को रोक िेती है। (4) चार्िंग लीड को अथय से िुड़े धातु की जिलल्डंग के साथ लगाया िाएगा और केबल का इन्सुलेिन, रगड़ प्रजतरोधी होगा और ऑपरेटटंग तापमान रेंि पर लचीलापन बनाए रखेगा। (5) आपूर्तय के अथय टर्मयनल और िाहन के प्रिाहकीय भागों के बीच एक-समान जिभि िाला कनेक्िन स्ट्थाजपत करने के जलये एक सुरिात्मक अथय चालक उपलब्ध कराया िाएगा िो सुसंगत मानकों के अनुरूप होगा। 126. जिद्यतु िाहन चार्िगं स्ट्टेिनों के जलए आग स ेसुरिा की अपिे ाएं- (1) जिद्युत् िाहन आपूर्तय उपकरण का एनक्लोिर स्ट्ियं अजििामक जििेषता िाली अजिरोधी सामग्री से तैयार दकया िाएगा और हैलोिन से मुि होगा।[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 55 (2) आग का पता लगाना, चेतािनी और जनयंत्रण प्रणाली सुसंगत मानकों के अनुसार उपलब्ध की िाएगी। 127. चार्िगं स्ट्टेिनों का परीिण- चार्िंग स्ट्टेिन का स्ट्िामी यह सुजनजित करेगा दक चार्िंग स्ट्टेिन और अिजिष्ट करंट साधनों के जनमायता के जनिेिों के अनुसार जनर्ियष्ट परीिण दकए गए हैं। 128. अजभलखे ों का रखरखाि- (1) चार्िंग स्ट्टेिनों के स्ट्िामी चार्िंग स्ट्टेिन के 50 ह्ज़य के नोजमनल आिृजत्त पर मानक िोल्टेि की आपूर्तय के साथ संगत होने के जलए जडिाइन, जनमायण और लेबललंग से संबंध में ठरकॉडय रखेंगे। (2) चार्िंग स्ट्टेिन के स्ट्िामी इन जिजनयमों में जनर्ियष्ट और सुसंगत मानकों के अनुसार सुसंगत परीिण प्रमाणपत्र का ठरकॉडय रखेंगे। (3) चार्िंग स्ट्टेिन के स्ट्िामी प्रत्येक जनरीिण, परीिण और आिजधक मूल्यांकन पठरणामों का ठरकॉडय रखेगा और आकलन के िौरान पाए गए दकसी भी मामले के ब्योरे और उन मामलों के संबंध में की िाने िाली दकसी भी कारयिाई के ठरकॉडय को रखेंगे। (4) चार्िंग स्ट्टेिन के स्ट्िामी िैसा दक उपरोि उप-जिजनयमन (1), (2) और (3) में जनर्ियष्ट ह,ै न्यूनतम सात िषों तक सभी अजभलेखों की एक प्रजत, कागिी या इलेक्रॉजनक रूप में रखेंगे और जनरीिण के िौरान अजधकाठरयों को एक प्रजत उपलब्ध कराएंगे। अध्याय 12 हाई िोल्टेि डायरेक्ट करंट के जलए अजतठरि सुरिा अपिे ाएं 129. हाई िोल्टेि डायरेक्ट करंट के जलए अजतठरि सरु िा अपिे ाएं- अध्याय 1 से 7 तक दिए गए जिजनयमों के अजतठरि इस अध्याय के अधीन जिजनयम, हाई िोल्टेि डायरेक्ट करंट पर लागू होंगे। 130. सामान्य सरु िा अपिे ाएं- (1) िाल्ि हॉल में हलैं गंग िाल्ि के ऊपर िहां भी िॉक िे का जनमायण दकया गया हो, िहााँ िॉक िे के नीचे एक तार की िाली प्रिान की िाएगी। (2) संिेिनिील मापन के जलए उपयोग दकए िाने िाले केबल, अलग और पूरी तरह से स्ट्क्ीन्ड या किर दकए गए चैनलों या गैल्िेनाइज्ड स्ट्टील पाइपों में रखे िाएंगे। (3) हाई िोल्टेि डायरेक्ट करंट स्ट्टेिन के प्रत्येक कमरे या कंपाटयमेंट में स्ट्िचाजलत प्रारंभन के साथ रोिनी का एक अलग आपातकालीन स्रोत प्रिान दकया िाएगा। (4) तेल में डूबे दकसी उपकरण को िॉल्ि हॉल के भीतर नहीं रखा िाएगा। (5) लेिर डायोड से लैस मॉड्यूल और िाइबर ऑजप्टक केबल के िंक्िन बॉक्स िाले जडब्बों के सभी िरिािों को लॉक दकया िाएगा और उसे लेिर चेतािनी प्रतीकों के साथ जचजननत दकया िाएगा। 131. दिल्टर बैंकों म ेंबाड़ लगाना- (1) आल्टरनेटटंग करंट और डायरेक्ट करंट दिल्टर बैंक िेत्र को बाड़ लगाने या अन्य साधनों से कम से कम 1.8 मीटर ऊंचाई तक कुिलता से संरजित दकया िाएगा जिससे दकसी भी अनजधकृत व्यजि को कंडक्टरों और उपकरणों तक पहुचं ने से रोका िा सके और ऐसे िेत्र की बाड़ को प्रभािी ढंग से अथय दकया िाएगा। (2) दिल्टर बैंक के िेंलसंग और अथय जस्ट्िच के गेट को इस तरह से इंटरलॉक दकया िाएगा दक दिल्टर बैंक के पूरी तरह से जडस्ट्कनेक्ट और जडस्ट्चािय होने के बाि ही गेट खोला िा सके। (3) एयर कोर स्ट्मूलथंग ठरएक्टर में चारों ओर से बाड़ लगाया िाएगा और यह बाड़, स्ट्मूलथंग ठरएक्टर के मैिेठटक क्लीयरेंस कंटूर में नहीं िॉल करना चाजहए। (4) अल्टरनेटटंग करंट दिल्टर में कॉमन न्यूरल बस को केिल एक लबंि ुपर अथय दकया िाएगा। 132. अर्थगं अपिे ाएं- (1) कन्िटयर रांसिॉमयर में पृथक पैरीमीटर अर्थंग कंडक्टर दिया िाएगा। (2) कन्िटयर रांसिॉमयर बैंक के लाइन साइड न्यूरल को केिल एक लबंि ुपर अथय दकया िाएगा। (3) एयर कोर िाले ठरएक्टर की सपोटय स्ट्रक्चर पठरजध का हर जहस्ट्सा इस तरह से अथय दकया िाएगा दक यह बंि लूप नहीं बना सके। (4) िाल्ि हॉल की रेजडयो फ्रीिेंसी इंटरिेरेंस स्ट्क्ीन जिद्युत से िुड़ी होगी और प्रभािी रूप से अथय की िाएगी। (5) मैटेजलक िीट, प्रीिैजब्रकेटेड स्ट्रक्चर मेंबर और रस जिसमें हाई िोल्टेि डायरेक्ट करंट उपकरण जस्ट्थत ह,ै इलैक्रीकली िुड़े होंगे और प्रभािी रूप से अथय दकए िाएंगे।56 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] (6) स्ट्मूलथंग ठरएक्टर के नीचे नींि में स्ट्टील रीइन्िोसयमेंट घटकों के बीच इंसुलेटटंग पैड या स्ट्लीव्स प्रिान दकए िाएंगे, िहां भी िे एक-िसू रे को क्ास कर रह ेहों। अध्याय 13 गसै इंसुलटे ेड सबस्ट्टेिन के जलए अजतठरि सुरिा अपिे ाएं 133. गसै इंसुलटे ेड सबस्ट्टेिन के जलए अजतठरि सुरिा अपिे ाएं- अध्याय 1 से 7 तक दिए गए जिजनयमों के अजतठरि इस अध्याय के अधीन जिजनयम गैस इंसुलेटेड सबस्ट्टेिन पर लागू होंगे। 134. सामान्य सरु िा अपिे ाएं- (1) गैस इंसुलेटेड सबस्ट्टेिन के प्रत्येक कमरे या कम्पाटयमेंट में स्ट्िचाजलत प्रारंभन के साथ रोिनी का एक अलग आपातकालीन स्रोत प्रिान दकया िाएगा। (2) गैस इंसुलेटेड सबस्ट्टेिन और केबल टर्मयनेिन यूजनट के फ्लैंिेि के बीच केबल किर प्रोटेक्िन यूजनट प्रिान की िाएगी। (3) 220 दकलोिोल्ट और उससे अजधक िोल्टेि के गैस इंसुलेटेड सबस्ट्टेिन की स्ट्थापना पार्िययल जडसचािय जनगरानी प्रणाली के साथ की िाएगी। (4) गैस इंसुलेटेड सबस्ट्टेिन के दकसी एक कम्पाटयमेंट से िायुमंडल में और कम्पाटयमेंट के बीच SF गैस ठरसाि की िर सुसंगत 6 मानकों के अनुसार जनधायठरत िर से अजधक नहीं होगी। 135. अर्थगं अपिे ाएं- (1) मूल उपकरण जनमायता की जसिाठरिों के अनुसार, जनयजमत अर्थंग के अलािा, गैस इंसुलेटेड सबस्ट्टेिन बे के बाड़े को उच्च आिृजत्त िजणक िोल्टेि के जलए अथय दकया िाएगा। (2) गैस इंसुलेटेड सबस्ट्टेिन प्रजतष्ठापन की अर्थंग सुसंगत मानकों के अनुसार होगी। (3) जस्ट्िलचंग प्रचालनों के कारण गैस इंसुलेटेड सबस्ट्टेिन के अंिर उत्पन्न रैिललंग िेब ऊिाय को बुलिंग श्राउड से प्रभािी अर्थंग प्रिान करके अथय की ओर मोड़ा िाएगा। अध्याय 14 जिजिध 136. जिचलन- (1) केन्द्रीय सरकार अथिा राज्य सरकार, यथाजस्ट्थजत, जलजखत आिेि द्वारा जिजनयम 32 को छोड़कर इन जिजनयमों म ें जिजनर्ियष्ट मामलों के संबंध में जिचलन की अनुमजत िे सकती ह।ै (2) इलैजक् रकल इंस्ट् पैक् टर अथिा खान के इलैजक् रकल इंस्ट् पैक् टर, जलजखत आिेि द्वारा अजभजलजखत दकए िाने िाले कारणों से जिजनयम 14 से 19, जिजनयम 30, जिजनयम 37 के उप-जिजनयम (2) (3) और (5), जिजनयम 38 का उप-जिजनयम (3), जिजनयम 39 के खंड (i) से (iv), जिजनयम 43 का खंड (xii), जिजनयम 45, जिजनयम 46 का उप-जिजनयम (2), जिजनयम 48, जिजनयम 54 से 56, जिजनयम 59 से 63, जिजनयम 67, जिजनयम 74, जिजनयम 77, जिजनयम 81 से 94, जिजनयम 104, जिजनयम 109 के उप-जिजनयम (6), (8) और (10), जिजनयम 116 और जिजनयम 119 से 135 में जनर्ियष्ट मामलों के संबंध में, अलग-अलग मामलों के आधार पर, जिचलन की अनुमजत िे सकता ह।ै स्ट्पष्टीकरण- इलैजक् रकल इंस्ट् पैक् टर या खान के इलैजक् रकल इंस्ट् पैक् टर द्वारा उप-जिजनयम (2) के तहत जिचलन की अनुमजत िेने िाला प्रत्येक आिेि, केन्द्र सरकार या राज्य सरकार के समि रखा िाएगा जिसका जनणयय अंजतम होगा। अनसु चू ी 1 जिद्यतु आपर्ू त यलाइनों और उपकरणों की हडैं ललगं [जिजनयम (21) का उप-जिजनयम (3) िखे ]ें भाग-। बरती िान ेिाली सािधाजनयां:- (1) हॉटलाइन अनुरिण प्रजिजित कार्मयक ही चालू लाइन पर काम करने के जलए अजभजहत दकए गए हैं। (2) लाइन के प्रत्येक जसरे पर टर्मयनल उप-केन्द्रों से कायय परजमट जलया िाएगा। (3) कायय का जनष् पािन उजचत योिना बनाकर और पूिय समझिारी और स्ट्पष्टता से दकया िाएगा।[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 57 (4) हॉटलाइन प्रचालनों के जलए अनुकूल िलिायु पठरजस्ट्थजत धूपिाला मौसम ह।ै यदि मौसम पूिायनुमान बाठरि अथिा तूिान का ह ै तो कायय आरंभ नहीं होगा। (5) कायय के संगिन के बारे में सिस्ट्यों के बीच चचाय की िाएगी और टीम के प्रत्येक सिस्ट्य का उत्तरिाजयत्ि तय की िाएगा। (6) कायय स्ट्थल पर िाने से पूिय सभी उपकरणों और औिारों के सही प्रचालन के जलए जनरीिण और िांच की िाएगी। (7) िोनों जसरों पर लाइन के जलए स्ट्ितः पुनः बंि ‘’आि’’ जस्ट्थजत पर होगा। (8) कायय पिजत पर टािर स्ट्थल पर िल के सिस्ट्यों के साथ जिचार जिमिय दकया िाएगा और प्रत्येक सिस्ट्य के उत्तरिाजयति को उजचत रीजत से जनधायठरत दकया िाएगा। (9) टािर/खंभों के समीप की भूजम को अपेजित उपकरणों के जलए साइट िेत्र उपलब्ध कराने के जलए साि दकया िाएगा। (10) सभी साि की गई हॉट जस्ट्टक्स, स्ट्रेन कैठरयर और अन्य एसम्बजलयों को भू-संपकय से बचाने के जलए हॉट लाइन टूल रैक में रखा िाएगा। (11) पहनने िाले हले मेट, सुरिा िूतों और सुरिा बैल्ट का अजनिायय रूप से उपयोग दकया िाएगा। (12) सभी हॉट जस्ट्टक और सीदढयों की सिाई की िाएगी और हॉट जस्ट्टक टेस्ट् टर द्वारा अखंडता के जलए िांच की िाएगी। (13) हॉट लाइन िल में सभी लाइनमैन कायय के िौरान जनिी सुरिात्मक उपकरण से लैस होंगे। (14) कोई लाइि-लाइन िल का सिस्ट्य टािर और कंडक्टर पर कोई मैटेजलक चेन, कलाई घड़ी अथिा अाँगूिी नहीं पहनेगा जिससे दक दकसी भी सरकुलेटटंग करंट से बचा िा सके। (15) िल के लाइनमैन सुचालक िुराबें, बूट, हल्ै मेट और हाथ के िास्ट्ताने पहनेंगे। ‘हॉट-एंड’ लाइनमैन पूणय बेयर हैंड सूट पहनेंगे। (16) कायय स्ट्थल पर तारपॉलीन िीट जबछाई िाएगी। (17) समस्ट्त कायय अिजध के िौरान एक लाइट िाहन जनकट ऱखा िाएगा। हॉट लाइन अनरु िण प्रचालन के जलए सामान्यतः अपजे ित औिार: प्रासंजगक मानको अथिा समान जिजनिेिनों के अनुरूप जनम्नजलजखत औिारों का उपयोग ऑन लाइन कायो में दकया िाएगा (1) िायर टोंग्स; (2) िायर टोंग्स सैडल; (3) टाई जस्ट्टक्स; (4) स्ट्रेन ललंक जस्ट्टक्स; (5) रोलर ललंक जस्ट्टक्स; (6) सस्ट्पेंिन ललंक जस्ट्टक्स; (7) आग्िीलरी आम्सय; (8) स्ट्रेन कैठरयर; (9) जिन पोल्स; (10) कम-ए-एलांग क्लैम्प; (11) सुरिा उपकरण िैसे कंडक्टर गाडसय, एक्स आमय गाडयस इंसुलेटर किसय, हडैं ग्लव्स और इसके सििृ आदि; (12) हॉट जस्ट्टक्स। सरु जित काय यिरू ीः हॉट लाइन अनुरिण प्रचालन के जलए जनम्नजलजखत सुरजित कायय िरू ी को अपनाया िाना चाजहए:58 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] िेि स ेिेि तक सरु िा क्लीयरेंस दकलोिोल्ट मीटर 11 0.61 33 0.71 66 0.91 110 1.02 132 1.07 220 1.52 400 2.13 िटडाउन काय यया परीिण करन ेके जलए जिद्यतु आपर्ू त यलाइनों और उपकरणों की हैंडललंग [जिजनयम (21) का उप-जिजनयम (3) िखे ]ें भाग-II बरती िान ेिाली सािधाजनया:ं- (1) जिद्युत आपर्ू तय लाइन या उपकरण में दकसी भी िट डाउन कायय या परीिण के प्रारंभ से पहले, कायय या परीिण के प्रभारी अजभयंता या पययिेिक संभाजित खतरों की पहचान करेंगे, िैसे दक; जबिली का करंट लगना, फ्लैस ऑिर, ऊंचाई से व्यजि का जगरना, ऊाँचाई से िस्ट्तुएाँ जगरना, उपकरण और संयंत्रों की जििलता, आग, और इसी तरह, िो काम करते समय या आिेजित िेत्र के पास परीिण करते समय सामने इस तरह की घटनाओं का सामना कर सकते हैं और काम करने िाले कर्मययों की सुरिा के जलए आिश्यक सािधानी बरतेगें। (2) अजभयंता या कायय के प्रभारी पययिेिक, दकसी भी कायय के प्रारंभ होने से पहले, पूरे कायय समूह या जगरोह को उन खतरों के बारे में िानकारी िेंगे जिनका सामना करना पड़ सकता ह ैऔर उनके द्वारा आिश्यक सािधाजनयां बरती िाएंगी। (3) कायय के प्रभारी अजभयंता या पययिेिक संबंजधत संचालन प्रभारी (प्रभारों) से उजचत परजमट-टू-िकय प्राप्त करेंगे और यह सुजनजित करेंगे दक जिद्युत आपूर्तय लाइन या उपकरण या सेक्िन ऊिाय के सभी स्रोतों से अलग है, डी-एनिायइज्ड ह ैऔर अथेड है। (4) अजभयंता या कायय के प्रभारी पययिेिक यह सुजनजित करेंगे दक कायय िेत्र में पयायप्त और उपयुि स्ट्थानीय अर्थंग लगाई गई है और अर्थंग रॉड जिद्युत आपूर्तय लाइन या उपकरण जिद्युत आपूर्तय के पृथक खंड से तब तक िुड़े रह ें िब तक दक सभी लोग और सामग्री को सुरजित िेत्र में ना ले िाया गया हो और काम पूरा होने पर काम करने का परजमट िापस कर दिया िाए। (5) यदि दकसी परीिण उद्देश्य के जलए स्ट्थानीय अथय को हटाने की आिश्यकता है, तो ऐसा तभी दकया िाएगा िब सभी काययरत कमी सुरजित िेत्र में, िमीन पर या टॉिर पर हों, और इंिीजनयर या पययिेिक की उपजस्ट्थजत में हों। यदि काम करने िाले कर्मययों को बाि में दकसी भी काम के जलए ऊपर िाने या कंडक्टर के पास िाने की आिश्यकता होती है, िैसे टेस्ट्ट लीड को हटाना, कसना या समायोिन करना, तो उन्ह ेंआिश्यकतानुसार स्ट्थानीय अथय को पुन: प्रयोग में लाने के बाि ही आगे बढ़ने की अनुमजत िी िाएगी। (6) अजभयंता या कायय के प्रभारी पययिेिक उपयुि माध्यमों से सकारात्मक रूप से पुजष्ट करेंगे दक काम करने िाले कर्मययों को उसी कायय पर िापस िाने के जलए मंिूरी िेने से पहले जिद्युत आपूर्तय लाइन या उपकरण या सेक्िन पूरी तरह से जनजष्क्य ह।ै (7) अजभयंता या कायय के प्रभारी पययिेिक िट डाउन या परीिण करते समय यह सुजनजित करेंगे दक काम करने िाले कमयचारी नििीकी आिेजित जिद्युत आपूर्तय लाइन या उपकरण या सेक्िन से सुरजित िरू ी बनाए रख हुए ह,ैं और कोई भी िस्ट्तु िैसे उपकरण और संयंत्र, सीढ़ी, क्ेन, मैन-जलफ्ट, और ऐसी की कोई भी िस्ट्तु हटा िी गई हो तादक सुरजित िरू ी का उल्लंघन न हो और काम करने िाले कर्मययों के जलए खतरा न हो। (8) मोबाइल क्ेन, डेठरक, मैन जलफ्ट और व्हील माउंटेड लैडर को प्रभािी ढंग से अर्थंग दकया िाएगा िब सदक्य उपकरण या सेक्िन के समीप में स्ट्थानांतठरत या संचाजलत दकया िा रहा हो।[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 59 (9) पोटेबल सीढ़ी और खंभे को केिल िैजति जस्ट्थजत में ले िाया िाएगा िब सदक्य लाइनों या उपकरण या िेत्र समीप ले िाया िा रहा हो। आग ेबरती िान ेिाली सािधाजनया:ाँ- (1) िब चािय दकए गए जिद्युत आपूर्तय लाइन या उपकरण या सेक्िन के पास कोई िट डाउन कायय या परीिण दकया िाता ह ै तब जिद्युत आपूर्तय लाइनों और उपकरणों पर काम या परीिण करते समय सभी दक्याकलापों के जलए स्ट्िामी के साथ-साथ िेकेिार द्वारा पयायप्त और प्रभािी पययिेिण सुजनजित दकया िाएगा। (2) अकेले कामगार को कभी भी जिद्युत आपूर्तय लाइनों, उपकरणों और यंत्रों पर या परीिण के िौरान काम करने की अनुमजत नहीं िी िाएगी। (3) िब एक ही या अलग-अलग स्ट्थानों पर जिजभन्न प्रकार के कायय प्रगजत पर हों, तो कड़ी जनगरानी के जलए पयायप्त पययिेिी कर्मययों को तैनात दकया िाएगा। उप-िेकेिारों के कर्मययों को पययिेिण कायय कभी भी प्रत्यायोजित नहीं दकया िाएगा। (4) तैनात पययिेिण कार्मयक ऊंचाई पर काम होते समय या परीिण प्रगजत पर होने पर काययस्ट्थल को नहीं छोड़ेंगे, क्योंदक काम करने िाले कर्मययों को असुरजित प्रैजक्टस के पठरणामों के बारे में पता नहीं हो सकता है। िब िट डाउन कायय हो या परीिण प्रगजत पर हो, तब पययिेिण कर्मययों द्वारा ऐसा कोई कायय नहीं दकया िाएगा, जिसके जलए उन्हें उस स्ट्थान को छोड़कर बाहर िाने की अपेिा होती हो। (5) िहां भी दकसी जिद्युत आपूर्तय लाइन, उपकरण या खंड पर एक दिन से अजधक के जलए िट डाउन दक्याकलापों को करने की अपेिा होती ह,ै काम करने िाले कर्मययों को काम दिर से िुरू करने के जलए टॉिर या संरचना पर चढ़ने के जलए मंिूरी िेने से पहले उि कायय स्ट्थल पर प्रिान की गई अर्थंग का जनरीिण इंिीजनयर या पययिेिक द्वारा प्रजतदिन सुबह उसकी िीक-िाक जस्ट्थजत, दिटनेस और समुजचत मिबूती के जलए दकया िाएगा। िटडाउन काय यया परीिण करन ेके जलए उच्च िोल्टेि डायरेक्ट करंट उपकरण की हडैं ललगं [जिजनयम (21) का उप-जिजनयम (3) िखे ]ें भाग-3 बरती िान ेिाली सािधाजनयााँ:- (1) कायय के प्रभारी अजभयंता या पययिेिक संबंजधत संचालन प्रभारी (प्रभारों) से उजचत परजमट-टू-िकय प्राप्त करेंगे और यह सुजनजित करेंगे दक जिद्युत आपूर्तय लाइन या उपकरण या िह भाग ऊिाय के सभी स्रोतों से अलग है, डी-एनिायइज्ड ह ैऔर अथेड है। (2) उच्च िोल्टेि डायरेक् ट करंट उपकरण के दकसी िट डाउन कायय या परीिण के प्रारंभ से पहले, कायय या परीिण के प्रभारी अजभयंता या पययिेिक संभाजित खतरों की पहचान करेंगे, िैसे; इलेक्रोक्यूिन, फ्लैि ओिर, ऊंचाई से व्यजि का जगरना, ऊंचाई से िस्ट्तुओं का जगरना, उपकरणों और संयत्रों की जििलता, आग, और इसी तरह की अन् य चीिें, िो चािय दकए गए िेत्र के पास कायय या परीिण करते समय सामने आ सकते ह ैंऔर काम कर रहे कर्मययों के सुरिा के जलए आिश्यक सािधानी बरतेगें। (3) कायय के प्रभारी अजभयंता या पययिेिक, दकसी भी कायय के प्रारंभ होने से पहले, पूरे कायय समूह या जगरोह को उन खतरों के बारे में िानकारी िेंगे जिनका सामना करना पड़ सकता ह ैऔर उनके द्वारा आिश्यक सािधाजनयां बरती िाएंगी। (4) नििीक जस्ट्थत सभी संस्ट्थापना भागों में चेतािनी लेबल लगाएं िाएं (कायय दकए िाने के बाि उसे हटा दिए िाए)। (5) कायय के प्रभारी अजभयंता या पययिेिक िाल्ि हॉल, डीसी दिल्टर िेत्र, एसी दिल्टर िेत्र और डीसी हॉल (यदि कोई हो) तक पहुंच की अनुमजत तभी िेंगे िब उसमें मौिूि उपकरण पूरी तरह से डी-एनिीकृत एिं प्रभािी रूप से अ्डय हों। (6) पूरे कैपेजसटर बैंक की अर्थंग के बाि ही एसी/डीसी दिल्टर बैंक पर काम िुरू होगा। (7) पूरे कैपेजसटर बैंक को अर्थंग करने और बैंक पर काम िुरू करने के बीच कम से कम िस जमनट का समय अंतराल होना चाजहए। उसके बाि यूजनट को िॉटय सर्कयट दकया िाना चाजहए। (8) डी-एनिायइज्ड बुलिंग को एक उजचत परीिण उपकरण का उपयोग करके इनडोर और आउटडोर साइड कम्पोजिट इंसुलेटर और बुलिंग के अन्य सभी जहस्ट्सों की सभी सतहों को छूकर संग्रहीत चािय के जलए िााँच की िाएगी। (9) िॉल बुलिंग के माध्यम से उच्च िोल्टेि डायरेक्ट करंट के अंिर गैस का िबाि दकसी भी काम को िुरू करने या बुलिंग को संभालने से पहले जनमायता द्वारा जनधायठरत स्ट्तर तक कम दकया िाएगा।60 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] िटडाउन काय यया परीिण करन ेके जलए गसै इंसुलटे ेड जस्ट्िचजगयर (िीआईएस) उपकरण की हडैं ललंग [जिजनयम (21) का उप-जिजनयम (3) िखे ]ें भाग-4 बरती िान ेिाली सािधाजनयााँ:- (1) कायय के प्रभारी अजभयंता या पययिेिक संबंजधत संचालन प्रभारी (प्रभारों) से उजचत परजमट-टू-िकय प्राप्त करेंगे और यह सुजनजित करेंगे दक जिद्युत आपूर्तय लाइन या उपकरण या िह भाग ऊिाय के सभी स्रोतों से अलग है, डी-एनिायइज्ड ह ैऔर अथेड है। (2) संचालन, रखरखाि और मरम्मत प्रजिजित और प्रमाजणत कर्मययों द्वारा ही की िानी चाजहए। (3) दकसी िट डाउन कायय या गैस इंसुलेटेड जस्ट्िचजगयर उपकरण के परीिण से पहले, कायय या परीिण के प्रभारी अजभयंता या पययिेिक संभाजित खतरों की पहचान करेंगे, िैसे; इलेक्रोक्यूिन, फ्लैि ओिर, ऊंचाई से व्यजि का जगरना, ऊंचाई से िस्ट्तुओं का जगरना, उपकरणों और संयंत्रों की जििलता, आग, और इसी तरह अन् य चीिें, िो चािय दकए गए िेत्र के पास कायय या परीिण करते समय सामने आ सकते ह ैंऔर काम कर रहे कर्मययों की सुरिा के जलए आिश्यक सािधानी बरतेंगे। (4) कायय के प्रभारी अजभयंता या पययिेिक, दकसी भी कायय के प्रारंभ होने से पहले, पूरे कायय समूह या जगरोह को उन खतरों के बारे में जिनका सामना करना पड़ सकता ह ैतथा उनके द्वारा िो आिश्यक सािधाजनयां बरती िानी है, की िानकारी िेंगे। (5) ऑपरेिन के िौरान जहयटरंग प्रोटेक्िन पहना िाएगा। (6) दकसी भी समय घेरे को छूते समय सािधानी बरती िाए क्योंदक घेरे 70 जडग्री सेजल्सयस के तापमान तक गमय हो सकते हैं। (7) भंडारण, पठरिहन और भरने िाले उपकरणों के उपयोग की प्रदक्याओं का अिलोकन करें। (8) व्यजिगत सुरिा उपकरण पहनें: श्वासयंत्र मास्ट्क (यदि आिश्यक हो तो स्ट्ि-जनजहत श्वास उपकरण), सुरिात्मक उपरी पोिाक, सुरिात्मक िस्ट्ताने, सुरिा िूते, सुरिा चश्मा। (9) सभी आस-पास के संस्ट्थापना भागों में चेतािनी लेबल लगाएं (कायय दकए िाने के बाि इसे हटा िें)। (10) इंटरलॉककंग जनयमों द्वारा आिश्यक उजचत जिद्युत जनकासी प्रिान करें। उिाहरण के जलए उपयुि टैग के साथ मुख्य सर्कयट और जनयंत्रण सर्कयट को जचजननत करें। (11) अनापेजित संपकों को रोकने के जलए स्ट्क्ीन, इंसुलेटटंग मैट या स्ट्पेसर जग्रड के साथ नििीक के लाइि भागों को ब्लॉक करें। (12) गैस इंसुलेटेड जस्ट्िचजगयर में दकसी भी जडब्बे पर काम करते समय, काम करने िाले व्यजि की सुरिा के जलए तत्काल नििीकी जडब्बे को भी जडप्रेसराइज़ दकया िाना चाजहए। (13) SF गैस जनम्नजलजखत घटनाओं िैसे आकय िॉल् ट, से िजूषत हो िाती ह ैऔर इसमें िहरीले पिाथय होते ह।ैं इसजलए, ऐसे मामलों में 6 SF की हडैं ललंग उजचत पीपीई का उपयोग करके और मूल उपकरण जनमायता से प्रजिजित कर्मययों द्वारा की िानी चाजहए। 6 (14) यदि घनत्ि मॉजनटर पर इंजगत SF गैस का घनत्ि ऑपरेटटंग रेंि में नहीं ह ैतो जस्ट्िचजगयर स्ट्थापना संचाजलत नहीं की िाएगी। 6 (15) यदि कोई असेंबली सदक्य है तो दकसी भी सुरिा किच को न हटाएं। (16) अजभयंता या कायय के प्रभारी पययिेिक यह सुजनजित करेंगे दक कायय िेत्र में पयायप्त और उपयुि स्ट्थानीय अर्थंग लगाई गई है और अर्थंग रॉड जिद्युत आपूर्तय लाइन या उपकरण जिद्युत आपूर्तय के पृथक खंड से तब तक िुड़े रह ें िब तक दक सभी लोग और सामग्री को सुरजित िेत्र में ना ले िाया गया हो और काम पूरा होने पर काम करने का परजमट-टू-िकय िापस कर दिया िाए।[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 61 अनसु चू ी-2 जनरीिण ठरपोटय के प्रारूप [जिजनयम (32) एि ं(45) िखे ]ें प्रारूप । (250 िोल्ट तक के अजधष्ठापन) ठरपोटय सं.................................. इलेजक् रकल इंस्ट् पेक् टर द्वारा जनरीिण अथिा आपूर्तयकताय/स्ट्ि ामी/उपभोकता द्वारा स्ट्ि:प्रमाणन की तारीख…………………..... जपछले जनरीिण अथिा स्ट्ि:प्रमाणन की तारीख......................................... 1. उपभोिा सं. ........................................... 2. िोल्ट और आपूर्तय प्रणालीः (i) िोल्ट....................... (ii) िेिो की सं............................... (iii) एसी/डीसी..................................... 3. िायटरंग का प्रकार......................................... (िायटरंग का प्रकार बताएं, चाह ेकेलसंग कैलपंग, सागौन की लकड़ी का लेड किर बैटन, कंसील्ड कंड्यूट, टि रबर िीथेड और कोई अन्य प्रकार हो) 4. उपभोिा अथिा स्ट्िामी का नाम............................................................................ 5. उपभोिा अथिा स्ट्िामी का पता.................................................................................. 6. पठरसरों की अिजस्ट्थजत.......................................................................................... 7. संस्ट्थापनों का जििरण................................................................................................ (क) संख्या संयोजित भार दकलोिाट में (i) बजतयों के प्िाइंट ........................ ................................... (ii) पंखों के प्िाइंट ....................... ................................... (iii) प्लग प्िाइंट ........................ ................................. (ख) अन्य उपकरण (पूणय जििरण प्रस्ट्तुत दकया िाना ह)ै : (i) ……………………………………………. (ii) …………………………………………… कुल संयोजित भार, दकलो िाट में......................................................................................... अजधकतम करंट मांग, एजम्पयर में......................................................................................... (कुल संयोजित भार के आधार पर) (ग) िनरेटर जििरण यथा जनमायण, क्.सं., केिीए रेटटंग तथा िोल्ट (i) ………………………………………………………………………………… (ii) …………………………………………………………………………………62 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] 8. अजधष्ठापन की सामान्य सजथजत: क्म स.ं जिजनयम स.ं अपिे ाएं ठरपोटय 1. जिजनयम-14 (i) क्या दकसी भी यंत्र िायटरंग से संबजं धत ओिरलोलडंग के हााँ/नहीं दिखने िाले संकेत (तों) ह?ैं (ii) फ्लैक्सीबल कोडय, साकेट जस्ट्िचों, प्लग जपनों कटआउटों संतोषिनक/संतोषिनक नहीं और बत्ती होल्डरों तथा ऐसी अन्य दिटटंग की ििा। (iii) िायटरंग की साधारण ििा। संतोषिनक/संतोषिनक नहीं (iv) यह बताएं की क्या कोई अप्राजधकृत अस्ट्थायी संस्ट्थापन हााँ/नहीं जिद्यमान ह?ैं (v) यह बताएं दक क्या सॉकेट अलग-अलग जस्ट्िचों द्वारा हााँ/नहीं जनयंजत्रत ह?ैं (vi) कोई अन्य िोष या ििा िो खतरे का स्रोत हो सकती हााँ/नहीं ह।ैं यदि हााँ तो जििरण िें। 2. जिजनयम-15 सेिा लाइनों, केिल िायटरंगों, यंत्रो और ऐसी अन्य िीटटंगों की संतोषिनक/संतोषिनक नहीं ििा पर ठरपोटय िें िो प्रिायकत्ताय/पठरसर के स्ट्िामी द्वारा लगाई गई हों। यदि संतोषिनक नहीं हैं तो जििरण िें। 3. जिजनयम-16 क्या प्रिायकत्ताय ने उपभोिा के पठरसर के भीतर आिठरत अजि हााँ/नहीं प्रजतरोध जनधान के भीतर उपयुि कट आउट लगाए ह।ैं 4. जिजनयम-17 (i) यह बताएाँ दक क्या लाईि कंडक्टरों पर जस्ट्िच लगाए गए हााँ/नहीं ह?ैं (ii) यह बताएाँ दक क्या जिजनयम के अनुसार स्ट्थायी प्रकृजत का हााँ/नहीं ऐसा सूचक लगाया ह ै जिससे अथेड अथिा अथेड न्यूरल कंडक्टर को लाईि कंडक्टर से अलग दकया गया है? (iii) क्या लसंगल िेि िोहरा खम्भा लोह आिठरत जस्ट्िचों की हााँ/नहीं ििा में फ्यूि की बिाय न्यूरल पर सीधी लाइन लगाई गई ह?ै 5. जिजनयम-18 (i) यह बताएं दक क्या प्रिायकताय द्वारा भूसंपर्कयत टर्मयनल हााँ/नहीं लगाया ह?ै (ii) क्या प्लग प्िाइंटो के जलए तीन जपन प्लग लगाए गए हैं? हााँ/नहीं (iii) भूसम्पकयन व्यिस्ट्था की सामान्य िश्ृ यता जस्ट्थजत। संतोषिनक/संतोषिनक नहीं 6. जिजनयम-19 क्या अनािृत्त सुचालक पहुाँच की जस्ट्थजत में ह?ै हााँ/नहीं 7. जिजनयम-36 कंडक्टरों और अर्थंग के बीच मैगा ओम में जिद्युत रोधन ..............मेगा ओह्म प्रजतरोधक बताएं। 8. जिजनयम-37 (i) यह बताएं दक क्या आपूर्तय के प्रारंभ के स्ट्थल के जनकट हााँ/नहीं अपेजित िमता के िुड़े हुए जस्ट्िच लगाए गए हैं? (ii) यह बताएं दक क्या िायटरंग को उपयुि संख्या में सर्कयटों हााँ/नहीं में जिभाजित दकया गया ह ै और ऐसे प्रत्येक सर्कयटों को उपयुि कट आउट द्वारा संरजित दकया गया है?[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 63 (iii) यह बताएं दक क्या प्रत्येक मोटर या यंत्र को उपयुि िुड़े हााँ/नहीं हुए जस्ट्िच द्वारा जनयंजत्रत दकया गया है? 9. जिजनयम-43 (i) क्या प्रत्येक िनरेटर, जस्ट्थर मोटर और िहां तक साध्य हो, हााँ/नहीं पोटेबल मोटर के फ्रेम को और अन्य सभी यंत्रो के, जिनका प्रयोग जिद्युत के जिजनयमन या जनयंत्रण के जलए दकया िाता ह,ै मैटेजलक भागों को (िो कंडक्टर के रूप में आिजयत नहीं ह)ै भूजम के साथ िो पृथक और सुजभन्न कनेक्िनों द्वारा भूसम्पर्कयत दकया गया है? (ii) क्या अथयिायर यांजत्रक नुकसान से मुि है? हााँ/नहीं (iii) क्या कंडयूट, अथिा लैड आिठरत िायटरंग की ििा में क्या हााँ/नहीं कंड्यूट अथिा लेड आिरण को िितापूियक भूसम् पर्कयत दकया गया ह?ै (iv) यदि उपभोिा का स्ट्ियं भूसंकपयन इलेक्रोड हो तो यह हााँ/नहीं बताएं दक क्या यह समुजचत रूप से जनष्पादित ह ै और .............ओम इसका परीिण कर जलया गया है? यदि हााँ तो भू-संपकयण प्रजतरोध का मान बताएं। 10. जिजनयम-44 क्या जिजनयम में पठरभाजषत उपयुि िमता के अिजिष्ट हााँ/नहीं करंट उपकरण प्रिान दकए गए हैं? 11. जिरोपठर लाइनें (i) यह बताएं दक क्या उपभोिा की कोई जिरोपठर लाइन है? हााँ/नहीं (ii) क्या उपभोिा के पठरसर के जनकट अन्य जिरोपठर लाइन हााँ/नहीं ह ै िो जिजनयम 60, 61 और 62 का अनुपालन करती हैं? यदि नहीं, तो ब्यौरा िीजिए। (iii) क्या सड़क क्ालसंग पर जिरोपठर लाइनों के जलए जिजनयम हााँ/नहीं 76 के तहत सुरिा की व्यिस्ट्था की गई ह?ै (iv) कोई अन्य ठटप्पजणयााँ। तारीख: जनरीिण अजधकारी/आपूर्तयकताय/स्ट्ि ामी/उपभोक् ता के हस्ट् तािर नाम....................... पिनाम................ िाईल सं................ प्रजतजलजप: कायायलय, जिद्युत जनरीिक................प्रेजषत *पृथक िीिार ट्यूबों या ब्रेकेटों, इलेक्रोजलयसय, जस्ट्िचों, छत के पंखों और (पोटेबल हैंड लैंपों और िहनीय उपस्ट्करों के अजतठरि) अन्य ऐसी दिटटंग पर तब तक नहीं लागू होगा िब तक दक िे अथय टर्मयनल के साथ न लगाए गए हों। प्रारूप-2 (जिजनयम (32) एि ं(45) िखे )ें (250 िोल्ट स ेअजधक तथा 650 िोल्ट स्ट्तर तक के अजधष्ठापन) ठरपोटय/आिेिन सं.................................. इलेजक् रकल इंस्ट् पेक् टर द्वारा जनरीिण अथिा आपूर्तयकता/स्ट्ि ामी/उपभोक् ता द्वारा स्ट्ि:प्रमाणन की तारीख.......... जपछले जनरीिण अथिा स्ट्ि:प्रमाणन की तारीख.........................................64 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] 1. उपभोिा सं..................................... 2. िोल्ट और प्रिाय की प्रणालीः (i) िोल्ट................ (ii) िेिों की संख्या............ (iii) ए.सी./डी.सी............... 3. उपभोिा अथिा स्ट्िामी का नाम...................................................... 4. उपभोिा अथिा स्ट्िामी का पता....................................................... 5. पठरसर की अिजस्ट्थजत....................................................................... 6. अजधष्ठापन की जिजिजष्टयां................................................................ (क) मोटरेः जनमायण संख्या एच.पी. ऐंजपयर िोल्ट (i) ........................................................................................................................... (ii) ........................................................................................................................... (ख) अन्य उपस्ट्कर (पूणय जििरण प्रस्ट्तुत दकया िाना ह)ै : (i) ............................................................................................................................ (ii) ............................................................................................................................ कुल कनेक् टेड लोड दकलोिाट/केिीए (ग) िनरेटर का जििरण यथा जनमायण, क्. सं. केिीए रेटटंग और िोल् ट : (i) …………………………………………………………………………………………………………………………… (ii) …………………………………………………………………………………………………………………… 7. अजधष्ठापन की सामान्य सजथजत: क्म स.ं जिजनयम स.ं अपिे ाएं ठरपोटय 1 जिजनयम-3 क्या अजभजहत व्यजियों का रजिस्ट्टर उजचत रूप से बनाया गया ह ै और हााँ/नहीं उसे अद्यतन रूप से सत्याजपत दकया गया है? 2 जिजनयम-14 (i) क्या दकसी भी यंत्र िायटरंग से संबंजधत ओिरलौंलडंग के दिखने हााँ/नहीं िाले संकेत ह?ैं (ii) क्या कोई अप्राजधकृत, अस्ट्थाई, अजधष्ठापन जिद्यमान है? हााँ/नहीं (iii) क्या जिद्युत प्रिाय लाइनें और संस्ट्थाजपत यंत्र इस प्रकार संरजित, हााँ/नहीं चाजलत और अनुरजित ह ैंजिससे खतरे से बचा िा सके? (iv) कोई अन्य साधारण ठटप्पणी। 3 जिजनयम-15 पठरसर के प्रिायकताय या स्ट्िामी द्वारा सर्ियस लाइन, केबल, तार, संतोषिनक/संतोषिनक उपकरण और ऐसी अन्य दिटटंग की जस्ट्थजत पर ठरपोटय िें। यदि नहीं संतोषिनक नहीं है तो जििरण िें।[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 65 4 जिजनयम-16 क्या प्रिायकत्ताय ििारा उपभोिा के पठरसर में पहुचाँ योग्य जस्ट्थजत में हााँ/नहीं लगाए गये कट आउट/सीबी पयायप्त रूप से आिठरत अजिरोधक आधान के भीतर ह?ैं 5 जिजनयम-17 (i) क्या लाईि कंडक्टरों पर जस्ट्िच लगाए गए हैं? हााँ/नहीं (ii) क्या जिजनयम के अनुसार स्ट्थायी प्रकृजत का ऐसा सूचक लगाया हााँ/नहीं गया है जिससे दक आईएस कलर कोड के अनुसार अथेड अथिा अथेड न्यूरल सुचालक को लाईि कंडक्टर से सुजभन्न दकया िा सके? (iii) क्या लसंगल िेि िोहरा खम्भा लौह आिठरत हााँ/नहीं जस्ट्िच/आइसोलेटर/सीबी की ििा में फ्यूि की बिाए न्यूरल पर सीधी लाइन लगाई ह?ै 6 जिजनयम-18 (i) क्या प्रिायकत्ताय द्वारा भू-सम् पर्कयत टर्मयनल लगाया गया है? हााँ/नहीं (ii) भ-ू सम् पकयन व्यिस्ट्था की सामान्य िश्ृ यता जस्ट्थजत। संतोषिनक/संतोषिनक नहीं 7 जिजनयम-19 (i) क्या भिन में अनािठरत कंडक्टर पहुचाँ के बाहर हैं? हााँ/नहीं (ii) क्या उनको जनजष्क्य करने के जलए सुगमता से पहुचाँ योग्य जस्ट्िच हााँ/नहीं लगाए गए ह?ैं 8 जिजनयम-20 क्या जहन्िी अथिा अंग्रेिी और जिले की स्ट्थानीय भाषा में सुसंगत हााँ/नहीं मानकों के अनुसार “खतरे की सूचना” सहििश्ृ य जस्ट्थजत में स्ट्थायी रूप से लगाई गई ह?ै 9 जिजनयम-21 (i) क्या इंसुलेटटंग फ्लोर अथिा मैंट उपलब्ध कराए गए हैं? हााँ/नहीं (ii) क्या पैनल के सामने और पीछे पैनल की पहचान उपलब्ध कराई हााँ/नहीं गई है? 10 जिजनयम-23 क्या इस जिजनयम के अधीन आने िाले िहनीय या पठरिहनीय उपस्ट्कर हााँ/नहीं के जलए प्रयुि नम्य केबल जिद्युत रोजधत और यांजत्रक िजत से पयायप्त रूप से संरजित ह?ै 11 जिजनयम-24 जिजभन्न कंडक्टरों के जलए प्रिान की गई मैटेजलक आिरण की ििा के संतोषिनक/संतोषिनक बारे में बताएं। नहीं 12 जिजनयम-26 क्या जिजभन्न िोल्ट पर प्रचालन करने के जलए सर्कयट अथिा उपस्ट्करों की हााँ/नहीं पहचान के जलए उन पर स्ट्थायी प्रकृजत के सूचक बनाये गये हैं? 13 जिजनयम-28 क्या सभी सर्कयटों अथिा उपस्ट्करों को इस प्रकार व्यिजस्ट्थत दकया गया हााँ/नहीं ह ै दक कोई भी पाटय यदि दकसी भी िोल्ट सीमा से अजधक िोल्ट, जिसके जलये यह आिजयत ह,ै से िघु यटनािि चािय हो िाता ह ै तो उसे कोई खतरा नहीं होगा? 14 जिजनयम-29 (i) क्या उत्पािन केंद्रों के मामले में मामूली जिद्युत अजि को बुझाने के हााँ/नहीं जलए समुजचत अजि िमन के अजतठरि सूखी रेत से भरी अजि बाल्टी को स्ट्पष्ट रूप से जचजननत दकया गया ह ै और उसे दकसी सहििश्ृ य स्ट्थान पर रखा गया ह?ै (ii) क्या प्राथजमक उपचार बॉक्स अथिा कपबोडों को स्ट्पष्ट रूप से हााँ/नहीं जचजननत और समुजचत रूप से लसै और उपलब्ध दकया गया है और उसका रखरखाि दकया िा रहा है?66 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] (iii) क्या प्राथजमक जचदकत्सा उपचार और िायर िाइटटंग में पयायप्त हााँ/नहीं संख्या में कमयचारी प्रजिजित ह?ैं 15 जिजनयम-30 (i) यह बताएं दक जिद्युत प्रघात से पीजड़त व्यजियों के आरोग्य लाभ हााँ/नहीं के जलए [ अंग्रेिी या लहिं ी में और जिले की स्ट्थानीय भाषा में] और िहााँ लहिं ी स्ट्थानीय भाषा ह,ै अंग्रेिी और लहिं ी में अनुिेि सहििश्ृ य स्ट्थान पर लगाए गए हैं? (ii) क्या अजभजहत व्यजि जिद्युत प्रघात से पीजड़त व्यजियों को होि हााँ/नहीं में लाने के जलए अनुिेि लागू करने में समथय है? 16 जिजनयम-36 चालकों और अथय के बीच मैगा ओह्म में जिद्युत रोधन प्रजतरोध बताएं। ………….मेगा ओम 17 जिजनयम-37 (i) क्या प्रिाय के प्रारंभ के स्ट्थल के जनकट उपयुि िुड़े हुए जस्ट्िच, हााँ/नहीं अथिा सर्कयट जियोिक लगाए गए हैं जिससे दक िे सुगमता से पहुचाँ योग्य हों और प्रिाय को पूणय रूप से जियोजित करने के जलए आसानी से चलाए िा सकें? (ii) क्या प्रत्येक सुजभन्न सर्कयट उपयुि सर्कयट ब्रेकर या कट आउट के हााँ/नहीं माध्यम से अजधक जिद्युत के जिरूि संरजित है? (iii) क्या मोटर या यंत्र को जनयंजत्रत करने के जलए प्रत्येक मोटर या हााँ/नहीं यंत्र के जनकट उपयुि िुड़ा हुआ जस्ट्िच या सर्कयट जियोिक लगाया गया ह?ै (iv) क्या यह सुजनजित करने के जलए पयायप्त पूियसािधाजनयााँ बरती हााँ/नहीं गई हैं दक कोई जिद्युन्मय भाग इस प्रकार अनािठरत नहीं है जिससे खतरा हो िाए? 18 जिजनयम-39 (i) क्या मुख्य जस्ट्िच बोडों के सामने पूरे 100 सेंटीमीटर का स्ट्थान हााँ/नहीं ह?ै (ii) क्या जस्ट्िच बोडय के पीछे का स्ट्थान की चौड़ाई 75 सेंटीमीटर स े हााँ/नहीं अजधक या 20 सेंटीमीटर से कम है? (iii) यदि जस्ट्िच बोडय के पीछे का स्ट्थान 75 सेंटीमीटर से अजधक हो तो हााँ/नहीं यह बताएं दक क्या जस्ट्िच बोडय के िोनों जसरों से आने िाने के मागय की ऊाँचाई 1.80 मीटर रखी गई है। 19 जिजनयम-43 (i) क्या प्रत्येक िनरेटर, जस्ट्थर मोटर और, िहााँ तक साध्य हो, हााँ/नहीं िहनीय मोटरों और सभी रांसिामयरों और अन्य यंत्रो, जिनका प्रयोग जिद्युत के जिजनयमन या जनयंत्रण के जलए दकया िाता ह,ै के धाजत्िक भागों को (िो चालको के रूप में आिजयत नहीं ह)ै और 250 िोल्ट से अजधक दकन्तु 650 िोल्ट से अनजधक िोल्ट पर जिद्युत की खपत करने िाले यंत्रों को भूजम के साथ िो पृथक और सुजभन्न कनेक्िनों द्वारा भू-सम्पर्कयत दकया गया ह?ै (ii) क्या दकसी जिद्युत प्रिाय लाइन या यंत्र को समाजिष्ट या संरजित हााँ/नहीं करने िाले धाजत्िक केस या धाजत्िक आिरणों को समुजचत रूप से भ-ू सम्पर्कयत और सभी िक्िन बाक्सों के आरपार इस प्रकार िोड़ा और संयोजित दकया गया ह ै जिससे यांजत्रक और जिद्युत संयोिन हो िाए? (iii) क्या उपभोिा का अथय इलेक्रोड समुजचत रूप से जनष्पादित है हााँ/नहीं और उसका परीिण कर जलया गया है? यदि हााँ, तो प्रजतरोध का ………ओम मान बताएं।[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 67 (iv) क्या अथय िायर यांजत्रक िजत से मुि है? हााँ/नहीं (v) क्या अथय प्रजतरोध मान का ठरकॉडय बना हुआ है? हााँ/नहीं (vi) क्या सुरिात्मक समजिभि बंधन का परीिण दकया गया ह?ै हााँ/नहीं (vii) क्या संस्ट्थापन के आदि में िॉल्ट लूप प्रजतबाधा परीिण दकया गया हााँ/नहीं ह?ै (viii) क्या प्रत्येक सर्कयट का िॉल्ट लूप प्रजतबाधा परीिण दकया गया हााँ/नहीं ह?ै (ix) क्या सभी स्रोतों के जलए िॉल्ट लूप प्रजतबाधा का परीिण दकया हााँ/नहीं गया ह?ै 20 जिजनयम-44 क्या जिजनयम में पठरभाजषत उपयिु िमता के अिजिष्ट करंट उपकरण हााँ/नहीं प्रिान दकए गए हैं? 21 जिजनयम-47 क्या उत्पािन ईकाइयों में सुरिा और इंटर लॉक दकया गया है? सुरिा हााँ/नहीं का जििरण दिया िाए। 22 जिरोपठर लाइनें (i) यह बताएं दक क्या उपभोिा की कोई जिरोपठर लाइनें है? हााँ/नहीं (ii) क्या उपभोिा के पठरसर के जनकट जिरोपठर लाइन जिजनयम 60, हााँ/नहीं 61 और 62 का अनुपालन करती ह?ै यदि नहीं, तो जििरण िें? (iii) क्या जिरोपठर लाइनों के जलए सुरिा की व्यिस्ट्था की है? हााँ/नहीं (iv) कोई अन्य ठटपजण्णयााँ। तारीख: जनरीिण अजधकारी/आपूर्तयकताय/स्ट्ि ामी/उपभोक् ता के हस्ट् तािर नाम....................... पिनाम................ िाईल सं................ प्रजतजलजप: कायायलय, जिद्युत जनरीिक................प्रेजषत प्रारूप-3 (जिजनयम 32 और 45 िखे )ें (650 िोल्ट स ेअजधक िोल्ट का अजधष्ठापन) ठरपोटय/आिेिन सं.................................. इलेजक् रकल इंस्ट् पेक् टर द्वारा जनरीिण अथिा प्रिायकताय/स्ट्ि ामी/उपभोक् ता द्वारा स्ट्ि:प्रमाणन की तारीख................... जपछले जनरीिण अथिा स्ट्ि:प्रमाणन की तारीख......................................... 1. उपभोिा सं..................................... 2. िोल्ट और प्रिाय की प्रणालीः (i) िोल्ट................ (ii) िेिों की संख्या............ (iii) ए.सी./डी.सी............... 3. उपभोिा अथिा स्ट्िामी का नाम......................................................68 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] 4. उपभोिा अथिा स्ट्िामी का पता....................................................... 5. पठरसर की अिजस्ट्थजत....................................................................... 6. अजधष्ठापन की जिजिजष्टयां................................................................ (क) रांसिामयर: (पूरा जििरण संलि दकया िाना ह)ै जनमायण क्.संख्या केिीए रेटटंग िोल्टेि रेटटंग प्रकार (i) ........................................................................................................................... (ii) ........................................................................................................................... (ख) िेनरेटर जििरण अथायत मेक, क्म संख्या, केिीए रेटटंग और िोल्टेि: (i) ........................................................................................................................... (ii) ........................................................................................................................... (ग) एचटी/एलटी जस्ट्िचजगयर/उपकरण के पूणय जििरण के साथ उपकरणों की सूची (उनकी रेटटंग के साथ प्रस्ट्तुत की िानी ह)ै : (घ) कुल संयोजित भार दकलोिाट/केिीए (संयोजित भार की पूणय सूची प्रस्ट्तुत की िानी है): 7. अजधष्ठापन की सामान्य सजथजत: क्. स.ं जिजनयम स.ं अपिे ाएं ठरपोटय 1 जिजनयम-3 क्या अजभजहत व्यजियों की सूची समुजचत रूप से बनाई और अनुप्रमाजणत हााँ/नहीं ओर अद्यतन रखी गई ह?ै 2 जिजनयम-5 क्या जनयमन के अधीन आिश्यक जिद्युत सुरिा अजधकारी अजभजहत दकया हााँ/नहीं गया ह?ै 3 जिजनयम-14 (i) क्या दकसी यंत्र के संबंध में ओिरलोलडंग के दिखने िाले संकेत हााँ/नहीं ह?ैं (ii) क्या कोई अप्राजधकृत अस्ट्थायी संस्ट्थापना जिद्यमान ह?ै हााँ/नहीं (iii) क्या मोटरों और जनयंत्रण उपस्ट्करों का आिजधक रूप से हााँ/नहीं ओिरहाल दकया िा रहा ह ैऔर रजिस्ट्टर में उसका अजभलेख रखा िा रहा है? (iv) क्या रांसिामयर तेल नमूनों का आिजधक रूप से परीिण दकया िा ………… केिी/एमएम रहा ह ै और पठरणाम रजिस्ट्टर में अजभजलजखत दकए िा रह े ह?ैं कृपया तेल के असंिाहक बल का मान बताएं। (v) क्या लाईटलनंग के जिरूि संरिण के जलए रांसिामयरों के जनकट हााँ/नहीं उपयुि लाईटलनंग अरेस्ट्टर लगाए गए हैं? (vi) क्या भ-ू प्रजतरोधक का आिजधक रूप से िषय में एक बार मापन हााँ/नहीं दकया िा रहा है और पठरणाम रजिस्ट्टर में अजभजलजखत दकए िा रह ेह?ैं अजभलेख की प्रजत संलग्न दकया िाना ह।ै (vii) कोई अन्य िोष या ििा िो खतरे का कारण बन सकती ह।ै यदि हााँ/नहीं हााँ, तो कृपया बताएं? (viii) क्या संचालन और रखरखाि डेटा को िीघ्र और आसान पुनप्राजय प्त हााँ/नहीं के जलए स्ट्पष्ट, िगीकृत और कम्प्यूटरीकृत दकया गया है? (ix) क्या 650 िोल्ट से अजधक िोल्टेि के इंस्ट्टॉलेिन या उपकरण के हााँ/नहीं[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 69 जलए अिजिष्ट िीिन मूल्यांकन और िीिन जिस्ट्तार काययक्म चलाए िा रह े हैं (15 िषय से अजधक पुराने प्रजतष्ठापनों या उपकरणों के जलए लागू)? (x) क्या उपकरण के जलए कारखाने में सभी आिश्यक प्रकार और हााँ/नहीं जनयजमत परीिण दकए गए हैं? उपरोि परीिण ठरपोटय और पठरणामों में कजमयां और जिसंगजतयां, यदि कोई हों, तो ठरपोटय की िाएं। (xi) भारतीय मानक अपेिाओं के संिभय में जिजनमायण में कोई त्रुठटया ाँ हााँ/नहीं यदि हों तो कृपया स्ट्पष्ट करें। 4 जिजनयम-15 पठरसर के प्रिायकताय या स्ट्िामी द्वारा सर्ियस लाइन, केबल, तार, संतोषिनक/संतोषिनक उपकरण और अन्य दिटटंग की जस्ट्थजत पर ठरपोटय िें। यदि संतोषिनक नहीं नहीं ह ैतो जििरण िें। 5 जिजनयम-16 क्या प्रिायकत्ताय ििारा उपभोिा के पठरसर में पहुचाँ योग्य जस्ट्थजत में हााँ/नहीं लगाए गये कट आउट/सीबी पयायप्त रूप से आिठरत अजिरोधक आधान के भीतर ह?ैं 6 जिजनयम-17 (i) क्या लाईि कंडक्टरों पर जस्ट्िच लगाए गए हैं? हााँ/नहीं (ii) क्या जिजनयम के अनुसार स्ट्थायी प्रकृजत का ऐसा सूचक लगाया गया हााँ/नहीं ह ै जिससे भूसम्पर्कयत या भूसम्पर्कयत न्यूरल कंडक्टर को लाईि कंडक्टर से सुजभन्न दकया गया ह?ै (iii) क्या लसंगल िेि िोहरा खम्बा लौह आिठरत जस्ट्िच/ सीबीएस की हााँ/नहीं ििा में फ्यूि की बिाए न्यूरल पर सीधी लाइन लगाई है? 7 जिजनयम-18 (i) क्या प्रिायकताय द्वारा भू-सम् पर्कयत टर्मयनल लगाया गया ह?ै हााँ/नहीं (ii) भ-ू सम् पकयन व्यिस्ट्था दक सामान्य िश्ृ यता जस्ट्थजत कैसी ह?ै संतोषिनक/ संतोषिनक नहीं 8 जिजनयम-19 (i) कय भिन में अनािठरत चालक पहुाँच के बाहर हैं? हााँ/नहीं (ii) क्या उनको जनजष्क्य करने के जलए सुगमता से पहुचाँ ने योग्य जस्ट्िच हााँ/नहीं लगाए गए ह?ैं 9 जिजनयम-20 क्या जहन्िी अथिा अंग्रेिी और जिले की स्ट्थानीय भाषा में सुसंगत मानकों हााँ/नहीं के अनुसार “खतरे की सूचना” सहििश्ृ य जस्ट्थजत में स्ट्थायी रूप से लगाई गई है? 10 जिजनयम-21 (i) क्या लाईि लाइन और उपस्ट्करों पर कायय करने की पिजत को हााँ/नहीं अपनाया गया ह?ै यदि हााँ, तो क्या अनुसूची-। के अनुसार सुरिा उपायों को अपनाया गया ह?ै (ii) क्या प्रासंजगक मानकों के अनुरूप इनसुलेटटंग फ्लोर अथिा मैट को हााँ/नहीं उपलब्ध कराया गया है? (iii) क्या पैनल के सामने और पीछे पैनल की पहचान को उपलब्ध कराया हााँ/नहीं गया ह।ै 11 जिजनयम-23 क्या इस जिजनयम के अधीन आने िाले िहनीय या पठरिहनीय उपस्ट्कर के हााँ/ नहीं जलए प्रयुि फ्लैक्सीबल केबल अजतजिद्युत-रोजधत और यांजत्रक िजत से पयायप्त रूप से संरजित है?70 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] 12 जिजनयम-24 जिजभन्न कंडक्टरों के जलए उपलब्ध कराई गई धाजत्िक उपकरण की ििा संतोषिनक/संतोषिनक बताएं। नहीं 13 जिजनयम-26 क्या जिजभन्न िोल्ट पर प्रचालन करने के जलए सर्कयट अथिा उपस्ट्करों की हााँ/नहीं पहचान के जलए उन पर स्ट्थायी प्रकृजत के सूचक बनाए गए हैं? 14 जिजनयम-28 क्या सभी सर्कयटों अथिा उपस्ट्करों को इस प्रकार व्यिजस्ट्थत दकया गया हााँ/नहीं ह ै दक कोई भी पाटय यदि दकसी भी िोल्ट सीमा से अजधक िोल्ट जिसके जलए यह आिजयत ह,ै िघू यटनािि चािय हो िाता ह ै तो उसे कोई खतरा नहीं होगा? 15 जिजनयम-29 (i) क्या उत्पािन केन्द्रों तथा संबंजधत उप-केंद्रो के मामले में अजि को हााँ/नहीं बुझाने के जलए समुजचत अजि िमन के अजतठरि सूखी रेत से भरी अजि बाल्टी को स्ट्पष्ट रूप से जचजननत दकया गया ह ै और उसे दकसी सहििश्ृ य स्ट्थ ान पर रखा गया ह?ै (ii) क्या प्राथजमक उपचार बॉक्स अथिा कपबोडों को स्ट्पष्ट रूप से हााँ/नहीं जचजननत और समुजचत रूप से लैस और उपलब् ध दकया गया है और उसका रखरखाि दकया िा रहा है? (iii) क्या प्राथजमक जचदकत्सा उपचार और िायर िाइटटंग में पयायप्त हााँ/नहीं संख्या में स्ट्टाि प्रजिजित ह?ैं 16 जिजनयम-30 (i) यह बताएं दक जिद्युत िॉक से पीजड़त व्यजियों के होि में लाने के हााँ/नहीं जलए (अंग्रेिी या लहिं ी में और जिले की स्ट्थानीय भाषा में) और िहां लहिं ी स्ट्थानीय भाषा है, अंग्रेिी और लहिं ी में अनुिेि सहििश्ृ य स्ट् थान पर लगाए गए ह ैं? (ii) क्या इस जनयमन में उजल्लजखत व्यजि जिद्युत िॉक से पीजड़त हााँ/नहीं व्यजियों को होि में लाने के जलए अनुिेि लागू करने में समथय है? 17 जिजनयम-36 चालको और अथय के बीच मेगा ओम में जिद्युत रोधन प्रजतरोधक बताएं। ..........मेगा ओम 18 जिजनयम-37 (i) क्या प्रिाय के प्रारंभ के स्ट्थल के जनकट उपयुि िुड़ा हुआ जस्ट्िच हााँ/नहीं अथिा सर्कयट ब्रेकर अथिा आपातकालीन ठरलपंग उपकरण लगाया गया ह,ै जिससे दक िह सुगमता से पहुचाँ योग्य हो और प्रिाय को पूणय रूप से जियोजित करने के जलए आसानी से चलाया िा सके? (ii) क् या रासिामयर के सेकेन्िी साइड पर पूणय करंट भार को िहन करने हााँ/नहीं और जियोजित करने के जलए उपयुि िुड़ा हुआ जस्ट्िच अथिा सर्कयट ब्रेकर लगाया गया ह?ै (iii) क्या प्रत्येक सुजभन्न सर्कयट को उपयुि सर्कयट ब्रेकर या कट आउट के हााँ/नहीं माध्यम से अजधक जिद्युत के जिरूि संरजित दकया गया है? (iv) 650 िोल्ट से अजधक दकन्तु 33 दकलोिोल्ट से अनजधक िोल्ट िाले हााँ/नहीं अन्य यंत्र या मोटर के जनकट मोटर या यंत्र की प्रिाय जनयंजत्रत करने के जलए उपयुि जस्ट्िच या सर्कयट ब्रेकर अथिा आपात कालीन ठरलपंग उपकरण लगाया गया ह?ै (v) क्या यह सुजनजित करने के जलए पयायप्त पूिय सािधाजनयां बरती गई हााँ/नहीं ह ैं दक कोई लाईि भाग इस प्रकार अनािठरत नहीं ह ै जिसस े खतरा हो िाए?[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 71 19 जिजनयम-39 (i) क्या मुख्य जस्ट्िच बोडों के सामने पूरे 100 सेंटीमीटर का स्ट्थान है? हााँ/नहीं (ii) क्या जस्ट्िच बोड़ो के पीछे से स्ट्थान की चौड़ाई 75 सेंटीमीटर से हााँ/नहीं अजधक या 20 सेंटीमीटर से कम है? (iii) यदि जस्ट्िच बोडय के पीछे का स्ट्थान की चौड़ाई 75 सेंटीमीटर से हााँ/नहीं अजधक हो तो यह बताएं दक क्या जस्ट्िच बोडय के िोनो जसरों से आने िाने के मागय की उंचाई 1.80 मीटर रखी गई है? 20 जिजनयम-46 (i) क्या सभी चालक और यंत्र, जिसके अंतगयत उनके लाईि भाग भी हैं, हााँ/नहीं पहुचाँ से बाहर ह?ै (ii) क्या मोटरों या अन्य यंत्रों का िाइंलडंग उपयुि रूप से संरजित ह?ै हााँ/नहीं (iii) क्या सबस्ट्टेिन या जस्ट्िलचंग स्ट्टेिन में 2000 लीटर से अजधक तेल हााँ/नहीं िाले उपकरण के बीच अन्िा उपकरणों और उपभोिा पठरसर के बीच अलगाि िीिारें एिं अजि बाधक िीिारें िैसा दक जिजनयमन के तहत आिश्यक ह,ै प्रिान की गई हैं? (iv) िहााँ दकसी एक तेल टंकी मे 9000 लीटर या उससे अजधक तेल का हााँ/नहीं उपयोग दकया गया है िहां, क्या उस तेल को जनकाल कर बाहर करने या हटाने की व्यिस्ट्था की गई ह ै िो ऐसी टंकी या टंदकयों से लीक हो सकता ह ैया जनकल सकता है? (v) क्या जिजनयमों के अनुसार उपयुि अजििमन प्रणाली प्रिान की गई हााँ/नहीं ह?ै (vi) क्या उपकेन्द्र के भीतर केबल युि खाइयों को गैर-ज्िलनिील हााँ/नहीं सामग्री से भर दिया गया ह ै या अज्ि लनिील पठट्टयों से पूरी तरह ढक दिया गया ह?ै (vii) क्या सुचालकों और यंत्रों को इस प्रकार व्यिजस्ट्थत दकया गया हैं दक हााँ/नहीं उन पर कायय करने के जलए उन्ह ेंभागों में जनजष्क्य दकया िा सके? 21 जिजनयम-47 क्या सुरिा और इंटर लॉक उपलब्ध कराए गए हैं? सुरिा योिनाओं और हााँ/नहीं उनकी रूपरेखाओं का जििरण िें। 22 जिजनयम-50 (i) क्या प्रजतष्ठापन के उन प्रत्येक मेटेजलक भागों, िो दक चालकों के रूप हााँ/नहीं में आिजयत नहीं, को भू-प्रणाली अथिा मैट के साथ कारगर ढंग से िो पृथक और सुजभन्न कनेक्िनों द्वारा भू-सम्पर्कयत दकया गया ह?ै (ii) क्या अथय िायर यांजत्रक नुकसान से मुि हैं? हााँ/नहीं (iii) क्या रांसिॉमयर और िेनरेटर पर न्यूरल पॉइंट को अथय के साथ िो हााँ/नहीं अलग और स्ट् पष् ट कनेक्िन द्वारा अथय दकया गया ह?ै (iv) क्या दकसी जिद्युत प्रिाय लाइन या यंत्र को अंतर्ियष्ट या संऱजित हााँ/नहीं करने िाले मैटेजलक केसों या आिरणों को समुजचत रूप से भू- सम् पर्कयत दकया गया है और िंक्िन बाक्सों के आर-पार इस प्रकार िोड़ा और संयोजित दकया गया है दक जिससे उसकी लंबाई में यांजत्रक और जिियुत संयोिन पूरे हो गए हैं? (v) क्या भ-ू संपकयन को समुजचत रूप से दकया गया ह ै और परीिण कर हााँ/नहीं जलया गया ह ै? यदि हााँ तो भूसंपकयन प्रजतरोध का मान बताएं? …………..ओम72 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] 23 जिजनयम-51 (i) क्या बाह्य (खम्बे की तरह को छोड़कर) उपकेन्द्र कम से कम 1.8 हााँ/नहीं मीटर ऊंचाई की बाड़ द्वारा िितापूियक संरजित कर दिया गया है? (ii) क्या एकल खंभे या एच खंभे पर रांसिामयर की माउंटटंग सुसंगत हााँ/नहीं मानक के अनुसार की गई ह?ै 24 जिजनयम-52 (i) िहां पर खम्भे की तरह के उपकेन्द्र के जलए प्लेटिामय की तरह के हााँ/नहीं जनमायण का प्रयोग दकया गया है, क्या िहां प्लेटिामय पर एक पुरूष के खड़े होने के जलए पयायप्त स्ट्थान रखा गया है? (ii) क्या हथपट्टी लगाई गई ह ै और इसे भ-ू संपकयन से संयोजित दकया हााँ/नहीं गया ह ै (यदि मैटेजलक है और उपकेन्द्र लकड़ी के आलम्बनो और लकड़ी के प्लेटिामय पर पठरजनर्मयत नहीं ह)ै ? 25 जिजनयम-53 क्या प्रत्येक स्ट्टैठटक कंडेन्सर के प्रिाय के जडस्ट्कनेक्िन पर, तत्काल या हााँ/नहीं स्ट्ित: जडस्ट्चाियर के जलए उपयुि व्यिस्ट्था की गई है? 26 जिरोपठर लाइनें (i) जिरोपठर लाइनों के प्रयुि चालकों का न्यूनतम माप क्या कंडक्टर का आकार..... ह?ै चालकों का प्रकार बताएं। (जिजनयम 57) (ii) क्या जिरोपठर लाइनों के कंडक्टर से उपर न्यूनतम ग्राउंड हााँ/नहीं की जक्लयरेंस जिजनयम 60 के अनुसार है? जक्लयरेंस के बारे में ………… मीटर बताएं। (iii) क्या िहां अजधकतम झोल के आधार पर िर्टयकल हााँ/नहीं जक्लयरेंस, िहां 650 िोल्ट से अजधक िोल्ट की लाइन दकसी भिन ………… मीटर या भिन के दकसी भाग के ऊपर से या समीप से गुिरती ह,ै जिजनयम-63 के अनुसार ह?ैं जक्लयरेंस के बारे में बताएं। (iv) क्या िायु िाब के कारण अजधकतम जििेप के आधार पर हााँ/नहीं जनकटतम चालक और ऐसे भिन के दकसी भाग के बीच हॉरीिोंटल ………… मीटर जक्लयरेंस जिजनयम-63 के अनुसार ह?ैं जक्लयरेंस के बारे में बताएं। (v) िहां जिजभन्न िोल्ट पर प्रणाली के भागरूप चालक उन्हीं हााँ/नहीं आलम्बों पर पठरजनर्मयत ह,ैं क्या लाइनमैनों और अन्य व्यजियों को जनम्नतर िोल्ट प्रणाली के उच्चतर िोल्ट प्रणाली से लीकेि द्वारा या सम्पकय में आने से उसकी सामान्य काययकरण िोल्ट से अजधक आिेजित हो िाने के खतरे के जिरूि रिा की जिजनयम-64 के अनुसार पयायप्त व्यिस्ट्था की गई है? (vi) िहां जिरोपठर लाइनें एक िसू रे को क्ॉस करती है या एक हााँ/नहीं िसू रे के समीप ह,ैं क्या िे एक िसू रे के सम्पकय में आने की संभािना के जिरूि जिजनयम-71 के अनुरूप ह?ैं (vii) क्या प्रत्येक रिक तार जिजनयम-72 के अनुसार प्रत्येक हााँ/नहीं ऐसे प्िाइंट पर, जिस पर उसकी जिद्युत जनरंतरता जियोजित होती ह,ै समुजचत रूप से भू-सम्पर्कयत है? (viii) (क) क्या जिरोपठर लाइनों के और उनसे संलि मैटल दिटटंगों के हााँ/नहीं मैटल सपोटय जिजनयम-74 के अनुसार स्ट्थायी रूप से और हााँ/नहीं िितापूियक भू-सम्पर्कयत दकए गए हैं? (ख) क्या प्रत्येक स्ट्टे िायर (उस ििा को छोड़कर िहां उसमें भूजम के कम से कम तीन मीटर की ऊंचाई पर जिद्युत रोधक लगाया गया ह)ै जिजनयम-74 के अनुसार भू-सम्पर्कयत ह।ैं[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 73 (ix) (क) क्या जिरोपठर लाइन को उसके टूटने की ििा में जिद्युत हाजन हााँ/नहीं रजहत करने के जलए जिजनयम-76 के अनुसार दकसी यन्त्र द्वारा हााँ/नहीं उपयुि रूप से संरजित दकया गया है? (ख) क्या जिजनयम-75 के अनुसार प्रत्येक आधार पर चढ़ाई-रोधी उपकरण प्रिान दकए गए ह?ैं (x) (क) क्या जिरोपठर लाइनों के स्ट्िामी ने ऐसी प्रत्येक लाइन, िो इस हााँ/नहीं प्रकार अनािठरत है दक उसे लाईटलनंग िजत हो सकती है, में हााँ/नहीं जिजनयम-77 के अनुसार लाईटलनंग के कारण जिद्युत सिय को अथय करने के जलए िि साधन अपनाएं हैं? (ख) क्या लाईटलनंग अरेस्ट्टसय स े अथय लीड को जिजनयम-77 के अनुसार पृथक अथय इलेक्रोड से कनेक्ट दकया गया है? (xi) क्या अप्रयुि जिरोपठर लाइनें जिजनयम-78 के अनुसार हााँ/नहीं सुरजित यांजत्रक ििा में बनाए रखी िा रही हैं? (xii) क्या िन जिभाग/ रेलिे/ पीटीसीसी/ रिा (एएचक्यू)/ हााँ/नहीं जसजिलनागर जिमानन िैसे प्राजधकरणों से सुसंगत मानकों के अनुसार कानूनी अनापजत्त िी िा चुकी ह?ै यदि हााँ, तो इसकी प्रजत संलि करें। (xiii) कोई अन्य ठटप्पजणयााँ। उपरोि के अलािा, यदि लागू हो, तो जनम्नजलजखत जिद्युत उपकरण िार परीिण जििरण दिया िाना चाजहए: क्.स.ं उपकरण की गई िाचं िाचं पठरणाम ठटप्पणी 1. फ्यूि सजहत संपकय (i) यांजत्रक प्रचालन सुचारण/गड़बड़ी युि जस्ट्िच (ii) फ्यूि की रेटटंग ----------एम्पीयर (iii) ब्लेड का संपकय पूणय/आंजिक 2. आइसोलेटर (i) यांजत्रक प्रचाल िीक/िीक नहीं क्म संख्या:- (ii) िरू स्ट्थ प्रचाल िीक/िीक नहीं जनमायण:- (iii) स्ट्थानीय प्रचाल िीक/िीक नहीं िमता:- (iv) संपकय प्रजतरोध का माप .........माइक्ो ओम (v) अथय जस्ट्िच के साथ इंटरलॉक िीक/िीक नहीं (vi) सर्कयट ब्रेकर के साथ इंटरलॉक िीक/िीक नहीं (vii) आई.आर.मान िेि-िेि िेि-अथय • खुली जस्ट्थजत ........... मगे ा ओम • बंि जस्ट्थजत ........... मगे ा ओम 3. सर्कयट ब्रेकर (i) सर्कयट ब्रेकर की रेटटंग (सर्कयट ब्रेकर • प्रकार ----------------- स्ट् थान और संख्या) • बोल्ट ---------------केिी सर्कयट ब्रेकर • सामान्य करंट ----------एम्पीयर74 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] जनयंत्रण सर्कयट • रपचटरंग िमता --------------केए (ii) आई.आर. मान िेि-िेि िेि-अथय • खुली जस्ट्थजत ........... मगे ा ओम • बंि जस्ट्थजत ........... मगे ा ओम (iii) संपकय प्रजतरोधक गजतिील संपकय प्रजतरोध .............माइक्ो ओम माप सजहत (iv) यांजत्रक प्रचालन तुरंत सुचारू/समय अंतराल (से.) (v) िरू स्ट्थ प्रचालन िीक/िीक नहीं (vi) स्ट्थानीय प्रचालन िीक/िीक नहीं (vii) आइसोलेटर के साथ इंटरलॉककंग िीक/िीक नहीं (viii) अथय जस्ट्िच के साथ इंटरलॉककंग िीक/िीक नहीं (ix) ओटीआई/ड्ब्लूटीआई/बुखहोल्ि/पीआरिी के िीक/िीक नहीं जलए अलामय और ठरप (x) अथय िाल्ट ठरले िीक/िीक नहीं (xi) ओिर करंट ठरले िीक/िीक नहीं (xii) अंडर िोल्ट ठरले िीक/िीक नहीं (xiii) अन्य सुरिा अलामय िीक/िीक नहीं (xiv) क्या जिजनयम 37 के सभी प्रािधान िीक/िीक नहीं संतोषिनक हैं? 4. रांसिामयर (i) इनसुलेिन प्रजतरोधक मान रांसिामयर • एचटी से एलटी -----------मेगा ओम संख्या, स्ट्थान, • एचटी से अथय ----------- मेगा ओम (रांसिामयर • एलटी से अथय ----------- मेगा ओम क्.सं. जनमायण, (ii) ब्रेक डाउन िोल्ट िांच िमता, • तेल नमूना-I (िीषय) ………… केिी िोल्टेि अनुपात,) • तेल नमूना- II (तल) ………… केिी (iii) िेक्टर समूह िांच िीक/िीक नहीं (iv) ध्रुिता िांच िीक/िीक नहीं (v) चुम्बकीय संतुलनः िीक/िीक नहीं (vi) टैन डेल्टा िांच (िमतानुसार) िीक/िीक नहीं (vii) संरिी टंकी में तेल स्ट्तरः िीक/िीक नहीं (viii) ब्रीथर कप में तेल स्ट्तर: िीक/िीक नहीं (ix) ओटीआई/ड्ब्लूटीआई सेटटंग ए/टी-----0c ए/टी----0c[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 75 (x) ओटीआई/ड्ब्लूटीआई अलामय ि ठरप प्रचालन िीक/िीक नहीं (xi) बुखहोल्ि ठरले का प्रचालन िीक/िीक नहीं (xii) पीआरिी का प्रचालन िीक/िीक नहीं (xiii) तेल ठरसाि िीक/िीक नहीं (xiv) िुष्क रांसिर के जलए डोर जस्ट्िच का िीक/िीक नहीं इंटरलॉक (xv) साईड जक्लयरेंस के जलए • साइड क्लीयरेंस: --------- सेमी • िो रान्सफ़ॉमयर के बीच -------- मीटर (xvi) बॉडी अथय प्रजतरोधन ------ओम (xvii) न् यूरल अथय प्रजतरोधन एन ------ ओम 1 एन ------ ओम 2 (xviii) प्रयुक् त अथय फ्लैट साइि सामग्री • िरीर: ------------- • तटस्ट्थ ------------- (xix) ऑनलोड का संचालन और ऑफ़लोड टैप िीक/िीक नहीं चेंिसय (xx) स्ट्िीप फ्रीिेंसी रेिोनेंस जिश्लेषण परीिण िीक/िीक नही (एसएिआरए) (xxi) असंिाहक आिृजत्त अनुनाि जिश्लेषण िीक/िीक नहीं (डीएिआरए) (xxii) आंजिक जनियहन परीिण िीक/िीक नहीं 5. डीिी (i) िेनरेटर का प्रकार िीक/िीक नहीं िेनरेटर: (ii) िसू रे आपूर्तय सूत्रों के साथ इंटरलॉककंग िीक/िीक नहीं िेनरेटर संख्या, (iii) बॉडी अथय प्रजतरोध ------ओम स्ट्थान (iv) न् यूरल अथय प्रजतरोध एन ------ ओम 1 (अल्टरनेटर और एन ------ ओम 2 इंिन क्.सं., (v) प्रयुक् त अथय फ्लैट साइि सामग्री (Cu/Al) जनमायण, • बॉडी: ----------- िमता ) • तटस्ट्थ: ----------- (vi) िेनरेटर सुरिा ब्यौरे 6. 6केबल (i) इन्सुलेिन प्रजतरोध मान . (जििरण दिया • िेि-िेि ............मगे ा ओम िाना ह:ै • िेि-अथय ............मेगा ओम आकार, लंबाई, • िेि-अथय+अन्य िेि ............मगे ा ओम76 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] प्रकार) (ii) केबल रे दिया गया/नहीं दिया गया (iii) केबल रे अर्थंग िीक/िीक नहीं (iv) केबल बेलडंग रेजडयस िीक/िीक नहीं..मीटर 7. 7पैनल (i) पैनलों की संख्या …………….. . (ii) पैनल का स्ट्थान पठरबि होना (iii) पैनल की रेटटंग एम्पीयर (iv) मुख्य बस बार का आकार और ितयमान रेटटंग …………. एमएम, और पैनल के जितरण बस बार …………..एम्पीयर (v) क्या पैनल का बस बार आकार पैनल की हााँ/नहीं रेटटंग के जलए उपयुि ह?ै (vi) पैनल का आईपी संरिण …………… (vii) केबल प्रजिजष्ट का प्रकार टॉप एंरी / बॉटम एंरी (viii) इनकमसय की संख्या और एक पैनल में बस संख्य ा ………… कप्लसय (ix) सर्कयट ब्रेकसय की रेटटंग एम्पीयर (x) पैनल में प्रत्येक रेटटंग के एमसीसीबी की संख्य ा ………… संख्या (xi) प्रत्येक रेटटंग के स्ट्पेयर एमसीसीबी की संख्या संख्य ा ………… (xii) िीिार से पैनल का क्लीयरेंस एमएम (xiii) िो पैनल यानी आसन्न पैनल के बीच का एमएम क्लीयरेंस (xiv) क्या जिजनयम 39 के सभी प्रािधानों का हााँ/नहीं पालन दकया गया? (xv) पैनल की अर्थंग के जलए उपयोग की िाने ……..स्ट् क् िायर एमएम िाली अथय जस्ट्रप का आकार 8. 8अर्थंग (i) अथय जस्ट्रप्स का धातु और आकार Cu/Al/GI . (ii) अर्थंग का प्रकार प्लेट/पाइप/समरूप (iii) अथय इलेक्रोड का स्ट्थान और संख्या ........स्ट् क् िायर एमएम (iv) प्रत्येक अथय इलेक्रोड और जग्रड के अथय .........ओम प्रजतरोध का मान (v) अथय मैट प्रजतरोध .........ओम 9. 9जिभि रांसिामयर (i) अनुपात परीिण िीक/िीक नहीं . (ii) ध्रुिीयता परीिण िीक/िीक नहीं (iii) तेल की बीडीिी ----------केिी[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 77 (iv) आईआर परीिण (आर) पी-ई---मेगा ओम (िाई) पी-ई---मेगा ओम (बी) पी-ई---मेगा ओम (v) टैन डेल्टा और धाठरता माप …………………. 10. 1करंट रांसिामयर (i) अनुपात परीिण िीक/िीक नहीं 0 (ii) ध्रुिीयता परीिण िीक/िीक नहीं . (iii) तेल की बीडीिी ----------केिी (iv) आईआर परीिण (आर) पी-ई---मेगा ओम (िाई) पी-ई---मेगा ओम (बी) पी-ई---मेगा ओम (v) टैन डेल्टा और धाठरता माप …………………. 11. 1ओिर हेड लाइन (i) डीपी संरचना के खंभो का आकार ............ 1और डीपी संरचना (ii) िेि-िेि और अथय से िेि के बीच जनकासी। …………….. . (iii) कंडक्टरों का ग्राउंड क्लीयरेंस ………………. (iv) ओिर हडे लाइन के रूट पर इलेजक्रकल िीक/िीक नहीं क्लीयरेंस की िांच (v) चौराहों पर रखिाली और जनकासी की िााँच िीक/िीक नहीं (vi) खंभों के आधार की िांच करें िीक/िीक नहीं (vii) अर्थंग व्यिस्ट्था िीक/िीक नहीं (viii) ओिर हेड लाइन में उपयोग दकए िाने िाले ………………… कंडक्टरों का न्यूनतम आकार क्या है? कंडक्टर के प्रकार बताएं। (ix) क्या जिजनयम 60, 62, 63, 64, 71, 72 हााँ/नहीं और 74 के सभी प्रािधान संतोषिनक हैं। सामान्य अिलोकन: 1. 1 (i) िेि-िेि, िेि-ग्राउंड और सेक्िनल . क्लीयरेंस की िांच 2. 2 (ii) अलग-अलग उपकरणों की जनमायण परीिण . ठरपोटय की िांच (प्रजतयां संलि करें) 3. 3 (iii) सामान्य अिलोकन और जिचार (जिजनयमों . की आिश्यकताओं से जिजिष्ट जिचलन स्ट्पष्ट रूप से सामने लाया िाए)78 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] तारीख: प्रिायकताय/माजलक/उपभोिा के हस्ट्तािर नाम______________________ पि_________________ िाइल संख्या सेिा में: ……………….के जलए, जिद्युत जनरीिक का कायायलय (प्रिायकता/यस्ट्ि ामी/उपभोिा द्वारा स्ट्ि:प्रमाणन के जलए) प्रमाणपत्र (केजिप्रा के जिजनयम 32 एि ं45 के अधीन (सरु िा और जिद्यतु आपर्ू त यस ेसबं जं धत उपाय) जिजनयमन, 2023) यह प्रमाजणत दकया िाता ह ैदक जिद्युत स्ट्थापना सभी तरह से पूणय ह ैऔर काम सीईए (जिद्युत आपूर्तय और सुरिा से संबंजधत उपाय) जिजनयम, 2023 और सुसंगत मानकों के अनुरूप दकया गया ह।ै दकए गए साइट परीिण िीक पाए गए हैं और जबना दकसी खतरे के उपकरण को संचाजलत करना जिद्युत रूप से सुरजित है। संलिः परीिण ठरपोटय (हस्ट्तािर)_____________________________ (हस्ट्तािर) स्ट्ि-जनरीिण अजधकारी/स्ट्ि-प्रमाजणत आपूर्तयकताय/या स्ट्िामी/उपभोिा चाटयडय जिद्युत सुरिा अजभयंता नाम __________________________________ नाम िस्ट्तािेि संख्या ____________________ सेिा में: ……………….के जलए, जिद्युत जनरीिक का कायायलय जनरीिण ठरपोटय के प्रारूप [जिजनयम (32) का उप-जिजनयम (3) िखे ]ें प्रारूप 4 (खान म ेंजिद्यतु प्रजतष्ठापन) ठरपोटय संख्या __________________________________ जनरीिण की तारीख : अंजतम जनरीिण की तारीख __________________ जनरीिण अजधकारी का नाम: 1. खान का नाम: 2. स्ट् िामी का नाम: 3. अजभकताय का नाम: 4. खान प्रबंधक का नाम: 5. कोजलयरी इंिीजनयर का नाम: 6. सुरिा अजधकारी का नाम: 7. अजभजहत जिद्युत सुरिा अजधकारी का नाम: 8. जिद्युत पययिेिक का नाम: 9. िकयमैन जनरीिक (जिद्युत) का नाम: 10. अजभयंता का नाम (संबंजधत अनुभाग):[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 79 11. िर्कंग सीम का नाम: 12. काययिील जिले का जनरीिण दकया: 13. जनरीिण के िौरान साथ गए व्यजियों के नाम: 14. िोल्टेि और आपूर्तय की प्रणाली: (i) िोल््स ________________ (ii) िेिों की संख्या _____________ (iii) एसी/डीसी _______________ 15. खान योिना के अनुसार स्ट्थाजपत प्रजतष्ठापनों/उपकरणों और उनके स्ट्थान का जििरण: 16. रोिनी का स्ट्तर: 17. मीथेन/अन्य जिस्ट्िोटक गैस का प्रजतित : 18. भूजमगत खिान के मामले में िाई बल्ब तापमान, िेट बल्ब तापमान: 19. भूजमगत खिान के मामले में हिा का िेग/गजत: 20. स्ट्थापना की सामान्य जस्ट्थजत: क्.स.ं जिजनयमन सख्ं या अपिे ाएं ठरपोटय 1. जिजनयमन-98 हर साल िरिरी के पहले दिन या उससे पहले, अनुसूची हां/नहीं IX या अनुसूची-X, िो भी लागू हो, में दिए गए िॉमय में नोठटस भेिा िाता ह।ै 2. जिजनयमन-99 इस जिजनयम के अधीन जिजनर्ियष्ट योिनाएाँ खान प्रबंधक हां/नहीं के कायायलय में रखी िाती ह ैं और खानों के जिद्युत जनरीिक को उपलब्ध रहती ह।ैं 3. जिजनयमन-100 (i) क्या खानों में चकाचौंध और तनाि पैिा दकए जबना हां/नहीं जबिली द्वारा पयायप्त रोिनी प्रिान की गयी ह?ै संतोषिनक/संतोषिनक नहीं (ii) क्या िहां उप-जिजनयम (1) जिजनयम 107 के अधीन हां/नहीं खान में जस्ट्िचजगयर खड़ा दकया गया है उस लबंि ु से संतोषिनक/संतोषिनक नहीं िाफ्ट तल के बीच और अन्य जितरण केंद्र के बीच संचार के कुिल साधन प्रिान दकए गए हैं? (iii) क्या केबल, टेलीकम्यूजनकेिन और जसिललंग हां/नहीं उपकरण के अलािा, उपकरण िाले प्रत्येक स्ट्थान पर संतोषिनक/संतोषिनक नहीं पयायप्त िमता और अनुमोदित प्रकार के आग बुझाने के उपकरण स्ट्थाजपत और िीक से बनाए रखे गए हैं? (iv) िहां डंपर या रैकलेस िाहन संचाजलत दकए िा रहे हां/नहीं ह,ैं िहां ओिर हेड लाइन या ओिर हेड केबल के सबसे जनचले कंडक्टर की िमीन के ऊपर न्यूनतम जनकासी ह,ै जिसकी ऊंचाई बारह मीटर से कम नहीं ह।ै 4. जिजनयमन-101 (i) क्या यांजत्रक िजत के खतरे को रोकने के जलए हां/नहीं रांसिामयर और जस्ट्िचजगयर को अलग-अलग कमरे, जडब्बे या बॉक्स में रखा गया है? (ii) क्या कमरा, कम्पाटयमेंट या बॉक्स कािी हि तक हां/नहीं80 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] बना हुआ ह ैऔर सूखा और रोिन रखा गया है? (iii) क्या उसमें स्ट्थाजपत सभी उपकरणों के जलए कुिल हां/नहीं िेंठटलेिन प्रिान दकया गया ह?ै 5. जिजनयमन-102 (i) क्या खिान की सतह पर और खिान के जिद्युत हां/नहीं जनरीिक द्वारा अनुमोदित तरीके से एक अर्थंग जसस्ट्टम से िोड़कर अर्थंग की गयी ह?ै (ii) क्या सभी मैटेजलक िीथ, किटरंग, हैंडल, िॉइंट हां/नहीं बॉक्स, जस्ट्िचजगयर फ्रेम, इंस्ट्ूमेंट किर, बॉक्स के संतोषिनक/संतोषिनक नहीं जस्ट्िच और फ्यूि किर, सभी लैंप होल्डर िब तक दक िें आग प्रजतरोधी सामग्री से बने इंसुलेटेड किर से कुिलतापूियक संरजित न हों, तथा िेनरेटर, रांसिॉमयर, मोटसय, पोटेबल मोटसय सजहत, के फ्रेम और बेडप्लेट को जिजनयम-102 में जनर्ियष्ट तरीके से एक अर्थंग जसस्ट्टम के कनेक्िन से िोड़ा गया ह?ै (iii) क्या अर्थंग जसस्ट्टम के सभी कंडक्टर की चालकता, हां/नहीं सभी भागों और सभी िोड़ों में, सबसे बड़े कंडक्टर जिसका उपयोग पूरी तरह से उपकरण की आपूर्तय के जलए दकया गया ह,ै की चालकता की कम से कम पचास प्रजतित के बराबर ह?ै 6. जिजनयमन-116 क्या जिजनयम-102 में जनर्ियष्ट तरीके से कनेक्िन और हां/नहीं जसस्ट्टम द्वारा न् यूरल या मध्य-लबंि ु को अर्थंग जसस्ट्टम से िोड़ा गया ह?ै 7. जिजनयमन-103 (i) क्या स्ट्िचाजलत रूप से जसस्ट्टम के दकसी भी जहस्ट्से में हां/नहीं आपूर्तय जडस्ट्कनेक्ट हो िाता है, िहां अथय िॉल् ट सजहत िॉल् ट होता ह?ै और क्या जबिली आपूर्तय की प्रजतबंजधत न् यूरल प्रणाली को इस प्रकार जडज़ाइन दकया गया ह ै दक िॉल् ट करंट की मात्रा जनर्ियष्ट मान तक सीजमत रह?े (ii) क्या जस्ट्िचजगयर और ठरले का संचालन प्रजतदिन हां/नहीं उत्पािन स्ट्टेिन, सबस्ट्टेिन या जस्ट्िच स्ट्टेिन पर इस उद्देश्य के जलए रखे गए रजिस्ट्टर में ििय दकया िाता ह?ै (iii) क्या जस्ट्िचजगयर और सुरिात्मक प्रणाली की हां/नहीं प्रभाििीलता को हमेिा चालू हालत में रखा और अनुरजित दकया िाता ह?ै (iv) क्या जस्ट्िचजगयर और सुरिात्मक प्रणाली की हर हां/नहीं तीन महीने में एक बार िााँच की िाती ह ैऔर उसके पठरणाम इस उद्देश्य के जलए रखे गए एक अलग रजिस्ट्टर में ििय दकए िाते है? 8. जिजनयमन-104 (i) क्या खिान में जबिली 11000 िोल्ट से अजधक हां/नहीं िोल्टेि पर प्रेजषत होती है और उसमें 6600 िोल्ट से अजधक िोल्टेि पर उपयोग की िाती है? (ii) क्या हैंड-हल्े ड पोटेबल उपकरण का िोल्टेि 125 हां/नहीं[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 81 िोल्ट से अजधक नहीं ह?ै लागू/लागू नहीं (iii) भूजमगत खिानों में, क्या प्रकाि व्यिस्ट्था में अथय से हां/नहीं िुड़ा एक मध्य या न् यूरल लबंि ु है और िेिों के बीच लागू/लागू नहीं िोल्टेि 125 िोल्ट से अजधक नहीं है? (iv) क्या खिान की सतह पर या खुली खिान में प्रकाि हां/नहीं व्यिस्ट्था का न् यूरल या मध्य लबंि ुअथय से िुड़ा है और िेिों के बीच िोल्टेि 250 िोल्ट से अजधक नहीं ह?ै (v) क्या खिान या तेल िेत्रों के भूजमगत कामकाि में हां/नहीं उपयोग दकए िाने िाले पोटेबल हैंड-लैंप का िोल्टेि लागू/लागू नहीं 30 िोल्ट से अजधक नहीं ह?ै 9. जिजनयमन-105 िहां जबिली को रूपांतठरत दकया िाता है, क्या िहां पर हां/नहीं जनम्न िोल्टेि तंत्र के गलती से उच्च िोल्टेि उपकरण से लीकेि या संपकय में आ िाने के कारण अपने सामान्य िोल्टेि से अजधक चािय हो िाने से उत्पन्न खतरे से बचाि के जलए उपयुि प्रािधान दकया गया है? 10. जिजनयमन-107 (i) क्या जबिली की आपूर्तय को काटने के जलए िीक से हां/नहीं जनर्मयत जस्ट्िचजगयर को खान के जिद्युत जनरीिक द्वारा अनुमोदित लबंि ुपर प्रिान दकया गया है? (ii) िब जस्ट्िचजगयर से जबिली की आपूर्तय करने िाली हां/नहीं कोई केबल या ओिरहैड लाइन चालू हो, तो क्या संचाजलत करने के जलए उि जस्ट्िचजगयर अजभजहत व्यजि की आसान पहुचं के भीतर उपलब्ध ह?ै (iii) क्या जबिली से चलने िाला मुख्य मैकेजनकल हां/नहीं िेंठटलेटर जस्ट्िचजगयर के साथ इंटरलॉक दकया गया लागू / लागू नहीं ह ै तादक मुख्य मैकेजनकल िेंठटलेटर के बंि होने की जस्ट्थजत में जबिली की आपूर्तय को स्ट्िचाजलत रूप से जडस्ट्कनेक्ट दकया िा सके? (iv) क्या प्रत्येक मोटर को जस्ट्िचजगयर द्वारा जनयंजत्रत हां/नहीं दकया िाता ह ै जिसे इस तरह से व्यिजस्ट्थत दकया गया हो दक मोटर से और उससे िुड़े सभी उपकरणों से आपूर्तय को जडस्ट्कनेक्ट दकया िा सके और क्या ऐसे जस्ट्िचजगयर को मोटर संचाजलत करने के जलए अजभजहत व्यजि द्वारा आसानी से संचाजलत करने के जलए रखा िाता ह?ै (v) क्या जस्ट्िचजगयर को इस तरह रखा गया है, ओिर- हां/नहीं करंट, ओिर-िोल्टेि और लसंगल िेलिंग की जस्ट्थजत में स्ट्िचाजलत रूप से आपूर्तय को जडस्ट्कनेक्ट कर िेता ह?ै (vi) क्या सहायक पंखे के बंि होने की जस्ट्थजत में जबिली हां/नहीं की आपूर्तय के स्ट्ित: जडस्ट्कनेक्ट हो िाने के जलए लागू / लागू नहीं िमीन के नीचे कोयला खिान के इन- बाय-िेस उपकरण को जबिली की आपूर्तय को जनयंजत्रत करने िाले जस्ट्िचजगयर के साथ सहायक पंखा इंटरलॉक82 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] दकया गया ह?ै 11. जिजनयम-108 (i) क्या सभी केबल जिद्युत-रोधी पिाथय से आिृत ह ैंऔर हां/नहीं यांजत्रक िजत से िितापूियक सुरजित ह ैं और पयायप्त संतोषिनक/संतोषिनक नहीं रूप से जनरंतर अंतराल पर और ऐसी ठरजत से समर्थयत ह ैदक ऐसे केबलों को नुकसान से बचाया िा सके? (ii) क्या सभी केबल धातु के आिरण से सुरजित ह ैं और हां/नहीं जिसमें एक पठरपथ (सर्कयट) के सभी सुचालक होते संतोषिनक/संतोषिनक नहीं ह ैं और धातु-आच्छादित केबलों का आच्छि और आमयडय केबलों की धातु आमयटरंग की मोटाई सुसंगत मानक में अनुिंजसत मोटाई से कम नहीं है? (iii) क्या प्रत्येक केबल का धातु आिरण जिद्युत और हां/नहीं यांजत्रक रूप से जनरंतर है और उसे जिजनर्ियष्ट संतोषिनक/संतोषिनक नहीं सुचालकता के अर्थंग प्रणाली के कनेक्िन द्वारा अथय दकया गया ह ैऔर िंग से प्रभािी रूप से सुरजित है? (iv) क्या प्रत्येक केबल के धातु आिरण में सभी भागों में हां/नहीं और सभी िोड़ों में कम से कम पचास प्रजतित के संतोषिनक/संतोषिनक नहीं बराबर सुचालकता ह,ै िो उि धातु आिरण से जघरे सबसे बड़े सुचालक की चालकता के बराबर है? (v) क्या केबल और सुचालक िहां मोटर, रांसिामयर, हां/नहीं जस्ट्िचजगयर और अन्य उपकरण से िुड़े हैं, स्ट्थाजपत हैं संतोषिनक/संतोषिनक नहीं तादक धातु आिरण को उपकरण से सुरजित रूप से िोड़कर िे यांजत्रक रूप से सुरजित रह ें और प्रत्येक केबल अंत में जिद्युत-रोधी सामग्री को िितापूियक सील कर दिया गया ह ै तादक इसके जिद्युत-रोधी गुणों में कमी को रोका िा सके? (vi) क्या घषयण को रोकने या गैस-िकड़न को सुरजित हां/नहीं करने के जलए िीक से सुजनर्मयत और प्रमाजणत ग्ल ैडों या बुिों का उपयोग दकया गया है? 12. जिजनयम-109 (i) क्या पोटेबल या रांसपोटेबल उपकरण के जलए हां/नहीं उपयोग दकए िाने िाले लचीले केबल ऐसे जिद्युत- रोधी पिाथय से आिृत ह ैंिो यांजत्रक िजत से सुरजित रहगें े? (ii) क्या केबल का लचीला धातु आिरण है, जिसका हां/नहीं उपयोग स्ट्ियं अथय सुचालक के जबना ऐसे उपकरण के जलए अथय कंडक्टर बनाने के जलए दकया िाता है? (iii) क्या प्रत्येक लचीली केबल िो पोटेबल या हां/नहीं रांसपोटेबल उपकरण के साथ उपयोग के जलए आिजयत ह,ै िीक से जनर्मयत कनेक्टसय द्वारा जसस्ट्टम और ऐसे उपकरणों से िुड़ा हुआ है? (iv) प्रत्येक लबंि ु पर िहां लचीले केबल मुख्य केबल से हां/नहीं िुड़े होते ह,ैं क्या एक सर्कयट ब्रेकर प्रिान दकया िाता ह ै िो ऐसे लचीले केबलों से आपूर्तय को[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 83 स्ट्िचाजलत रूप से जियोजित करने में सिम होता है? (v) क्या पोटेबल या रांसपोटेबल मिीन से िुड़ी प्रत्येक हां/नहीं लचीली केबल की समय-समय पर अजभजहत व्यजि द्वारा िांच की िाती ह?ै (vi) क्या दकसी पोटेबल या रांसपोटेबल के साथ हां/नहीं जिजनर्ियष्ट लंबाई से अजधक लचीली केबल का उपयोग दकया िा रहा ह?ै (vii) क्या पोटेबल या रांसपोटेबल उपकरण से जभन्न अन्य हां/नहीं उपकरण के साथ लचीले केबल का उपयोग दकया िाता ह?ै 13. जिजनयम-110 क्या सभी पोटेबल और रांसपोटेबल मिीनें सुसंगत हां/नहीं उपबंध से संबंजधत जस्ट्िचजगयर से ठरमोट कंरोल पर काम करती ह?ैं 14. जिजनयमन-111 (i) क्या सभी उपकरणों को उजचत रूप से धूल, गंिगी हां/नहीं और नमी से मुि रखा गया है, और बाधा से मुि संतोषिनक/संतोषिनक नहीं रखा गया ह?ै (ii) क्या लहिं ी और जिले की स्ट्थानीय भाषा में जनम्नजलजखत सूचनाएं इस प्रकार जडिाइन और हां/नहीं संरजित की गयी ह ैंदक िे सभी समय पर आसानी से पढ़ी िा सकें, और िें जनम्नजलजखत स्ट्थानों पर हां/नहीं प्रिर्ियत की गयी ह:ैं- • िहां जिद्युत उपकरणों का उपयोग दकया िा रहा है, ऐसे उपकरणों के संचालन या अन्यथा हस्ट्तिेप करने के जलए अनामजनर्ियष्ट व्यजियों को जनजषक करने िाली सूचना; • खान के अंिर या सतह पर िहां टेलीिोन या संचार के अन्य साधन उपलब्ध कराए िाते हैं, खिान की सतह पर व्यजि को पूणय अनुिेि िेने िाली सूचना, खिान में जिद्युत की आपूर्त य बंि करने के जलए िारी दकया गया है? (iii) क्या पोटेबल और रांसपोटेबल उपकरण सजहत सभी हां/नहीं उपकरण केिल उन व्यजियों द्वारा संचाजलत दकए िाते ह ैं िो इस प्रयोिन के जलए अजभजहत दकए गये ह?ै (iv) िहां लचीले केबलों के साथ बोल्ट प्रकार से जभन्न हां/नहीं प्लग-एंड-सॉकेट-कपललंग का उपयोग दकया िाता ह,ै क्या िहााँ पर सुचालक के सदक्य होने पर युग्मन को खोलने से रोकने के जलए जिद्युत इंटर-लॉक या अन्य अनुमोदित उपकरण प्रिान दकया गया ह?ै 15. जिजनयम-112 यथाजस्ट्थजत जिजनयम के प्रािधानों के अनुपालन पर ठरपोटय संतोषिनक/संतोषिनक नहीं िें। 16. जिजनयम-114 (i) क्या जसिल और टेलीिोन के तारों को अन्य केबलों हां/नहीं और उपकरणों के संपकय में आने से रोकने के जलए84 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] पयायप्त सािधानी बरती िाती है? (ii) क्या दकसी एक पठरपथ (सर्कयट) में प्रयुि िोल्टेि हां/नहीं 30 िोल्ट से अजधक नहीं ह?ै 17. जिजनयम-115 (i) क्या ओिरहैड रॉली-िायर जसस्ट्टम पर इलेजक्रक हां/नहीं लोकोमोठटि द्वारा ढुलाई, 650 िोल्ट से अजधक की िोल्टेि पर नहीं है? (ii) क्या खान के इलैजक्रकल इंस्ट्पेक्टर की जलजखत पूिय हां/नहीं सहमजत से स्ट्टोरेि बैटरी लोकोमोठटि द्वारा ढुलाई का उपयोग दकया िाता ह?ै 18. जिजनयम-117 (i) क्या खान के इलैजक्रकल इंस्ट्पेक्टर द्वारा जनिेजित हां/नहीं इलजै क्रकल पययिेिकों को प्रजतष्ठापन के पययिेिण के जलए एक तेल-िेत्र में एक या एक से अजधक कुओं के स्ट्िामी, एिेंट या प्रबंधक या एिेंट या स्ट्िामी द्वारा जलजखत रूप में जनयुि दकया िाता है? (ii) क्या इंस्ट्पेक्टर द्वारा जनिेजित इलेक्रीजियन को इस हां/नहीं जिजनयम में जिजनर्ियष्ट कतयव्यों के अनुपालन के जलए एक तेल-िेत्र में एक या एक से अजधक कुओं के स्ट्िामी, एिेंट या प्रबंधक या एिेंट या माजलक द्वारा जलजखत रूप में जनयुि दकया िाता है? 19. जिजनयम-118 क्या इलैजक्रकल प्रजतष्ठापनों के संचालन और रखरखाि के हां/नहीं जलए लगे व्यजियों ने जििेष खनन प्रजतष्ठापनों के जलए संतोषिनक/संतोषिनक नहीं प्रजििण प्राप्त दकया ह?ै तारीख: जनरीिण अजधकारी के हस्ट्तािर नाम....................... पिनाम................ िाईल सं................ इलेजक् रकल इंस्ट् पेक् टर को प्रजत...............................के जलए प्रेजषत अनसु चू ी-।।। उपभोिा को प्रत्यके आपर्ू त यलबिं ुपर प्रिायकता यद्वारा परीिण के िौरान पठरणाम प्राप्त करन ेके जलए प्ररूप [जिजनयम (33) का उप-जिजनयम (4) िखे ]ें 1. उपभोिा का नाम और पता: 2. प्रजतष्ठापन के ब्यौरे: 3. प्रजतष्ठापन का िॉट सर्कयट स्ट्तर: 4. प्रजतष्ठापन आरंभ होने की तारीख: (अजतठरि आपूर्त्तय या पुनयसंयोिन की जस्ट्थजत में): 5. दकए गए परीिण के पठरणाम:[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 85 क्.स.ं उपस्ट्कर दकए गए परीिण परीिण पठरणाम ठटप्पणी 1. फ्यूि सजहत संपकय (i) यांजत्रक प्रचालन सुचारण/गड़बड़ी युि जस्ट्िच (ii) फ्यूि की रेटटंग ----------एम्पीयर (iii) ब्लेड का संपकय पूणय/आंजिक 2. आइसोलेटर (i) यांजत्रक प्रचाल िीक/िीक नहीं क्म संख्या:- (ii) िरू स्ट्थ प्रचाल िीक/िीक नहीं जनमायण:- (iii) स्ट्थानीय प्रचाल िीक/िीक नहीं िमता:- (iv) संपकय प्रजतरोध का माप .........माइक्ो ओम (v) अथय जस्ट्िच के साथ इंटरलॉक िीक/िीक नहीं (vi) सर्कयट ब्रेकर के साथ इंटरलॉक िीक/िीक नहीं (vii) आई.आर.मान िेि-िेि िेि-अथय • खुली जस्ट्थजत ........... मगे ा ओम • बंि जस्ट्थजत ........... मगे ा ओम 3. सर्कयट ब्रेकर (i) सर्कयट ब्रेकर की रेटटंग (सर्कयट ब्रेकर • प्रकार ----------------- स्ट् थान और • बोल्ट ---------------केिी संख्या) • सामान्य करंट ----------एम्पीयर सर्कयट ब्रेकर • रपचटरंग िमता --------------केए जनयंत्रण सर्कयट (ii) आई.आर. मान िेि-िेि िेि-अथय • खुली जस्ट्थजत ........... मगे ा ओम • बंि जस्ट्थजत ........... मगे ा ओम (iii) संपकय प्रजतरोधक गजतिील संपकय प्रजतरोध .............माइक्ो ओम माप सजहत (iv) यांजत्रक प्रचालन तुरंत सुचारू/समय अंतराल (से.) (v) िरू स्ट्थ प्रचालन िीक/िीक नहीं (vi) स्ट्थानीय प्रचालन िीक/िीक नहीं (vii) आइसोलेटर के साथ इंटरलॉककंग िीक/िीक नहीं (viii) अथय जस्ट्िच के साथ इंटरलॉककंग िीक/िीक नहीं (ix) ओटीआई/ड्ब्लूटीआई/बुखहोल्ि/पीआरिी िीक/िीक नहीं के जलए अलामय और ठरप (x) अथय िाल्ट ठरले िीक/िीक नहीं (xi) ओिर करंट ठरले िीक/िीक नहीं86 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] (xii) अंडर िोल्ट ठरले िीक/िीक नहीं (xiii) SF िाब अलामय तथा ठरप प्रचालन िीक/िीक नहीं 6 परीिण के सभी प्रािधान संतोषिनक हैं? 4. रांसिामयर (i) इनसुलेिन प्रजतरोधक मान रांसिामयर • एचटी से एलटी -----------मेगा ओम संख्या, स्ट्थान, • एचटी से अथय ----------- मेगा ओम (रांसिामयर • एलटी से अथय ----------- मेगा ओम क्.सं. जनमायण, (ii) ब्रेक डाउन िोल्ट िांच िमता, • तेल नमूना-I (िीषय) ………… केिी िोल्टेि अनुपात,) • तेल नमूना- II (तल) ………… केिी (iii) िेक्टर समूह िांच िीक/िीक नहीं (iv) ध्रुिता िांच िीक/िीक नहीं (v) चुम्बकीय संतुलनः िीक/िीक नहीं (vi) टैन डेल्टा िांच (िमतानुसार) िीक/िीक नहीं (vii) संरिी टंकी में तेल स्ट्तर िीक/िीक नहीं (viii) ब्रीथर कप में तेल स्ट्तर िीक/िीक नहीं (ix) ओटीआई/ड्ब्लूटीआई सेटटंग ए/टी-----0c ए/टी----0c (x) ओटीआई/ड्ब्लूटीआई अलामय ि ठरप प्रचालन िीक/िीक नहीं (xi) बुखहोल्ि ठरले का प्रचालन िीक/िीक नहीं (xii) पीआरिी का प्रचालन िीक/िीक नहीं (xiii) तेल ठरसाि िीक/िीक नहीं (xiv) िुष्क रांसिर के जलए डोर जस्ट्िच का िीक/िीक नहीं इंटरलॉक (xv) साईड जक्लयरेंस के जलए • साइड क्लीयरेंस: --------- सेमी • िो रान्सफ़ॉमयर के बीच -------- मीटर (xvi) बॉडी अथय प्रजतरोधन ------ओम (xvii) न् यूरल अथय प्रजतरोधन एन ------ ओम 1 एन ------ ओम 2 5. डीिी सैट (i) िसू रे आपूर्तय सूत्रों के साथ इंटरलॉककंग िीक/िीक नहीं • आल्टरनेटर (ii) बॉडी अथय प्रजतरोध ------ओम • इंिन (iii) न् यूरल अथय प्रजतरोध एन ------ ओम 1 की क्म सं. एन ------ ओम 2 6. केबल (i) इन्सुलेिन प्रजतरोध मान[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 87 आकार: • िेि-िेि ............मेगा ओम …….िगय जम.मी • िेि-अथय ............मगे ा ओम • िेि-अथय+अन्य िेि ............मगे ा ओम (ii) केबल बेलडंग रेजडयस िीक/िीक नहीं..मीटर 7. अर्थंग (i) अथय जस्ट्रप्स का धातु और आकार Cu/Al/GI …….िगय जम.मी (ii) अर्थंग का प्रकार • प्लेट अर्थंग: हााँ/नहीं • पाइप अर्थंग: हााँ/नहीं • काउंटर प्िाइि अर्थंग हााँ/नहीं (iii) अथय इलैक्रोड के अथय प्रजतरोध का जनम्नजलजखत के जलए मान: एन --ओम 1 • ठरएक्टर न्यूरल: एन ---ओम 2 • एलए: (आर)-----ओम • ढााँचा: (िाई)-----ओम • उपकरण का फ्रेम ढााँचा: (बी)------ओम • मोटस य ------ओम ------ओम ------ओम 8. जिभि रांसिामयर (i) अनुपात परीिण िीक/िीक नहीं (ii) ध्रुिीयता परीिण िीक/िीक नहीं (iii) तेल की बीडीिी ----------केिी (iv) आईआर परीिण (आर) पी-ई---मेगा ओम (िाई) पी-ई---मेगा ओम (बी) पी-ई---मेगा ओम 9. करंट रांसिामयर (i) अनुपात परीिण िीक/िीक नहीं (ii) ध्रुिीयता परीिण िीक/िीक नहीं (iii) तेल की बीडीिी ----------केिी (iv) आईआर परीिण (आर) पी-ई---मेगा ओम (िाई) पी-ई---मेगा ओम (बी) पी-ई---मेगा ओम 10. ओिर हेड लाइन (i) सुचालक/टािर की िास्ट्तजिक जस्ट्थजत िीक/िीक नहीं (ii) टािर उपसाधन की परीिण िीक/िीक नहीं (iii) टािर िुटटंग प्रजतरोध ------ओम88 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] (iv) सुचालक जनरंतरंता परीिण िीक/िीक नहीं (v) ग्राउंड जक्लयरेंस की परीिण िीक/िीक नहीं (vi) रूट पर जिद्युत जक्लयरेंस की परीिण िीक/िीक नहीं क्.स.ं मि अिलोकन 1. अपेजित िेि से िेि, िेि से ग्राउंड और सेक्िनल िरू ी की िांच। 2. उपस्ट्कर अजभन्यास और समग्र प्रजतष्ठापन ब्यौरों की िांच। 3. यथालागू अथय-मैट या अथय-इलैक्रॉड्स के प्रजतरोध का परीिण। 4. एकल उपस्ट्करों की उपभोिा की पूिय-आरंभन परीिण ठरपोटों की िांच। 5. एकल उपस्ट्करों के जिजनमायता की नेमी/प्रकार परीिण ठरपोटों की िांच। 6. क्या जनरीिक का अनुमोिन, यदि लागू ह,ै प्राप्त कर जलया गया है? 7. क्या स्ट्िामी का जिजनयम के अनुपालन के बारे में स्ट्ि:प्रमाणन प्राप्त कर जलया गय़ा है? 8. सामान्य प्रेिण और जिचार (जिजनयमों की अपेिाओं में से जिजिष्ट पठरितयनों का स्ट्पष्ट रूप से उल्लेख दकया िाए) प्राजधकारी का नाम, हस्ट्तािर और मुहर अनसु चू ी- IV आपर्ू त्त यकी असिलता के बाबत सचू ना के जलए प्ररूप [जिजनयम (41) का उप-जिजनयम (3) िखे ]ें (1) आपूर्त्तयकताय का नाम और पताः (2) आपूर्तय की असिलता की तारीख और समयः (3) असिलता के कारण प्रभाजित िेत्रः (4) असिलता के कारणः (5) आपूर्त्तय के प्रत्याितयन के जलए संभाजित समयः (6) अजतठरि सूचना, यदि कोई होः तारीख: स्ट्थानः (नाम, हस्ट्तािर, पिनाम और प्राजधकारी की मुहर) समयः[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 89 अनसु चू ी- V 650 िोल्ट स ेअजधक आपर्ू त्त,य पठरिर्ततय , सचं ाठरत या उपयोग की गई जिद्यतु के जलए न्यनू तम सरु िा कायिय ील िरू ी [जिजनयम (46) के उप-जिजनयम- (2) (iii) को िखे ]ें उच्चतम प्रणाली िोल्टि (दकलोिोल्ट) सरु िा कायिय ील िरू ी (मीटर) 12 2.6 36 2.8 72.5 3.1 145 3.7 245 4.3 420 6.4 800 10.3 (1) उपरोि मान 1000 मीटर से अनजधक की ऊाँचाईयााँ के जलए जिजधमान्य ह।ै 1000 मीटर से अजधक और 3000 मीटर तक की ऊाँचाई के जलए िरू ी में िृजि करने के जलए 1.25 प्रजतित प्रजत 100 मीटर का करेक्िन िैक्टर लागू दकया िाएगा; (2) उपरोि सुरिा काययिील िरू ी 2.44 मीटर की इनसुलेिन ऊाँचाई पर आधाठरत ह ै िो जिद्युत-रोधक पर न्यूनतम लबंि ु की भूतल से ऊाँचाई है िहााँ ये अ्डय मेटल से जमलता है; (3) ‘सुरिा काययिील िरू ी’, हिा में एक ओर उपस्ट्कर के सदक्य भाग के बीच और िसू री ओर अथय या उपकरण का अन्य जहस्ट्सा या सुचालक जिस पर कायय करना आिश्यक हो, के बीच बनाए िानी िाली न्यूनतम िरू ी है; (4) ‘उच्चतम जसस्ट्टम िोल्ट’ को उच्चतम आरएमएस िेि टू िेि िोल्ट के रुप में पठरभाजषत दकया गया ह ैिो प्रणाली के दकसी भी लबंि ु पर दकसी भी समय सामान्य प्रचालन पठरजस्ट्थजतयों में पायी िाती ह।ै इसमें िोल्ट रांजसएंट (िसै े जसस्ट् टम जस्ट्िलचंग के कारण) और असामान्य प्रणाली पठरजस्ट्थजतयों के कारण अस्ट्थाई िोल्ट (िैसे िाल् ट पठरजस्ट्थजतया ं या अत् यजधक भार के अकस्ट् मात् जडसकनेक् िन के कारण) को सजम्मजलत नहीं दकया गया ह।ै अनसु चू ी - VI एचिीडीसी प्रजतष्ठापन की ओिरहडै लाइनों के जसिाय, बाहरी एचिीडीसी उप-केन्द्रों म ेंअनाितृ सचु ालक या दकसी भी उपकरण के सदक्य भागों के जलए बनाए िानी िाली न्यनू तम सरु िा िरू ी [जिजनयम (46) के उप-जिजनयम (3) को िखे ें] क्म स.ं डीसी िोल्टि पोल टू अथ यिरू ी (मीटर) ग्राउंड िरू ी (मीटर) 1. 100 दकलोिोल्ट 1.17 4.55 2. 200 दकलोिोल्ट 1.80 5.65 3. 300 दकलोिोल्ट 2.45 6.75 4. 400 दकलोिोल्ट 3.04 8.00 5. 500 दकलोिोल्ट 3.65 9.00 6. 600 दकलोिोल्ट 3.98 10.1 7. 800 दकलोिोल्ट 5.30 11.290 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] (1) उपरोि ग्राउंड िरू ी उन उपकरणों पर लागू नहीं होते ह ैं िो बाड़ या भिन के भीतर रखे िाते ह ैं और िहां एक उपयुि सुरिा इंटरलॉककंग योिना के माध्यम से सदक्य जस्ट्थजत में पहुचं को जनिायठरत दकया िाता ह।ै (2) उपरोि पोल से अथय िरू ी 1.35 के बराबर के अंतराल कारक का प्रयोग करते हुए सुचालक- अिसंरचना इलैक्रोड जिन्यास के जलए ह।ै (3) य़ह माना िाता ह ैदक उप-केन्द्रों के भीतर बहुत से जिजभन्न प्रकार के इलैक्रोड जिन्यास जिजभन्न मानों के साथ होंगे इसजलए उपरोि िरू ी को जििेष इलैक् रोड जिन् यास के जलए न् यूनतम ग्राउन् ड िरू ी की ितय पर अंतराल िैक्टर के आधार पर आंतठरत दकया िाएगा। (4) जिद्युत उपकरण के जलए िरू ी प्रित्त की िाएगी जिससे उपस्ट्कर के समीप कायय कर रहे प्रचालन और अनुरिण कार्मयक को जबना दकसी खतरे के प्रचालन और अनुरिण और समुजचत हिा आने िाने के जलए पयायप्त स्ट्थान उपलब्ध कराया िा सके। अनसु चू ी-VII भाग- क 220 दकलोिोल्ट और उसस ेअजधक िोल्टेि िग यके रासं िामरय और ठरएक्टर के जििलता की सचू ना िने ेहते ु प्रपत्र [जिजनयम (48) का उप-जिजनयम (8) िखे ]ें i. उपकेन्द्र का नाम : ii. यूठटजलटी : iii. िोषपूणय उपस्ट्कर (आईसीटी/ऑटो-रांसिामयर/िीटी/ठरएक्टर आदि) : iv. रेटटंग (एमिीए/एमिीएआर,िोल्टेि अनुपात, 1-िेि/3 िेि) : v. जनमायण (मूल उपस्ट्कर जिजनमायता) : vi. क्म संख्या : vii. िॉल्ट होने की तारीख और समय : viii. (प्रचालन या आिजधक परीिण/रखरखाि) के िौरान पाया गया िॉल्ट : ix. जिजनमाणय का िषय : x. चालू होने की तारीख : xi. घटनाओं का क्म/ िॉल्ट के ब्यौरे : (टाईम स्ट्टाम्प के साथ घटनाओं का क्म, िॉल्ट के िौरान सुरिा का संचालन) xii. असिलता के पिात् दकए गए परीिणों के ब्यौरे (असिलता की खोि : के पिात् कौन से परीिण दकए गए)। यदि कोई परीिण नहीं दकया गया था, तो इसके कारण बताए। xiii. प्रेिण : (िश्ृ य प्रेिण िैसे टैंक का उभरना, आग, तेल का कोई ठरसाि, रांसिामयर/ठरएक्टर और आस-पास के उपस्ट्कर/सामग्री आदि के जिजभन्न घटकों में हुए नुकसान) xiv. असिलता के संभाजित कारण : xv. यदि मूल उपस्ट्कर जिजनमायता के प्रजतजनजध ने उपस्ट्कर का जनरीिण : दकया था या असिलता के पश्तात् साइट का िौरा दकया था, तो उनकी ठटप्पणी, एमओएम आदि संलि करें।[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 91 xvi. उपस्ट्कर की ितयमान जस्ट्थजत ( क्या यह मरम्मत योग्य ह ै या मरम्मत : संभि नहीं ह)ै xvii. (क) जपछले रखरखाि के ब्यौरे (दकए गए परीिणों सजहत जपछले : रखरखाि में दकए गए दक्याकलाप, रखरखाि दक्याकलापों की आिजधकता) (ख) क्या इन परीिणों में कोई असामान्यता िेखी गई है? यदि हां, तो परीिण ठरपोटय संलि करें। (ग) असामान्यता को िरू करने के जलए क्या किम उिाए गए थे? xviii. इसी इकाई पर दकसी भी जपछली असिलता के ब्यौरे : xix. क्या तीसरी कुंडलन प्रिान दकया गया ह ै : हााँ/नहीं xx. तीसरा भार दकया गया : हााँ/नहीं यदि हााँ, तो तीसरे भार जिजनर्ियष्ट करें xxi. क्या तीसरा टर्मयनल अनािृत/जिद्यतु रोधी हैं xxii. तीसरा के जलए सुरिा के ब्यौरे : xxiii. क्या ठरले समय यूटीसी के साथ लसंक्ोनाइज़ दकया गया है : xxiv. बुलिंग ब्यौरे (ओआईपी/आरआईपी/आरआईएस, चीनी जमट्टी के : बरतन/पॉलीमर हाऊलसंग) xxv. ऑन लोड टैप चेंिर या ऑि सर्कयट टैप चेंिर : xxvi. असिलता के समय ओएलटीसी की टैप जस्ट्थजत : xxvii. ओएलटीसी के संचालन का जपछला ठरकॉडय : xxviii. टैप रेंि : xxix. आईसीटी/िीटी/ठरएक्टर के जलए प्रिान की गई सुरिा के ब्यौरे : xxx. संचाजलत सुरिा का जििरण : xxxi. क्या उपकरण िीक से अथय दकया गया है : xxxii. उपकेन्द्र का अथय प्रजतरोध और इसके मापन की तारीख : xxxiii. सिय अरेस्ट्टर: : (क) क्या सुरिा के जलए सिय अरेस्ट्टर प्रिान दकया गया है? हां/नहीं (ख) क्या सिय अरेस्ट्टर के काययकुिलता की जस्ट्थजत की जनगरानी की िाती हां/नहीं ह?ै हां/नहीं (ग) क्या असिलता के िौरान सिय अरेस्ट्टर काउंटर की रीलडंग बिली गई ? xxxiv. सभी िोल्टेि स्ट्तर की बुलिंग के लाइटलनंग इम्पल्स और जस्ट्िलचंग : इम्पल्स जििस्ट्टैंड िोल्टेि92 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] xxxv. सभी िोल्टेि स्ट्तर की िाइंलडंग के लाइटलनंग इम्पल्स और जस्ट्िलचंग : इम्पल्स जििस्ट्टैंड िोल्टेि xxxvi. प्रिान की गई अजि सुरिा के प्रकार (इमल्सीिायर जसस्ट्टम/नाईरोिन : इंिेक्िन आधाठरत अजि सुरिा प्रणाली/ िोम आधाठरत सुरिा आदि) xxxvii. असिलता के समय मौसम की जस्ट्थजत (साि आकाि / बाठरि / आंधी : आदि) xxxviii. चालू दकए िाने से पहले साइट पर उपस्ट्कर के भंडारण की जस्ट्थजत: : (क) भंडारण की अिजध (ख) जनजष्क्य चािय या चािय नहीं (ग) सूखी हिा युि/नाइरोिन युि/तेल युि xxxix. क्या इस रांसिॉमयर या जडिाइन दकए गए समान रांसिॉमयर/ठरएक्टर : पर िॉटय सर्कयट परीिण दकया गया या गणना के आधार पर िॉटय सर्कयट सहन करने की िमता सत्याजपत की गई थी? xl. असिलता के पहले थ्रू िाल्ट की संख्या उपस्ट्कर के द्वारा िहन दकया गया : xli. जनम्नजलजखत को संलि करें: : (क) उपकेन्द्र का लसंगल लाइन आरेख (ख) असिल उपस्ट्कर के िोटोजचत्र (ग) गड़बड़ी ठरकॉडयर / यहां तक दक लॉगर डेटा भी (घ) असिलता के पिात् दकए गए परीिणों की ठरपोटय (ङ) कारखाना परीिण के पठरणाम (च) प्री-कमीिलनंग परीिण पठरणाम (छ) संरिण योिनाबि आरेख (संस्ट्थापन के प्रबंधक / काययकारी इंिीजनयर के हस्ट्तािर और नाम) संपकय ब्यौरे (पता / मोबाइल नंबर / िोन नंबर / ईमेल) सेिा में, सजचि केंद्रीय जिद्युत प्राजधकरण सेिा भिन, आरके पुरम नई दिल्ली-110066 भाग-ख 220 दकलोिोल्ट और उसस ेअजधक िोल्टेि िग यकी पारेषण लाइनों के टािरों की असिलता की सचू ना िेन ेके जलए प्रारूप [जिजनयम (48) का उप-जिजनयम (8) िखे ]ें 1. िोल्टेि स्ट्तर के साथ पारेषण लाइन का नाम: 2. घटना/असिलता का पता चलने की तारीख और समय 3. लाइन की लंबाई (दकमी):[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 93 4. जिन्यास का प्रकार: [(डी/सी टािरों पर लटका हुआ एस/सी, डी/सी, एम/सी, एस/सी, संकीणय आधार और इसी प्रकार) 5. असिल टािरों की संख्या और टािरों के प्रकार: [एक्सटेंिन के साथ/जबना एक्सटेंिन के सस्ट्पेंिन/टेंिन/डेड एंड/स्ट्पेिल टािर/ठरिर क्ॉलसंग टािर/पॉिर लाइन क्ॉलसंग/रेलिे क्ॉलसंग आदि, (एक्सटेंिन का प्रकार और लंबाई बताएं)] 6. जनकटतम उपकेन्द्र के संिभय में टॉिर स्ट्थान संख्या (नाम उप्रिर्ियत करें): 7. सुचालक का नाम और आकार: 8. प्रजत बंडल उप-सुचालकों और बंडल स्ट्पेलिंग की संख्या: 9. अथय िायर/ओपीिीडब्ल्यू की संख्या और आकार (यदि प्रित्त दकया गया हो): 10. उपयोग में आने िाले जिद्युत रोधक का प्रकार (पोर्सयलेन / ग्लास / पॉलीमर): 11. जिद्युत रोधक का जिन्यास (आई / िी / िाई / तनाि): 12. प्रजत लस्ट्रंग जिद्युत रोधक की संख्या और प्रजत िेि लस्ट्रंग की संख्या: 13. संजनमायण/चालू होने का िषय: 14. काययकारी एिेंसी: 15. असिलता की तारीख पर मौसम की जस्ट्थजत: 16. मैिान की श्रेणी: 17. जिश्वसनीयता स्ट्तर: 18. िायु िेत्र (1/2/3/4/5/6) और िायु का िेग: 19. टािर की अर्थंग के ब्यौरे जििरण (पाइप प्रकार/काउंटर पोईि): 20. IS:802 (1977/1995/2015 कोई अन्य कोड) के अनुसार जडज़ाइन की गई लाइन: 21. लाइन जडिाइन करने िाला अजभकरण: 22. जडिाइन में कोई जििेष जिचार: 23. तारीख सजहत अंजतम अनुरिण दक्याकलाप के ब्यौरे: 24. असिलता से पहले लाइन में जिद्युत प्रिाह: 25. टािरों के असिलता होने से पहले/पिात् में जमला कोई लापता सिस्ट्य: 26. असिलता के बाि नींि की जस्ट्थजत: 27. असिलता का संजिप्त जििरण: [िोटोजचत्र के साथ (यदि उपलब्ध हो), अन्य संबंजधत िानकारी िैसे टािर अनुसूची, चक्िात/हिा तूिान आदि से संबंजधत खबर के जलए अखबार की कतरन] 28. असिलता का संभाजित कारण: 29. लाइन/टािर की जपछली असिलता के ब्यौरे: 30. क्या ईआरएस पर लाइन को बहाल दकया िाएगा या अजतठरि टािर का उपयोग दकया िाएगा: 31. प्रत्याितयन की संभाजित तारीख: 32. ितयमान जस्ट्थजत: 33. असिलता के पिात दकए गए दकसी भी परीिण के ब्यौरे (परीिण ठरपोटय संलि करें): 34. नििीकी अजधकृत िेधिाला से असिलता की तारीख और समय में िायु की गजत के ऑकड़े: 35. असिलता टािर का स्ट्थान94 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] क. स्ट्थान जनिेिांक: ख. जनकटतम हिाई अड्डा: ग. जिला और राज्य: 36. सभी आयामों के साथ असिल टािर(ओं) का लसंगल लाइन डायग्राम/जक्लयरेंस डायग्राम (टािर की आधार चौड़ाई सजहत िैजति और लंबित आयाम) 37. टॉिर का ििन: 38. टॉिर स्ट्पॉटटंग डाटा: 39. प्रभाजित सेक्िन की टािर अनुसूची 40. टािर के जडिाइन के जलए सैग टेंिन गणना पर जिचार दकया गया 41. असिलता टािरों का जडिाइन िस्ट्तािेि: 42. कोई अन्य सुसंगत िानकारी: (संस्ट्थापन के प्रबंधक / काययकारी इंिीजनयर के हस्ट्तािर और नाम) संपकय ब्यौरे (पता / मोबाइल नंबर / िोन नंबर / ईमेल) सेिा में, सजचि केंद्रीय जिद्युत प्राजधकरण सेिा भिन, आरके पुरम नई दिल्ली-110066 अनसु चू ी-VIII क साकं ेजतक िोल्टेि प्रणाली िाली सिे ा लाइनों सजहत अल्टरनटे टंग करंट ओिरहैड लाइनों के न्यनू तम सचु ालक के जलए भजू म के ऊपर िाय ुऔर रािमागों की सड़क की सतह या सड़कों या रेलि ेकॉठरडोर या नौिहन या गरै - नौिहन नदियों के जलए न्यनू तम िरू ी। [जिजनयम (60) का उप-जिजनयम (1) िखे ]ें प्रणाली का भूजम के ऊपर िरू ी रािमागय रेलिे कॉठरडोर में चालक और रेल निी पार करने के जलए सांकेजतक पर चालक स्ट्तर के बीच िरू ी (एम) एचएिएल के ऊपर िरू ी िोल्टेि और सड़क सड़क के सड़क के अन्य सामान्य रेलि े रैक पर नौिहन गैर- नौिहन की सतह के पार दकनारे कहीं ओएचई (िहां डबल स्ट्टैक निी (एम) निी (एम) बीच िरू ी (एम) (एम) रेलिे रैक पर कंटेनर चलाने (एम) (एम) डबल स्ट्टैक के जलए ऊचाई कंटेनर नहीं िाले ओएचई। चलाया िाना ह।ै ) 650 िोल्ट 5.80 5.50 4.60 भूजमगत भूजमगत केबल भूजमगत केबल 16.50 5.80 तक केबल 11 केिी 6.50 5.80 4.60 भूजमगत भूजमगत केबल भूजमगत केबल 19.00 6.50 केबल 22 केिी 6.50 5.80 5.20 भूजमगत भूजमगत केबल भूजमगत केबल 19.00 6.50 केबल 33 केिी 6.50 5.80 5.20 11.60 या भूजमगत केबल भूजमगत केबल 19.00 6.50 भूजमगत केबल[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 95 66 केिी 6.50 6.10 5.50 11.60 या भूजमगत केबल भूजमगत केबल 19.00 6.50 भूजमगत केबल 110 केिी 6.50 6.10 6.10 11.60 15.56 17.56 19.00 6.50 132 केिी 6.50 6.10 6.10 11.60 15.56 17.56 19.22 6.50 220 केिी 7.02 7.02 7.02 12.52 16.46 18.46 20.10 7.02 400 केिी 8.84 8.84 8.84 14.00 18.26 20.26 21.90 8.84 765 केिी 18.00* 18.00* 18.00* 18.80 21.86 23.86 25.55 18.00 1200 केिी 24.00* 24.00* 24.00* 30.00 25.46 27.46 29.90 24.00 नौगम्य नदियों के जलए, संबंजधत नौिहन/बंिरगाह प्राजधकरणों के परामिय से सबसे ऊंच े मस्ट्तूल के संबंध में िरू ी जनयत की िाएगी। * 400 दकलोिोल्ट से अजधक िोल्टेि पर मुख्य रूप से इंडक्िन प्रभाि और समय के साथ पठरितयनिील जिद्युत िेत्र (आईसीएनआईआरपी सीमा: 10 केिी/एम व्यािसाजयक िोजखम के जलए) के कारण अजधक मात्रा की िरू ी। अनसु चू ी VIII ख साकं ेजतक िोल्टेि प्रणाली िाली सिे ा लाइनों सजहत हाई िोल्टेि डायरेक्ट करंट (एचिीडीसी) ओिरहडै लाइनों के न्यनू तम सचु ालक के जलए भजू म के ऊपर िाय ुऔर रािमागों की सड़क की सतह या सड़कों या रेलि ेकॉठरडोर या नौिहन या गरै - नौिहन नदियों के जलए न्यनू तम िरू ी। [जिजनयम (60) का उप-जिजनयम (2) िखे ]ें डीसी सतह की रािमागय पर चालक और रेल स्ट्तर निी पार करने के जलए एचएिएल के ऊपर िरू ी क्.सं. िोल्टेि िरू ी (एम) चालक और के बीच न्यूनतम नौिहन निी गैर- नौिहन निी (एम) सड़क की सतह जनकासी (एम) (एम) के बीच िरू ी (एम) 1. 100 केिी 6.50 11.25 # 19.00 6.50 2. 200 केिी 7.30 12.05 # 19.90 7.30 3. 300 केिी 8.50 13.25 # 20.90 8.50 4. 400 केिी 9.40 14.15 # 21.90 9.40 5. 500 केिी 12.50 17.25 21.23 22.90 12.50 7. 800 केिी 18.00 22.75 25.74 25.90 18.00 1. रािमागय िरू ी के जलए सतह िरू ी से 4.75 मीटर अजधक िरू ी अपेजित होती है (भारतीय सड़क कांग्रेस िस्ट्तािेिों, 1983 में यथा उजल्लजखत यान की 4.75 की ऊंचाई को ध्यान में रखते हुए) 2. # : रेलि ेिरू ी के जलए एचिीएसी मानों की तुलना में 10% अजधक मान अपेजित होती ह ै(एचिीएसी मानों को, भारतीय रेलिे िस्ट्तािेज़: आईआरएसओडी, 2004 में उजल्लजखत दकया गया ह)ै । 3. भारतीय अंतिेिीय िलमागय प्राजधकरण (भारत में अंतिेिीय िलमागों का िगीकरण), जिजनयम, 2006 के जिजनयम म ें यथा उजल्लजखत नौिहन संबंधी निी िरू ी।96 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] अनसु चू ी-VIII ग ग्राउंड, िर्टयकल और हॉठरिॉन्टल िरू ी [जिजनयम 60 का उप-जिजनयम (1), जिजनयम 62 का उप-जिजनयम (5) और जिजनयम 63 का उप-जिजनयम (5) िखे ें] M G C L a x im u m D e fle c tio n V C L H C L B u G R O U N D ild in g stru c tu re M V a x im C L u m D e fle c tio n G C L M a x . S a g M a x . S a g M a x . S a g C . C C o n d u cto r p o rtio n s M in im u m learan ce L in e िीसीएल: ग्राउंड िरू ी : उप-जिजनयम 60 के अनुसार िीसीएल: िर्टयकल िरू ी : उप-जिजनयम 62 एिं 63 के अनुसार एचसीएल: िैजति िरू ी : उप-जिजनयम 62 एिं 63 के अनुसार अनसु चू ी IX खानों के जलए िार्षकय जििरणी का प्ररूप [जिजनयम 98 का उप-जिजनयम (1) िेख]ें यह प्ररूप स्ट्िामी, एिेंट, प्रबंधक या इंिीजनयर द्वारा उजचत ढंग से भरा िाना चाजहए और जनरीिक को प्रत्येक िषय िरिरी के पहले दिन ही भेिा िाना चाजहए। भाग-क समाजप्त िषय: 20XX__ खान का नाम: राज्य: खान की जस्ट्थजत: जिला: खान का डाक पता: स्ट्िामी का नाम और पता: एिेंट का नाम:[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 97 प्रबंधक का नाम: इंिीजनयर का नाम: जिद्युत पययिेिक का नाम: भाग-ख (1) आपूर्तय की प्रणाली (प्रत्यि धारा या प्रत्यािती धारा): आपूर्तय का िोल्टेि: आिजधकता (प्रत्यािती धारा की जस्ट्थजत में): आपूर्तय के स्रोत: (2) िोल्टेि जिस पर जिद्युत का उपयोग दकया िाता ह:ै - लाइटटंग: जिद्युत: (3) मोटर आदि का जििरण: जिद्यतु (क) सतह पर मोटर के प्रकार (एच.पी./के.डब्ल्यू.) जनयंत्रण जगयर का प्रकार स्ट्थान प्रयोिन जिसके जलए उपयोग दकया /उपकरण और िोल्टेि िाए (ख) खानों म ें मोटर के प्रकार जनयंत्रण स्ट्थान प्रयोिन जिसके जलए संिातन ज्िलनिील गैस या (एच.पी./के.डब्ल्यू.) /उपकरण जगयर का उपयोग दकया िाए िाष्प का प्रजतित और िोल्टेि प्रकार (ग) लाईटटंग लाईटटंग दिटटंग का प्रकार िॉटेि स्ट्थान ज्िलनिील गैस या िाष्प का प्रजतित अनसु चू ी X तेल-ित्रे ों के जलए िार्षकय जििरणी का प्ररूप [जिजनयम 98 का उप-जिजनयम (1) िेख]ें यह प्ररूप स्ट्िामी, एिेंट, प्रबंधक या इंिीजनयर द्वारा उजचत ढंग से भरा िाना चाजहए और खान के जिद्युत जनरीिक को प्रत्येक िषय िरिरी के पहले दिन ही भेिा िाना चाजहए।98 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] भाग-क समाजप्त िषय: 20XX__ तेल-िेत्र का स्ट्थान: राज्य: तेल-िेत्र का नाम: जिला: तेल-िेत्र का डाक पता: स्ट्िामी का नाम और पता: एिेंट का नाम: प्रबंधक का नाम: इंिीजनयर का नाम: जिद्युत पययिेिक का नाम: भाग-ख (1) आपूर्तय की प्रणाली (प्रत्यि धारा या प्रत्यािती धारा): आपूर्तय का िोल्टेि: आिजधकता (प्रत्यािती धारा की जस्ट्थजत में): आपूर्तय के स्रोत: (2) िोल्टेि जिस पर जिद्युत का उपयोग दकया िाता ह:ै - लाइटटंग: जिद्युत: (3) तेल-िेत्र में प्रयुि मोटर आदि का जििरण:- (क) कुओं पर सं. या कुएं के अन्य पहचान जचनन जिललंग या मोटर का प्रकार और लैंप की संख्या और जिद्युत के अन्य पंलपंग एचपी प्रकार उपकरण 1 2 3 4 5 (ख) कुओं पर नहीं मोटर का प्रकार और एचपी प्रयोिन जिसके जलए उपयोग दकया िाए मानजचत्र पर पहचान जचनन 1 2 3 (4) िेत्र में उपयोग हते ु जिद्युत के अन्य उपकरण, िो मि 3 में सजम्मजलत नहीं ह:ैं- उपकरणों के प्रकार और दकलोिाट में माप प्रयोिन जिसके जलए उपयोग दकया िाए मानजचत्र पर पहचान जचनन[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 99 अनसु चू ी XI खानों और तेल-ित्रे ों के जलए लॉग िीट जिजनयम 112 का उप-जिजनयम (9), जिजनयम 117 के उप-जिजनयम (9) िखे ें िैजनक लॉग िीट: (1) जिद्युत पययिेिक का नाम: (2) जिनकी ठरपोटय की िानी ह:ै - (क) प्रणाली के इन्सुलेिन की जस्ट्थजत। (ख) इन्सुलेिन का जिजनर्ियष्ट िोष (उपस्ट्कर की प्रत्येक असिलता का जििरण दिया िाना चाजहए)। (ग) िघु यटनाएं या खतरनाक घटना (जिद्युत के झटके के दकसी भी मामले और उपकरण में खुले स्ट्पार्कंग के दकसी भी मामले में उन स्ट्थानों पर िहां जिजनयमन 112 लागू होता है)। (घ) जिजनयम 112 के उप-जिजनयम (9) द्वारा यथा अपेजित आपूर्तय का जडसकनेक्िन और ठरकनेक्िन। (ङ) जिजनयम 102 के उप-जिजनयम (3) द्वारा यथा उपबंजधत अथय िॉल्ट जडटेक्टरों या ठरकॉडयरों का परीिण। (च) जिजनयम 117 द्वारा यथा उपबंजधत उपस्ट्कर का परीिण। (i) जनयम 117 के उप-जिजनयम (9) द्वारा यथा अपेजित जनयजमत परीिण। (ii) जिजनयम 117 के उप-जिजनयम (9) द्वारा यथा अपेजित जििेष परीिण* (3) ठटप्पणी: - हस्ट्तािठरत द्वारा परीिा की गई जिद्युत पययिेिक/इंिीजनयर/प्रबंधक: * जििरजणत करें दक दकस उपकरण का परीिण या परीिा की गई ह ैऔर पठरणाम क्या ह।ै ठटप्पणी:- यह लॉग िीट यथासंभि पूणय रूप से भरी िानी चाजहए। यदि, उिाहरण के जलए, ठरपोटय करने के जलए इन्सुलेिन में कोई िोष नहीं ह,ै तो ठरि स्ट्थान में 'कोई नहीं' िब्ि जलखा िाना चाजहए। राकेि गोयल, सजचि [जिज्ञापन III/4/असा./154/2023-24]100 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] CENTRAL ELECTRICITY AUTHORITY NOTIFICATION New Delhi, the 8th June, 2023 No. CEA-PS-16/1/2021-CEI Division.—Whereas the draft of the Central Electricity Authority (Measures relating to Safety and Electric Supply) Regulations, 2022 was published in six newspaper dailies, as required by sub- section (3) of section 177 of the Electricity Act, 2003 (36 of 2003) read with sub-rule (2) of rule 3 of the Electricity (Procedure for Previous Publication) Rules, 2005 for inviting objections and suggestions from all persons likely to be affected thereby, before the expiry of the period of forty-five days, from the date on which the copies of the newspaper containing the said draft regulations were made available to the public; And whereas copies of the said newspapers containing the public notices and the said draft regulations on the website of the Central Electricity Authority were made available to the public on 14th June, 2022; And whereas the objections and suggestions received from the public on the said draft regulations were considered by the Central Electricity Authority; Now, therefore, in exercise of the powers conferred by clause (b) of sub-section (2) of section 177 and read with section 53 of the Electricity Act, 2003, and in suppression of the Central Electricity Authority (Measures relating to Safety and Electric Supply) Regulations, 2010, except as respects things done or omitted to be done before such suppressions, the Central Electricity Authority hereby makes the following regulations, namely: – Chapter I Preliminary 1. Short title and Commencement. – (1) These regulations may be called the Central Electricity Authority (Measures relating to Safety and Electric Supply) Regulations, 2023. (2) These regulations shall come into force on the date of publication in the Official Gazette. (3) Scope and extent of application. – These regulations shall be applicable to electrical installation including electrical plant and electric line, and the person engaged in the generation or transmission or distribution or trading or supply or use of electricity. 2. Definitions. – (1) In these regulations, unless the context otherwise requires, (a) “Act” means the Electricity Act, 2003 (36 of 2003); (b) “accessible” means within physical reach without the use of any appliance or special effort; (c) “aerial bunched cable” means polyethylene or cross linked polyethylene insulated cable having three or four cores with aluminium conductors twisted over a central bare or insulated aluminium alloy or steel messenger wire; (d) “apparatus” means electrical apparatus and includes all machines, fittings, accessories and appliances in which conductors are used; (e) “bare” means not covered with insulating materials; (f) “bonding conductor” means the inter connecting conductors for the purpose of equipotential bonding with the main earth; (g) “cable” means a length of insulated single conductor, solid or stranded, or two or more such conductors each provided with its own insulation, which are laid up together; (h) “chartered electrical safety engineer” means a person authorised by the Appropriate Government as referred in regulation 6; (i) “circuit” means an arrangement of conductor or conductors for conveying electricity and forming a system or a branch of a system and protected at the origin; (j) “circuit breaker” means a mechanical switching device, capable of making, carrying and breaking currents under normal circuit conditions and also making, carrying for a specified duration and breaking currents under specified abnormal circuit condition; (k) “concentric cable” means a composite cable comprising an inner conductor which is insulated and one or more outer conductors which are insulated from one another and are disposed over the insulation of, and more or less around, the inner conductor; (l) “conductor” means any wire, cable, bar, tube, rail or plate used for conducting electricity;[भाग III—खण्‍ड 4] भारत‍का‍राजपत्र‍:‍असाधारण 101 (m) “conduit” means rigid or flexible metallic tubing or mechanically strong and fire resisting non-metallic tubing into which a cable or cables may be drawn for the purpose of affording it for mechanical protection; (n) “connected load" means the sum of the ratings in kilowatt or kilovolt-ampere of the apparatus connected to the installation of the consumer which may be connected simultaneously to the source; (o) “contact potential” means electric potential difference across the junction of two different objects in the absence of electric current; (p) “covered with insulating material” means adequately covered with insulating material of such quality and thickness as to prevent danger; (q) “cut out” means any device for automatically interrupting the flow of electricity through the conductor when the current increases above a pre-determined value, and shall also include fusible cut-out; (r) “danger” means risk to health or life or any part of body from electric shock, burn or other injuries to person, or property, or from fire or explosion, attendant upon the generation, transmission, transformation, conversion, distribution or use of electricity; (s) “dead” means at or about earth potential and disconnected from any live system and is used only with reference to current carrying parts when these parts are not live; (t) “designated person” means a person whose name appears in the record maintained under sub-regulation (2) of regulation 3 by the supplier or consumer, or the owner, agent or manager of all electrical installations including mine, or the agent of any company operating in an oil-field or the owner of a drilled well in an oil-field or a contractor; (u) “earthing” means connection of the exposed conductive and extraneous parts of an installation to the main earthing terminal of that installation or connection of neutral of transformer or generator or equipment to general mass of earth or earth bonded bar of that installation; (v) “earthing arrangement or earthing system” means all the electric connections and devices involved in the earthing of a system, an installation or equipment; (w) “electric vehicle” means any vehicle propelled, partly or wholly, by an electric motor drawing current from a rechargeable storage battery, or other portable energy storage devices or other self-generating electric source; (x) “electric vehicle supply equipment” means an element in electric vehicle charging infrastructure that supplies electric energy for recharging the battery of electric vehicles; (y) “enclosed substation” means any premises or enclosure or part thereof, being large enough to enable the entry of a person after the apparatus therein is in position, containing apparatus for transforming or converting electricity to or from a voltage at or exceeding six hundred fifty volt (other than transforming or converting solely for the operation of switch gear or instruments) with or without any other apparatus for switching, controlling or otherwise regulating the electricity, and includes the apparatus therein; (z) “enclosed switching station” means any premises or enclosure or part thereof, being large enough to enable the entry of a person, after the apparatus therein is in position, containing apparatus for switching, controlling or otherwise regulating electricity at or exceeding six hundred fifty volt but not for transforming or converting electricity (other than for transforming or converting solely for the operation of switchgear or instruments) and includes the apparatus therein; (za) “equipotential bonding” means an electrical connection putting various exposed conductive parts and extraneous conductive parts at a substantially equal potential; (zb) “exposed conductive part” means a conductive part which can readily be touched and which is not normally live, but which may become live under fault conditions; (zc) “extraneous conductive part” means a conductive part not forming part of the electrical installation and liable to introduce an electric potential, generally the electric potential of a local earth; (zd) “flameproof enclosure” means an enclosure in which the parts which can ignite an explosive atmosphere are placed and which can withstand the pressure developed during an internal explosion of an explosive mixture and which prevents the spread of explosion to the explosive atmosphere surrounding the enclosure; (ze) “flexible cable” means a cable consisting of one or more cores each formed of a group of wires, the diameter and the physical properties of the wires and insulating material are to allow flexibility; (zf) “guarded” means covered, shielded, fenced or otherwise protected by means of suitable casings, barrier,102 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] rails or metal screens to remove the possibility of dangerous contact or approach by persons or objects to a point of danger; (zg) “hand-held portable apparatus” means an apparatus designed to be capable of being held in the hands and moved while connected to a supply of electricity; (zh) “high voltage direct current” means direct current voltage one hundred kilovolt and above used for transmission of power; (zi) “inspector of mines” means an inspector appointed under the mines Act, 1952 (35 of 1952); (zj) “installation” means any composite electrical unit used for the purpose of generating, transforming, transmitting, converting, distributing or utilizing electricity; (zk) “Installation Manager” has the same meaning as defined in the Oil Mines Regulations, 2017; (zl) “intrinsically safe circuit” means any circuit in which any spark or any thermal effect produced in the conditions specified in the relevant standards, which include normal operation and specified fault conditions and not capable of causing ignition of a given explosive gas atmosphere; (zm) “intrinsically safe apparatus” means an electrical apparatus in which all the circuits are intrinsically safe circuits; (zn) “lightning arrester” means a device which has the property of diverting to earth any electrical surge of excessively high amplitude applied to its terminals and is capable of interrupting follow on current, if present, and restoring itself thereafter to its original operating conditions; (zo) “linked switch” means a switch with all the poles mechanically linked to operate simultaneously; (zp) “live” means electrically charged; (zq) “load despatcher” means the personnel engaged in operation of Load Despatch Centre; (zr) “metallic covering” means mechanically strong metal covering surrounding one or more conductors; (zs) “mine” shall have the same meaning as defined in clause (j) sub-section (1) of section 2 of the Mines Act, 1952 (35 of 1952); (zt) “neutral conductor” means that conductor of a multi-wire system, the voltage of which is normally intermediate between the voltages of the other conductors of the system and shall also include return wire of a single phase system; (zu) “notified voltage” means a voltage notified by the Appropriate Government under intimation to the Authority for the purpose of specifying the voltage level up to which self-certification is to be carried out under regulation 32 and regulation 45; (zv) “occupier” means the owner or person in occupation of the premises where electricity is used or proposed to be used; (zw) “open sparking” means sparking which owing to the lack of adequate provisions for preventing the ignition of inflammable gas external to the apparatus would ignite such inflammable gas; (zx) “owner or agent or manager of a mine” have the same meanings as are assigned to them in the Mines Act, 1952 (35 of 1952); (zy) “portable apparatus” means an apparatus which is so designed as to be capable of being moved while in operation; (zz) “portable hand lamp” means a portable light-fitting provided with suitable handle, guard and flexible cord connected to a plug; (zza) “protective conductor” means a conductor used for protection against electric shock and intended for connecting together which may include exposed conductive parts, extraneous conductive parts, the main earthing terminal, and the earthed point of the source, or an artificial neutral; (zzb) “self-certification” means a certification by a supplier or owner or consumer in the prescribed format as required under regulation 32 and regulation 45; (zzc) “socket outlet” means an electrical device that is for fixing at a point where fixed wiring terminates, and provides a detachable connection with the pins of a plug, and has two or more contacts and includes a cord extension socket attached to a flexible cord that is permanently connected to installation wiring; (zzd) “span” means the horizontal distance between two adjacent supporting points of an overhead conductor;[भाग III—खण्‍ड 4] भारत‍का‍राजपत्र‍:‍असाधारण 103 (zze) “standard” means Indian Standard and in absence of Indian Standard, International Electrotechnical Commission Standard, Institute of Electrical and Electronic Engineers Standard, European Norms Standard in the sequence of their appearance unless stated otherwise; (zzf) “street box” means an enclosed structure, either above or below ground containing apparatus for transforming, switching, controlling or otherwise regulating electricity; (zzg) “supplier” means any generating company or licensee from whose system electricity flows into the system of another generating company or licensee or consumer; (zzh) “supply lead” means a piece of equipment used to establish the connection between the electric vehicle and either a socket-outlet or a charging point; (zzi) “switch” means a manually operated device for opening and closing or for changing the connection of a circuit; (zzj) “switchboard” means an assembly including the switchgear for the control of electrical circuits, electric connections and the supporting frame; (zzk) “switchgear” shall denote switches, circuit breakers, cut-outs and other apparatus used for the operation, regulation and control of circuits; (zzl) “system” means an electrical system in which all the conductors and apparatus are electrically connected to a common source of electric supply; (zzm) “telecommunication line” means any equipment, structure and cable designed or intended for use in telecommunication; (zzn) “transportable apparatus” means apparatus which is operated in a fixed position but which is so designed as to be capable of being moved readily from one place to another; (zzo) “watt” is a unit of active power; and (zzp) “MW” means megawatt and is equal to 106 watts. (2) Words and expressions used herein and not defined in these regulations but defined in the Act shall have the meanings respectively assigned to them in the Act. Chapter II Designated Person, Chartered Electrical Safety Engineer, Training and Certification 3. Designated person to operate and carry out the work on electrical lines and apparatus. – (1) The supplier or consumer, or owner of electrical installation, owner or agent or manager of a mine, or agent of any company operating in an oil-field or owner of a drilled well in an oil-field or a contractor who has entered into a contract with a supplier or a consumer, or owner of electrical installation, owner or agent or manager of a mine, or agent of any company operating in an oil-field or owner of a drilled well in an oil-field to carry out duties incidental to the generation, transformation, transmission, conversion, distribution or use of electricity shall designate person for the purpose to operate and carry out the work on electrical lines and apparatus. (2) The supplier or consumer, or owner or agent or manager of a mine, or agent of any company operating in an oil-field or the owner of a drilled well in an oil-field or a contractor referred to in sub-regulation (1) shall maintain a record, in paper or electronic form, wherein the names of the designated person and the purpose for which they are designated, shall be entered. (3) No person shall be designated under sub-regulation (1) unless,- (i) he possesses a certificate of competency or electrical work permit, issued by the Appropriate Government; and (ii) his name is entered in the register referred to in sub-regulation (2). 4. Inspection of record of designated person. – (1) The record maintained under sub-regulation (2) of regulation 3 shall be produced before the Electrical Inspector as and when required. (2) If on inspection, the Electrical Inspector finds that the designated person does not comply with sub-regulation (3) of regulation 3, he shall recommend the removal of the name of such person from the record. 5. Electrical Safety Officer. – (1) All suppliers of electricity including generating companies, transmission companies and distribution companies shall designate an Electrical Safety Officer for ensuring observance of safety measures specified under these regulations in their organisation for construction, operation and maintenance of electrical system of all generating stations, transmission lines, substations, distribution systems and supply lines.104 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] (2) The Electrical Safety Officer shall possess a degree in Electrical Engineering with at least five years experience in operation and maintenance of electrical installations or a Diploma in Electrical Engineering with at least ten years experience in operation and maintenance of electrical installations: Provided that the Electrical Safety Officer designated for mines shall possess educational qualification as mentioned in sub-regulation (2) with at least five years of experience in operation and maintenance of electrical installations relevant to mines. (3) For every electrical installation including factory registered under the Factories Act, 1948 (63 of 1952) with more than 250 kW connected load and mines and oil-field as defined in the Mines Act, 1952 (35 of 1952), with more than 2000 kW connected load, the owner of the installation or the management of the factory or mines, as the case may be, shall designate Electrical Safety Officer under sub-regulation (1) and having qualification and experience specified in sub-regulation (2), for ensuring the compliance of the safety provisions laid under the Act and the regulations made thereunder: Provided that the Electrical Safety Officer shall carryout recommended periodic tests as per the relevant standards, and inspect such installations at intervals not exceeding one year, and keep a record thereof in Form I or Form II or Form III or Form IV, as the case may be, of Schedule II of these regulations; test reports and a register of recommendations in regard with safety duly acknowledged by owner; compliances made thereafter; and such records shall be made available to the Electrical Inspector, as and when required. 6. Chartered Electrical Safety Engineer. – (1) The Appropriate Government shall authorise Chartered Electrical Safety Engineer from amongst persons having the qualification and experience as per the guidelines issued by the Authority to assist the owner or supplier or consumer of electrical installations for the purpose of self- certification under regulation 32 and regulation 45 of these regulations. (2) The Appropriate Government shall upload the name of the Chartered Electrical Safety Engineer, as soon as any person is authorised as Chartered Electrical Safety Engineer, on the web portal of the Government or the Department dealing with matters of inspection of electrical installations for the information of the owner or supplier or consumer. 7. Safety measures for operation and maintenance of generating station. – (1) The Engineers and Supervisors engaged or appointed to operate or undertake maintenance of any part or whole of a generating station shall hold degree or diploma in Engineering relevant to the electrical installations from a recognised institute or university. (2) The Engineers and Supervisors engaged or appointed for operation and maintenance of generating station shall have successfully undergone the type of training as specified by the Authority in its guidelines issued under sub-regulation (4) from time to time, within two years from the date of engagement or appointment. (3) The Technicians to assist Engineers or Supervisors shall possess a certificate in appropriate trade, preferably with a two years course from an Industrial Training Institute recognised by the Central Government or the State Government and shall have successfully undergone the type of training as specified in sub-regulation (4), within two years from the date of engagement or appointment: Provided that the existing employees, as on the date of notification of these regulations, who are extending technical assistance to Engineers or Supervisors and do not have requisite qualification as mentioned in this regulation, shall have to undergo the training either from Power Sector Skill Council or from training institute recognised by the Authority for carrying out trade specific course as per the guidelines issued by the Authority and get certificate as mentioned above within two years from the date of notification of these regulations. (4) The Authority shall issue guidelines for the training for operation and maintenance of generating station within six months of the notification of these regulations: Provided that the duration and content of the training course shall be as specified in the guidelines. (5) The owner of every generating station shall arrange for training of personnel engaged or appointed to operate and undertake maintenance of the generating station from its own institute or any other institute recognised by the Authority or State Government as per the guidelines and shall maintain records of the assessment of these personnel issued by the training institute in the format prescribed in guidelines and such records shall be made available to the Electrical Inspector, as and when required. (6) The certificate of recognition of the training institute under these regulations shall be displayed by the Institute on its website at home page. (7) Notwithstanding anything contained in sub-regulation (4), the training syllabus may be customised by the owner of the generating station of capacity below 100 MW owning the training institute for the purpose of imparting training to its employees under intimation to the Authority.[भाग III—खण्‍ड 4] भारत‍का‍राजपत्र‍:‍असाधारण 105 8. Safety measures for operation and maintenance of transmission and distribution systems. – (1) The Engineers or Supervisors engaged or appointed to operate or undertake maintenance of transmission and distribution systems shall hold degree or diploma in appropriate trade of Engineering from a recognised institute or university. (2) The Engineers and Supervisors engaged or appointed to operate or undertake maintenance of transmission and distribution systems shall have successfully undergone the type of training specified in guidelines as per sub- regulation (4), within two years from the date of engagement or appointment. (3) The Technicians to assist Engineers or Supervisors shall possess a certificate in appropriate trade, preferably with a two years course from an Industrial Training Institute recognised by the Central Government or State Government and should have successfully undergone the type of training as specified in guidelines as per sub- regulation (4), within two years from the date of engagement or appointment: Provided that the existing employees, as on the date of notification of these regulations, who are extending technical assistance to Engineers or Supervisors and do not have requisite qualification as mentioned in this regulation, shall have to undergo the training either from Power Sector Skill Council or from training institute recognised by the Authority for carrying out trade specific course as per the guidelines issued by the Authroity and get certificate as mentioned above within two years from the date of notification of these regulations. (4) The Authority shall issue guidelines for the training for operation and maintenance of transmission, distribution systems within six months of the notification of these regulations: Provided that the duration and content of the training course shall be as specified in the guidelines. (5) Owner of every transmission or distribution system shall arrange for training of their personnel engaged or appointed to operate and undertake maintenance of transmission and distribution system, in his own institute or any other institute recognised by the Authority or State Government as per the guidelines and shall maintain records of the assessment of these personnel issued by the training institute in the format prescribed in guidelines and such records shall be made available to the Electrical Inspector, as and when required. 9. Training and Certification of personnel engaged for operation and maintenance at Load Despatch Centres. – (1) The personnel engaged for operation and maintenance at the control room shall hold degree or diploma in Electrical Engineering or in related trade of Engineering from a recognised institute or university. (2) The Authority shall issue guidelines for the training and certification of personnel engaged for operation and maintenance at control room within six months of the notification of these regulations: Provided that the roles and responsibilities of the certification agency, duration and content of the basic and advance certification and training course shall be as specified in the guidelines. (3) The certification agency shall be a training institute recognised by the Authority: Provided that the Load Despatch Centre shall arrange for training and certification of load despatcher from the certification agency recognised by the Authority as per guidelines issued under sub-regulation (2) of this regulation within six months of their engagement: Provided further that no personnel shall be engaged as load despatcher without certification: Provided also that existing employee engaged in Load Despatch Centre shall be trained as per guidelines specified under sub-regulation (2) of this regulation within two years from the date of coming in force of these regulations. (4) The training institute shall maintain records of the assessment of load despatcher in electronic form in the format prescribed in guidelines specified under sub-regulation (2) of this regulation and such records shall be made available to the Secretary, Central Electricity Authority on annual basis. (5) The personnel other than the load despatcher engaged in the Load Despatch Centre shall undergo requisite training in their related work in the Load Despatch Centre within six months of their engagement. (6) The Load Despatch Centre shall submit the details of certified load despatchers and the training details of the other personnel to Secretary, Central Electricity Authority on annual basis in the prescribed format: Provided that Appropriate Government may provide suitable incentive to load despatchers on successful completion of training. 10. Keeping of records and inspection thereof. – (1) The generating company or licensee shall maintain records of the maps, plans and sections relating to supply or transmission of electricity in physical or digital form and provide the same to the Electrical Inspector for inspection as and when required.106 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] (2) The Electrical Inspector shall supply a copy of the report of inspection referred to in sub-regulation (1), to the generating company or licensee, as the case may be. 11. Deposit of maps. – Whenever a licence is granted by the Appropriate Commission, two sets of maps specifying the particular for which the licence is granted shall be signed and dated corresponding to the date of notification of the licence by an officer designated by the Appropriate Commission: Provided that one set of maps shall be retained by the designated officer and the other set shall be furnished to the licensee. 12. Deposit of printed copies. – (1) Every person who is granted a licence shall, within thirty days of the grant thereof, have physical or digital copies of the licence and maps showing the area of supply as specified in the licence to exhibit the same for public inspection at all reasonable times at its head office, local offices, if any, and at the office of every local authority within the area of supply. (2) Every such licensee shall, within the aforesaid period of thirty days, supply free of charge one copy of the licence along with the relevant maps to every local authority within the area of supply and shall also make necessary arrangements for the sale of physical or digital copies of the licence and maps to all persons applying for the same, at a price to be notified by the Appropriate Government from time to time. 13. Plan for area of supply to be made and kept open for inspection. – (1) The licensee shall, after commencing supply of electricity, forthwith cause a plan, to be made in physical or digital form, of the area of supply, and shall cause to be marked thereon the alignment and in the case of underground works, the approximate depth below the surface of all the existing electric supply lines, street distribution boxes and other works, and shall once in every year cause that plan to be duly corrected so as to show the electric supply lines, street distribution boxes and other works for the time being in position and shall also made sections showing the approximate level of all his existing underground works other than service lines. (2) Every plan shall be drawn to such horizontal and vertical scale as the Appropriate Commission may require: Provided that no scale shall be required unless maps of the locality on that scale are for the time being available to the public. (3) Every plan and section so made or corrected, or a copy thereof, marked with the date when it was made or corrected, shall be kept by the licensee at his principal office or place of business within the area of supply, and shall at all reasonable times be open to the inspection of all applicants, and copies thereof shall be supplied. (4) The licensee shall ensure that all new and old plans and sections shall be compatible to the Global Positioning System mapping or mapping through any other latest technology. (5) The licensee shall, if required by an Electrical Inspector, and, where the licensee is not a local authority, by the local authority, if any, concerned, supply free of charge to such Electrical Inspector or local authority a duplicate copy of every such plan or section or a part of the same duly corrected. (6) The copies of plans and sections under this regulation shall be supplied by the licensee to every applicant on the payment of such fee as the Appropriate Commission may, by regulation, specify. Chapter III General safety requirements 14. General safety requirements pertaining to construction, installation, protection, operation and maintenance of electric supply lines and apparatus. – (1) All electric supply lines and apparatus shall be of sufficient rating for power, insulation and estimated fault current and of sufficient mechanical strength, for the duty cycle which they may be required to perform under the environmental conditions of installation, and shall be constructed, installed, protected, worked and maintained in such a manner as to ensure safety of human beings, animals and property. (2) Save as otherwise provided in these regulations, the relevant standards including National Electrical Code and National Building Code shall be followed to carry out the purpose of these regulations and where relevant Indian standards are not available, International standards shall be followed and in the event of any inconsistency, the provisions of these regulations shall prevail. (3) The material and apparatus used shall conform to the relevant standards. (4) All electrical equipment shall be installed above the Highest Flood Level and where such equipment is not possible to be installed above Highest Flood Level, it shall be ensured that there is no seepage or leakage or logging of water. 15. Service lines and apparatus on consumer’s premises. – (1) The supplier shall ensure that all electric supply lines, wires, fittings and apparatus belonging to him or under his control, up to the point of commencement of[भाग III—खण्‍ड 4] भारत‍का‍राजपत्र‍:‍असाधारण 107 supply, which are on a consumer‟s premises, are in a safe-condition and in all respects fit for supplying electricity and the supplier shall take precautions to avoid danger arising on such premises from such supply lines, wires, fittings and apparatus. (2) The service lines placed by the supplier on the premises of a consumer which are underground or which are accessible shall be so insulated and protected by the supplier as to be secured under all ordinary conditions against electrical, mechanical, chemical or other injury to the insulation. (3) The consumer shall, as far as circumstances permit, take precautions for the safe custody of the equipment on his premises belonging to the supplier. (4) The consumer shall also ensure that the installation of the licensee under his control is kept in a safe condition. 16. Switchgear on consumer’s premises. – (1) The supplier shall provide a suitable switchgear in each conductor of every service line other than an earthed or earthed neutral conductor or the earthed external conductor of a concentric cable within a consumer‟s premises, in an accessible position and such switchgear shall be contained within an adequately enclosed fireproof receptacle: Provided that where more than one consumer is supplied through a common service line, each such consumer shall be provided with an independent switchgear at the point of rigid junction to the common service. (2) Every electric supply line other than the earthed or earthed neutral conductor of any system or the earthed external conductor of a concentric cable shall be protected by a suitable switchgear by its owner. 17. Identification of earthed and earthed neutral conductors and position of switches and switchgear therein. – Where the conductors include an earthed conductor of a two-wire system or an earthed neutral conductor of a multi-wire system or a conductor which is to be connected thereto, the following conditions shall be complied with, - (i) an indication of a permanent nature shall be provided by the owner of the earthed or earthed neutral conductor, or the conductor which is to be connected thereto, to enable such conductor to be distinguished from any live conductor and such indication shall be provided as per relevant standards, namely: – (a) where the earthed or earthed neutral conductor is the property of the supplier, at or near the point of commencement of supply; (b) where a conductor forming part of a consumer‟s system is to be connected to the supplier‟s earthed or earthed neutral conductor, at the point where such connection is to be made; and (c) in all other cases, at a point corresponding to the point of commencement of supply. (ii) no cut-out, link, switch or circuit breaker other than a linked switch arranged to operate simultaneously on the earthed or earthed neutral conductor and live conductors shall be inserted or remain inserted in any earthed or earthed neutral conductor of a two wire-system or in any earthed or earthed neutral conductor of a multi-wire system or in any conductor connected thereto: Provided that the above requirement shall not apply in case of a link for testing purposes, or a switch for controlling a generator or transformer. 18. Earthed terminal on consumer’s premises. – (1) The supplier shall provide and maintain on the consumer‟s premises for the consumer‟s use, a suitable earthed terminal in an accessible position at or near the point of commencement of supply as per relevant standards: Provided that in the case of installation of voltage exceeding 250 V the consumer shall, in addition to the aforementioned earthing arrangement, provide his own earthing system with an independent electrode and the same shall be interlinked with the earthed terminal mentioned in sub-regulation (1) through a suitable link. (2) The consumer shall take all reasonable precautions to prevent mechanical damage to the earthed terminal and its lead belonging to the supplier. 19. Accessibility to bare conductors. – Where bare conductors are used in a building, the owner of such conductors shall, - (a) ensure that they are inaccessible to general public; (b) provide in readily accessible position switches for rendering them dead whenever necessary; and (c) take such other safety measures as are specified in the relevant standards. 20. Danger Notices. – The owner of every installation of voltage exceeding 250 V shall affix permanently in a conspicuous position a danger notice in Hindi or English and the local language of the district, with a sign of108 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] skull and bones of a design as per relevant standards on, - (a) every motor, generator, transformer and other electrical plant and equipment together with apparatus used for controlling or regulating the same; (b) all supports of overhead lines of voltage exceeding 650 V which can be easily climbed upon without the aid of ladder or special appliances; and (c) luminous tube sign requiring supply, X-ray and similar high frequency installations of voltage exceeding 650 V but not exceeding 33 kV: Provided that where it is not possible to affix such notices on any generator, motor, transformer or other apparatus, they shall be affixed as near as possible thereto, or the word „danger‟ and the voltage of the apparatus concerned shall be permanently painted on it: Provided further that where the generator, motor, transformer or other apparatus is within an enclosure one notice affixed to the said enclosure shall be sufficient for the purposes of this regulation. Explanation. – For the purposes of clause (b) rails, tubular poles, wooden supports, reinforced cement concrete poles and pre stressed cement concrete poles without steps, I-sections and channels, shall be deemed as supports which cannot be easily climbed upon. 21. Handling of electric supply lines and apparatus. – (1) Before any conductor or apparatus is handled, adequate precautions shall be taken, by earthing or other suitable means, to discharge electrically such conductor or apparatus, and any adjacent conductor or apparatus if there is danger therefrom, and to prevent any conductor or apparatus from being accidentally or inadvertently electrically charged when persons are working thereon shall be followed as per the relevant standards. (2) Every person who is working on an electric supply line or apparatus or both shall be provided with, – (a) personal protective equipment, tools and devices such as rubber gloves and safety footwear suitable for working voltage, safety belts for working at height, nonconductive ladder, earthing devices of appropriate class, helmet, line tester, hand lines, voltage detector and hand tools as per the relevant standards; and (b) any other device for protecting him from mechanical and electrical injury due to arc flash and such personal protective equipment, tools and devices shall conform to the relevant standards and shall always be maintained in sound working condition. (3) No person shall operate and undertake maintenance work on any part or whole of an electrical plant or electric supply line or apparatus and no person shall assist such person on such work, unless he is designated in that behalf and observes the safety precautions given in Part-I, Part-II, Part-III and Part-IV, as the case may be, of Schedule I. (4) Every telecommunication line on supports carrying an overhead line of voltage exceeding 650 V but not exceeding 33 kV shall, for the purpose of working thereon, be deemed to be a line of voltage exceeding 650 V: Provided that prior permission shall be taken from the concerned licensee before laying telecommunication lines on electric supports. (5) For the safety of operating personnel, all non-current carrying metal parts of switchgear and control panels shall be properly earthed and insulating floors or mat conforming to the relevant standards, of appropriate voltage level shall be provided in front and rear of the panels where such personnel are required to carry out operation, maintenance or testing work. (6) All panels shall be painted with the description of their identification at front and at the rear. 22. Supply to vehicles and cranes. – Every person owning a vehicle, travelling crane, or the like to which electricity is supplied from an external source shall ensure that it is efficiently controlled by a suitable switch enabling all voltage to be cut off in one operation and, where such vehicle, travelling crane or the like runs on metal rails, the owner shall ensure that the rails are electrically continuous and earthed at multiple points to ensure equipotential. 23. Cables for portable or transportable apparatus. – (1) Flexible cables shall not be used for portable or transportable motors, generators, transformers, rectifiers, electric drills, electric sprayers, welding sets or any other portable or transportable apparatus unless they are insulated for required voltage as per the relevant standards and adequately protected from mechanical damage. (2) Where the protection is by means of metallic covering, the covering shall be in metallic connection with the frame of any such apparatus and earthed. (3) The cables shall be three core type and four core type for portable and transportable apparatus working on[भाग III—खण्‍ड 4] भारत‍का‍राजपत्र‍:‍असाधारण 109 single phase and three phase supply, respectively and the core meant to be used for earth connection shall be easily identifiable. 24. Cables protected by bituminous materials. – (1) Where the supplier or the owner has brought into use an electric supply line, other than an overhead line, which is not completely enclosed in a continuous metallic covering connected with earth and is insulated or protected in situ by composition or material of a bituminous character, – (i) any pipe, conduit, or the like into which such electric supply line may have been drawn or placed shall, unless other arrangements are approved by the Electrical Inspector in any particular case, be effectively sealed at its point of entry into any street box so as to prevent any flow of gas to or from the street box; and (ii) such electric supply line shall be periodically inspected and tested where accessible, and the result of each such inspection and test shall be duly recorded by the supplier or the owner. (2) The supplier or the owner shall not bring into use any further electric supply line as aforesaid which is insulated or protected in situ by any composition or material known to be liable to produce noxious or explosive gases on excessive heating. 25. Street boxes. – (1) Street boxes shall not contain gas pipes, and precautions shall be taken to prevent, any influx of water or gas. (2) Where electric supply lines forming part of different systems pass through the same street box, they shall be readily distinguishable from one another and all electric supply lines at or in street boxes shall be adequately supported and protected so as to prevent risk of damage to or danger from adjacent electric supply lines. (3) All street boxes shall be regularly inspected for the purpose of detecting the presence of gas and if any influx or accumulation is discovered, the owner shall give immediate notice to the agency or company owning gas pipeline in the neighborhood of the street box and in cases where a street box is large enough to admit the entrance of a person therein have been placed in position, provision shall be made, - (i) to ensure that any gas which may by accident have obtained access to the box shall escape before a person is allowed to enter and the box shall have provision for sufficient cross ventilation; and (ii) for the prevention of danger from sparking. (4) The owners of all street boxes or pillar boxes containing circuits or apparatus shall ensure that their covers and doors are kept closed and locked and are so provided that they can be opened only by means of a key or a special appliance. (5) The street or pillar boxes shall be erected with the live parts at least 0.6 metre above the ground level or above the flood level of the local site condition, whichever is higher. 26. Distinction of different circuits. – The owner of every generating station, substation, junction box or pillar box in which there are any circuits or apparatus, whether intended for operation at different voltages or at the same voltage, shall ensure by means of indication of a permanent nature that the respective circuits are readily distinguishable from each other. 27. Distinction of the installations having more than one feed. – The owner of every installation including substation, double pole structure, four pole structure or any other structure having more than one feed, shall ensure by means of indication of a permanent nature, that the installation is readily distinguishable from other installations. 28. Accidental charging. – (1) The owners of all circuits and apparatus shall so arrange them that there shall be no danger of any part thereof becoming accidentally charged to any voltage beyond the limits of voltage for which they are intended. (2) Where alternating current and direct current circuits are installed on the same box or support, they shall be so arranged and protected that they shall not come into contact with each other. 29. Provisions applicable to protective equipment. – (1) Fire buckets filled with clean dry sand and ready for immediate use for extinguishing fires, in addition to fire extinguishers suitable for dealing with fires, shall be conspicuously marked and kept in all generating stations, enclosed substations and enclosed switching-stations in convenient location. (2) Appropriate type of fire extinguisher conforming to the relevant standards, shall be installed, maintained, periodically inspected and tested as per the relevant standards for extinguishing and controlling fire and record of such tests shall be maintained. (3) Sufficient number of first-aid boxes or cupboards conspicuously marked and equipped with such contents as the State Government may specify or as per the relevant standards, shall be provided and maintained at110 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] appropriate locations in every generating station, enclosed substation, enclosed switching station and in vehicles used for maintenance of lines so as to be readily available and accessible at all the times and all such boxes and cupboards shall, except in the case of unattended substations and switching stations, be kept under the charge of responsible persons who are trained in first-aid treatment and one of such persons shall be available during working hours. (4) Two or more gas masks shall be provided conspicuously and installed and maintained at accessible places in every generating station with capacity of five megawatt and above and enclosed substation with transformation capacity of five megavolt-ampere and above for use in the event of fire or smoke: Provided that where more than one generator with capacity of five megawatt and above is installed in a power station, each generator shall be provided with at least two separate gas masks in an accessible and conspicuous place. (5) In every generating station, substation or switching station, an artificial respirator, fire extinguishers, first-aid boxes and gas masks shall be provided and kept in good working condition and locations of the same shall be displayed in the control room and operator cabin. (6) Address and contact number of the nearest Doctor, Hospital with a facility for first-aid treatment for electric shock and burns, ambulance service and fire service shall be prominently displayed near the electric shock treatment chart in control room and operator cabin. 30. Display of instructions for resuscitation of persons suffering from electric shock. – (1) Instructions, in English or Hindi and the local language of the District and where Hindi is the local language, in English and Hindi for the resuscitation of persons suffering from electric shock, shall be affixed by the owner in a conspicuous place in every generating station, enclosed substation, enclosed switching station, mines and in every factory as defined in the Factory Act, 1948 (63 of 1952) in which electricity is used and in such other premises where electricity is used as the Electrical Inspector may, by notice in writing served on the owner, direct. (2) The owner of every generating station, enclosed substation, enclosed switching station and every factory or other premises to which these regulations apply, shall ensure that all designated persons or persons engaged or appointed to operate and maintain electrical plants or transmission or distribution systems are acquainted with and are competent to apply the instructions referred to in sub-regulation (1). 31. Precautions to be adopted by consumers, owners, occupiers, electrical contractors, electrical workmen and suppliers. – (1) No electrical installation work, including additions, alterations, repairs and adjustments to existing installations, except such replacement of lamps, fans, fuses, switches, domestic appliances of voltage not exceeding 250 V and fittings as in no way alters its capacity or character, shall be carried out upon the premises of or on behalf of any consumer, supplier, owner or occupier for the purpose of supply to such consumer, supplier, owner or occupier except by an electrical contractor licenced in this behalf by the State Government and on its behalf under the direct supervision of a person holding a certificate of competency and by a person holding a permit issued or recognised by the State Government: Provided that in the case of works executed for or on behalf of the Central Government and in the case of installations in mines, oil-fields and railways, the Central Government and in other cases the State Government, may, by notification in the Official Gazette, exempt on such conditions as it may impose, any such work described therein either generally or in the case of any specified class of consumers, suppliers, owners or occupiers: Provided further that in the case of works executed for or on behalf of the Central Government and in the case of installations in mines, oil-fields and railways, an electrical contractor having licence issued by any State Government or Union Territory administration shall not require licence from other State Government in which the works are to be executed. (2) No electrical installation work which has been carried out in contravention of sub-regulation (1) shall either be energised or connected to the works of any supplier. 32. Periodic inspection and testing of installations. – (1) The periodic inspection and testing of installation of voltage above the notified voltage belonging to the owner or supplier or consumer, as the case may be, shall be carried out by the Electrical Inspector: Provided that the electrical installation below or equal to the notified voltage shall be self-certified by the owner or supplier or consumer, as the case may be. (2) The periodicity of electrical inspection by the Electrical Inspector or the self-certification by the supplier, owner or consumer shall be as directed by the Appropriate Government: Provided that the periodicity of electrical inspection and self-certification shall not exceed five years:[भाग III—खण्‍ड 4] भारत‍का‍राजपत्र‍:‍असाधारण 111 Provided further that in respect of the electrical installation belonging to mines, oil-fields and railways, such direction shall be issued by the Central Government. (3) The periodic inspection and testing of installation of voltage equal to or below the notified voltage belonging to the owner or supplier or consumer, as the case may be, shall be carried out by the owner or supplier or consumer and shall be self-certified for ensuring observance of safety measures specified under these regulations and the owner or supplier or consumer, as the case may be, shall submit the report of self-certification to the Electrical Inspector in the Form I or Form II or Form III or Form IV, as the case may be, of Schedule II: Provided that the electrical installation so self-certified shall be considered as duly inspected and tested only after the report of self-certification is duly received by the office of Electrical Inspector and if not acknowledged by the Electrical Inspector within three working days, it shall be deemed to be received: Provided further that the owner or supplier or consumer has the option to get his installation inspected and tested by the Electrical Inspector of the Appropriate Government. (4) Notwithstanding anything contained in sub-regulation (3), every electrical installation covered under section 54 of the Act including every electrical installation of mines, oil-fields and railways shall be periodically inspected and tested by the Electrical Inspector of the Appropriate Government. (5) Where the supplier is directed by the Central Government or the State Government, as the case may be, to inspect and test the installation, such supplier shall report on the condition of the installation to the consumer concerned in the Form I, Form II, Form III and Form IV as provided in Schedule II and shall submit a copy of such report to the Electrical Inspector. (6) The Electrical Inspector may, on receipt of such report, accept the report submitted by the supplier or record variations as the circumstances of each case may require and may recommend that the defects may be rectified as per report. (7) In the event of the failure of the owner of any installation to rectify the defects in his installation pointed out by the Electrical Inspector in his report and within the time indicated therein, such installation shall be liable to be disconnected under the directions of the Electrical Inspector after serving the owner of such installation with a notice for a period not less than forty eight hours: Provided that the installation shall not be disconnected in case an appeal is made under sub section (2) of section 162 of the Act and appellate authority has stayed the orders of disconnection. (8) It shall be the responsibility of the owner of all installations to maintain and operate the installations in a condition free from danger and as recommended by the manufacturer or by the relevant standards. 33. Testing of consumer’s installation. – (1) Upon receipt of an application for a new or additional supply of electricity and before commencement of supply or recommencement of supply after the supply has been disconnected for a period of six months, the supplier shall either test the installation himself or accept the test results submitted by the consumer when same has been duly signed by the licenced electrical contractor: Provided that in case of voltage level equal to or below the notified voltage, Chartered Electrical Safety Engineer can also test the installation on request of owner. (2) The testing and verifications shall be carried out as per relevant standards. (3) The testing equipment shall be calibrated by a Government authorised or National Accreditation Board for Testing and Calibration Laboratories accredited laboratory at periodical interval as per the periodicity specified by them. (4) The supplier shall maintain a record of test results obtained at each supply point to a consumer, as per the forms provided in Schedule III. (5) If as a result of such inspection and test, the supplier is satisfied that the installation is likely to be dangerous, he shall serve on the applicant a notice in writing requiring him to make such modifications as are necessary to render the installation safe and may refuse to connect or reconnect the supply until the required modifications have been completed. 34. Generating units required to be inspected by Electrical Inspector. – The capacity above which generating units including generating units producing electricity from renewable sources of energy shall be required to be inspected by the Electrical Inspector before commissioning, shall be as per the notification issued by the Appropriate Government in this regard. Chapter IV General conditions relating to supply and use of electricity112 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] 35. Precautions against leakage before connection. – (1) The supplier shall not connect its works with the apparatus in the premises of any applicant seeking supply unless the supplier is satisfied that at the time of making the connection cause a leakage from that installation or apparatus of a magnitude detrimental to safety which shall be checked by measuring the installation‟s or apparatus‟ insulation resistance as stipulated in the relevant standards. (2) If the supplier declines to make a connection under the provisions of sub-regulation (1) the supplier shall convey to the applicant the reasons thereof, in writing for so declining. 36. Leakage on consumer’s premises. – (1) If the Electrical Inspector or the supplier has reasons to believe that there is leakage in the system of a consumer which is likely to affect injuriously the use of electricity by the consumer or by other persons, or which is likely to cause danger, he may give notice to the consumer in writing to inspect and test the consumer‟s installation. (2) If after such notice, the consumer fails to provide access to its installation for inspection and testing, or an insulation resistance of the consumer‟s installation is so low as to prevent safe use of electricity, the supplier may, and if directed so by the Electrical Inspector shall discontinue the supply of electricity to the installation but only after giving to the consumer forty eight hours notice in writing for disconnection of supply and shall not recommence the supply until he or the Electrical Inspector is satisfied that the cause of the leakage has been removed. 37. Supply and use of electricity. – (1) The electricity shall not be supplied, transformed, converted, inverted or used or continued to be supplied, transformed, converted, inverted or used unless the conditions provided in sub- regulations (2) to (8) are complied with. (2) The following controls of requisite capacity to carry and break the current shall be installed as near as possible after the point of commencement of supply so as to be readily accessible and capable of completely isolating the supply to the installation, such equipment being in addition to any control switch installed for controlling individual circuits or apparatus, namely: – Supplied at voltage Control Below 11 kV. Switch fuse unit or a circuit breaker by consumers. 11 kV and above. A circuit breaker by consumers. (3) In case of every transformer the following shall be provided, namely: – (i) on primary side of transformer, a linked switch with fuse or gang operated air break switch with fuse or circuit breaker of adequate capacity: Provided that the linked switch with fuse on the primary side of the transformer may be of such capacity as to carry the full load current and to break only the magnetising current of the transformer: Provided further that for transformer having capacity of 1000 kVA and above, a circuit breaker shall be provided: Provided also that the linked switch with fuse or gang operated air break switch with fuse or circuit breaker on the primary side of the transformer shall not be required for the unit auxiliary transformer and generator transformer; (ii) on the secondary side of all transformers a circuit breaker of adequate rating shall be installed: Provided that for supplier‟s transformers of capacity below 1000 kVA, a linked switch with fuse or circuit breaker of adequate rating shall be installed on secondary side. (4) Except in the case of composite control gear designed as a unit each distinct circuit is to be protected against excess energy by means of a suitable fuse link or a circuit breaker of adequate breaking capacity, suitably located and so constructed as to prevent danger from overheating, arcing or scattering of hot metal when it comes into operation and to permit for ready renewal of the fuse link without danger. (5) The supply of electricity to each motor or a group of motors or other apparatus meant for operating one particular machine shall be controlled by a suitable linked switch or a circuit breaker or an emergency tripping device with manual reset of requisite capacity placed in such a position as to be adjacent to the motor or a group of motors or other apparatus readily accessible to and easily operated by the person incharge and so connected in the circuit that by its means all supply of electricity can be cut off from the motor or group of motors or apparatus from any regulating switch, resistance of other device associated therewith. (6) All insulating materials shall be as per their applicaton and their mechanical strength shall be sufficient for[भाग III—खण्‍ड 4] भारत‍का‍राजपत्र‍:‍असाधारण 113 the purpose so as to maintain adequately their insulating property under all working conditions in respect of temperature, moisture, salinity and pollution. (7) Adequate precautions shall be taken to ensure that no live parts are exposed as to cause danger. (8) Every consumer shall use all reasonable means to ensure that where electricity is supplied by the supplier, no person other than the supplier shall interfere with service lines and apparatus placed by the supplier on the premises of the consumer. 38. Provisions for supply and use of electricity in multi-storeyed building more than fifteen metre in height. – (1) The connected load and voltage of supply above which inspection is to be carried out by an Electrical Inspector for a multi-storeyed building of more than fifteen metre height shall be notified by the Appropriate Government. (2) Before making an application for commencement of supply or recommencement of supply after an installation has been disconnected for a period of six months or more, the owner or occupier of a multi-storeyed building shall give not less than thirty days notice in writing to the Electrical Inspector specifying therein the particulars of installation and the supply of electricity shall not be commenced or recommenced within this period, without the approval in writing of the Electrical Inspector. (3) The following safety measures shall be provided in the multi-storeyed buildings of more than fifteen metre height and other premises such as airports, hospitals, hotels, places of entertainment, places of worship, cultural centers, stadium, academic buildings, test labs, industrial installations, installation with explosive or flammable material, railway or metro stations and other public buildings, namely: – (i) the supplier or owner of the installation shall provide at the point of commencement of supply a suitable isolating device with cut-out or breaker to operate on all phases except neutral in the three-phase, four-wire circuit and fixed in a conspicuous position at not more than 1.70 metre above the ground so as to completely isolate the supply to the building in case of emergency; (ii) the owner or occupier of a multi-storeyed building shall ensure that electrical installations and works inside the building are carried out and maintained in such a manner as to prevent danger due to shock and fire hazards, and the installation is carried out as per the relevant standards; (iii) no other service pipes and cables shall be taken through the ducts provided for laying of power cables and all ducts provided for power cables and other services shall be provided with fire barrier at each floor crossing; (iv) the Fire Retardant Low Smoke and Low Halogen power cables shall be used in building of more than fifteen metre height as per relevant standards: Provided that Halogen Free Flame Retardant power cables as per the relevant standards shall be used in airports, hospitals and hotels irrespective of height; (v) distribution of electricity to the floors shall be done using bus bar trunking system; (vi) lightning protection of the building shall be as per the relevant standards; (vii) verification of electrical wiring of the building shall be carried out as per the relevant standards; and (viii) electricity meter shall not be installed in the passage of staircase. 39. Conditions applicable to installations of voltage exceeding 250 Volts. – The following conditions shall be complied with where electricity of voltage above 250 V is supplied, converted, transformed or used, namely: – (i) all conductors, other than those of overhead lines, shall be completely enclosed in mechanically strong metal casing or metallic covering which is electrically and mechanically continuous and adequately protected against mechanical damage unless the said conductors are accessible only to a designated person or are installed and protected so as to prevent danger: Provided that non-metallic conduits conforming to the relevant standards may be used for installations of voltage not exceeding 650 V; (ii) all metal works, enclosing, supporting or associated with the installation, other than that designed to serve as a conductor shall be connected with an earthing system as per relevant standards and the provisions of regulation 43; (iii) every switch board shall comply with the following, namely: – (a) a clear space of not less than one metre in width shall be provided in front of the switchboard; (b) if there are any attachments or bare connections at the back of the switchboard, the space, if any,114 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] behind the switchboard shall be either less than twenty centimetre or more than seventy five centimetre in width, measured from the farthest protruding part of any attachment or conductor; and (c) if the space behind the switchboard exceeds seventy five centimetre in width, there shall be a passage way from either end of the switchboard, clear to a height of 1.8 metre; (iv) in case of installations provided in premises where inflammable materials including gases and chemicals are produced, handled or stored, the electrical installations, equipment and apparatus shall comply with the requirements of flame proof, dust tight, totally enclosed or any other suitable type of electrical fittings depending upon the hazardous zones as per the relevant standards; (v) where an application has been made to a supplier for supply of electricity to any installation, the supplier shall not commence the supply or where the supply has been discontinued for a period of six months or more, recommence the supply unless the consumer has complied with the relevant provisions in these regulations; (vi) where a supplier proposes to supply or use electricity at or to recommence supply of voltage exceeding 250 V but not exceeding 650 V after it has been discontinued for a period of six months, he shall, before connecting or reconnecting the supply, give notice in writing of such intention to the Electrical Inspector; and (vii) if at any time after connecting the supply, the supplier is satisfied that any provision of these regulations have not been complied with, the supplier shall give notice of the same in writing to the consumer and the Electrical Inspector, specifying the defects and to rectify such defects in a reasonable time: Provided that if the consumer fails to rectify such defects the supplier may discontinue the supply after giving the consumer a reasonable opportunity of being heard and recording reasons in writing and the supply shall be discontinued only on written orders of an officer duly notified by the supplier in this behalf and shall be restored with all possible speed after such defects are rectified by the consumer to the satisfaction of the supplier. 40. Appeal to Electrical Inspector in regard to defects. – (1) If any applicant for a supply or a consumer is aggrieved by the action of the supplier in declining to commence, to continue or to recommence the supply of electricity to his premises on the grounds that the installation is defective or is likely to be dangerous, he may appeal to the Electrical Inspector to test the installation and the supplier shall not, if the Electrical Inspector intimates that the installation is free from the defect or danger complained of, refuse supply to the consumer on the grounds aforesaid, and shall, within twenty four hours after the receipt of such intimation from the Electrical Inspector, commence, continue or recommence the supply of electricity. (2) Any test for which application has been made under sub-regulation (1), shall be carried out within seven days after the receipt of such application. 41. Precautions against failure of supply and notice of failures. – (1) The layout of the electric supply lines of the supplier for the supply of electricity throughout his area of supply shall under normal working conditions be sectionalised and so arranged, and provided with switchgear or circuit-breakers, so located, as to restrict within reasonable limits the extent of the portion of the system affected by any failure of supply. (2) The supplier shall take all reasonable precautions to avoid any accidental interruptions of supply, and also to avoid danger to the public or to any employee or designated person when engaged on any operation during and in connection with the installation, extension, replacement, repair and maintenance of any works. (3) The supplier shall send to the Electrical Inspector a notice of failure of supply of such kind as the Electrical Inspector may from time to time require to be notified to him, and such notice shall be sent by the earliest mode of communication after the failure occurs or after the failure becomes known to the supplier and shall be in the Form given in Schedule IV. (4) For the purpose of testing or for any other purpose connected with the efficient working of the supplier‟s installations, the supply of electricity may be discontinued by the supplier for such period as may be necessary, subject to not less than twenty four hours notice being given by the supplier to all consumers likely to be affected by such discontinuance: Provided that no such notice shall be given in cases of emergency. Chapter V Safety provisions for electrical installations and apparatus of voltage not exceeding 650 V 42. Test of insulation resistance. – Where any electric supply line for use at voltages not exceeding 650 V has been disconnected from a system for the purpose of addition, alteration or repair, such electric supply line shall not be reconnected to the system until the supplier or the owner has carried out the test. 43. Connection with earth. – The following conditions shall apply to the connection with earth of systems at[भाग III—खण्‍ड 4] भारत‍का‍राजपत्र‍:‍असाधारण 115 voltage exceeding 50 V but not exceeding 650 V, namely: – (i) neutral conductor of a three phase, four-wire system and the middle conductor of a two-phase, three-wire system shall be earthed as per the relevant standards; (ii) neutral conductor shall also be earthed at one or more points along the distribution system or service line in addition to any connection with earth which shall be at the consumer‟s premises; (iii) in the case of a system comprising electric supply lines having concentric cables, the external conductor or armour of such cables shall be earthed by two separate and distinct connections with earthing system; (iv) in a direct current system, earthing and safety measures shall be as per the relevant standards; (v) every building shall have protective equipotential bonding by interconnecting the exposed and extraneous conductive parts as per the relevant standards; (vi) the alternating current systems which are connected with the earth as provided in this regulation shall be electrically interconnected: Provided that each connection with the earth is bonded to the metal sheathing and metallic armouring, if any, of the electric supply lines; (vii) the frame of every generator, stationary motor, portable motor, and the metallic parts, not intended as conductors, all transformers and any other apparatus used for regulating or controlling electricity, and all electricity consuming apparatus, of voltage exceeding 250 V but not exceeding 650 V shall be earthed by two separate and distinct connections with earth by the owner as specified in the relevant standards; (viii) all metal casing or metallic coverings containing or protecting any electric supply line or apparatus shall be connected with the earth and shall be so joined and connected across all junction boxes and other openings as to provide good mechanical and electrical connection throughout the length: Provided that the conditions mentioned in this regulation shall not apply, where the supply voltage does not exceed 250 V and the apparatus consists of wall tubes or brackets, electroliers, switches, ceiling fans or other fittings, other than portable hand lamps and portable and transportable apparatus, unless provided with the earth terminal and to class-II apparatus and appliances of the relevant standards: Provided further that where the supply voltage is not exceeding 250 V and where the installations are either new or renovated, all plug sockets shall be of the three pin type, and the third pin shall be permanently and effectively earthed; (ix) All earthing systems shall, – (a) consist of equipotential bonding conductors capable of carrying the prospective earth fault current without exceeding the allowable temperature limits as per relevant standards in order to maintain all non- current carrying metal works reasonably at earth potential and to avoid dangerous contact potentials being developed on such metal works; (b) have earth fault loop impedance sufficiently low to permit adequate fault current for the operation of protective device within the time stipulated in the relevant standards; and (c) be mechanically strong, withstand corrosion and retain electrical continuity during the life of the installation and all earthing systems shall be tested to ensure effective earth bonding as per the relevant standards, before the electric supply lines or apparatus are energised; (x) all earthing systems belonging to the supplier shall in addition, be tested for resistance on dry day during the dry season at least once in a year; (xi) earth fault loop impedance shall be tested to ensure the automatic operation of the protective device and a record of every earth test made and the result thereof shall be kept by the supplier for a period of not less than two years after the day of testing and shall be available to the Electrical Inspector when required; (xii) earth fault loop impedance of each circuit shall be limited to a value determined by the type and current rating of the protective device used such that, on the occurrence of an earth fault, disconnection of the supply shall occur before the prospective touch voltage reaches a harmful value; and (xiii) the neutral point of every generator and transformer shall be earthed by connecting it to the earthing system not by less than two separate and distinct connections. 44. Residual Current Device. – The use of electricity to electrical installation, shall be controlled by a residual current device to disconnect the supply having rated residual current and duration as per the relevant standards: Provided that in domestic installation, residual current device having residual operating current not116 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] exceeding 30 milliampere shall be used: Provided further that such protective device shall not be required for supply lines having protective devices which are effectively bonded to the neutral of supply transformers and conforming to regulation 76. Chapter VI Safety provisions for electrical installations and apparatus of voltage exceeding 650 V 45. Approval by the Electrical Inspector and self-certification. – (1) (a) Every electrical installation of notified voltage and below shall be inspected, tested and self-certified by the owner or supplier or consumer, as the case may be, of the installation before commencement of supply or recommencement after shutdown for six months or more for ensuring observance of safety measures specified under these regulations and such owner or supplier or consumer, as the case may be, shall submit the report of self-certification to the Electrical Inspector in the forms as provided under Schedule II of these regulations: Provided that the self-certified electrical installation shall be considered fit for the commencement of supply or recommencement after shutdown for six months only after the report of self-certification is duly received by the office of Electrical Inspector and if not acknowledged by the Electrical Inspector within three working days, it shall be deemed to be received: Provided further that the owner or supplier or consumer, as the case may be, has the option to get his installation inspected and tested by the Electrical Inspector of the Appropriate Government; (b) Notwithstanding anything contained in clause (a), every electrical installation covered under section 54 of the Act including every electrical installation of railways shall be inspected and tested by the Electrical Inspector of the Appropriate Government as specified in sub-regulation (3). (2) The voltage above which inspection and testing of electrical installations including installations of supplier or consumer to be carried out by the Electrical Inspector, shall be notified by the Appropriate Government; (3) Every electrical installation of voltage above the notified voltage and all the apparatus of the generating units above the capacity specified under regulation 34, shall be inspected and tested by the Electrical Inspector before commencement of supply or recommencement after shutdown for six months or more for ensuring observance of safety measures specified under these regulations. (4) Before making an application to the Electrical Inspector for permission to commence or recommence supply in installations above the notified voltage after an installation has been disconnected for six months or more, the supplier shall ensure that electric supply lines or apparatus of more than notified voltage belonging to him are placed in position, properly joined, and duly completed and examined, and the supply of electricity shall not be commenced by the supplier for installations of voltage needing inspection under these regulations unless the provisions of regulations 14 to 31, regulations 35 to 37, regulations 46 to 53 and regulations 57 to 80 have been complied with and the approval in writing of the Electrical Inspector has been obtained by him: Provided that the supplier may energise the aforesaid electric supply lines or apparatus for the purpose of tests specified in regulation 48. (5) The owner of any installations of voltage above the notified voltage shall, before making application to the Electrical Inspector for approval of his installation or additions thereto, test every circuit or additions thereto, other than an overhead line, and satisfy himself that they withstand the application of the testing voltage set out in regulation 48 and shall duly record the results of such tests and submit them to the Electrical Inspector: Provided that the Electrical Inspector may direct such owner to carry out such tests, as he deems necessary or accept the certified tests of the manufacturer in respect of any particular apparatus in place of the tests required by this regulation. (6) The owner of any installation who makes any addition or alteration to his installation shall not connect to the supply his apparatus or electric supply lines, comprising the said alterations or additions, unless and until such alteration or addition has been approved in writing by the Electrical Inspector or self-certified by the owner of the installation, as the case may be. (7) In case of installations of mines and oil-fields, the electrical installations of voltage 650 V and above shall not be connected to supply, unless and until such installation work including alterations or additions or recommencement after shutdown for six months are approved in writing by the Electrical Inspector of Mines: Provided that the electrical installations of voltage below 650 V in mines and oil-fields are to be self- certified by the owner or agent or manager of the mine before commencement of supply or recommencement after shutdown for six months or more in the manner specified in sub-regulation (1). 46. Use of electricity at voltage exceeding 650 V. – (1) The Electrical Inspector where the supply voltage exceeds[भाग III—खण्‍ड 4] भारत‍का‍राजपत्र‍:‍असाधारण 117 the notified voltage shall not authorise the supplier to commence supply or recommence the supply, where the supply has been discontinued for a period of six months or more, or the supplier, where the supply voltage is equal to or below the notified voltage but exceeds 650 V, shall not commence supply or recommence the supply where supply has been discontinued for a period of six months or more, to any consumer unless, – (a) all conductors and apparatus situated on the premises of the consumer are so placed as to be inaccessible except to the designated person; (b) the consumer has provided and agreed to maintain a separate building or a locked weather proof and fire proof enclosure of agreed design and location, to which the supplier at all times shall have access for the purpose of housing his apparatus and metering equipment, or where the provision for a separate building or enclosure is impracticable, the consumer has segregated the aforesaid apparatus of the supplier from any other part of his own apparatus: Provided that the segregation shall be made by the fire walls, if the Electrical Inspector considers it to be necessary: Provided further that in the case of an outdoor installation the consumer shall suitably segregate the aforesaid apparatus belonging to the supplier from his own; (c) all pole type substations are constructed and maintained in accordance with regulation 52. (2) Where electricity at voltage exceeding 650 V is supplied, converted, transformed or used, the owner shall, – (i) maintain safety clearances for electrical apparatus as per relevant standards specification so that sufficient space is available for easy operation and maintenance without any hazard to the operating and maintenance personnel working near the equipment and for ensuring adequate ventilation: Provided that in case of mines, the safety clearances for electrical apparatus to be as per relevant mining regulations; (ii) not allow any encroachment below such installation: Provided that where the Electrical Inspector comes across any such encroachment, he shall direct the owner to remove such encroachments; (iii) maintain minimum safety working clearances specified in Schedule V for the bare conductors or live parts of any apparatus in outdoor substations excluding overhead lines of installations of voltage exceeding 650 V; (iv) ensure that the live parts of all apparatus within the reach from any position in which a person may require to be, are suitably protected to prevent danger; (v) ensure that where the transformer is used, suitable provision shall be made, either by connecting with earth, a point of the circuit at the lower voltage or otherwise, to guard against danger by reason of the said circuit becoming accidentally charged above its normal voltage by leakage from or contact with the circuit at the higher voltage; (vi) not install a substation or a switching station with apparatus having more than 2000 litre of oil in the basement where proper oil draining arrangement cannot be provided; (vii) undertake the following measures, where a substation or a switching station with oil-filled apparatus, such as transformer, static condenser, switchgear or oil circuit breaker having more than 2000 litre of oil is installed, whether indoor or outdoors,- (a) the separation wall or fire barrier walls of thickness and dimensions as specified in the relevant standards shall be provided between the apparatuses and between the apparatus and adjacent building if building wall adjacent to the apparatuses is not rated for four hours fire withstand rating; (b) provisions shall be made for suitable oil soakpit and where use of more than 9000 litre of oil in any one oil tank, receptacle or chamber is involved, provision shall be made for the draining away or removal of any oil which may leak or escape from the tank, receptacle or chamber containing the same, and special precautions shall be taken to prevent the spread of any fire resulting from the ignition of the oil from any cause and adequate provision shall be made for extinguishing any fire which may occur; (c) spare oil shall not be stored in the vicinity of any oil filled equipment in any such substation or switching station; and (d) all the transformers and switchgears shall be maintained in accordance with the maintenance schedules prepared in accordance with the relevant standards;118 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] (viii) without prejudice to the above measures, undertake adequate fire detection and protection arrangement for quenching the fire of the apparatus; (ix) ensure that every transformer of 10 MVA or reactor of 10 MVAR and above rating shall be provided with automatic fire fighting system as per relevant standards; (x) undertake the following measures, where it is necessary to locate the substation, or switching station in the basement, namely: – (a) the transformer room be in the first basement at the periphery; (b) the direct access to the transformer room be provided from outside and the surrounding walls of four hours fire withstand rating be provided as per relevant standards; (c) the entrances to the transformer room be provided with fire resistant doors of two hour fire rating and the door shall always be kept closed and a notice of this effect be affixed on outer side of the door; (d) a curb of a suitable height be provided at the entrance in order to prevent the flow of oil from a ruptured transformer into other parts of the basement; (e) the cables to primary side and secondary side have sealing at all floors and wall opening of atleast two hours fire withstand rating; and (f) Fire Retardant Low Smoke Low Halogen cable as per relevant standards be used; (xi) ensure that oil filled transformers installed indoors in other than residential or commercial buildings are placed on the ground floor or not below the first basement; (xii) ensure that only dry type transformer shall be used inside the residential and commercial buildings; (xiii) ensure that cable trenches inside the substations and switching stations containing cables are filled with sand, pebbles or similar non-inflammable materials or completely covered with non-inflammable slabs; and (xiv) ensure that unless the conditions are such that all the conductors and apparatus may be made dead at the same time for the purpose of cleaning or for other work, the said conductors and apparatus shall be so arranged that these may be made dead in sections, and that work on any such section may be carried on by the person designated or appointed or engaged or permited under these regulations without danger. (3) The minimum clearances specified in Schedule VI shall be maintained for bare conductors or live parts of any high voltage direct current apparatus in outdoor substations, excluding high voltage direct current overhead lines. (4) There shall not be tapping of another transmission line from the main line for 66 kV and above class of lines: Provided that during natural calamities, tapping may be allowed to ensure emergency power supply to affected areas till normalcy is restored. 47. Inter-locks and protection for use of electricity at voltage exceeding 650 V. – (1) The owner shall ensure the following, namely: – (i) isolators and the controlling circuit breakers shall be inter-locked so that the isolators cannot be operated unless the corresponding breaker is in open position; (ii) isolators and the corresponding earthing switches shall be inter-locked so that no earthing switch can be closed unless and until the corresponding isolator is in open position; (iii) where two or more supplies are not intended to be operated in parallel, the respective circuit breakers or linked switches controlling the supplies shall be inter-locked to prevent possibility of any inadvertent paralleling or backfeed; (iv) when two or more transformers are operated in parallel, the system shall be so arranged as to trip the secondary breaker of the transformer in case the primary breaker of that transformer trips; (v) all gates or doors which provide access to live parts of an installation shall be inter-locked in such a way that these cannot be opened unless the live parts are made dead and proper discharging and earthing of these parts shall be ensured before any person comes in close proximity of such parts; and (vi) where two or more generators operate in parallel and neutral switching is adopted, inter-lock shall be provided to ensure that the generator breaker cannot be closed unless one of the neutrals is connected to the earthing system.[भाग III—खण्‍ड 4] भारत‍का‍राजपत्र‍:‍असाधारण 119 (2) The following protection shall be provided in all systems and circuits to automatically disconnect the supply under abnormal conditions, namely: – (i) over current protection to disconnect the supply automatically if the rated current of the equipment, cable or supply line is exceeded for a time which the equipment, cable or supply line is not designed to withstand; (ii) earth fault or earth leakage protection to disconnect the supply automatically, if the earth fault current exceeds the limit of current for keeping the contact potential within the reasonable values; (iii) buchholz relay, pressure relief device and winding and oil temperature protection with alarm and trip contacts shall be provided on all transformers of ratings 1000 kVA and above; (iv) transformers of capacity 10 MVA and above shall be protected against incipient faults by differential protection; (v) all generators with rating of 100 kVA and above shall be protected against earth fault or leakage; (vi) all generators of rating 1000 kVA and above shall be protected against faults within the generator winding using restricted earth fault protection or differential protection or by both; (vii) high speed bus bar differential protection along with local breaker back up protection shall be commissioned and shall always be available at all 132 kV and above voltage substations and switching stations and generating stations connected with the grid: Provided that in respect of existing 132 kV substations and switching stations having more than one incoming feeders, the high speed bus bar differential protection along with local breaker back up protection, shall be commissioned and shall always be available; and (viii) in addition to above, all electrical protection system for generating stations, substations and transmission lines shall be as per the regulations notified by the Authority under clause (e) of sub-section (2) of section 177 of the Act. 48. Testing, Operation and Maintenance. – (1) Before the approval is accorded by the Electrical Inspector under regulation 45, the manufacturer‟s test certificates shall, if required, be produced for all the type, acceptance and routine tests as required under the relevant standards. (2) No new apparatus, cable or supply line of voltage exceeding 650 V shall be commissioned unless such apparatus, cable or supply line are subjected to site tests as per relevant standards. (3) No apparatus, cable or supply line of voltage exceeding 650 V which has been kept disconnected for a period of six months or more from the system for alterations or repair, shall be connected to the system until such apparatus, cable or supply line are subjected to the site tests as per relevant standards. (4) Notwithstanding the provisions of this regulation, the Electrical Inspector may require certain tests to be carried out before or after charging the installations. (5) All apparatus, cables and supply lines shall be maintained in healthy conditions and tests shall be carried out periodically as per the relevant standards. (6) Records of all tests, trippings, maintenance works and repairs of all apparatus, cables and supply lines shall be duly kept in such a way that these records can be compared with the past records. (7) It shall be the responsibility of the owner of all installations of voltage exceeding 650 V to maintain and operate the installations in a condition free from danger and as recommended by the manufacturer or by the relevant standards. (8) Failures of any 220 kV and above voltage level transformer, reactor and transmission line towers shall be reported by the owner of electrical installation, within forty eight hours of the occurrence of the failure, to the Authority and the reasons for failure and measures to be taken to avoid recurrence of failure shall be sent to the Authority within one month of the occurrence in the forms provided in Schedule VII: Provided that in case of mines and oil-fields, the failure of 10 MVA or above transformers shall be reported to Electrical Inspector of mines. 49. Precautions to be taken against excess leakage in case of metal sheathed electric supply lines. – The following precautions shall be taken in case of electric supply lines other than overhead lines, for use at voltage exceeding 650 V, namely: – (i) the conductors of the cable except the cable with thermoplastic or cross linked polyethylene, insulation without any metallic screen or armour shall be enclosed in metal sheathing which shall be electrically continuous and connected with earth, and the conductivity of the metal sheathing shall be maintained and reasonable120 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] precautions shall be taken where necessary to avoid corrosion of the sheathing; (ii) the resistance of the earth connection with metallic sheath shall be kept low enough to permit the controlling circuit breaker or cut-out to operate in the event of any failure of insulation between the metallic sheath and the conductor. Explanation. – For the purposes of this regulation; (a) in the case of thermoplastic insulated and sheathed cables with metallic armour, the metallic wire or tape armour shall be considered as metal sheathing; and (b) where an electric supply line as aforesaid has concentric cables and the external conductor is insulated from an outer metal sheathing and connected with earth, the external conductor may be regarded as the metal sheathing for the purposes of this regulation provided that the foregoing provisions as to conductivity are complied with. 50. Connection with earth for apparatus exceeding 650 V. – (1) The entire switchyard or substation equipment and buildings including all non-current carrying metal parts associated with an installation shall be effectively earthed to an earthing system or mat which shall, – (i) limit the touch and step potential to tolerable values as per relevant standards; (ii) limit the earth potential rise to tolerable values as per relevant standards, so as to prevent danger due to transfer of potential through ground, earth wires, cable sheath, fences, pipe lines or other such equipment; and (iii) maintain the resistance of the earth connection to such a value as to make operation of the protective device effective. (2) In the case of star connected system with earthed neutrals or delta connected system with earthed artificial neutral point,- (i) the neutral point of every generator and transformer shall be earthed by connecting it to the earthing system not by less than two separate and distinct connections: Provided that the neutral point of a generator may be connected to the earthing system through an impedance to limit the fault current: Provided further that in the case of multi-machine systems, neutral switching may be resorted to, for limiting the injurious effect of harmonic current circulation in the system; (ii) the generator or transformer neutral shall be earthed through a suitable impedance where an appreciable harmonic current flowing in the neutral connection causes interference with the communication circuits; and (iii) in case of the delta connected system, the neutral point shall be obtained by the insertion of a earthing transformer and current limiting resistance or impedance wherever considered necessary at the commencement of such a system. (3) In case of generating stations, substations and other installations of voltage exceeding 33 kV, the system neutral earthing and protective frame earthing may be, if system design so warrants, integrated into common earthing grid provided the resistance to earth of combined mat does not cause the step and touch potential to exceed the values as per relevant standards. (4) Single phase systems of voltage exceeding 650 V shall be effectively earthed. (5) In the case of a system comprising electric supply lines having concentric cables, the external conductor shall be connected with the earth. (6) Where a supplier proposes to connect with earth an existing system for use at voltage exceeding 650 V which has not hitherto been so connected with earth, he shall give not less than fourteen days notice in writing together with particulars of the proposed connection with earth to the telegraph authority established under the Indian Telegraph Act, 1885 (13 of 1885). (7) Where the earthing lead and earth connection are used only in connection with earthing guards laid under overhead lines of voltage exceeding 650 V but not exceeding 33 kV where they cross a telecommunication line or a railway line, and where such lines are equipped with earth leakage protective device, the earth resistance shall not exceed twenty five ohms and the project authorities shall obtain no objection certificate from Railway Authorities and Power and Telecommunication Coordination Committee before energisation of the facilities. (8) Every earthing system belonging to either the supplier or the consumer shall be tested for its resistance to earth on a dry day during dry season not less than once in a year and records of such tests shall be maintained[भाग III—खण्‍ड 4] भारत‍का‍राजपत्र‍:‍असाधारण 121 and produced, if so required, before the Electrical Inspector. 51. General conditions for transformation and control of electricity. – Where electricity of voltage exceeding 650 V is transformed, converted, regulated or otherwise controlled in substations or switching stations including outdoor substations and outdoor switching stations or in street boxes constructed underground, the following provisions shall be ensured, namely: – (i) substations and switching stations shall preferably be erected above ground, but where necessarily constructed underground due provisions for ventilation and drainage shall be made and any space housing switchgear shall not be used for storage of any materials especially inflammable and combustible materials or refuse; and (ii) (a) outdoor substations except pole type substations and outdoor switching stations shall, unless the apparatus is completely enclosed in a metal covering connected with earth, the said apparatus also being connected with the system by armoured cables, be protected by fencing not less than 1.8 metre in height or other means so as to prevent access to the electric supply lines and apparatus therein by an unauthorised person and the fencing of such area shall be earthed efficiently; and (b) transformer mounting structure shall be as per the regulations notified by the Authority under clause (e) of sub-section (2) of section 177 of the Act. 52. Pole type substations. – Where platform type construction is used for a pole type substation and sufficient space for a person to stand on the platform is provided, a proper hand rail shall be built around the platform and if the hand rail is of metal, it shall be connected with the earth: Provided that in the case of pole type substation on wooden supports and wooden platform, the metal hand rail shall not be connected with the earth. 53. Condensers. – Suitable arrangement shall be made for immediate and automatic or manual discharge of every static condenser on disconnection of supply. 54. Supply to luminous tube sign installations of voltage exceeding 650 V but not exceeding 33 kV. – (1) Any person who proposes to use or who is using electricity for the purpose of operating a luminous tube sign installation, or who proposes to transform or is transforming electricity to a voltage exceeding 650 V but not exceeding 33 kV for any such purpose shall comply with the following conditions, namely: – (i) all live parts of the installation, including all apparatus and live conductors in the secondary circuit, but excluding the tubes except in the neighbourhood of their terminals, shall be inaccessible to undesignated persons and such parts shall be effectively screened; (ii) irrespective of the method of obtaining the voltage of the circuit which feeds the luminous discharge tube sign, no part of any conductor of such circuit shall be in metallic connection, except in respect of its connection with earth, with any conductor of the supply system or with the primary winding of the transformer; (iii) all live parts of an exterior installation shall be so disposed as to protect them against the effects of the weather and such installation shall be so arranged and separated from the surroundings as to limit, as far as possible, the spreading of fire; (iv) the secondary circuit shall be permanently earthed at the transformer and the core of every transformer shall be earthed; (v) where the conductors of the primary circuit are not in metallic connection with the supply conductors, one phase of such primary circuit shall be permanently earthed at the motor generator or convertor, or at the transformer and an earth leakage circuit breaker of sufficient rating shall be provided on the side of voltage not exceeding 250 V to detect the leakage in such luminous tube sign installations; (vi) a sub-circuit which forms the primary circuit of a fixed luminous discharge tube sign installation shall be reserved solely for such purpose; (vii) a separate primary final sub-circuit shall be provided for each transformer or each group of transformers having an aggregate input not exceeding 1000 volt-amperes of a fixed luminous discharge tube sign installation; (viii) an interior installation shall be provided with suitable adjacent means for disconnecting all phases of the supply except the “neutral” in a three-phase, four-wire circuit; (ix) for installations on the exterior of a building a suitable emergency fire-proof linked switch to operate on all phases except the neutral in a three-phase, four-wire circuit shall be provided and fixed in a conspicuous position at not more than 1.70 metre above the ground;122 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] (x) a special “caution” notice shall be affixed in a conspicuous place on the door of every enclosure of voltage exceeding 650 V but not exceeding 33 kV to the effect that the supply must be cut off before the enclosure is opened; (xi) where static condensers are used, they shall be installed on the load side of the fuses and the primary side of the transformers where the voltage does not exceed 250 V; (xii) where static condensers are used on primary side, provision shall be made for automatic or manual discharging of the condensers when the supply is cut off; and (xiii) before using the static condensers or any interrupting device on the voltage exceeding 650 V, the executing agencies shall test and ensure that automatic discharging device is functional thereon. (2) The owner or user of any luminous tube sign or similar installation of voltage exceeding 650 V but not exceeding 33 kV shall not bring the same into use without giving to the Electrical Inspector not less than fourteen days‟ notice in writing of his intention so to do. 55. Supply to electrode boilers of voltage exceeding 650 V but not exceeding 33 kV. – (1) Where a system having a point connected with earth is used for supply of electricity to an electrode boiler of voltage exceeding 650 V which is also connected with earth, the owner or user of electrode boiler shall comply with the following conditions, namely: – (i) the metal work of the electrode boiler shall be efficiently connected to the metal sheathing and metallic armouring, if any, of the electric supply line of voltage exceeding 650 V but not exceeding 33 kV whereby electricity is supplied to the electrode boiler; (ii) the supply of electricity at voltage exceeding 650 V to the electrode boiler shall be controlled by a suitable circuit-breaker so set as to operate in the event of the phase currents becoming unbalanced to the extent of ten per cent of the rated current consumption of the electrode boiler under normal conditions of operation: Provided that if in any case a higher setting is essential to ensure stability of operation of the electrode boiler, the setting may be increased so as not to exceed fifteen per cent of the rated current consumption of the electrode boiler under normal conditions of operation; (iii) an inverse time element device may be used in conjunction with the aforesaid circuit breaker to prevent the operation thereof unnecessarily on the occurrence of unbalanced phase currents of momentary or short duration; and (iv) the supplier or owner shall serve a notice in writing on the telegraph authority at least seven days prior to the date on which such supply of electricity is to be afforded specifying the location of every point, including the earth connection of the electrode boiler, at which the system is connected with earth. (2) The owner or user of any electrode boiler of voltage exceeding 650 V shall not bring the same into use without giving the Electrical Inspector not less than fourteen days‟ notice in writing of his intention so to do. 56. Supply to X-ray and high frequency installations. – (1) Any person, who proposes to use or who is using electricity for the purpose of operating an X-ray or similar high-frequency installation, other than portable units or shock-proof self contained and stationary units shall comply the following conditions, namely: – (i) mechanical barriers shall be provided to prevent too close an approach to any parts of the X-ray apparatus of voltage exceeding 650 V but not exceeding 33 kV, except the X-ray tube and its leads, unless such parts of voltage exceeding 650 V but not exceeding 33 kV have been rendered shock proof by being shielded by earthed metal or adequate insulating material; (ii) where generators operating at 300 kV peak or more are used, such generators shall be installed in rooms separate from those containing the other equipment and any step-up transformer employed shall be so installed and protected as to prevent danger; (iii) a suitable switch shall be provided to control the circuit supplying a generator and shall be so arranged as to be open except while the door of the room housing the generator is locked from the outside; (iv) X-ray tubes used in therapy shall be mounted in an earthed metal enclosure; and (v) every X-ray machine shall be provided with a milliammeter or other suitable measuring instrument, readily visible from the control position and connected, if practicable, in the earthed lead, but guarded if connected in the lead of voltage exceeding 650 V but not exceeding 33 kV: Provided that earth leakage circuit breaker of sufficient rating shall be provided on the side wherein voltage does not exceed 250 V to detect the leakage in such X-ray installations.[भाग III—खण्‍ड 4] भारत‍का‍राजपत्र‍:‍असाधारण 123 Explanation. – For the purposes of this regulation “shock proof”, as applied to X-ray and high-frequency equipment, shall mean that such equipment is guarded with earthed metal so that no person may come into contact with any live part. (2) In the case of nonshock proof equipment.- (i) the overhead conductors of voltage exceeding 650 V but not exceeding 33 kV, unless suitably guarded against personal contact, shall be adequately spaced and high voltage leads on tilting tables and fluoroscopes shall be adequately insulated or so surrounded by barriers as to prevent inadvertent contact; (ii) the circuit of voltage not exceeding 250 V of the step up transformer shall contain a manually operated control device having overload protection, in addition to the over current device for circuit protection, and these devices shall have no exposed live parts and for diagnostic work there shall be an additional switch in the said circuit, which shall be of one of the following types:- (a) a switch with a spring or other mechanism that will open automatically except while held close by the operator; or (b) a time switch which will open automatically after a definite period of time for which it has been set; (iii) if more than one piece of apparatus be operated from the same source of voltage exceeding 650 V, each shall be provided with a switch of voltage exceeding 650 V to give independent control; (iv) low frequency current-carrying parts of a machine of the quenched-gap or open gap type shall be so insulated or guarded that they cannot be touched during operation but the high frequency circuit- proper which delivers high-frequency current normally for the therapeutic purposes shall be exempt from such insulation; (v) all X-ray generators having capacitors shall have suitable means for discharging the capacitors manually; and (vi) except in the case of self-contained units, all 200 kV peak or higher X-ray generators shall have a sphere gap installed in the system of voltage exceeding 650 V but not exceeding 33 kV adjusted so that it will break down on over voltage surges. (3) (i) all non-current carrying metal parts of tube stands, fluoroscopes and other apparatus shall be properly earthed and insulating floors, mats or platforms shall be provided for operators in proximity to parts of voltage exceeding 650 V unless such parts have been rendered shock proof; and (ii) where short wave therapy machines are used, the treatment tables and examining chairs shall be wholly non-metallic. (4) The owner of any X-ray installation or similar high frequency apparatus shall not bring the same into use without giving to the Electrical Inspector not less than fourteen days‟ notice in writing of his intention to do so: Provided that the aforesaid notice shall not be necessary in the case of shock-proof portable X-ray and high-frequency equipment which have been inspected before the commencement of their use and periodically thereafter. Chapter VII Safety requirements for overhead lines and underground cables 57. Material and strength. – (1) All conductors of overhead lines other than those provided in regulation 70 shall have a breaking strength of not less than 350 kgf. (2) Where the voltage does not exceed 250 V and the span is less than fifteen metre and is drawn through the owner‟s or consumer‟s premises, a conductor having an actual breaking strength of not less than 150 kgf may be used. 58. Joints. – (1) No conductor or earthwire of an overhead line shall have more than one joint in a span: Provided that there shall be no joints in the conductor or earthwire in a span of crossing over the highways, expressways and railway lines. (2) The joint between conductors or earthwires of overhead lines shall be mechanically and electrically secured124 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] under the conditions of operation and the ultimate strength and the electrical conductivity of the joint shall be as per relevant standards. 59. Maximum stresses and factors of safety. – (1) The load and permissible stresses on the structural members, conductors and earth wire of self supporting steel lattice towers or steel monopole towers for overhead transmission lines shall be as per relevant standards. (2) Overhead lines not covered in sub-regulation (1) shall have the minimum factors of safety as per the table given below:- Description Minimum factor of safety metal supports 1.5 mechanically processed concrete supports 2.0 hand-moulded concrete supports 2.5 wood supports 3.0 (3) The minimum factor of safety shall be based on such load as may cause failure of the support to perform its function, assuming that the foundation and other components of the structure are intact. (4) The load shall be equivalent to the yield point stress or the modulus of rupture, as the case may be, for supports subject to bending and vertical loads and the crippling load for supports used as strut. (5) The strength of the supports of the overhead lines in the direction of the line shall not be less than one-fourth of the strength required in the direction transverse to the line. (6) The minimum factor of safety for stay-wires, guard-wires or bearer-wires shall be 2.5 based on the ultimate tensile strength of the wire. (7) The tension limit for conductor and earth wire shall be as per relevant standards. (8) For the purpose of calculating the factors of safety in sub-regulation (2), the following conditions shall be observed, namely: – (i) the maximum wind pressure shall be as specified in the relevant standards; (ii) for cylindrical bodies the effective area shall be taken as full projected area exposed to wind pressure; and (iii) the maximum and minimum temperatures shall be as specified in the relevant standards. (9) Notwithstanding anything contained in sub-regulation (2) to (8), in localities where overhead lines are likely to accumulate ice or snow, the load and permissible stresses on the structural members, conductors and earth wire of self supporting steel lattice towers and steel monopole towers for overhead transmission lines shall be as per relevant standards and in accordance with the specifications laid down, from time to time, by the Appropriate Government by order in writing. 60. Clearance in air of the lowest conductor of overhead lines. – (1) The minimum clearance above ground and across road surface of National Highway or Expressway or State Highway or other road or highest traction conductor of railway corridor or navigational or non-navigational river of the lowest conductor of an alternating current overhead line, including service lines, of nominal voltage shall have the values specified in Schedule VIII A. (2) The minimum clearances regarding high voltage direct current line shall be as per Schedule VIII B. (3) In case of Electric lines of 33 kV and below passing through the protected areas (National Parks, Wildlife Sanctuaries, Conservation Reserves, Community Reserves), Eco-sensitive zones around the protected areas and Wildlife Corridors, only underground cable shall be used. (4) No tower footing or structure of an overhead line of voltage 33 kV or above or high voltage direct current, shall be closer than twenty five metre from the edge of the right of way of a Petroleum or Natural Gas pipeline. (5) Wherever overhead line of voltage 33 kV or above or high voltage direct current intending to cross the right of way of a Petroleum or Natural Gas pipeline, the angle of crossing of the overhead line with respect to the pipelines shall preferably be at right angles and, in any case, the crossing angle shall not be less than seventy five degrees. 61. Clearance between conductors and trolley wires. – (1) No conductor of an overhead line crossing a tramway or trolley bus route using trolley wires shall have less than the following clearances above any trolley wire, namely: –[भाग III—खण्‍ड 4] भारत‍का‍राजपत्र‍:‍असाधारण 125 (i) lines of voltage not exceeding 650 V - 1.2 metre: Provided that where an insulated conductor suspended from a bearer wire crosses over a trolley wire the minimum clearance for such insulated conductor shall be 0.6 metre. (ii) lines of voltage exceeding 650 V up to and including 11000 V - 1.8 metre; (iii) lines of voltage exceeding 11000 V but not exceeding 33000 V - 2.5 metre; (iv) lines of voltage exceeding 33 kV - 3.0 metre. (2) In any case of a crossing specified in sub-regulation (1), whoever lays his overhead line later, shall provide the clearance between his own overhead line and the overhead line which will be crossed in accordance with the provisions of the sub-regulation (1): Provided that if the later entrant is the owner of the lower overhead line and is not able to provide adequate clearance, he shall bear the cost for modification of the upper line so as to comply with sub-regulation (1). 62. Clearance from buildings of lines of voltage and service lines not exceeding 650 V. – (1) An overhead line shall not cross over an existing building as far as possible and no building shall be constructed under an existing overhead line. (2) Where an overhead line of voltage not exceeding 650 V passes above or adjacent to or terminates on any building, the following minimum clearances from any accessible point, on the basis of maximum sag, shall be observed, namely: – (i) for any flat roof, open balcony, varandah roof and lean-to-roof, – (a) when the line passes above the building, a vertical clearance of 2.5 metre from the highest point; and (b) when the line passes adjacent to the building, a horizontal clearance of 1.2 metre from the nearest point; (ii) for pitched roof, – (a) when the line passes above the building, a vertical clearance of 2.5 metre immediately under the line; and (b) when the line passes adjacent to the building, a horizontal clearance of 1.2 metre. (3) Any conductor so situated as to have a clearance less than that specified in sub-regulation (2) shall be replaced with Aerial Bunched Cable and to be attached at suitable intervals to a bare earthed bearer wire having a breaking strength of not less than 350 kgf. (4) The horizontal clearance shall be measured when the line is at a maximum deflection from the vertical due to wind pressure. (5) The vertical and horizontal clearances shall be measured as per illustration provided in Schedule VIII C. Explanation. – For the purposes of this regulation, the expression “building” shall be deemed to include any structure, whether permanent or temporary. 63. Clearances from buildings of lines of voltage exceeding 650 V. – (1) An overhead line shall not cross over an existing building as far as possible and no building shall be constructed under an existing overhead line. (2) Where an overhead line of voltage exceeding 650 V passes above or adjacent to any building or part of a building it shall have on the basis of maximum sag a vertical clearance above the highest part of the building immediately under such line, of not less than, – (i) for lines of voltages exceeding 650 V and up to and - 3.7 metre; including 33 kV (ii) for lines of voltages exceeding 33 kV - 3.7 metre plus 0.30 metre for every additional 33 kV or part thereof. (3) The horizontal clearance between the nearest conductor and any part of such building shall, on the basis of maximum deflection due to wind pressure, be not less than, – (i) for lines of voltages exceeding 650 V and up to and - 1.2 metre; including 11 kV126 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] (ii) for lines of voltages exceeding 11kV and up to and - 2.0 metre; including 33 kV (iii) for lines of voltages exceeding 33 kV - 2.0 metre plus 0.3 metre for every additional 33 kV or part thereof. (4) For high voltage direct current systems, the vertical and horizontal clearances, on the basis of maximum deflection due to wind pressure, from buildings shall be maintained as below: Sl. No. High Voltage Direct Current Vertical Clearance (metre) Horizontal Clearance (metre) 1. 100 kV 4.6 2.9 2. 200 kV 5.8 4.1 3. 300 kV 7.0 5.3 4. 400 kV 7.9 6.2 5. 500 kV 9.1 7.4 6. 600 kV 10.3 8.6 7. 800 kV 12.4 10.7 (5) The vertical and horizontal clearances shall be as measured as illustrated in Schedule VIII C. Explanation. – For the purposes of this regulation, the expression “building” shall be deemed to include any structure, whether permanent or temporary. 64. Conductors at different voltages on same supports. – Where conductors of different voltages are laid on the same supports, the owner shall make adequate provision to guard against danger to linemen and others, from the lower voltage system being charged above its nominal voltage, by leakage from or contact with the higher voltage and the methods of construction and the applicable minimum clearances between the conductors of the two systems shall be as provided in regulation 71. 65. Erection or alteration of buildings, structures, flood banks and elevation of roads. – (1) If at any time subsequent to the erection of an overhead line, whether covered with insulating material or not or underground cable, any person proposes to erect a new building or structure or flood bank or to raise any road level or to carry out any other type of work whether permanent or temporary or to make in or upon any building, or structure or flood bank or road, any permanent or temporary addition or alteration, such person and the contractor whom he employs to carry out the erection, addition or alteration, shall give intimation in writing of his intention to do so, to the supplier or owner and to the Electrical Inspector and shall furnish therewith a scale drawing showing the proposed building, structure, flood bank, road or any addition or alteration and scaffolding thereof required during the construction. (2) On receipt of such intimation, the supplier or owner shall examine,- (a) whether the overhead line or underground cable under reference was laid in accordance with the provisions of these regulations and any other law for the time being in force; (b) whether it is technically feasible; (c) whether it meets the requirement of right of way; and (d) whether such person was liable to pay the cost of alteration of the overhead line or underground cable and if so, issue a notice within a period of thirty days to such person together with an estimate of the cost of the expenditure likely to be incurred to alter the overhead line or underground cable and require him to deposit, within thirty days of the receipt of the notice, with the supplier or owner, the amount of the estimated cost. (3) If such person disputes the cost of alteration of the overhead line or underground cable estimated by the supplier or owner or even the responsibility to pay such cost, the dispute may be referred to the Electrical Inspector who shall after hearing both parties decide upon the issue in accordance with sub-regulation (4). (4) The Electrical Inspector shall estimate the cost of alteration of overhead line or underground cable on the following basis, namely: – (a) the cost of material used for the alteration after accounting for the depreciated cost of the material of the[भाग III—खण्‍ड 4] भारत‍का‍राजपत्र‍:‍असाधारण 127 existing line or underground cable; (b) the wages of labour employed in the alteration; and (c) the supervision charge to the extent of fifteen per cent of the wages mentioned in clause (b) and charges incurred by the owner or supplier or consumer in complying with the provisions of section 67 of the Act, in respect of alterations. (5) Any addition or alteration to the building or structure shall be allowed only after the deposit of such estimated cost to the supplier or owner. (6) No work upon such building, structure, flood bank, road and addition or alteration thereto shall commence or continue until the Electrical Inspector certifies that regulations 60, 62 , 63, 66 and regulation 79 have not been contravened either during or after the construction: Provided that the Electrical Inspector may, if he is satisfied that the overhead line or underground cable has been so guarded as to secure the protection of persons or property from injury, certify within fifteen days that the work may be executed prior to the alteration of the overhead line or underground cable or in the case of temporary addition or alteration, without alteration of the overhead line or underground cable. (7) The supplier or owner shall, on receipt of such deposit, alter the overhead line or underground cable in such a way that it does not contravene the regulations 60, 62, 63 and 79 either during or after such construction within two months from the date of such deposit or within such longer period as the Electrical Inspector may permit for reasons to be recorded in writing. 66. Transporting and storing of material near electric lines. – (1) No rods, pipes or similar materials shall be taken below, or in the vicinity of any bare overhead conductors or lines: Provided that if these materials contravene the regulations 62 and 63, such materials shall be transported under the direct supervision of a person designated or appointed or engaged or permitted under these regulations. (2) No rods, pipes or other similar materials shall be brought within the flash over distance of bare live conductors or overhead lines. (3) No material or earth work or agricultural produce shall be dumped or stored, no trees grown below or in the vicinity of bare overhead conductors or lines in contravention to the regulations 62 and 63. (4) No flammable material shall be stored under the electric line. (5) No fire shall be allowed below overhead lines and above the demarcated underground cables. 67. General clearances. – (1) For the purpose of computing the vertical clearance of an overhead line, the maximum sag of any conductor shall be calculated on the basis of the maximum sag in still air and the maximum temperature as specified under regulation 59 and computing any horizontal clearance of an overhead line the maximum deflection of any conductor shall be calculated on the basis of the wind pressure specified under regulation 59. (2) No blasting for any purpose shall be done within three hundred metre from the boundary of a substation or from the electric supply lines of voltage exceeding 650 V or tower structure thereof without the written permission of the owner of such substation or electric supply lines or tower structures; and in case of mining lease hold area, without the written permission of the Electrical Inspector of mines. (3) No cutting of soil within ten metre from the tower structure of 110 kV and above voltage level shall be permitted without the written permission of the owner of tower structure. (4) No person shall construct brick kiln or other polluting units near the installations or transmission lines of 220 kV and above within a distance of 500 metre. 68. Routes in proximity to airport or aerodromes. – Overhead lines shall not be laid in the vicinity of airport or aerodromes unless the Airport Authorities or concerned defence authorities have approved in writing the route of the proposed overhead lines as per relevant standards. 69. Maximum interval between supports. – All conductors shall be attached to supports at intervals not exceeding the safe limits based on the ultimate tensile strength of the conductor and the factor of safety specified under regulation 59: Provided that in the case of overhead lines carrying conductors of voltage not exceeding 650 V when laid over, along or across any street, the interval shall not, without the consent in writing of the Electrical Inspector, exceed sixty five metre. 70. Conditions to apply where telecommunication lines and power lines are carried on same supports. – (1) Every overhead telecommunication line laid on supports of an electric line shall consist of conductors each128 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] having a breaking strength of not less than 270 kgf. (2) Every telecommunication line laid on supports of an electric line shall be protected against lightning as per relevant standards. (3) Where a telecommunication line is laid on supports of an electric line of voltage exceeding 650 V, a suitable arrangement shall be made to safeguard any person against injury resulting from contact, leakage or induction between such electric and telecommunication lines. 71. Lines crossing or approaching each other and lines crossing street and road. – Where an overhead line crosses or is in proximity to any telecommunication line, the owner of the overhead line or the telecommunication line, whosoever lays his line later, shall arrange to provide for protective devices or guarding arrangement as per code of practice or guidelines issued by Power and Telecommunication Coordination Committee and shall observe the following provisions, namely: – (i) when it is intended to lay a telecommunication line or an overhead line which will cross or be in proximity to an overhead line or a telecommunication line, as the case may be, the person proposing to lay such line shall give one month notice of his intention so to do along with the relevant details of protection and drawings to the owner of the existing line; (ii) guarding arrangement shall be provided where a line of voltage not exceeding 33 kV crosses a road or street or telecommunication line; (iii) where an overhead line crosses or is in proximity to another overhead line, guarding arrangements shall be provided so as to safeguard against the possibility of their coming into contact with each other; and (iv) where an overhead line crosses another overhead line, minimum clearances as provided in the table below shall be ensured:- Minimum clearances in metre between lines crossing each other Sl. Nominal System Voltage 110-132 11-66 kV 220 kV 400 kV 765 kV 1200 kV No. (kV) kV 1. below 11 2.44 3.05 4.58 5.49 7.94 10.44 2. 11-66 2.44 3.05 4.58 5.49 7.94 10.44 3.05 3. 110-132 3.05 4.58 5.49 7.94 10.44 4. 220 4.58 4.58 4.58 5.49 7.94 10.44 5. 400 5.49 5.49 5.49 5.49 7.94 10.44 7.94 6. 765 7.94 7.94 7.94 7.94 10.44 7 1200 10.44 10.44 10.44 10.44 10.44 10.44 Provided that no guarding arrangement is required when an electric line of voltage exceeding 33 kV crosses over another line of 250 V and above voltage or a road or a tram subject to the condition that adequate clearances are provided between the lowest conductor of the line of voltage exceeding 33 kV and the top most conductor of the overhead line crossing underneath the line of voltage exceeding 33 kV and the clearances as stipulated in regulation 60 from the topmost surface of the road maintained; (v) where an overhead direct current line crosses another overhead line, minimum clearances as provided in the table below shall be ensured:- Minimum clearances in metre between AC and DC lines crossing each other Sl.No. System Voltage 100 kV 200 kV 300 kV 400 kV 500 kV 600 kV 800 kV AC/DC DC DC DC DC DC DC DC 1. below 11 kV AC 3.05 4.71 5.32 6.04 6.79 7.54 9.04 2. 11-66 kV AC 3.05 4.71 5.32 6.04 6.79 7.54 9.04 3. 110-132 kV AC 3.05 4.71 5.32 6.04 6.79 7.54 9.04 4. 220 kV AC 4.58 4.71 5.32 6.04 6.79 7.54 9.04[भाग III—खण्‍ड 4] भारत‍का‍राजपत्र‍:‍असाधारण 129 5. 200 kV DC 4.71 4.71 5.32 6.04 6.79 7.54 9.04 6. 300 kV AC 5.32 5.32 5.32 6.04 6.79 7.54 9.04 7. 400 kV AC 5.49 5.49 5.49 6.04 6.79 7.54 9.04 8. 400 kV DC 6.04 6.04 6.04 6.04 6.79 7.54 9.04 9. 500 kV DC 6.79 6.79 6.79 6.79 6.79 7.54 9.04 10. 600 kV DC 7.54 7.54 7.54 7.54 7.54 7.54 9.04 11. 765 kV AC 7.94 7.94 7.94 7.94 7.94 7.94 9.04 12. 800 kV DC 7.94 7.94 7.94 7.94 7.94 9.04 9.04 13. 1200 kV AC 10.44 10.44 10.44 10.44 10.44 10.44 10.44 (vi) a person laying or proposing to lay a line which may cross or be in proximity with an existing line, shall provide arrangements on his own line or require the owner of the other overhead line to provide guarding arrangements as referred to in clause (iii) and (iv); (vii) in all cases referred to in this regulation the expenses of providing the guarding arrangements or protective devices shall be borne by the person whose line was laid later; (viii) where two lines cross each other, the crossing shall be made as nearly at right angles as the nature of the case admits and as near the support of the line as practicable, and the support of the lower line shall not be placed in the right of way of the upper line; and (ix) the guarding arrangement shall be carried out by the owner of the support on which it is made and he shall be responsible for its proper maintenance. 72. Guarding. – (1) Where guarding arrangement is required under these regulations, the following shall be observed, namely: – (i) every guard wire shall be connected with the earth at each point at which its electrical continuity is broken; (ii) every guard wire shall have an actual breaking strength of not less than 635 kgf and if made of iron or steel, shall be galvanised; and (iii) every guard wire or cross-connected system of guard wires shall have sufficient current carrying capacity to ensure them rendering dead, without risk of fusing of the guard wire, till the contact of any live wire has been removed. (2) In the case of a line crossing over a trolley wire, the guarding arrangement shall be subjected to the following conditions, namely: – (i) where there is only one trolley-wire, two guard-wires shall be provided as illustrated in DIAGRAM-A; (ii) where there are two trolley wires and the distance between them does not exceed forty centimetre, two guard-wires shall be provided as illustrated in DIAGRAM-B; (iii) where there are two trolley wires and the distance between them exceeds forty centimetre but does not exceed 1.2 metre, three guard-wires shall be provided as illustrated in DIAGRAM-C; (iv) where there are two trolley-wires and the distance between them exceeds 1.2 metre, each trolley-wire shall be separately guarded as illustrated in DIAGRAM-D;130 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] DIAGRAM-A 20 cm 20 cm O O MIN 60 cm O ______________________________________________________________ DIAGRAM-B DIAGRAM-C 20 cm 20 cm 20 cm 20 cm O O O O O MIN MIN MIN MIN 60 cm 60 cm 60 cm 60 cm O Upto O O Over O 40 cm 40 cm and upto 120 cm _____________________________________________________________ DIAGRAM-D 20 cm 20 cm 20 Cms 20 cm O O O O 60 cm 60 cm O O Over 120 cm (v) the rise of trolley boom shall be limited such that the trolley wire shall not foul the guard wires; and (vi) where a telegraph-line is liable to fall or be blown down upon an arm, stay-wire or span-wire and so slide-down upon a trolley-wire, guard hooks shall be provided to prevent such sliding. 73. Service lines from overhead lines. – No service line or tapping shall be taken off an overhead line except at a point of support: Provided that the number of tappings per conductor shall not be more than six in case of connections at voltage not exceeding 650 V. 74. Earthing. – (1) Earthing of support of overhead lines up to 33 kV shall be provided as under, namely: – (a) all metal supports and all reinforced and pre-stressed cement concrete supports of overhead lines and metallic fittings attached thereto, shall be permanently and effectively earthed by providing a continuous[भाग III—खण्‍ड 4] भारत‍का‍राजपत्र‍:‍असाधारण 131 earth wire and securely fastened to each pole and connected with the earth at each support and the metallic fittings attached thereto shall also be permanently and effectively earthed; (b) metal cross arms and insulator pins for Plain Cement Concrete and Pre-Stressed Cement Concrete poles shall be bonded together and normally earthed at every pole; (c) for locations involving railways, electric line crossings and special structures, pipe or rod type earthing shall be provided; (d) all steel poles on which switches, transformers, fuses are mounted shall be earthed; (e) for poles of the electric lines below 650 V guarding arrangement with continuous earth wire or messenger wire in case of aerial bunched cable shall be provided and shall be connected to earth at three equidistant points in every km; and (f) each stay-wire shall be similarly earthed unless insulator of same voltage class as that of line has been placed in it at a height not less than three metre from the ground and shall be provided with insulated tube up to three metre height from the ground. (2) For 66 kV and above voltage class overhead line, earthing and requirement of earth wire shall be as per the regulations notified by the Authority under clause (e) of sub-section (2) of section 177 of the Act. 75. Anti-climbing devices. – The owner of every overhead line of voltage exceeding 650 V shall make adequate arrangements as per relevant standards to prevent unauthorised persons from climbing any of the supports of such overhead lines which can be easily climbed upon without the help of a ladder or special appliances: Provided that the barbed wires conforming to relavant standards for a vertical distance of 30 to 40 cm, at a height of 3.5 metre to 4 metre from ground level or clamps with protruding spikes at a height of 3 to 4 metre shall be provided on each pole or tower of 11 kV line and above. Explanation. – For the purposes of this regulation, rails, reinforced cement concrete poles and pre-stressed cement concrete poles without steps, tubular poles, wooden supports without steps, I-sections and channels shall be deemed as supports which cannot be easily climbed upon. 76. Safety and protective devices. – (1) Every overhead line which is not being suspended from a dead bearer wire, not being covered with insulating material and not being a trolley-wire, is laid over any part of a street or other public place or in any factory or mine or on any consumer‟s premises shall be protected with earth guarding for rendering the line electrically harmless in case its conductor breaks. (2) An Electrical Inspector may, by notice in writing, require the owner of any such overhead line, wherever it may be laid, to protect it in the manner specified in sub-regulation (1) of this regulation. (3) To prevent bird dropping on the suspension insulator strings, suitable bird guards as per relevant standards, shall be provided on cross arms of suspension tower or suspension pole structures, over the suspension insulator strings. 77. Protection against lightning. – (1) The owner of every overhead line, substation or generating station which is exposed to lightning shall adopt means as per relevant standards for diverting electrical surges to the earth due to lightning which may result into injuries. (2) The earthing lead for any lightning arrester shall be as short as possible and shall not pass through any iron or steel pipe, but shall be taken as directly as possible from the lightning arrester without touching any metal part to a separate vertical earth electrode or junction of the earth mat already provided for the substation of voltage exceeding 650 V subject to the avoidance of bends wherever practicable: Provided that a vertical earth electrode shall be connected to the junction of the earth mat. 78. Unused overhead lines. – Where an overhead line ceases to be used as an electric supply line, namely: – (i) the owner shall maintain it in a safe mechanical condition in accordance with regulation 59 or remove it; and (ii) the Electrical Inspector shall, by a notice in writing served on the owner, require him to maintain it in a safe mechanical condition or to remove it within thirty days of the receipt of the notice. 79. Laying of cables. – (1) No underground power cable of voltage level up to 33 kV shall be laid without a minimum underground depth from ground surface to top of the cable as per relevant standards: Provided that the underground power cable meant for use exceeding 33 kV shall be laid with a minimum underground depth of 1.2 metre. (2) No underground telecommunication cable shall be laid without a minimum separation distance of 0.3 metre132 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] and 0.6 metre to the underground power cable of voltage up to 33 kV and exceeding 33 kV, respectively. 80. Protection against electromagnetic interference. – The owner of every electric supply line of voltage level 11 kV or above shall obtain the clearance of Power Telecommunication Co-ordination Committee to ensure the safety of the personnel and telecommunication line as per the requirement of section 160 of the Act. Chapter VIII Additional Safety requirements for electric traction 81. Application of Chapter. – (1) The regulations in this chapter shall apply only where electricity is used for the purposes of traction: Provided that nothing in this chapter shall apply to electricity used for the public carriage of passengers, animals or goods on, or for the lighting or ventilation of the rolling stock of any railway or tramway subject to the provisions of the Railways Act, 1989 (24 of 1989). (2) In this chapter the conductor used for transmitting electricity to a vehicle is referred to as the “line” and the other conductor as the “return”. (3) The owner of the line, return, rails or trolley wire, as the case may be, shall be responsible for the observance of regulations 82 to 95. (4) Before an application is made by the owner of an installation of voltage exceeding 650 V to the Electrical Inspector for permission to commence or recommence supply after such installation has been disconnected for six months and above, the supplier shall ensure that the electric supply lines or apparatus at voltage exceeding 650 V belonging to him are placed in position, properly connected and duly completed. (5) The supply of electricity shall not be commenced by the supplier unless and until the Electrical Inspector is satisfied that the provisions of regulations 46 to 52 and regulations 82 to 95 have been complied with and the approval in writing of the Electrical Inspector has been obtained by him. 82. Voltage of supply to vehicle. – No person shall supply electricity to any trolley wire or other conductor at voltage exceeding 650 V used in direct electrical and mechanical connection with any vehicle, except with the written approval of the Central Government or the State Government, as the case may be, and subject to such conditions as the State Government may think reasonable to impose. 83. Insulation of lines. – Every line shall be insulated throughout and a line may consist of either bare conductors supported on structures through insulators or insulated cable. 84. Insulation of returns. – (1) Where any rails on which cars run, or any conductors laid between or within 0.9 metre of such rails, form any part of a return, such part may be uninsulated and all other returns or parts of a return, shall be insulated, unless they are of such conductivity as to secure the conditions under sub-regulations (2) and (3) of regulation 85. (2) Where any part of a return is uninsulated, it shall be connected with the negative or neutral of the system. 85. Proximity to metallic pipes. – (1) Where an uninsulated return is in proximity to any metallic pipe, structure or substance not belonging to the owner of the return, the owner of uninsulated return shall, if so required by the owner of such pipe, structure or substance, connect his return therewith at his own expense. (2) Where the return is partly or entirely uninsulated, the owner shall, in the construction and maintenance of his system, adopt such means for reducing the difference produced by the current between the potential of the uninsulated return at any one point and the potential of the uninsulated return at any other point as to ensure that the difference of potential between the uninsulated return and any metallic pipe, structure or substance in the vicinity shall not exceed four volts where the return is relatively positive, or one and one-third volts where the return is relatively negative. (3) The owner of any such pipe, structure or substance in respect of it require the owner of the uninsulated return at reasonable times and intervals to ascertain by test in his presence or in the presence of his representative, whether the condition specified in sub-regulation (2) is fulfilled, and, if such condition is found to be fulfilled, all reasonable expenses of, and incidental to, carrying out of the test shall be borne by the owner of the pipe, structure or substance. (4) The potential of uninsulated return with respect to earth at any point shall not exceed 50 V under normal conditions. (5) The petroleum sidings installation earth shall be connected to the uninsulated return to make it equipotential and pipelines in the vicinity of the track should be properly earthed. 86. Difference of potential on return. – Where the return is partly or entirely uninsulated, the owner shall keep a[भाग III—खण्‍ड 4] भारत‍का‍राजपत्र‍:‍असाधारण 133 continuous record of the difference of potential, during the working of his system, between every junction of an insulated return with an uninsulated return and the point on the route most distant from that junction, and the difference of potential shall not, under normal running conditions, exceed a mean value of seven volts between the highest momentary peak and the average for the hour of maximum load. 87. Leakage on conduit system. – Where both the line and the return are placed within a conduit, the following conditions shall be fulfilled in the construction and maintenance of the system, namely: – (i) where the rails are used to form any part of the return, they shall be electrically connected at distances not exceeding thirty metre apart, with the conduit by means of copper strips having a cross-sectional area of at least 0.40 sq. cm or by other means of equal conductivity and where the return is wholly insulated and contained within the conduit, the latter shall be connected with earth at the generating station or substation through an instrument suitable for the indication of any contact or partial contact of either the line or the return with the conduit; and (ii) the leakage current shall be ascertained daily, before or after the hours of running, when the line is fully charged and if at any time it is found to exceed 0.6 ampere per km of single tramway track, the transmission and use of electricity shall be suspended unless the leakage is stopped within twenty four hours. 88. Leakage on system other than conduit system. – Where both the line and the return are not placed within a conduit, the leakage current shall be ascertained daily before or after the hours of running, when the line is fully charged and if at any time it is found to exceed 0.3 ampere per km of single tramway track, the transmission and use of electricity shall be suspended unless the leakage is stopped within twenty four hours. 89. Passengers not to have access to electric circuit. – Precautions to the satisfaction of an Electrical Inspector shall be taken by the owner of every vehicle to prevent, - (i) the access of passengers to any portion of the electric circuit where there is danger from electric shock; and (ii) any metal, hand-rail or other metallic substance liable to be handled by passengers, becoming charged. 90. Isolation of sections. – Every trolley wire shall be constructed in sections not exceeding 1.6 km in length, and means shall be provided for isolating each section. 91. Minimum size and strength of trolley wire. – No trolley-wire shall be of less cross-sectional area than 0.5 sq. cm or shall have an actual breaking load of less than 2000 kg. 92. Height of trolley wire and length of span. – A trolley wire or a traction feeder on the same supports as a trolley wire shall, at no place be, at a height from the surface of the street of less than 5.2 metre except, where it passes under a bridge or other fixed structure, or through or along a tunnel or mineshaft or the like in which case it shall be suspended to the satisfaction of an Electrical Inspector. 93. Earthing of guard wires. – Every guard wire shall be connected with earth at each point at which its electrical continuity is broken and shall also be connected with the rails at intervals of not more than five spans. 94. Proximity to magnetic observatories and laboratories. – Traction works shall not be carried out in the vicinity of geomagnetic observatories and laboratories without the concurrence of the Central Government or of any officer authorised by it in this behalf. 95. Records. – (1) The owner shall keep the following records, namely: – (i) daily records showing, – (a) the maximum working current from the source of supply; (b) the maximum working voltage at the source of supply; (c) the difference of potential, as required under regulation 86; and (d) the leakage current, if any, as required under regulations 87 and 88; (ii) occasional records showing, – (a) every test made under sub-regulation (2) and (3) of regulation 85; (b) every stoppage of leakage, together with the time occupied; and (c) particulars of any abnormal occurrence affecting the electrical working of the system. (2) The records so kept under sub-regulation (1) shall be open to examination by Electrical Inspector. Chapter IX Additional Safety requirements for mines and oil-fields134 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] 96. Application of chapter. – The regulation in this chapter shall apply only where electricity is used in mines as defined in the Mines Act, 1952 (35 of 1952) and oil-fields. 97. Responsibility for observance. – (1) It shall be the duty of every person in charge of and responsible to the mine including the owner, agent, manager, engineer and installation manager and Engineer of mine and oil-field to comply with and enforce the regulations and it shall be the duty of all persons employed to conduct their work in accordance with the regulations: Provided that in case of power stations, transformer substations, converter substations, rectifier substations and accumulator, storage stations for supplying electricity to solely and mainly for the purpose of working of the mine or number of mines and which do not fall in the precincts of a mine, Engineer holding a degree in electrical engineering from university with adequate experience may be appointed as manager of that installations. Explanation. – For the purposes of this regulation, the word “Engineer” shall, – (i) in the case of a coal mine, have the same meaning as assigned to it in the Coal Mines Regulations, 2017; (ii) in the case of a metalliferous mine, have the same meaning as assigned to it in the Metalliferous Mines Regulations, 1961, as amended from time to time; and (iii) in the case of an oil-field, means the Installation Manager‟ under the Oil Mines Regulations, 2017. 98. Notices. – (1) On or before the first day of February in every year, in respect of every mine or oil-field, returns giving the size and type of apparatus, together with such particulars in regard to circumstances of its use as may be required, shall be sent to the Electrical Inspector of mines by the persons specified in regulation 97 in the Form provided in Schedule IX or, as the case may be, Schedule X, whichever is applicable. (2) The persons specified in regulation 97, shall also give to the Electrical Inspector of mines not less than seven days notice in writing of the intention to bring into use any new installation in a mine or oil-field giving details of apparatus installed and its location: Provided that in case of any additions or alterations to an existing installation of voltage not exceeding 650 V, immediate notice in writing shall be sent to the Electrical Inspector of mines before such additions or alterations are brought into use: Provided further that this regulation shall not apply to telecommunication or signalling apparatus: Provided also that in case of emergency which may lead to loss of life or machinery and is detrimental to safety of mine, intimation shall be given within twenty four hours to the Electrical Inspector of mines giving the healthiness of the apparatus alongwith self-certification report of such additions or alterations undertaken. 99. Plans. – (1) A correct plan, on the same scale as the plan kept at the mine in fulfillment of the requirements of the Mines Act, 1952 (35 of 1952), and Single Line Diagram of the electrical installations from point of commencement of supply shall be available in the office at the mine showing the position of all fixed apparatus and conductors therein, other than lights, telecommunication or signalling apparatus, or cables for the same. (2) A similar plan on the scale not less than 25 cm to a km (1:4000) shall be kept by the manager or owner of one or more wells in any oil-field. (3) A similar plan and Single Line Diagram on such scale as the Central Government may direct and Single Line Diagram showing the position of all electric supply lines shall be kept in the office of any licensee, owner or other person transmitting or distributing electricity in a mine or oil-field. (4) The plans specified under this regulation shall be examined and corrected as often as necessary to keep them up-to-date and the dates of such examinations shall be entered thereon by the manager or owner of the mine or wells and such plans shall be available to the Inspector, or inspector of mines, at any time and in case extent of hazardous area is revised, equipment covered under such area shall be reviewed as per the relevant standards and or ATmosphere EXplosible. 100. Lighting, overhead lines, communication and fire precautions. – (1) Adequate illumination by electricity as per relevant standards shall be provided in the mines: Provided that in a belowground coal mine, such lighting fixtures shall be of a type approved by the Chief Inspector of mines: Provided further that one or more flame safety lamps or such lighting system approved by the Chief Inspector of mines shall be maintained in all places where failure of the electric light at any time shall be prejudicial to safety:[भाग III—खण्‍ड 4] भारत‍का‍राजपत्र‍:‍असाधारण 135 Provided also that in a belowground metalliferous mine or any open cast mine or oil-fields, such lighting fixtures shall be suitable for the type of application conforming to the relevant standards or harmonised standards, and adequate emergency lighting system shall be maintained in all places where failure of the electric light at any time shall be prejudicial to safety. (2) Efficient means of communication shall be provided in every mine between the point where the switchgear under sub-regulation (1) of regulation 107 is erected, the shaft bottom and other distributing centres in the mines. (3) Fire extinguishing appliances of adequate capacity and of an approved type as per relevant standards as amended from time to time shall be installed and properly maintained in every place in a mine containing apparatus, other than cables, telecommunication and signalling apparatus. (4) In case of mines, minimum clearance above ground of the lowest conductor of overhead lines or overhead cables where dumpers or trackless vehicles are being operated, shall not be less than twelve metre in height from the ground across the road where dumpers or trackless vehicles cross: Provided that where dumper bucket in raised position, the clearance between the top of dumper body and to the lowest conductor of overhead lines or overhead cables shall not be less than one metre. 101. Isolation and fixing of transformer and switchgear. – (1) Transformers and switchgear shall be placed in a separate room, compartment or box where necessary or in a manner to prevent danger of mechanical damage and spread of fire. (2) Unless the apparatus is so constructed, protected and worked as to obviate the risk of fire, no inflammable material shall be used in the construction of any room, compartment or box containing apparatus, or in the construction of any of the fittings therein and each such room, compartment or box shall be substantially constructed and shall be kept dry and illuminated and efficient ventilation shall be provided for all apparatus installed therein. (3) All apparatus that has to be worked or attended to and all handles intended to be operated shall be placed at a spacious working place which is accessible, clear of obstruction and free from danger, so far as circumstances permit. 102. Method of earthing. – (1) Where earthing is necessary in a mine, it shall be carried out by connection to an earthing system at the surface substation of the mine. (2) All metallic sheaths, coverings, handles, joint boxes, switchgear frames, instrument covers, switch and fuse covers of boxes, all lamp holders, unless efficiently protected by an insulated covering made of fire resisting material, and the frames and bedplates of generators, transformers and motors, including portable motors, shall be earthed by connection to an earthing system in the manner specified in sub-regulation (1). (3) Where cables are provided with a metallic covering constructed and installed in accordance with clause (iv) (d) of regulation 108, such metallic covering may be used as a means of connection to the earthing system. (4) All conductors of an earthing system shall have conductivity, at all parts and all joints, at least equal to fifty per cent of that of the largest conductor used solely to supply the apparatus, a part of which is desired to be earthed: Provided that no conductor of an earthing system shall have a cross-sectional area less than 0.15 sq. cm except in the case of the earth conductor of a flexible cable used with portable apparatus where the voltage does not exceed 125 V, and the cross-sectional area and conductance of the earthcore is not less than that of the largest of the live conductors in the cable. (5) All joints in earth conductors and all joints in the metallic covering of cables shall be properly soldered or otherwise effectively made. (6) No switch, fuse or circuit breaker shall be inserted in any earth conductor. (7) This regulation shall not apply, except in the case of portable apparatus, to any system in a mine in which the voltage does not exceed 30 V. 103. Protective equipment. – (1) In the interest of safety, the earth fault current shall not be more than 750 milliampere in installations of voltage exceeding 250 V and up to 1100 V for below ground mines and oil-fields, and 50 ampere in installations of voltage exceeding 1100 V and up to 11 kV in open cast mines and the magnitude of the earth fault current shall be limited to these specified values by employing suitably designed, restricted neutral system of power supply including neutral-ground monitoring protection system: Provided that all electrical installations, in or after notification of these regulations, of voltage exceeding 1100 V and up to 11 kV for below ground mines, open cast mines and oil mines or oil-fields, the magnitude of the earth fault current shall be limited up to 10 A by employing suitably designed, restricted neutral system of136 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] power supply including neutral-ground monitoring protection system: Provided further that the settings of protective relays thereof shall be set between 200 to 400 milliampere for individual apparatus of voltage up to 1100 V with suitable time delay protection. (2) The operation of the switchgear and the relays shall be recorded daily at the generating station, substation or switch station in a register kept for the purpose and in electronic form also. (3) The effectiveness of switchgear and protective system shall always be kept in working order and shall be checked by calibrating and testing at least once in a year and the result thereof shall be recorded in separate register kept for the purpose and in electronic form: Provided that wherever numerical relays are being used they shall be checked by testing procedure as per guidelines of original equipment manufacturer or the relevant standards and periodicity of such checking shall be at least once in a year. 104. Voltage limits. – Electricity shall not be transmitted into a belowground mine at a voltage exceeding 11000 V and shall not be used therein at a voltage exceeding 6600 V: Provided that, - (i) where hand-held portable apparatus is used, the voltage shall not exceed 125 V; (ii) where electric lighting is used, – (a) in belowground mines, the lighting system shall have a mid or neutral point connected with earth and the voltage shall not exceed 125 V between phases; (b) on the surface of a mine or in an open cast mine or oil mines or oil-fields, the voltage may be raised to 250 V, if the neutral or the mid-point of the system is connected with earth and the voltage between the phases does not exceed 250 V; (iii) where portable hand-lamps are used in belowground mines and hazardous area of oil mines or oil-fields, the voltage shall not exceed 30 V; (iv) where any circuit is used for the remote control or electric inter-locking of apparatus, the circuit voltage shall not exceed 30 V for below ground mine or hazardous area of oil-fields: Provided that in hazardous areas of oil mines or oil-fields, the said voltage can be up to 250 V, if the on- off control push-button stations or remote controls are housed in an appropriate enclosure like: (i) Flame proof enclosure type „d‟; (ii) Pressurised enclosure type „p‟; (iii) Sand filled apparatus type „q‟; (iv) Increased safety enclosure type „e‟, „n‟, and „o‟: Provided further that the control circuit shall have suitable protection against shock hazards, and the trippings due to faults do not adversely affect the operational safety: Provided also that in fixed plants on surface of the mines or opencast mines, the said voltage for the remote control or electric inter-locking may be permitted up to 250 V. 105. Transformers. – In mines or oil-fields, the transformers used for providing voltages to control circuits or remote control or interlocking or for hand held apparatus, shall have suitable provision to guard against danger by reason of the lower voltage apparatus becoming accidentally charged above its normal voltage by leakage from or contact with the higher voltage apparatus. 106. Switchgear and terminals. – Switchgear and all terminals, cable ends, cable joints and connections to apparatus shall be totally enclosed and shall be constructed, installed and maintained as to comply with the following requirements, namely: – (i) all parts shall be of mechanical strength sufficient to resist rough usage; (ii) all conductors and contact areas shall be of adequate current-carrying capacity and all joints in conductors shall be properly soldered or otherwise efficiently made; (iii) the lodgement of any matter likely to diminish the insulation or affect the working of any switchgear shall be prevented; (iv) all live parts shall be so protected or enclosed as to prevent persons accidentally coming into contact with them and to prevent danger from arcs, short-circuits, fire, water, gas or oil;[भाग III—खण्‍ड 4] भारत‍का‍राजपत्र‍:‍असाधारण 137 (v) where there may be risk of igniting gas, coal-dust, oil or other inflammable material, all parts shall be so protected as to prevent open sparking; and (vi) every switch or circuit-breaker shall be so constructed as to be capable of opening the circuit it controls and dealing with any short-circuit without danger. 107. Disconnection of supply. – (1) Properly constructed switchgear for disconnecting the supply of electricity to a mine or oil-field shall be provided at a point recommended by the Electrical Inspector of mines. (2) At any time, when any cable or overhead line supplying electricity to the mine from the aforesaid switchgear is live, a person designated to operate the said switchgears shall be available within easy reach thereof: Provided that in the case of gassy coal seam of second degree and third degree gassiness, the main mechanical ventilator operated by electricity shall be interlocked with the switchgear so as to automatically disconnect the power supply in the event of stoppage of main mechanical ventilator. (3) When necessary in the interest of safety, any apparatus suitably placed, shall be provided for disconnecting the supply from every part of a system. (4) If the Electrical Inspector of mines, in the interest of safety considered it necessary, he may direct that the apparatus specified in sub-regulation (3) shall be so arranged as to disconnect automatically, from the supply, any section of the system subjected to a fault. (5) Every motor shall be controlled by switchgear which shall be so arranged as to disconnect the supply from the motor and from all apparatus connected thereto and such switchgear shall be so placed as to be easily operated by the person designated to operate the motor. (6) A suitably rated switchgear incorporated with protective mechanism to disconnect automatically the supply in the event of conditions of over-current, earth fault or leakage, under voltage and single phasing. (7) Auxiliary fan shall be interlocked with the switchgear controlling power supply to the in-bye face equipment of below ground coal mine for automatic disconnection of power supply in the event of the stoppage of the auxiliary fan. (8) Every feeder of the mine shall be controlled by a suitably rated switchgear incorporated with protective mechanism in a manner so as to disconnect the supply automatically in the event of conditions of over-current, short circuit, single phasing, under voltage and earth fault or leakage as relevant. 108. Cables. – All cables, other than flexible cables for portable or transportable apparatus, shall fulfill the following requirements, namely: – (i) all such cables, other than the outer conductor of a concentric cable, shall be covered with insulating material and shall be efficiently protected from mechanical damage and supported at sufficiently frequent intervals and in such a manner as to prevent damage to such cables; (ii) (a) except as provided in clause (iii) no cables other than concentric cables or single core or two core or multi core cables protected by a metallic covering and which contain all the conductors of a circuit shall be used where the voltage exceeds 125 V or when an Inspector considers that there is risk of igniting gas or coal dust or other inflammable material, and so directs; (b) the sheath of metal-sheathed cables and the metallic armouring of armoured cables shall be of a thickness not less than that recommended from time to time in the relevant standard of the Bureau of Indian Standards; (iii) where a voltage exceeding 250 V but not exceeding 650 V direct current system is used, two single core cables may be used for any circuit provided that their metallic coverings are bonded together by earth conductors so placed that the distance between any two consecutive bonds is not greater than thirty metre measured along either cable; (iv) The metallic covering of every cable shall be. – (a) electrically and mechanically continuous throughout; (b) earthed, if it is required, to be earthed by a connection to the earthing system of conductivity; (c) efficiently protected against corrosion where necessary; (d) of a conductivity at all parts and at all joints at least equal to fifty per cent of the conductivity of the largest conductor enclosed by the said metallic covering; and (e) where there may be risk of igniting gas, coal-dust, or other inflammable material, so constructed as138 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] to prevent, as far as practicable, the occurrence of open sparking as the result of any fault or leakage from live conductors; (v) cables and conductors where connected to motors, transformers, switchgear and other apparatus, shall be installed so that, - (a) they are mechanically protected by securely attaching the metallic covering to the apparatus; and (b) the insulating material at each cable end is efficiently sealed so as to prevent the diminution of its insulating properties; (vi) where necessary to prevent abrasion or to secure gas-tightness, properly constructed glands or bushes shall be provided; (vii) unarmoured cables or conductors shall be conveyed either in metallic pipes or metal casings or suspended from efficient insulators by means of non-conducting materials which will not cut the covering and which shall prevent contact with any timbering or metal work and if separate insulated conductors are used, they shall be installed at least 3.75 cm apart and shall not be brought together except at lamps, switches and fittings. 109. Flexible cables. – (1) Flexible cables for portable or transportable apparatus shall be two core or multi core, unless required for electric welding, and shall be covered with insulating material which shall be efficiently protected from mechanical injury. (2) If flexible metallic covering is used either as the outer conductor of a concentric cable or as a means of protection from mechanical injury, it shall not be used by itself to form an earth conductor for such apparatus, but it may be used for that purpose in conjunction with an earthing core. (3) Every flexible cable intended for use with portable or transportable apparatus shall be connected to the system and to such apparatus by properly constructed connectors: Provided that for machines of voltage exceeding 650 V but not exceeding 11 kV a bolted type connector shall be used and the trailing cable shall be suitably anchored at the machine end. (4) At every point where flexible cables are joined to main cables, a circuit breaker shall be provided which is capable of automatically disconnecting the supply from such flexible cables. (5) Every flexible cable attached to a portable or transportable machine shall be examined periodically by the person designated to operate the machine, and if such cable is used underground, it shall be examined at least once in each shift by such person and if such cable is found to be damaged or defective, it shall forthwith be replaced by a cable in good condition. (6) If the voltage of the circuit exceeds 250 V, all flexible cables attached to any transportable apparatus shall be provided with flexible metallic screening or pliable armouring and cables of portable apparatus shall be provided with flexible metallic screening on all the power and pilot cores: Provided that the provision of this regulation shall not apply to flexible cables attached to any transportable or portable apparatus used in open cast mines or below ground mines where reeling and unreeling of such cables is necessary as per design features of the equipment. (7) All flexible metallic screening or armouring specified in sub-regulation (6) shall fulfill the requirement specified in clause (iv) of regulation 108: Provided that in the case of separately screened flexible cables the conductance of each such screen shall not be less than twenty five per cent of that of the power conductor and the combined conductance of all such screens shall in no case be less than that of 0.15 sq. cm copper conductor. (8) Flexible cable exceeding hundred metre in length shall not be used with any portable or transportable apparatus: Provided that such flexible cable when used with coal cutting machines or cutter or loader or armoured face conveyor for long wall operation, or with shuttle cars or load haul dumper or cutter loader or all alike equipment for development and de-pillaring operation shall not exceed two hundred fifty metre in length: Provided further that the aforesaid cable in case of an open cast mine when used with electrically operated heavy earth moving machinery shall not exceed six hundred metre in length and for bucked wheel excavator at 11 kV shall not exceed one thousand metre in length: Provided also that in case of dragline or 42 cubic metre capacity shovel, flexible cable length may be raised up to 600 metre. (9) Flexible cable, when installed in a mine, shall be efficiently supported and protected from mechanical injury.[भाग III—खण्‍ड 4] भारत‍का‍राजपत्र‍:‍असाधारण 139 (10) Flexible cables shall not be used with apparatus other than portable or transportable apparatus: Provided that, in case of applications like, submersible pumps, and skid mounted pumps, installed in the mines, the use of flexible cable is allowed subject to the follow of measures as to prevent the mechanical damage to the cables. (11) Where flexible cables are used they shall be detached or otherwise isolated from the source of supply when not in use, and arrangements shall be made to prevent the energising of such cables by undesignated persons. 110. Portable and transportable machines. – The person designated to operate an electrically driven coal-cutter, or other portable or transportable machine, shall not leave the machine while it is in operation and shall, before leaving the area in which such machine is operating, ensure that the supply is disconnected from the flexible cable which supplies electricity to the machine and when any such machine is in operation, steps shall be taken to ensure that the flexible cable is not dragged along by the machine: Provided that all portable and transportable machines used in underground mines shall operate on remote control from the concerned switchgear with pilot core protection: Provided further that the portable and transportable machines used in open cast mines shall have the provision such that the power supply to the machine from concerned switchgear is remotely controlled from the machine: Provided also that the portable or transportable machines used in open cast mine, provision of tripping device or switch device from the operator‟s cabin shall be provided to disconnect power supply to such machine from the field switchgear. 111. Sundry precautions. – (1) All apparatus shall be maintained reasonably free from dust, dirt and moisture, and shall be kept clear of obstruction. (2) All apparatus other than portable and transportable apparatus shall be housed in a room, compartment or box so constructed as to protect the contents from damage occasioned by falling material or passing traffic. (3) Inflammable or explosive material shall not be stored in any room, compartment or box containing apparatus, or in the vicinity of any apparatus. (4) In case of a fault in any circuit, the part affected shall be made dead without delay and shall remain so until the fault has been remedied. (5) While lamps are being changed the supply shall be disconnected. (6) No lamp holder shall have metallic connection with the guard or other metal work of a portable hand lamp. (7) The following notices in Hindi and local language of the district, so designed and protected as to be easily legible at all times, shall be exhibited at the following places, namely: – (i) where electrical apparatus is in use, a notice forbidding undesignated persons to operate or otherwise interfere with such apparatus; (ii) in the interior or at the surface of the mine where a telephone or other means of communication is provided, a notice giving full instructions to person, at the surface of the mine, designated to effect the disconnection of the supply of electricity to the mine. (8) All apparatus, including portable and transportable apparatus, shall be operated only by those persons who are designated for the purpose. (9) Where a plug-and-socket-coupling other than of bolted type is used with flexible cables, an electrical inter- lock or other approved device shall be provided to prevent the opening of the coupling while the conductors are live. 112. Precautions where gas exists. – (1) In any part of a coal-seam of the first degree gassiness, – (i) all cables shall be constructed, installed, protected, operated and maintained in such a manner as to prevent risk of open sparking; (ii) all signalling, telecommunication, remote control and insulation tester circuits shall be so constructed, installed, protected, operated and maintained as to be intrinsically safe; (iii) all apparatus including portable and transportable apparatus including lighting fittings used at any place which lies in-bye of the last ventilation connection shall be flame-proof: Provided that electrically operated or battery operated portable or transportable apparatus such as shuttle car, men or material transporting equipment of increased safety type “e” shall be permitted at any place with suitable monitoring devices for detection of gases, if any;140 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] (iv) all electric lamps at any place which lie in-bye of the last ventilation connection and return airways shall be in flame proof enclosure and at other places these shall be in increased safety enclosure type „e‟. (2) At any place which lies in any part of a coal-seam of second and third degree gassiness, – (i) all signalling, telecommunication, remote control and insulation tester circuits shall be so constructed, installed, protected, operated and maintained as to be intrinsically safe; (ii) all cables shall be constructed, installed, protected, operated and maintained in such a manner as to prevent risk of open sparking; (iii) all apparatus, including portable and transportable apparatus used at any place within ninety metre of any working face or goaf in case of a second degree gassy mine and within two hundred seventy metre of any working face or goaf in case of third degree gassy mine or at any place which lies in-bye of the last ventilation connection or in any return airways shall be flame-proof; and (iv) all electric lamps shall be enclosed in flame-proof enclosures. (3) In any oil mine or oil-field, at any place within the zone-2 hazardous areas, – (i) all signalling and telecommunication, remote control and insulation tester circuits shall be so constructed, installed, operated, protected and maintained as to be intrinsically safe; (ii) all cables shall be so constructed, installed, operated and maintained as to prevent risk of open sparking; (iii) all apparatus including portable and transportable apparatus shall have the enclosures conforming to the relevant standards; and (iv) all electric lamps shall be enclosed in increased safety enclosure type „e‟. (4) In oil mine or oil-fields at any place within the zone-1 hazardous areas, – (i) all signalling and telecommunication, remote control and insulation tester circuits shall be so constructed, installed, operated, protected and maintained as to be intrinsically safe; (ii) all cables shall be so constructed, installed, operated and maintained as to prevent risk of open sparking; (iii) all apparatus including portable and transportable apparatus shall have enclosures conforming to the relevant standards; and (iv) all electric lamps shall be enclosed in flame-proof enclosures. (5) In any oil mine at any place within zone-0 hazardous area, no electrical equipment shall be used and where it is not practicable, intrinsically safe apparatus are only to be used which shall be conforming to relevant standards and such installation of apparatus shall conform to relevant standards and the details of installation, certified by the owner or agent or manager or installation manager shall be submitted to the Electrical Inspector of mines. (6) In any coal-seam of degree second and degree third gassiness or the hazardous area the supply shall be discontinued,- (i) immediately, if open sparking occurs; (ii) during the period required for examination or adjustment of the apparatus, which shall necessitate the exposing of any part liable to open sparking; (iii) the supply shall not be reconnected until the apparatus has been examined by the electrical supervisor or one of his duly appointed assistants and until the defect, if any, has been remedied or the necessary adjustment made; and (iv) a flame safety lamp shall be provided and maintained in a state of continuous illumination near an apparatus, including portable or transportable apparatus, which remains energised and where the appearance of the flame of such safety lamps indicates the presence of inflammable gas, the supply to all apparatus in the vicinity shall be immediately disconnected and the incident reported forthwith to an official of the mine and such apparatus shall be interlocked with the controlling switch in such a manner as to disconnect power supply automatically in the event of percentage of inflammable gas exceeding one and one quarter in that particular district: Provided that where apparatus for automatic detection of the percentage of inflammable gas or vapor are employed in addition to the flame safety lamps, such apparatus shall be approved by the inspector of mines and maintained in perfect order.[भाग III—खण्‍ड 4] भारत‍का‍राजपत्र‍:‍असाधारण 141 (7) In any part of a coal-seam of any degree of gassiness or in any hazardous area of an oil-fields, if the presence of inflammable gas in the general body of air is found at any time to exceed one and one quarter per cent, the supply of energy shall be immediately disconnected from all cables and apparatus in the area and the supply shall not be reconnected so long as the percentage of inflammable gas remains in excess of one and one quarter per cent. (8) In oil-fields where concentration of inflammable gas exceeds twenty percent of its lower explosive limit a system should be in place to activate an audio alarm at appropriate location. On activation of such alarm immediate action shall be taken to make operations safe and to isolate the cause in order to ensure safety of men, equipment, environment. In case the lower explosive limit rises to forty percent, the supply of electricity shall be cut-off immediately from all cables and apparatus lying within thirty metre of the installation and all sources of ignition shall also be removed from the said area and normal work shall not be resumed unless the area is made gas-free: Provided that such disconnection shall not apply to intrinsically safe environment monitoring scientific instruments. (9) Any such disconnection or reconnection of the supply shall be noted in the log sheet in hard copy and electronic form which shall be maintained in the form set out in Schedule XI and shall be reported to the Electrical Inspector of mines. (10) The provisions of this regulation shall apply to any metalliferrous mine which may be notified by the inspector of mines if inflammable gas occurs or if the inspector of mines is of the opinion that inflammable gas is likely to occur in such mine. Explanation. – For the purposes of this regulation, – (1) The expression „coal-seam of first degree gassiness‟, „coal-seam of second degree gassiness‟, „coal- seam of third degree gassiness‟ and „flame-proof apparatus‟ shall have the meanings respectively assigned to them in the Coal Mines Regulations, 2017. (2) The following areas in oil mine or oil-fields shall be known as hazardous areas, namely: – (i) an area of not less than ninety metre around an oil-well where a blow-out has occurred or is likely to occur, as may be designated by the Installation Manager or the senior most official present at the site; (ii) an area within sixteen metre of an open discharge of petroleum bearing fluid from a well under production test; (iii) an area within fifteen metre of: (a) a producing well-head or any point of open discharge of the crude there from or other point where emission of hazardous atmosphere is normally likely to arise; or (b) any wildcat or exploration well-head being drilled in an area where abnormal pressure conditions are known to exist; (iv) any area within three metre of: (a) any producing well-head where a closed system of production is employed such as to prevent the emission or accumulation in the area in normal circumstances of a hazardous atmosphere; or (b) exploration or interspaced well-head being drilled in an area where the pressure conditions are normal and where the system of drilling employed includes adequate measures for the prevention in normal circumstances of emission or accumulation within the area of a hazardous atmosphere; (3) “hazardous atmosphere” means “an atmosphere containing any inflammable gases or vapours in a concentration capable of ignition”. (4) “Zone 0 hazardous area” means “an area in which hazardous atmosphere is continuously present”. (5) “Zone 1 hazardous area” means “an area in which hazardous atmosphere is likely to occur under normal operating conditions”. (6) “Zone 2 hazardous area” means “an area in which hazardous atmosphere is likely to occur under abnormal operating conditions”. 113. Shot-firing. – (1) When shot-firing is in progress adequate precautions shall be taken to protect apparatus and conductors, other than those used for shot-firing, from injury.142 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] (2) Current from lighting or power circuits shall not be used for firing shots. (3) The construction of shot firing cables shall conform to relevant standards and adequate precautions shall be taken to prevent such cable touching other cables and apparatus. 114. Signalling. – Where electrical signalling is used, - (i) adequate precautions shall be taken to prevent signal and telephone wires coming into contact with other cables and apparatus; (ii) the voltage used in any one circuit shall not exceed 30 V; (iii) contact-makers shall be so constructed as to prevent the accidental closing of the circuit; and (iv) bare conductors, where used shall be installed in suitable insulators. 115. Haulage. – Haulage by electric locomotives on the overhead trolley-wire system, at voltage not exceeding 650 V and haulage by storage battery locomotives may be used with the prior permission in writing of the Electrical Inspector of mines, and subject to such conditions as he may impose in the interests of safety. 116. Earthing of neutral points. – Where the voltage of an alternating current system exceeds 30 V, the neutral or mid-point shall be earthed by connection to an earthing system in the manner specified in regulation 102: Provided that when the system concerned is required for blasting and signalling purposes, the provisions of this regulation shall not apply: Provided further, that in case of unearthed neutral system, it shall be equipped with a suitable ground protection system approved by the Electrical Inspector of Mines to ensure isolation of power supply to the faulty section in appropriate manner. 117. Supervision. – (1) One or more electrical supervisors shall be appointed in writing by the owner, agent or manager of a mine or by the agent or the owner, of one or more wells in an oil-field to supervise the installation and such number of supervisors shall be on duty as per guidelines issued by Directorate General of Mines Safety from time to time under intimation in writing to the Authority or as directed by the Electrical Inspector of mines. (2) The electrical supervisor so appointed shall be the person holding a valid Electrical Supervisor's Certificate of Competency, covering mining installations issued by the Appropriate Government. (3) Adequate number of electricians as per guidelines issued by Directorate General of Mines Safety from time to time under intimation in writing to the Authority and or as directed by the Electrical Inspector of mines shall be appointed in writing by owner, agent or manager of a mine or by the owner or Agent of oil-field for carrying out the duties. (4) The Electrician shall be a person holding license under sub-regulation (1) of regulation 31. (5) For small open cast mines and below ground mines receiving supply at voltage not more than 650 V and not having portable or transportable apparatus, electrical supervisor and electrician shall be appointed for more than one mine with the approval of the Electrical Inspector of Mines. (6) Every person appointed to operate, supervise, examine or adjust any apparatus shall be competent to undertake the work which he is required to carry out as directed by the Engineer. (7) The electrical supervisor shall be responsible for the proper performance of the following duties, by himself or by an electrician appointed under sub-regulation (1), – (i) thorough examination of all apparatus, including the testing of earth conductors and metallic coverings for continuity, as often as may be necessary to prevent danger; and (ii) examination and testing of all new apparatus, and of all apparatus, re-erected in the mine before it is put into service in a new position. (8) In the absence of any electrical supervisor, the owner, agent or manager of the mine and oil-field shall appoint in writing a substitute electrical supervisor. (9) The electrical supervisor or the substitute electrical supervisor appointed under sub-regulation (8) to replace him shall be personally responsible for the maintenance at the mine or oil-field, of a log-book made up of the daily log sheets prepared in the form set out in Schedule XI and the results of all tests carried out in accordance with the provisions of sub-regulation (7) shall be recorded in the log-sheets prepared in the form set out in Schedule XI. 118. Training of personnel engaged for operation and maintenance of electrical installations in mines and oil- fields. – (1) The persons engaged for operation and maintenance of electrical installations in mines are required to undergo the type of training meant for the particular mining installations of Coal or Oil or Metal, training[भाग III—खण्‍ड 4] भारत‍का‍राजपत्र‍:‍असाधारण 143 syllabus as issued by Directorate General of Mines Safety from time to time under intimation in writing to the Authority. (2) The owner or manager or agent of the mine shall arrange for training of their personnel engaged in the operation and maintenance of electrical installations of mines in his own institute or any other institute recognized by the Central Government or State Government. (3) The refresher training shall be imparted at a periodicity of intervals not more than two years. A register or in electronic form by the Owner or Manager or Agent of a mine or by the owner or agent, of one or more wells in an oil-fields of the mine shall be maintained wherein the names of the persons trained, due date of refresher training and the like shall be entered and the register maintained shall be produced before the Electrical Inspector of mines whenever required by him. Chapter X Additional safety requirements for renewable generating stations 119. Additional safety requirements for renewable generating stations. – The regulations under this chapter shall be applicable to renewable generating stations which shall be in addition to the regulations provided from chapter I to VII. 120. Safety requirements for biomass and waste to energy installations. – All biomass plants and waste to energy plants including Municipal solid waste or refuse derived fuel shall comply with the safety standards as mentioned in Regulations notified by the Authority under clause (e) of sub-section (2) of section 177 of the Act. 121. Safety requirements for solar installations. – (1) The following general safety requirement for solar installations shall be ensured, namely: – (i) clear pathways of minimum seventy five centimetre in width with hand rails for roof access and emergency exit shall be provided for roof top system; (ii) there shall be clear pathways, walkways between the rows or columns of solar panels which is necessary for cleaning and maintenance; (iii) cables shall be laid in trenches for ground based photovoltaic installation; (iv) ground mounted solar installations shall be protected by fencing or other means not less than 1.8 metre in height so as to prevent unauthorised entry; (v) disconnection switches or circuit breakers provided in combiner boxes to disconnect the photovoltaic system from all other conductors of the system shall be located at a readily accessible location; (vi) three phases on the alternating current side, and positive and negative conductor on the direct current side shall be marked and identified with different colours; (vii) inverter unit for solar photovoltaics shall be installed in the periphery of the building and as near as the solar panel: Provided that the direct current cable shall be ultraviolet protected or routed through ultraviolet protected pipe; (viii) there shall be a manual disconnection switch to isolate the system from grid and shall be situated outside the alternating current combiner box; and (ix) protection shall be deployed (for both input and output) on site for overload, surge current, surge voltage, short circuit, high temperature, over voltage, under voltage and over frequency, under frequency, reverse polarity and lightning. (2) The following earthing requirements for solar installations shall be ensured, namely: – (i) solar earthing shall be as per the relevant standard; (ii) the frame of inverter cabinet shall be connected with the earthing bus bar through the earthing terminals using flexible braided copper wire; (iii) all metal casing and shielding of the plant, each array structure of the photovoltaic yard, equipment, inverters and control systems shall be earthed through proper earthing; (iv) earthing system shall connect all non-current carrying metal receptacles, electrical boxes, appliance frames, chasis and photovoltaic module mounting structures in one long run and the earth strips shall be interconnected by proper welding and shall not be bolted; (v) there shall be adequate number of interconnected earth pits provided in each location and minimum144 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] required gap shall be provided in between earth pits as per relevant standard. (3) The following protection, testing and interlocking requirement for solar installations shall be ensured; namely: – (i) the solar photovoltaic power plant shall be provided with lightning and over voltage protection by deploying required number of lightning arresters as per the relevant standards; (ii) every combiner box shall be provided with suitable surge protective device with arc extinguishing capability as per the relevant standards to avoid any risk of fire; (iii) the input circuits of combiner box shall be provided with over current protection as per the relevant standards; (iv) the output circuits of combiner box shall be provided with isolation protection; (v) earth fault protection and insulation monitoring for photovoltaic arrays and inverters shall be provided; (vi) all photovoltaic modules safety qualification shall comply with relevant standards. (4) Requirement to prevent fire for solar installations. – A fire detection system and automatic fire suppression system shall comply with the relevant standards. (5) Additional safety requirements for floating solar photovoltaic energy installations. – Photovoltaic modules and associated structure of floating solar power plant shall comply with the relevant standards for tests such as salt mist, ammonia corrosion, environmental stress cracking of High Density Poly Ethylene, stress cracking resistance of High Density Poly Ethylene and standard test method for tensile properties of plastics. 122. Safety requirements for wind energy installations. – (1) All wind energy generation systems including wind turbines, wind power plants onshore and offshore connected with the grid shall be as per relevant standards. (2) Transformers for wind turbine applications shall be as per the relevant standards. (3) Portable fire extinguishers shall also be kept at various locations in plants to take immediate action in case of fire. (4) Any wind turbine workers exposed to a potential fall shall be supported by a certified fall arrest system such as a full body safety harness. Chapter XI Additional safety requirements for electric vehicle charging station 123. Additional safety requirements for electric vehicle charging station. – The regulations under this chapter shall be applicable to electric vehicle charging stations which shall be in addition to the regulations provided from chapter I to VII. 124. General safety requirements for electric vehicle charging station. – (1) Electric vehicle charging stations shall be provided with separate protection against the overload of input supply and output supply as per relevant standards. (2) Socket-outlet of supply of electric vehicle charging points shall be installed at least 800 millimetre above the finished ground level. (3) A cord extension set or second supply lead shall not be used in addition to the supply lead for the connection of the electric vehicle to the charging point and shall not be used as a cord extension set. (4) No adaptor shall be used to connect a vehicle connector to a vehicle inlet. (5) The distance between the charging point and the connection on the electric vehicle shall not be more than five metre during charging. (6) The portable socket outlets shall not be permitted for electric vehicle charging. (7) The lightning protection system shall be provided for the electric vehicle charging stations as per relevant standards. (8) The electric vehicle charging station shall be equipped with a protective device against the uncontrolled reverse power flow from electric vehicle to the charging point. (9) One second after disconnecting the electric vehicle from the supply mains, the voltage between accessible conductive parts or any accessible conductive part and earth shall be less than or equal to 42.4 V (30 V ), or peak rms 60 V DC, and the stored energy available shall be less than 20 J: Provided that, if the voltage is greater than 42.4 V (30 V ) or 60 V DC, or the energy is 20 J or peak rms[भाग III—खण्‍ड 4] भारत‍का‍राजपत्र‍:‍असाधारण 145 more, a warning label shall be attached in a conspicuous position on the charging stations. (10) A vehicle connector used for direct current charging shall be locked on the vehicle inlet if the voltage is higher than 60 V DC and in case of charging system malfunction, a means for safe disconnection shall be provided. (11) The electric vehicle charging point shall disconnect supply of electricity to prevent overvoltage at the battery, if the output voltage exceeds maximum voltage limit permissible for the vehicle. (12) The electric vehicle charging points shall not energise the charging cable when the vehicle connector is in unlock position. (13) The electric vehicle connector shall not unlock if the voltage between the vehicle connector and the earth is more than 60 V. (14) Safety clearance between the oil or gas dispenser and electric vehicle charging point shall be as per the order issued by the Authority. (15) Only four core cable shall be used for charging points which require three phase power supply. (16) Underground cables shall not cross the underground oil tank or oil pipeline. (17) Underground cables through the charging area or vehicles passage shall be avoided and if provided shall be at a minimum depth of one metre from the finished ground surface. 125. Earth protection system for the charging station. – (1) Each electric vehicle charging points shall be supplied individually by a dedicated sub-circuit protected by an overcurrent protective device complying with the relevant standards and the overcurrent protective device shall be part of a switchboard. (2) Co-ordination of all protective devices in the charging stations shall be ensured. (3) All electric vehicle charging stations shall be provided with an earth continuity monitoring system that disconnects the supply in the event of the earthing connection to the vehicle becomes ineffective. (4) The charging lead shall be fitted with an earth-connected metal shielding and the cable insulation shall be wear resistant and maintain flexibility over the operating temperature range. (5) A protective earth conductor shall be provided to establish an equipotential connection between the earth terminal of the supply and the conductive parts of the vehicle which shall be as per the relevant standards. 126. Requirement to prevent fire for electric vehicle charging station. – (1) The enclosure of electric vehicle supply equipment shall be made of fire retardant material with self-extinguishing property and free from halogen. (2) The fire detection, alarm and control system shall be provided as per relevant standards. 127. Testing of charging station. – The owner of the charging station shall ensure that the tests as specified in the manufacturer‟s instructions for the residual current devices and the charging station have been carried out. 128. Maintenance of records. – (1) The owner of the charging station shall keep records of design, construction and labelling to be compatible with a supply of standard voltage at a nominal frequency of 50 Hz of the charging station. (2) The owner of the charging station shall keep records of the relevant test certificates as indicated in these regulations and as per the relevant standards. (3) The owner of the charging station shall keep records of the results of every inspection, testing and periodic assessment and details of any issues observed during the assessment and any actions required to be taken in relation to those issues. (4) The owner of the charging station shall retain a copy of all records, as specified in sub-regulation (1), (2) and (3) of above, either in hard form or in electronic form, for at least seven years and shall provide a copy of the records to the officials during the inspection. Chapter XII Additional safety requirements for high voltage direct current 129. Additional safety requirements for high voltage direct current. – The regulations under this chapter shall be applicable to high voltage direct current which shall be in addition to the regulations provided from chapter I to VII. 130. General safety requirements. – (1) A wire mesh shall be provided beneath the walk way; wherever constructed above the hanging valves in the valve hall.146 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] (2) Cables used for sensitive measurements shall be laid in separate and completely screened or covered channels or galvanised steel pipes. (3) A separate emergency source of illumination with automatic initiation shall be provided in every room or compartment of high voltage direct current station. (4) No oil immersed apparatus shall be kept within the valve hall. (5) All doors of compartments containing modules equipped with laser diodes and junction boxes of the fibre optic cables shall be locked and marked with laser warning symbols. 131. Fencing of filter banks. – (1) Alternating Current and Direct Current filter banks area shall be efficiently protected by fencing or other means, not less than 1.8 metre in height, so as to prevent access to the conductors and apparatus therein by any unauthorised person and the fencing of such area shall be effictively earthed. (2) The gate of fencing and earth switch of the filter bank shall be interlocked such that the gate can be opened only after the disconnection and discharging of the filter bank completely. (3) The air core smoothing reactor shall be fenced all around and the fence shall not fall in the Magnetic Clearance Contour of the smoothing reactor. (4) Common neutral bus in Alternating Current filters shall be earthed at one point only. 132. Earthing requirements. – (1) Converter transformer shall be provided with separate perimeter earthing conductor. (2) The line side neutral of the converter transformer bank shall be earthed at one point only. (3) Every part of support structure circumference of the air cored reactor shall be earthed in a manner such that it is not forming closed loops. (4) Radio Frequency Interference screen of valve hall shall be electrically connected and effectively earthed. (5) Metallic sheet, prefabricated structure members and trusses housing high voltage direct current apparatus shall be electrically connected and effectively earthed. (6) Insulating pads or sleeves shall be provided between the steel reinforcement components, in foundation beneath the smoothing reactor, wherever they are crossing each other. Chapter XIII Additional safety requirements for gas insulated substation 133. Additional safety requirements for gas insulated substation. – The regulations under this chapter shall be applicable to gas insulated substation which shall be in addition to the regulations provided from chapter I to VII. 134. General safety requirements. – (1) A separate emergency source of illumination with automatic initiation shall be provided in every room or campartment of gas insulated substation. (2) Cable cover protection unit shall be provided between flanges of gas insulated substation and cable termination unit. (3) Gas insulated substation installation of 220 kV and above voltage shall be provided with partial discharge monitoring system. (4) SF gas leakage rate from any single compartment of gas insulated substation to atmosphere and between 6 compartments shall not exceed as stipulated in the relevant standards. 135. Earthing requirements. – (1) Enclosure of gas insulated substation bay shall be earthed for high frequency transient voltage as per original equipment manufacturer recommendations, apart from the regular earthing. (2) Earthing of gas insulated substation installation shall be as per relevant standards. (3) Travelling wave energy generated inside the gas insulated substation due to switching operations shall be diverted to the earth by providing effective earthing from bushing shroud to the earth. Chapter XIV Miscellaneous 136. Deviations. – (1) The Central Government or the State Government, as the case may be, by an order in writing, allow deviations in respect of matters referred in these regulations except regulation 32. (2) The Electrical Inspector or the Electrical Inspector of mines may, by an order in writing, and reasons to be[भाग III—खण्‍ड 4] भारत‍का‍राजपत्र‍:‍असाधारण 147 recorded allow deviation in respect of matters referred in regulations 14 to 19, regulation 30, sub-regulations (2), (3) and (5) of regulation 37, sub-regulation (3) of regulation 38, clauses (i) to (iv) of regulation 39, clause (xii) of regulation 43, regulation 45, sub-regulation (2) of regulation 46, regulations 48, regulations 54 to 56, regulations 59 to 63, regulation 67, regulation 74, regulation 77, regulations 81 to 94, regulation 104, sub- regulations (6), (8) and (10) of regulation 109, regulation 116 and regulations 119 to 135 on case to case basis. Explanation. – Every order allowing the deviations by the Electrical Inspector or the Electrical Inspector of Mines under sub-regulation (2) shall be placed before the Central or State Government which shall have the final decision. Schedule I Handling of electric supply lines and apparatus [See sub-regulation (3) of regulation (21)] Part-I Precautions to be observed: - (1) Hotline maintenance trained personnel only shall be designated to do work on line. (2) Work permit shall be taken from the terminal substations at each end of the line. (3) Work shall be performed with proper planning and prior understanding and clarity. (4) Favourable climatic condition for hotline operations is sunny weather. If the weather forecasts rain or thunderstorms work will not begin. (5) Organisation of work shall be discussed among the members and responsibility of each team member fixed. (6) Before going to the work site, all equipment and tools shall be inspected and checked for correct operation. (7) Auto re-closure shall be in `OFF‟ position for the line at both ends. (8) The work procedure shall be discussed with the team member at the tower location and the responsibility of each member shall be properly defined. (9) The land in close vicinity to the tower/poles shall be cleared to provide a site area for the required tools. (10) All cleaned hot sticks, strain carrier and other assemblies shall be kept on the hotline tool rack to avoid ground contact. (11) Helmet, safety shoes and safety belt shall compulsorily be used. (12) All hot sticks and ladders shall be cleaned and checked for integrity by the hot sticks tester. (13) All linemen in the hotline team shall be equipped with personal protective equipment during the work. (14) No live-line team members on the tower and conductor shall wear any metallic chain, wristwatch or ring to avoid any circulating current. (15) The team of linemen shall wear conductive socks, boots, helmets and hand gloves. The `hot-end‟ lineman shall wear complete bare hand suit. (16) Tarpaulin sheet should be laid on the work area. (17) A light vehicle shall be kept nearby during entire work period. Tools normally required for hot line maintenance operation: - The following tools conforming to the relevant standards or equivalent specifications shall be used in on-line working: (1) Wire tongs; (2) Wire tongs saddle; (3) Tie sticks; (4) Strain link sticks; (5) Roller link sticks; (6) Suspension link sticks; (7) Auxiliary arms; (8) Strain carrier;148 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] (9) Gin poles; (10) Cum-a-along clamp; (11) Safety equipment like conductor guards, X-arm guards, insulator covers, hand gloves and the like; and (12) Hot sticks. Safe Working Distance: - The following safe working distances shall be observed for hot line maintenance operations: Phase to Phase Safe Clearance kV Metre 11 0.61 33 0.71 66 0.91 110 1.02 132 1.07 220 1.52 400 2.13 Handling electric supply lines and apparatus for carrying out shutdown work or testing [See sub-regulation (3) of regulation (21)] Part-II Precautions to be observed: - (1) Before commencement of any shutdown work or testing in an electric supply line or apparatus, the Engineer or Supervisor in-charge of the work or testing shall identify the possible hazards, such as; electrocution, flash over, fall of person from height, fall of objects from height, failure of tools and plants, fire, and the like, that may be encountered while carrying out the work or testing near charged area and take necessary precaution to protect the working personnel. (2) The Engineer or Supervisor in-charge of the work shall, before commencement of any work, brief the entire working group or gang regarding the hazards that may be encountered and the necessary precautions to be taken by them. (3) The Engineer or Supervisor in-charge of the work shall obtain proper permit-to-work from the concerned Operation In-charge(s) and ensure that the electric supply line or apparatus or section is isolated from all sources of energy, de-energised and earthed. (4) The Engineer or Supervisor in-charge of the work shall ensure that adequate and appropriate local earths are fixed at the zone of working, and the earthing rods remain connected to the isolated section of the electric supply line or apparatus or section till all men and materials have been moved away to safe zone and permit to work is returned on completion of the work. (5) If the local earths are required to be removed for any testing purpose, the same shall be done only when all the working personnel are in the safe zone, on the ground or on the tower, and in the presence of the Engineer or Supervisor. If the working personnel are required to go up or approach the conductor(s) subsequently for any work, such as removal of test leads, tightening or adjustment, they shall be permitted to proceed only after re-fixing the local earths, as required. (6) The Engineer or Supervisor in-charge of the work shall positively confirm by suitable means that the electric supply line or apparatus or section is totally dead before giving clearance for the working personnel to approach the same. (7) The Engineer or Supervisor in-charge of the work shall, while carrying out the shutdown work or testing, ensure that working personnel are maintaining safe distance from the adjacent charged electric supply line or apparatus or section, and also, no objects, such as tools and plants, ladders, cranes, man-lifts, and the like, are moved, so as to infringe the safe distance, endangering the working personnel. (8) Mobile cranes, derricks, man lifts and wheel mounted ladders shall be effectively earthed when being moved or[भाग III—खण्‍ड 4] भारत‍का‍राजपत्र‍:‍असाधारण 149 operated in close proximity with energised apparatus or section. (9) Portable ladders and poles shall be carried only in the horizontal position when being moved in close proximity with energised lines or equipment or area. Further Precautions to be observed: - (1) Adequate and effective supervision shall be ensured by the owner as well as the contractor for all activities while working or testing on electric supply lines and apparatus when any shutdown work or testing is done near charged electric supply line or apparatus or section. (2) Lone worker shall never be allowed to work on electric supply lines, equipment and apparatus or while testing. (3) Sufficient supervisory personnel shall be deployed for close monitoring while various type of works are under progress at the same or different locations. Supervising work shall never be delegated to the sub-contractors' personnel. (4) The deployed Supervising Personnel shall not leave the working spot when shutdown work at height or testing is in the progress, as the working personnel may not be aware of the consequences of unsafe practices. No other work, which requires them to move out of the location, shall be undertaken by Supervising personnel, when shutdown work or testing is in the progress. (5) Wherever shutdown activities are required to be carried out for more than one day on any electric supply lines, apparatus or section, earthing provided at the said work site shall be inspected by the Engineer or Supervisor everyday morning for their healthiness, fitness and proper tightening, before giving clearance for the working personnel to climb the tower or structure to resume the work. Handling high voltage direct current apparatus for carrying out shutdown work or testing [See sub-regulation (3) of regulation (21)] Part-III Precautions to be observed: - (1) The Engineer or Supervisor in-charge of the work shall obtain proper Permit-To-Work (PTW) from the concerned Operation In-charge(s) and ensure that the electric supply line or apparatus or section is isolated from all sources of energy, de-energised and earthed. (2) Before commencement of any shutdown work or testing of high voltage direct current apparatus, the Engineer or Supervisor in-charge of the work or testing shall identify the possible hazards, such as; electrocution, flash over, fall of person from height, fall of objects from height, failure of tools and plants, fire, and the like, that may be encountered while carrying out the work or testing near charged area and take necessary precaution to protect the working personnel. (3) The Engineer or Supervisor in-charge of the work shall, before commencement of any work, brief the entire working group or gang of the hazards that may be encountered and the necessary precautions to be taken by them. (4) Attach warning labels to all neighboring installation parts (to be removed after the works have been carried out). (5) The Engineer or Supervisor in-charge of the work shall allow access to the valve hall, DC Filter Area, AC Filter Area and DC hall (if any) only when the apparatus therein are completely de-energised and effectively earthed. (6) The work on AC/DC filter bank shall only begin after earthing the entire capacitor bank. (7) There shall be at least ten minute time gap between earthing the entire capacitor bank and starting the work on bank. There after unit must be short circuited. (8) The de-energised bushing shall be checked for stored charge by touching all the surfaces of both indoor and outdoor side composite insulators and all other parts of the bushing using a proper test instrument. (9) The gas pressure inside high voltage direct current through wall bushing shall be reduced to a level prescribed by the manufacturer before starting any work or handling of the bushing. Handling Gas Insulated Switchgear (GIS) apparatus for carrying out shutdown work or testing [See sub-regulation (3) of regulation (21)] Part-IV Precautions to be observed: -150 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] (1) The Engineer or Supervisor in-charge of the work shall obtain proper Permit-To-Work from the concerned Operation In-charge(s) and ensure that the electric supply line or apparatus or section is isolated from all sources of energy, de-energised and earthed. (2) Operation, maintenance and repair must be carried out by trained and certified personnel only. (3) Before commencement of any shutdown work or testing of gas insulated switchgear apparatus, the Engineer or Supervisor in-charge of the work or testing shall identify the possible hazards, such as; electrocution, flash over, fall of person from height, fall of objects from height, failure of Tools and Plants, fire, and the like, that may be encountered while carrying out the work or testing near charged area and take necessary precaution to protect the working personnel. (4) The Engineer or Supervisor in-charge of the work shall, before commencement of any work, brief the entire working group or gang of the hazards that may be encountered and the necessary precautions to be taken by them. (5) Wear hearing protection during operation. (6) Take care while touching the enclosure at any time as enclosures may heat up to the temperature of 70°C. (7) Observe the procedures for storage, transportation, and the use of filling equipment. (8) Wear the personal protective equipment: respirator mask (self-contained breathing equipment if necessary), protective overall, protective gloves, safety shoes, safety glasses. (9) Attach warning labels to all neighboring installation parts (to be removed after the works have been carried out). (10) Provide proper electrical clearance as required by interlocking rules. Mark e.g. main circuits and control circuits with appropriate tags. (11) Block off neighboring live parts with screens, insulating mats or spacer grids in order to prevent unintended contacts. (12) While working on any compartment in gas insulated switchgear, the immediate adjacent compartment(s) must be also depressurised for safety of the working person. (13) SF gas becomes contaminated and contains poisonous substances after events such as arc faults. Hence, 6 handling of SF in such cases must be done using proper PPEs and by a trained personnel, preferably from the original 6 equipment manufacturer. (14) The switchgear installation shall not be operated if the density of SF gas indicated at the density monitors is 6 not in the operating range. (15) Do not remove any protective covers if an assembly is energized. (16) The Engineer or Supervisor in-charge of the work shall ensure that adequate and appropriate local earths are fixed at the zone of working, and the earthing rods remain connected to the isolated section of the electric supply line or apparatus or section till all men and materials have been moved away to safe zone and Permit-To-Work is returned on completion of the work. Schedule II Forms of Inspection Report [See regulation (32) and (45)] FORM I (Installations of voltage up to and including 250V) Report __________ Date of inspection by Electrical Inspector or self-certification by supplier/owner/consumer ______________________________ Date of last inspection or self-certification ___________________ 1. Consumer No. ______________________ 2. Voltage and system of supply:[भाग III—खण्‍ड 4] भारत‍का‍राजपत्र‍:‍असाधारण 151 (i) Volts _____________(ii) No. of Phases _____________ (iii) AC/DC _______________ 3. Type of wiring* _______________ *State type of wiring whether casing capping, lead covered of teak wood batten, concealed conduit, Tough Rubber Sheathed and any other type. 4. Name of the consumer or owner _____________________________ 5. Address of the consumer or owner _____________________________ 6. Location of the premises _____________________________ 7. Particulars of the installations: Number Connected Load in kW (a) (i) Light Points ___________ _______________ (ii) Fan Points ___________ _______________ (iii) Plug Points ___________ _______________ (b) Other equipment (complete details to be furnished): (i) _____________________________ (ii) _____________________________ Total connected load in kW _____________________________ Maximum current demand in Amps _____________________________ (on the basis of total connected load) (c) Generators: (complete detail to be enclosed) Make S. No. kVA rating Voltage rating Type (i) ________________________________________________________________ (ii) ________________________________________________________________ 8. General conditions of the installation: Sl. No. Regulation No. Requirements Report 1. Regulation 14 (i) Is/Are there any visible sign(s) of overloading in Yes/No respect of any apparatus wiring? (ii) Condition of flexible cords, sockets, switches, plug- Satisfactory/ pins, cut-outs and lamp holders and such other fittings. Not Satisfactory (iii) General condition of wiring. Satisfactory/ Not Satisfactory (iv) Whether any unauthorised temporary installation exist? Yes/No (v) State if sockets are controlled by individual switches. Yes/No (vi) Any other defect or condition which may be a source of Yes/No danger. If yes, give details. 2. Regulation 15 Give report on condition of service lines, cables, wires, Satisfactory/ apparatus and such other fittings placed by the supplier or Not Satisfactory owner of the premises. If not satisfactory, give details. 3. 1 Regulation 16 Whether suitable cut-outs provided by the supplier at the Yes/No consumer‟s premises are within enclosed fire proof receptacle? 4. 1 Regulation 17 (i) State if switches are provided on live conductors. Yes/No (ii) State if indication of a permanent nature is provided as Yes/No per regulation so as to distinguish earthed or earthed152 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] neutral conductor from the live conductor. (iii) Whether a direct line is provided on the neutral in the Yes/No case of single-phase double pole iron clad switches instead of fuse? 5. Regulation 18 (i) State if earthed terminal is provided by the supplier. Yes/No (ii) Have three pin plugs been provided for plug points? Yes/No (iii) General visible condition of the earthing arrangement. Satisfactory/ Not Satisfactory 6. Regulation 19 Are the live parts in building inaccessible? Yes/No 7. Regulation 36 State insulation resistance between conductors and earth in -------- Mega Ohms Mega Ohms. 8. Regulation 37 (i) State if linked switches of requisite capacity are Yes/No provided near the point of commencement of supply. (ii) State if the wiring is divided in suitable number of Yes/No circuits and each such circuit is protected by suitable cut-out. (iii) State if supply to each motor or apparatus is controlled Yes/No by suitable linked switch. 9. Regulation 43 (i) Have the frames of every generator, stationary motor Yes/No and so far as practicable portable motor and the metallic parts (not intended as conductors) of all other apparatus used for regulating* or controlling electricity been earthed by two separate and distinct connections with earth? (ii) Is the earth wire free from mechanical damage? Yes/No (iii) In the case of conduit, or lead covered wiring, has the Yes/No conduit or lead-cover been efficiently earthed? (iv) If the consumer has his own earth-electrode, state if it ------- Ohms is properly executed and has been tested. If yes, give value of earth resistance 10. Regulation 44 Whether residual current device of appropriate capacity as Yes/No defined in Regulation have been provided? 11. Overhead Lines (i) State if the consumer has any overhead lines. Yes/No (ii) Does the overhead line near the premises of consumer Yes/No meets the requirement of regulation 60, 61 and 62? If not, give details. (iii) Is guarding provided for overhead lines as per Yes/No Regulation 76? (iv) Any other remarks. Date: Signature of the supplier/ Owner / Consumer Name ______________________ Designation _________________ File No. ____________________ To: Office of Electrical Inspector for ………………... * Not applicable to isolated wall tubes or to brackets, electroliers, switches, ceiling fans and such other fittings (other than portable hand lamps and transportable apparatus) unless provided with earth terminal.[भाग III—खण्‍ड 4] भारत‍का‍राजपत्र‍:‍असाधारण 153 FORM II [See Regulation (32) and (45)] (Installations of voltage level more than 250 V up to and including 650 V) Report / Application No. __________ Date of inspection by Electrical Inspector or self-certification by supplier/owner/consumer ______________________________ Date of last inspection or self-certification ___________________ 1. Consumer No. ______________________ 2. Voltage and system of supply: (ii) Volts _____________(ii) No. of Phases _____________ (iii) AC/DC _______________ 3. Name of the consumer or owner _____________________________ 4. Address of the consumer or owner _____________________________ 5. Location of the premises _____________________________ 6. Particulars of the installations: (a) Motors: Make S. No. kW/MW rating Voltage rating Type (i) ________________________________________________________________ (ii) ________________________________________________________________ (b) Other equipment (complete details to be furnished): (i) ________________________________________________________________ (ii) ________________________________________________________________ (c) Total connected load kW / kVA _________________________________________ (d) Generators: (complete detail to be enclosed) Make S. No. kVA rating Voltage rating Type (iii) ________________________________________________________________ (iv) ________________________________________________________________ 7. General condition of the installation: Sl.No. Regulation No. Requirements Report 1. Regulation 3 Is the record of the designated persons properly made and kept Yes/No up to date and duly attested? 2. Regulation 14 (i) Is/Are there any visible sign(s) of overloading in respect Yes/No of any apparatus wiring? (ii) Whether any unauthorised temporary installation exist? Yes/No (iii) Are the electric supply lines and apparatus so installed, Yes/No protected, worked and maintained as to prevent danger? (iv) Any other general remarks. 3. Regulation 15 Give report on condition of service lines, cables, wires, Satisfactory/ apparatus and such other fittings placed by the supplier or Not Satisfactory owner of the premises. If not satisfactory, give details. 4. Regulation 16 Whether suitable cut-outs/CBs provided by the supplier at the Yes/No consumer‟s premises are within enclosed fire proof receptacle? 5. Regulation 17 (i) Whether switches are provided on live conductors? Yes/No (ii) Whether indication of a permanent nature is provided as Yes/No per regulation so as to distinguish earthed or earthed neutral conductor from the live conductor as per IS color154 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] code? (iii) Whether a direct line is provided on the neutral in the case Yes/No of single-phase double pole iron clad switches/Isolators/CBs instead of fuse? 6. Regulation 18 (i) Whether earthed terminal is provided by the supplier? Yes/No (ii) General visible condition of the earthing arrangement. Satisfactory/ Not Satisfactory 7. Regulation 19 (i) Are bare conductors in building inaccessible? Yes/No (ii) Whether readily accessible switches have been provided Yes/No for rendering them dead? 8. Regulation 20 12. Whether “Danger Notice” in Hindi and the local language of Yes/No the district and of a design as per the relevant standards is affixed permanently in conspicuous position? 9. Regulation 21 (i) Whether insulating floor or mats have been provided? Yes/No (ii) Whether identification of panel has been provided on the Yes/No front and the rear of the panel? 10. Regulation 23 Whether flexible cables used for portable or transportable Yes/No equipment covered under the regulation, are heavily insulated and adequately protected from mechanical injury? 11. Regulation 24 State the condition of metallic coverings provided for various Satisfactory/ conductors. Not Satisfactory 12. Regulation 26 Whether the circuits or apparatus intended for operating at Yes/No different voltage(s) are distinguishable by means of indication(s) of permanent nature? 13. Regulation 28 Whether all circuits and apparatus are so arranged that there is Yes/No no danger of any part(s) becoming accidentally charged to any voltage beyond the limits of voltage for which it/they is/are intended? 14. Regulation 29 (i) In the case of generating stations, whether fire-buckets Yes/No filled with clean dry sand have been conspicuously marked and kept in convenient location in addition to fire- extinguishers suitable for dealing with fires ? (ii) Whether First Aid Boxes or cupboards conspicuously Yes/No marked and properly equipped are provided and maintained? (iii) Is adequate staff trained in First Aid Treatment and Yes/No firefighting? 15. Regulation 30 (i) Whether instructions in English or Hindi and the local Yes/No language of the district and where Hindi is the local language, in English and Hindi, for the resuscitation of persons suffering from electric shock have been affixed in a “conspicuous place”? (ii) Are the persons specified under this Regulation able to Yes/No apply instructions for resuscitation of persons suffering from electric shock? 16. Regulation 36 State insulation resistance between conductors and earth in ----- Mega Ohms Mega Ohms. 17. Regulation 37 (i) Whether a suitable linked switch, or circuit breaker is Yes/No placed near the point of commencement of supply so as to be readily accessible and capable of being easily operated[भाग III—खण्‍ड 4] भारत‍का‍राजपत्र‍:‍असाधारण 155 to completely isolate the supply? (ii) Whether every distinct circuit is protected against excess Yes/No electricity by means of a suitable circuit breaker or cut-out ? (iii) Whether suitable linked switch or circuit breaker is Yes/No provided near each motor or apparatus for controlling supply to the motor or apparatus? (iv) Whether adequate precautions are taken to ensure that no Yes/No live parts are so exposed as to cause danger? 18. Regulation 39 (i) Whether clear space of 100 cm is provided in front of Yes/No the main switchboard? (ii) Whether the space behind the switchboard exceeds 75 Yes/No cm in width or is less than 20 cm? (iii) In case the clear space behind the switchboard exceeds Yes/No 75 cm, state whether a passage way from either end of the switchboard to a height of 1.80 metre is provided. 19. Regulation 43 (i) Have the frame of every generator, stationary motor and Yes/No so far as practicable, portable motor and the metallic parts (not intended as conductors) of all transformers and any other apparatus used for regulating or controlling electricity and all apparatus consuming electricity at voltage exceeding 250 V but not exceeding 650 V been earthed by two separate and distinct connections with earth? (ii) Have the metal casings or metallic coverings containing Yes/No or protecting any electric supply line or apparatus been properly earthed and so joined and connected across all junction boxes as to make good mechanical and electrical connection? (iii) Whether the consumer‟s earth-electrode is properly Yes/No executed and has been tested. If yes, give value of earth _____Ohm resistance? (iv) Is the earth wire free from any mechanical damage? Yes/No (v) Whether record of earth resistance value maintained? Yes/No (vi) Is the protective equipotential bonding tested? Yes/No (vii) Is the fault loop impedance at origin of installation Yes/No tested? (viii) Is the fault loop impedance of each circuit tested? Yes/No (ix) Is the fault loop impedance tested for all sources? Yes/No 20. Regulation 44 Whether Residual Current Device of Appropriate capacity as Yes/No defined in Regulation have been provided? 21. Regulation 47 Have the protections and interlocks for the generating units Yes/No been provided. Details of the protections shall be given. 22. Overhead Lines (i) State if the consumer has any overhead lines. Yes/No (ii) Does the overhead line near the premises of consumer Yes/No meets the requirement of regulations 60, 61 and 62? If not, give details. (iii) Is guarding provided for overhead lines as per regulation Yes/No 76? (iv) Any other remarks. Yes/No156 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] Date: Signature of the supplier/ Owner / Consumer Name ______________________ Designation _________________ File No. ____________________ To: Office of Electrical Inspector for ………………... FORM III (See Regulation 32 and 45) (Installations of voltage exceeding 650 V) Report / Application No. __________ Date of inspection by Electrical Inspector or self-certification by supplier/owner/consumer ______________________________ Date of last inspection or self-certification ___________________ 1. Consumer No. ______________________ 2. Voltage and system of supply: (iii) Volts _____________(ii) No. of Phases _____________ (iii) AC/DC _______________ 3. Name of the consumer or owner _____________________________ 4. Address of the consumer or owner _____________________________ 5. Location of the premises _____________________________ 6. Particulars of the installations: (a) Transformers: (complete detail to be enclosed) Make S. No. kVA/MVA rating Voltage rating Type (i) ________________________________________________________________ (ii) ________________________________________________________________ (b) Generators: (complete detail to be enclosed) Make S. No. kVA/MVA rating Voltage rating Type (v) ________________________________________________________________ (vi) ________________________________________________________________ (c) List of Motors with rating, protection, overload setting, size of earth conductor used to be furnished Make S. No. kW/MW rating Voltage rating Type (iii) ________________________________________________________________ (iv) ________________________________________________________________ (d) List of equipment with complete details of HT /LT switchgears/ apparatus with their rating to be furnished): (iii) ________________________________________________________________ (iv) ________________________________________________________________ (e) Total connected load kW / kVA _________________________________________ Complete list of connected loads to be furnished. 7. General condition of the installation: Sl. Regulation No. Requirements Report No.[भाग III—खण्‍ड 4] भारत‍का‍राजपत्र‍:‍असाधारण 157 1. Regulation 3 Is the record of the designated persons properly made and kept Yes/No up to date and duly attested? 2. Regulation 5 Whether Electrical Safety Officer as required under the Yes/No Regulation is designated? Regulation 14 (i) Is/Are there any visible sign(s) of overloading in respect Yes/No of any apparatus? (ii) Whether any unauthorised temporary installation exist? Yes/No (iii) Whether the motors and controlling equipment are Yes/No being overhauled periodically and record kept of the same in a register? (iv) Whether the transformer oil samples are being tested Yes/No periodically and results recorded in a register? State ---- kV/mm value of dielectric strength of oil. (v) Whether suitable lightning arresters have been provided Yes/No near the transformers for protection against lightning? (vi) Whether earth resistance is being measured periodically Yes/No once a year and results recorded in a register? Copy of record to be enclosed. (vii) Any other defect or condition which may be a source of Yes/No danger. If yes, please explain? (viii) Whether operation and maintenance data has been Yes/No clarified, categorised and computerised for prompt and easy retrieval? (ix) Whether residual life assessment and life extension Yes/No programmes are being undertaken for installations or equipment of voltage exceeding 650 V (applicable for installations or equipment more than 15 years old)? (x) Whether all required type and routine tests at factory Yes/No done for equipment? Deficiencies and discrepancies in above test report and results, if any, shall be reported. (xi) Are there deficiencies in construction with reference to Yes/No Indian Standard requirements? Please specify. 4. Regulation 15 Give report on condition of service lines, cables, wires, Satisfactory/ apparatus and such other fittings placed by the supplier or Not Satisfactory owner of the premises. If not satisfactory, give details. 5. Regulation 16 Whether suitable cut-outs/CBs provided by the supplier at the Yes/No consumer‟s premises are within enclosed fire proof receptacle? 6. Regulation 17 (i) Whether switches are provided on live conductors? Yes/No (ii) Whether indication of a permanent nature is provided as Yes/No per Regulation so as to distinguish earthed or earthed neutral conductor from the live conductor? (iii) Whether a direct line is provided on the neutral in the case Yes/No of single-phase double pole iron clad switches/CBs instead of fuse? 7. Regulation 18 (i) Whether earthed terminal is provided by the supplier? Yes/No (ii) General visible condition of the earthing arrangement. Satisfactory/ Not Satisfactory158 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] 8. Regulation 19 (i) Are live parts in building inaccessible? Yes/No (ii) Whether readily accessible switches have been provided Yes/No for rendering them dead? 9. Regulation 20 13. Whether “Danger Notice” in Hindi and the local language of Yes/No the district and of a design as per the relevant standards is affixed permanently in conspicuous position? 10. Regulation 21 (i) Whether the practice of working on live lines and Yes/No apparatus is adopted? If so, have the safety measure been adopted as per Schedule I? (ii) Whether insulating floor or mats conforming to the Yes/No relevant standards have been provided? (iii) Whether identification of panel has been provided on the Yes/No front and the rear of the panel? 11. Regulation 23 Whether flexible cables used for portable or transportable Yes/No equipment covered under the Regulation, are heavily insulated and adequately protected from mechanical injury? 12. Regulation 24 State the condition of metallic coverings provided for various Satisfactory/ conductors. Not Satisfactory 13. Regulation 26 Whether the circuits or apparatus intended for operating at Yes/No different voltage(s) are distinguishable by means of indication(s) of permanent nature? 14. Regulation 28 Whether all circuits and apparatus are so arranged that there is Yes/No no danger of any part(s) becoming accidentally charged to any voltage beyond the limits of voltage for which it/they is/are intended? 15. Regulation 29 (i) In the case of generating stations and enclosed sub Yes/No stations, whether fire-buckets filled with clean dry sand have been conspicuously marked and kept in convenient location in addition to fire-extinguishers suitable for dealing with electric fires? (ii) Whether First Aid Boxes or cupboards conspicuously Yes/No marked and properly equipped are provided and maintained? (iii) Is adequate staff trained in First Aid Treatment and Yes/No firefighting? 16. Regulation 30 (i) Whether instructions in English or Hindi and the local Yes/No language of the district and where Hindi is the local language, in English and Hindi, for the resuscitation of persons suffering from electric shock have been affixed in a “conspicuous place”? (ii) Are the persons mentioned in this regulation able to Yes/No apply instructions for resuscitation of persons suffering from electric shock? 17. Regulation 36 State insulation resistance between conductors and earth in ----- Mega Ohms Mega Ohms. 18. Regulation 37 (i) Whether a suitable linked switch, or a circuit breaker, or Yes/No an emergency tripping device is placed near the point of commencement of supply so as to be readily accessible and capable of being easily operated to completely isolate the supply? (ii) Whether suitable linked switch or a circuit breaker to Yes/No carry and break the full load current is provided on the[भाग III—खण्‍ड 4] भारत‍का‍राजपत्र‍:‍असाधारण 159 secondary side of a transformer? (iii) Whether every distinct circuit is protected against excess Yes/No electricity by means of a suitable circuit breaker or cut- out? (iv) Whether linked switch or circuit breaker or emergency Yes/No tripping device is provided near the motor or other apparatus at voltage exceeding 650 V but not exceeding 33kV for controlling supply to the motor or apparatus? (v) Whether adequate precautions are taken to ensure that no Yes/No live parts are so exposed as to cause danger? 19. Regulation 39 (i) Whether clear space of 100 cm is provided in front of the Yes/No main switchboard? (ii) Whether the space behind the switchboard exceeds 75 Yes/No cm in width or is less than 20 cm? (iii) In case the clear space behind the switchboard exceeds Yes/No 75 cm, state whether a passage way from either end of the switchboard to a height of 1.80 metre is provided. 20. Regulation 46 (i) Whether all conductors and apparatus including live Yes/No parts thereof are inaccessible (ii) Whether all windings of motors or other apparatus are Yes/No suitably protected? (iii) Whether the separation wall or fire wall between Yes/No apparatuses or consumer premises, in a substation or a switching station with apparatus having more than 2000 litres of oil are installed, have been provided as required under the regulation? (iv) Where 9000 litre or more of oil is used in any one oil Yes/No tank, has provision been made for draining away or removal of oil which may leak or escape from such tank(s)? (v) Whether suitable firefighting system as per the regulation Yes/No has been provided? (vi) Whether trenches inside substation containing cables are Yes/No filled with non-inflammable material or completely covered with non-inflammable slabs? (vii) Are conductors and apparatus so arranged that they may Yes/No be made dead in sections for carrying out work thereon? 21. Regulation 47 Whether protections and interlocks have been provided? Give Yes/No the details of the protection schemes and their settings. 22. Regulation 50 (i) Have all non-current carrying metal parts associated with Yes/No the installation been effectively earthed with the earthing system or mat by two separate and distinct connections? (ii) Is the earth wire free from any mechanical damage? Yes/No (iii) Has the neutral point at the transformer and generator Yes/No been earthed by two separate and distinct connections with earth? (iv) Have the metal casings or metallic coverings containing Yes/No or protecting any electric supply line or apparatus been properly earthed and so joined and connected across all junction boxes as to make good mechanical and160 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] electrical connections throughout their whole length? (v) Whether earthing has been properly executed and has Yes/No been tested. If yes, give value of earth resistance. ___Ohm 23. Regulation 51 (i) Is the outdoor (except pole type) substation efficiently Yes/No protected by fencing not less than 1.8 metre in height? (ii) Whether the mounting of a transformer on a single pole or Yes/No H pole is done as per relevant standard. 24 Regulation 52 (i) Where platform type construction is used for pole type Yes/No substation, has sufficient space for a man to stand on the platform been provided? (ii) Has hand-rail been provided and connected with earth (if Yes/No metallic and if substation has not been erected on wooden supports and wooden platform)? 25. Regulation 53 Has suitable provision been made for immediate and Yes/No automatic or manual discharge of every static condenser on disconnection of supply? 26 Overhead Lines (i) What is the minimum size of the conductors of overhead Minimum size of lines used? State the type of conductors. (Regulation 57) Conductor --- (ii) Whether clearances above ground of the lowest conductor Yes/No of overhead lines are as per regulation 60? State --- metre clearance. (iii) On the basis of maximum sag, whether vertical clearances Yes/No where the line of voltage exceeding 650 V passes above --- metre or adjacent to any building or part of a building as per regulation 63? State clearance. (iv) On the basis of maximum deflection due to wind pressure, Yes/No whether horizontal clearances between the nearest --- metre conductor and any part of such building are as per regulation 63? State clearance. (v) Where conductors forming parts of system at different Yes/No voltages are erected on the same supports, whether adequate provision has been made as per regulation 64 to guard against danger to linemen and others from the lower voltage system being charged above its normal working voltage by leakage from or contact with the higher voltage system? (vi) Where overhead lines cross or are in proximity to each Yes/No other whether they have been suitably protected to guard against possibility of their coming in contact with each other as per regulation 71? (vii) Has every guard wire been properly earthed as per Yes/No regulation 72 at each point at which its electrical continuity is broken? (viii) (a) Whether metal supports of overhead lines and Yes/No metallic fittings attached thereto are permanently earthed Yes/No as per regulation 74? (b) Has each stay-wire (except in case where an insulator has been placed in it at a height not less than 3 metre from the ground) been earthed as per regulation 74? (ix) (a) Whether overhead line is suitably protected with a Yes/No device for rendering the line electrically harmless in case[भाग III—खण्‍ड 4] भारत‍का‍राजपत्र‍:‍असाधारण 161 it breaks as per regulation 76? Yes/No (b) Whether anti-climbing devices have been provided at each support as per regulation 75? (x) (a) Has the owner of overhead lines adopted efficient Yes/No means for diverting to earth any electrical surges due to Yes/No lightning in every overhead line which is so exposed as to be liable to injury from lightning as per regulation 77? (b) Whether earth lead from the lightning arresters is connected to a separate earth electrode as per regulation 77? (xi) Whether unused overhead lines are maintained in a safe Yes/No mechanical condition as per regulation 78? (xii) Whether statutory clearances from Authorities i.e. Forest Yes/No Department/Railways/PTCC/Defence (AHQ) /Civil Aviation have been taken as per the relevant standards. If yes, enclose copies of the same. (xiii) Any other remarks. Yes/No In addition to above, following electrical equipment wise test details to be given, if applicable: Sl. Equipment Test Conducted Test Results Remarks No. 1. Linked Switch with (i) Mechanical operation Smooth/Trouble some fuses (s) (ii) Rating of Fuse -------Amps (iii) Contact of blades Full/Partial 2. Isolator (i) Mechanical operation Ok/Not Ok (Sl. No.--- (ii) Remote Operation OK/Not OK Make: (iii) Local Operation OK/Not OK Capacity: (iv) Measurement of contact resistance (v) Interlocking with earth switch OK/Not OK (vi) Interlocking with Circuit Breaker OK/Not OK (vii) IR Values Phase to Phase and Phase to Earth  Open condition --- M Ohm --- M Ohm  Closed condition --- M Ohm --- M Ohm 3. Circuit Breaker (i) Rating of Circuit Breaker (Circuit breaker  Type ------------- location and no.)  Voltage ------------- kV Circuit breaker  Normal Current ------------- Amps control circuits  Rupturing Current -------------- kA (ii) IR Values Phase to Phase and Phase to Earth  Open condition --- M Ohm --- M Ohm  Closed Condition --- M Ohm --- M Ohm (iii) Contact Resistance including -------------micro ohm Dynamic Contact Resistance Measurement (iv) Mechanical Operation Instant smooth /time gap (Sec.) (v) Remote operation OK/Not OK162 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] (vi) Local Operation OK/Not OK (vii) Interlocking with Isolator OK/Not OK (viii) Interlocking with earth switch OK/Not OK (ix) Alarm and Trip for OK/Not OK OTI/WTI/Buchholz/PRV/etc., (x) Earth Fault Relay OK/Not OK (xi) Over Current Relay OK/Not OK (xii) Under Voltage Relay OK/Not OK (xiii) other safety Alarms OK/Not OK (xiv) Whether all the provisions of OK/Not OK Regulation 37 are satisfactory? 4. Transformer (i) Insulation Resistance Values Transformer No.,  HT to LT --------------M ohm Location,  HT to Earth --------------M ohm (Transformer Sl. No.  LT to Earth --------------M ohm Make, Capacity, Voltage Ratio) (ii) Break down Voltage test  Oil sample I (Top) -------------- kV  Oil Sample II (Bottom) -------------- kV (iii) Vector Group Test OK/Not OK (iv) Polarity Tests OK/Not OK (v) Magnetic Balance OK/Not OK (vi) Tan Delta Test OK/Not OK (vii) Oil level in conservator tank OK/Not OK (viii) Oil level in breather cup OK/Not OK (ix) OTI/WTI settings A/T--- 0C/--- 0C A/T---0C/--- 0C (x) OTI/WTI alarm and trip operation OK/Not OK (xi) Operation of Buchholz relay OK/Not OK (xii) Operation of PRV OK/Not OK (xiii) Oil leakage OK/Not OK (xiv) Interlock of door switch of dry OK/Not OK transformer (xv) Clearances  Side Clearance: ---------cm  Between two Transformers: ----------Metre (xvi) Body Earth Resistance ---------- Ohm (xvii) Neutral Earth Resistance N ---Ohm, N ---Ohm 1 2 (xviii) Earth Flat Size Material used  Body: -----------  Neutral: ----------- (xix) Operation of ON LOAD & OFF OK/Not OK LOAD Tap Changers (xx) Sweep Frequency Resonance OK/Not OK Analysis Test (SFRA) (xxi) Dielectric Frequency Resonance OK/Not OK Analysis (DFRA) Test (xxii) Partial Discharge Tests OK/Not OK 5 DG Generators: (i) Type of Generator Generator No., (ii) Interlocking with other supply OK/Not OK[भाग III—खण्‍ड 4] भारत‍का‍राजपत्र‍:‍असाधारण 163 Location, sources (Alternator and (iii) Body earth resistance ---------- Ohm Engine Sl. No. Make, Capacity) (iv) Neutral earth resistance N ---Ohm N ---Ohm 1 2 (v) Earth Flat Size, Material used (Cu/Al) ------------------  Body: ------------------  Neutral: (vi) Generator Protection details ------------------ 6. Cable (i) Insulation Resistance Values: (Details to be given:  Ph - Ph: --------- M Ohm size, length, type)  Ph – Earth: --------- M Ohm  Ph – Earth + other Ph: --------- M Ohm (ii) Cable trays Provided/ Not provided (iii) Cable tray earthing OK/Not OK (iv) Cables bending radius OK/Not OK -----------metre 7. Panels (i) No. of panels ___ Nos (ii) Location of panel To be enclosed (iii) Rating of the panel ____Amp (iv) Size and current rating of the main ____ mm, _____Amp Bus bars and the distribution Bus bars of the panel (v) Whether the Bus bar size of the Yes/No panel suitable to rating of the panel (vi) IP Protection of panel ________ (vii) Type of cable entry Top Entry/Bottom Entry (viii) No. of Incomers and Bus couplers ___ Nos in a Panel (ix) Ratings of the Circuit Breakers ____Amp (x) No. of MCCBs of each rating in ___ Nos the panel (xi) No. of spare MCCBs of each rating ___ Nos (xii) Panel Clearance from the wall ____mm (xiii) Clearance between two panels i.e. ____mm adjacent panels (xiv) Whether all the provisions of Yes / No Regulation 39 followed (xv) Size of the Earth strip used for ___sqmm earthing of the panel 8. Earthing (i) Metal and size of Earth Strips Cu/Al/GI --- Sqmm (ii) Type of earthing Plate/Pipe/Counterpoise (iii) Location and No. of earth electrode ____Nos (iv) Values of Earth resistance of each _____Ω earth electrode and Grid (v) Earth mat resistance _____Ω 9. Potential (i) Ratio test OK/not OK Transformer (ii) Polarity test OK/not OK (iii) BDV of oil ---------- kV (iv) IR test (R) P-E-------M Ohm164 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] (Y) P-E-------M Ohm (B) P-E-------M Ohm (v) Tan Delta and Capacitance _______ measurement 10. Current Transformer (i) Ratio test OK/not OK (ii) Polarity test OK/not OK (iii) BDV of oil ---------- kV (iv) IR test (R) P-E-------M Ohm (Y) P-E-------M Ohm (B) P-E-------M Ohm (v) Tan Delta and Capacitance _______ measurement 11. Overhead lines and (i) Size of the poles of DP structure _______ DP structure (ii) Clearance between phases to phase _______ and phase to earth. (iii) Ground clearance of the _______ conductors. (iv) Check of electrical clearance along Ok/ Not Ok the route of overhead line, (v) Check of guarding and clearance at Ok/ Not Ok road crossings. (vi) Check the footings of the poles. Ok/ Not Ok (vii) Earthing arrangements Ok/ Not Ok (viii) What is the minimum size of the _______ conductors of overhead lines used? State the type of conductors. (ix) Whether all the provisions of Yes / No regulation 60, 62, 63, 64, 71, 72 and 74 are satisfied. General Observations: 1. Ch eck of phase to phase, phase to ground and sectional clearance 2. Ch eck of Manufacture test reports of individual equipment (Copies to be enclosed) 3. Ge neral observation and views (Specific deviation from the requirements of the Regulations shall be clearly brought out) Date: Signature of the supplier/ Owner / Consumer Name ______________________ Designation _________________ File No. ____________________ To: Office of Electrical Inspector for ………………... (For Self-certification by supplier /owner /consumer) CERTIFICATE [Under Regulation (32) and (45) of CEA (Measures relating to Safety & Electricity Supply) Regulation, 2023] This is to certify that the electrical installation is complete in all respects and the work has been carried out conforming to the CEA (Measures relating to Safety & Electric Supply) Regulation, 2023 and relevant standards. The site tests done are found to be in order and it is electrically safe to operate the apparatus free from any danger.[भाग III—खण्‍ड 4] भारत‍का‍राजपत्र‍:‍असाधारण 165 Encl: Test reports (Signature) (Signature) Self-certifying supplier / owner / consumer Chartered Electrical Safety Engineer Name ______________________ Name ______________________ File No. ____________________ To: Office of Electrical Inspector for ………………... Forms of Inspection Report [See sub-regulation (3) of regulation (32)] FORM IV (Electrical Installations in Mine) Report No.: ______________ Date of Inspection: ______________ Date of last inspection: ______________ Name of the Inspecting Officer: ______________ 1. Name of the Mine: 2. Name of the Owner: 3. Name of the Agent: 4. Name of the Mine Manager: 5. Name of the Colliery Engineer: 6. Name of the Safety Officer: 7. Name of the designated Electrical Safety Officer: 8. Name of the Electrical Supervisor: 9. Name of the workman Inspector (Electrical) : 10. Name of the Engineer (concerned Section) : 11. Name of the working seam: 12. Working district Inspected: 13. Name of the persons accompanied during inspection: 14. Voltage and system of supply: (i) Volts ________________ (ii) No. of Phases _____________ (iii) AC/DC _______________ 15. Particulars of the installations/ apparatus installed and their location as per mine plan: 16. Illumination level: 17. Percentage of methane/other explosive gas: 18. Dry bulb temperature, wet bulb temperature in case of underground mine: 19. Velocity/speed of air in case of underground mineL: 20. General conditions of the installation: Sl. Regulation No. Requirements Report No. 1. Regulation 98 On or before the first day of February in every year, notice in Yes/No the form set out in Schedule IX or Schedule X whichever is applicable is sent. 2. Regulation 99 The plans specified under this regulation are kept in the office of Yes/No the mine manager and available to the Inspector or inspector of166 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] mines. 3. Regulation 100 (i) Whether adequate illumination by electricity without Yes/No causing glare and strain has be provided in the mines? Satisfactory/ Not satisfactory (ii) Whether efficient means of communication is provided Yes/No between the point where the switchgear under sub- Satisfactory/ regulation (1) Regulation 107 is erected, the shaft bottom and other distributing centers in the mine. Not Satisfactory (iii) Whether fire extinguishing appliances of adequate capacity Yes/No and of an approved type are installed and properly Satisfactory/ maintained in every place containing apparatus, other than cables, telecommunication and signalling apparatus. Not Satisfactory (iv) Is minimum clearance above ground of the lowest Yes/No conductor of overhead lines or overhead cables where dumpers or trackless vehicles are being operated, not less than twelve metre in height. 4. Regulation 101 (i) Are transformers and switchgear placed in a separate room, Yes/No compartment or box where necessary to prevent danger of mechanical damage? (ii) Is the room, compartment or box substantially constructed Yes/No and kept dry and illuminated? (iii) Is efficient ventilation provided for all apparatus installed Yes/No therein? 5. Regulation 102 (i) Is earthing carried out by connection to an earthing system Yes/No at the surface of the mine and in a manner approved by Electrical Inspector of mines? (ii) Are all metallic sheaths, coverings, handles, joint boxes, Yes/No switchgear frames, instrument covers, switch and fuse Satisfactory/ covers of boxes, all lamp holders, unless efficiently protected by an insulated covering made of fire resisting Not satisfactory material, and the frames and bedplates of generators, transformers and motors, including portable motors, earthed by connection to an earthing system in the manner specified in regulation 102? (iii) Are all conductors, of an earthing system having Yes/No conductivity, at all parts and all joints, at least equal to fifty per cent of that of the largest conductor used solely to supply the apparatus? 6. Regulation 116 Whether the neutral or mid-point is earthed by connection to the Yes/No earthing system in the manner specified in regulation 102. 7. Regulation103 (i) Is automatically disconnection of supply to any part of the Yes/No system, where a fault, including an earth fault, occurs and is the fault current limited to the specified values, by employing suitably designed, restricted neutral system of power supply? (ii) Whether the operation of the switchgear and the relays are Yes/No recorded daily at the generating station, substation or switch station in a register kept for the purpose? (iii) Whether the effectiveness of the switchgear and the Yes/No protective system being always kept and maintained in working order? (iv) Whether the switchgear and the protective system checked Yes/No once every three months and the result thereof recorded in a[भाग III—खण्‍ड 4] भारत‍का‍राजपत्र‍:‍असाधारण 167 separate register kept for the purpose? 8. Regulation 104 (i) Is electricity transmitted into a mine at a voltage exceeding Yes/No 11000 V and used therein at a voltage exceeding 6600 V? (ii) Is the voltage of hand-held portable apparatus used, not Yes/No exceeding 125 V? Applicable/ Not applicable (iii) In belowground mines, whether the lighting system has a Yes/No mid or neutral point connected with earth and the voltage Applicable/ Not not exceeds 125 V between phases is used? applicable (iv) On the surface of a mine or in an open cast mine, has the Yes/No neutral or the midpoint of the lighting system is connected with earth and the voltage between the phases not exceeds 250 V? (v) Is the voltage of portable hand-lamps used in underground Yes/No working of mine or oil-fields not exceeding 30 V? Applicable/ Not applicable 9. Regulation 105 Where electricity is transformed, has suitable provision made to Yes/No guard against danger by reason of the lower voltage apparatus becoming accidentally charged above its normal voltage by leakage from or contact with the higher voltage apparatus. 10. Regulation 107 (i) Whether properly constructed switchgear for disconnecting Yes/No the supply of electricity provided at a point approved by Electrical Inspector of mines? (ii) When any cable or overhead line supplying electricity from Yes/No the aforesaid switchgear is live, whether a person designated to operate the said switchgears is available within easy reach thereof? (iii) Whether the main mechanical ventilator operated by Yes/No electricity interlocked with the switchgear so as to Applicable/ Not automatically disconnect the power supply in the event of stoppage of main mechanical ventilator? applicable (iv) Whether every motor is controlled by switchgear, arranged Yes/No so as to disconnect the supply from the motor and from all apparatus connected thereto and whether such switchgear be so placed to easily operate by the person designated to operate the motor? (v) Is the switchgear so placed, disconnects the supply Yes/No automatically, in the event of conditions of over-current, over-voltage and single phasing? (vi) Is the Auxiliary fan interlocked with the switchgear Yes/No controlling power supply to the in bye face equipment of Applicable/ Not below ground coal mine for automatic disconnection of power supply in the event of the stoppage of the auxiliary applicable fan? 11. Regulation 108 (i) Whether all cables are covered with insulating material and Yes/No efficiently protected from mechanical damage and Satisfactory/Not supported at sufficiently frequent intervals and in such a satisfactory manner as to prevent damage to such cables? (ii) Whether all cables are protected by a metallic covering and Yes/No which contain all the conductors of a circuit and the sheath Satisfactory/Not of metal-sheathed cables and the metallic armouring of168 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] armoured cables is of a thickness not less than that satisfactory recommended in the relevant Standard? (iii) Is the metallic covering of every cable electrically and Yes/No mechanically continuous throughout, earthed by a Satisfactory/Not connection to the earthing system of conductivity specified satisfactory therein and efficiently protected against corrosion? (iv) Whether the metallic covering of every cable is having a Yes/No conductivity at all parts and at all joints at least equal to Satisfactory/Not fifty per cent of the conductivity of the largest conductor satisfactory enclosed by the said metallic covering? (v) Are the cables and conductors where connected to motors, Yes/No transformers, switchgear and other apparatus, installed so Satisfactory/Not that they are mechanically protected by securely attaching satisfactory the metallic covering to the apparatus and the insulating material at each cable end is efficiently sealed so as to prevent the diminution of its insulating properties? (vi) Whether properly constructed and certified glands or Yes/No bushes are used to prevent abrasion or to secure gas- tightness? 12. Regulation 109 (i) Whether flexible cables used for portable or transportable Yes/No apparatus are covered with insulating material which shall be efficiently protected from mechanical injury? (ii) Is the flexible metallic covering of a cable, used by itself to Yes/No form an earth conductor for such apparatus without an earth conductor? (iii) Whether every flexible cable intended for use with portable Yes/No or transportable apparatus connected to the system and to such apparatus by properly constructed connectors? (iv) At every point where flexible cables are joined to main Yes/No cables, is a circuit breaker provided which is capable of automatically disconnecting the supply from such flexible cables? (v) Is every flexible cable attached to a portable or Yes/No transportable machine examined periodically by the designated person? (vi) Whether flexible cable exceeding in specified length being Yes/No used with any portable or transportable? (vii) Are flexible cables used with apparatus other than portable Yes/No or transportable apparatus? 13. Regulation 110 Whether all portable and transportable machines operate on Yes/No remote control from the concerned switchgear with relevant provision? 14. Regulation 111 (i) Whether all apparatus maintained reasonably free from Yes/No dust, dirt and moisture, and kept clear of obstruction? Satisfactory/ Not satisfactory (ii) Whether the following notices in Hindi and local language of the district, so designed and protected as to be easily Yes/No legible at all times, be exhibited at the following places, namely: – Yes/No  where electrical apparatus is in use, a notice forbidding undesignated persons to operate or otherwise interfere with such apparatus;  in the interior or at the surface of the mine where a[भाग III—खण्‍ड 4] भारत‍का‍राजपत्र‍:‍असाधारण 169 telephone or other means of communication is provided, a notice giving full instructions to person, at the surface of the mine, designated to effect the disconnection of the supply of electricity to the mine? (iii) Whether all apparatus, including portable and transportable Yes/No apparatus, operated only by those persons who are designated for the purpose? (iv) Where a plug-and-socket-coupling other than of bolted type Yes/No is used with flexible cables, whether an electrical inter-lock or other approved device provided to prevent the opening of the coupling while the conductors are live? 15. Regulation 112 Give report on the compliance of provisions of this regulation as Satisfactory/Not the case maybe. satisfactory 16. Regulation 114 (i) Whether adequate precautions are taken to prevent signal Yes/No and telephone wires coming into contact with other cables and apparatus? (ii) Is the voltage used in any one circuit not exceeding 30 V? Yes/No 17. Regulation 115 (i) Whether haulage by electric locomotives on the overhead Yes/No trolley-wire system, at voltage not exceeding 650V? (ii) Whether haulage by storage battery locomotives used with Yes/No the prior consent in writing of the Electrical Inspector of mines? 18. Regulation 117 (i) Whether electrical supervisors, as directed by Electrical Yes/No Inspector of mines are appointed in writing by the owner, agent or manager of a mine or by the agent or the owner, of one or more wells in an oil-field to supervise the installation? (ii) Whether electricians as directed by the Electrical Inspector Yes/No of mines, are appointed in writing by the owner, agent or manager of a mine or by the agent or the owner, of one or more wells in an oil-field for compliance with the duties specified in this regulation? (iii) Whether persons appointed to operate, supervise, examine Yes/No or adjust any apparatus are competent to undertake the Satisfactory/Not work which he is required to carry out as directed by the satisfactory Engineer? (iv) Whether the electrical supervisor is maintaining log-book Yes/No made up of the daily log sheets prepared in the form set out in Schedule-XI? 19. Regulation 118 Whether the persons engaged for operation and maintenance Yes/No of electrical installations have undergone training meant for Satisfactory/Not the particular mining installations satisfactory Date: Signature of the Inspecting Officer Name ______________________ Designation _________________ File No. ____________________ Copy forwarded to Electrical Inspector for ………………....170 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] Schedule III Form for obtaining test results by supplier at each supply point to consumer [See sub-regulation (4) of regulation (33)] 1. Name and address of the consumer 2. Details of installation 3. Short circuit fault level of the installation 4. Date of commissioning of installation (in case of additional supply or reconnection) 5. Results of tests conducted: Sl. Equipment Test Conducted Test Results Remarks No. 1. Linked Switch (i) Mechanical operation Smooth/troublesome with fuse(s) (ii) Rating of fuse --------- Amp. (iii) Contact of blades Full/Partial 2. Isolator (i) Mechanical operation OK/not OK (ii) Remote operation OK/Not OK (iii) Local operation OK/Not OK (iv) Measurement of contact resistance --------------micro Ohm (v) Interlocking with earth switch OK/Not OK (vi) Interlocking with CB OK/Not OK (vii) IR Values Ph-Ph Ph-E  Open condition --- M Ohm --- M Ohm  Closed condition --- M Ohm --- M Ohm 3. Circuit Breaker (i) Rating of Circuit Breaker Sl. No. ------ (a) Type ------------------- Circuit Breaker (b) Voltage ------------------- kV Control Circuits (c) Normal Current ------------------- Amps (d) Rupturing capacity ------------------- KA (ii) IR Values Ph-Ph Ph-E  Open condition --- M Ohm --- M Ohm  Closed condition --- M Ohm --- M Ohm (iii) Contact Resistance -------------micro Ohm (iv) Mechanical operation Instant smooth/ time gap (Sec.) (v) Remote operation OK/Not OK (vi) Local operation OK/Not OK (vii) Interlocking with isolator OK/Not OK (viii) Interlocking with earth switch OK/Not OK (ix) Alarm and Trip for OTI/ WTI/ OK/Not OK Buchholz / PRV (x) Earth Fault Relay OK/Not OK (xi) Over Current Relay OK/Not OK (xii) Under Voltage Relay OK/Not OK (xiii) SF pressure alarm and trip operation OK/Not OK 6 test 4. Transformer (i) Insulation Resistance Values: Sl. No. ----  HT to LT --------------M ohm[भाग III—खण्‍ड 4] भारत‍का‍राजपत्र‍:‍असाधारण 171  HT to Earth --------------M ohm  LT to Earth --------------M ohm (ii) Break down Voltage Test  Oil Sample – I (Top) --------------kV  Oil Sample – II (Bottom) --------------kV (iii) Vector Group Test OK/Not OK (iv) Polarity Tests OK/Not OK (v) Magnetizing Balance OK/Not OK (vi) Tan Delta Test ( as per capacity) OK/Not OK (vii) Oil level in conservator Tank: OK/Not OK (viii) Oil level in breather cup OK/Not OK (ix) OTI/WTI settings A/T---- 0C A/T----0C (x) OTI/WTI alarm and trip operation OK/Not OK (xi) Operation of Buchholz relay OK/Not OK (xii) Operation of PRV OK/Not OK (xiii) Oil leakage OK/Not OK (xiv) Interlock of door switch for dry OK/Not OK transformer (xv) Clearances for  Side clearance --------- Cms  Between two Transformers ---------- Metre (xvi) Body earth resistance ---------- Ohm (xvii) Neutral earth resistance N ---Ohm 1 N ---Ohm 2 5. DG Set (i) Interlocking with other Supply OK/Not OK Sl. no. for Sources (ii) Body earth resistance ---------- Ohm  Alternator: (iii) Neutral earth resistance N ---Ohm  Engine: 1 N ---Ohm 2 6. Cables (i) Insulation Resistance Values: Size: ----Sq. mm  Ph - Ph : --------- M Ohm  Ph – Earth: ---------M Ohm  Ph – Earth + other Ph: ---------M Ohm (ii) Bending Radius OK/Not OK 7. Earthing (i) Metal and Size of Earth Strips Cu/Al/GI --- Sq. mm (ii) Type of Earthings:  Plate Earthing Yes/No  Pipe Earthing Yes/No  Counter poise Earthing Yes/No (iii) Values of earth resistances of earth electrodes for N ----ohm N ----ohm 1 2  Reactor Neutral: (R) ---ohm (Y) ---ohm  LAs: (B) ----ohm  Structure: --------ohm  Frames/Bodies of equipment: --------ohm  Motors: --------ohm 8. Potential (i) Ratio test OK/Not OK172 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] Transformer (ii) Polarity test OK/Not OK (iii) BDV of oil ----------kV (iv) IR test (R) P-E-------M Ohm (Y) P-E-------M Ohm (B) P-E-------M Ohm 9. Current (i) Ratio test OK/Not OK Transformer (ii) Polarity test OK/Not OK (iii) BDV of oil ----------kV (iv) IR test (R) P-E-------M Ohm (Y) P-E-------M Ohm (B) P-E-------M Ohm 10. Transmission (i) Physical condition of conductor/tower OK/Not OK line (ii) Check of tower accessories OK/Not OK (iii) Tower footing resistance ----------Ohm (iv) Conductor continuity test OK/Not OK (v) Check of ground clearance OK/Not OK (vi) Check of electrical clearance along the OK/Not OK route General Observations: Sl. No. Item Observations 1. Check of required phase to phase, phase to ground and sectional clearance. 2. Check of equipment lay out and over all installation details. 3. Test of resistance of earth mat or earth electrodes as applicable. 4. Check of consumer‟s pre-commissioning test reports of individual equipment. 5. Check of manufacturer‟s routine/type test reports of individual equipment. 6. Whether Inspector‟s approval if applicable is obtained? 7. Whether owner‟s self-certification about compliance with the Regulations is obtained? 8. General observation and views (specific deviation from the requirements of the Regulations shall be clearly brought out). Name, Signature and Seal of the Authority Schedule IV Form for notice in respect of failure of supply [See sub-regulation (3) of regulation (41)] (1) Name and address of the supplier : (2) Date and time of failure of supply : (3) Areas affected due to failure : (4) Causes of failure : (5) Probable time for restoration of supply : (6) Additional information, if any : Date : (Name, Signature, Designation and Seal of Authoity) Place: Time:[भाग III—खण्‍ड 4] भारत‍का‍राजपत्र‍:‍असाधारण 173 Schedule V Minimum safety working clearances where electricity at voltage exceeding 650 V is supplied, converted, transformed or used [See sub-regulation (2)(iii) of regulation (46)] Highest System Voltage (kV) Safety Working Clearance (Metre) 12 2.6 36 2.8 72.5 3.1 145 3.7 245 4.3 420 6.4 800 10.3 (1) The above values are valid for altitude not exceeding 1000 m. A correction factor of 1.25 per cent per 100 m is to be applied for increasing the clearance for altitude more than 1000 m and up to 3000 m; (2) The above safety working clearances are based on an insulation height of 2.44 m which is the height of lowest point on the insulator, where it meets the earthed metal, from the ground; (3) “Safety Working Clearance” is the minimum clearance to be maintained in air between the live part of the equipment on one hand and earth or another piece of equipment or conductor on which it is necessary to carry out the work, on the other; (4) The “Highest System Voltage” is defined as the highest rms phase to phase voltage which occurs under normal operating conditions at any time and at any point of the system. It excludes voltage transients (such as those due to system switching) and temporary voltage variations due to abnormal system conditions (such as those due to fault conditions or the sudden disconnection of large loads). Schedule VI Minimum safety clearances to be maintained for bare conductors or live parts of any apparatus in out- door HVDC substations, excluding overhead lines of HVDC istallations [See sub-regulation (3) of regulation (46)] Sl. No. DC Voltage (kV) Pole to Earth Clearance Ground Clearance (Metre) (Metre) 1. 100 kV 1.17 4.55 2. 200 kV 1.80 5.65 3. 300 kV 2.45 6.75 4. 400 kV 3.04 8.00 5. 500 kV 3.65 9.00 6. 600 kV 3.98 10.10 7. 800 kV 5.30 11.20 (1) The above ground clearances are not applicable to equipment that are housed within fence or a building and where access is prevented under energised condition through a suitable safety interlocking scheme;174 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] (2) The above pole to earth clearances are for conductor-structure electrode configuration using gap factor k equal to 1.35. (3) It is recognised that within a substation many different types of electrode configurations shall be there with different values of k, therefore, the above clearance shall be modified based upon the values of gap factor for a particular electrode configuration subjected to the minimum ground clearance. (4) Clearance shall be provided for electrical apparatus so that sufficient space is available for easy operation and maintenance without any hazard to the operating and maintenance personnel working near the equipment and for ensuring adequate ventilation. Schedule VII Part-A Form for reporting failure of transformer & reactor of 220 kV and above voltage class [See sub-regulation (8) of regulation (48)] 1. Name of Substation : 2. Utility : 3. Faulty Equipment : (ICT/auto-transformer/GT/reactor etc.) 4. Rating : (MVA/MVAR, Voltage ratio, 1-phase/3phase) 5. Make (Original equipment manufacturer) : 6. Serial No. : 7. Date and time of occurrence of fault : 8. Fault discovered during operation or periodic testing/ : maintenance 9. Year of manufacturing : 10. Date of commissioning : 11. Sequence of events/Description of fault : (SoE with time stamp, protection operated during fault) 12. Details of tests done after failure : (What tests were conducted after the discovery of failure. If no tests were conducted, reasons for the same may be stated.) 13. Observations : (Visual observations e.g. bulging of tank, fire, any leakage of oil, damage to various components of transformer/ reactor and nearby equipment/ material etc.) 14. Probable cause of failure : 15. If original equipment manufacturer representative had : inspected the equipment or visited the site after failure, their remarks, MoM etc. may be attached. 16. Present condition of equipment :[भाग III—खण्‍ड 4] भारत‍का‍राजपत्र‍:‍असाधारण 175 (Whether repairable or beyond repair) 17. (a) Details of previous maintenance : (Activities carried out in previous maintenance including the tests conducted, periodicity of the maintenance activities) (b) Whether any abnormality observed in these tests. If yes, attach the test reports. (c) What steps were taken to address the abnormality? 18. Details of any previous failure on the same unit : 19. Is tertiary winding provided : Yes/No 20. Is tertiary loaded? : Yes/No If yes, specify load on tertiary 21. Whether tertiary terminals are bare/ insulated? 22. Details of protection for tertiary : 23. Whether relay time is synchronised with UTC? : Yes/No 24. Bushing details : (OIP/RIP/RIS, porcelain /polymer housing) 25. On Load Tap Changer or Off Circuit Tap : Changer 26. Tap position of OLTC at the time of failure : 27. Past record of operation of OLTC : 28. Tap range : 29. Details of P\protection provided for : transformer/GT/reactor 30. Details of Protection operated : 31. Whether equipment is properly earthed : 32. Earth resistance of substation and date of its measurement : 33. Surge arrester: : (a) Is SA provided for protection? Yes/No (b) Whether healthiness of SA is monitored? Yes/No (c) Whether reading of SA counter changed during failure? Yes/No 34. Lightning Impulse and Switching Impulse Withstand : Voltage of the bushings of all voltage level 35. Lightning Impulse and Switching Impulse Withstand : Voltage of the winding of all voltage level 36. Type of fire protection provided : (Emulsifier system/ N Injection based fire protection 2 system/ foam based protection etc.) 37. Weather conditions at the time of failure : (clear sky/rainy/thunderstorm etc.)176 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] 38. Storage condition of equipment at site before commissioning: : (a) Period of storage (b) Idle charged or uncharged (c) Dry air filled/Nitrogen filled/ oil-field illed 39. Whether short circuit test was carried out on this transformer : or same design transformer/reactor or short circuit withstand capability was verified on the basis of calculation? 40. Number of through faults the equipment : was subjected to before failure 41. Attach the following: : (a) Single Line Diagram of the substation (b) Photographs of the failed equipment (c) Disturbance Recorder/Even Logger Data (d) Reports of tests conducted after (e) failure (f) Factory test results (g) Pre-commissioning test results (h) Protection schematic diagram (Signature and name of Manager/ Executive Engineer of the installation) Contact details (Address /Mobile No./Phone No./Email) To, The Secretary Central Electricity Authority Sewa Bhawan, R .K. Puram New Delhi-110066 Part-B Form for reporting failure of towers of 220 kV and above voltage class transmission lines [See sub-regulation (8) of regulation (48)] 1. Name of Transmission line with voltage level: 2. Date and time of occurrence/discovery of failure: 3. Length of line (km): 4. Type of configuration: (S/C, D/C, M/C, S/C strung on D/C towers, narrow base and the like): 5. Number of Towers and Type of Towers failed: [Suspension/ tension/ dead end/ special tower/ river crossing tower/ Power line crossing/ Railway Crossing etc., with/ without extension (indicate the type & length of extension)] 6. Tower location no. with reference to nearest substation (indicate Name): 7. Name and size of conductor: 8. No. of sub-conductors per bundle and bundle spacing:[भाग III—खण्‍ड 4] भारत‍का‍राजपत्र‍:‍असाधारण 177 9. Number and size of earth wire/ OPGW (if provided): 10. Type of insulators in use (Porcelain/ Glass/ Polymer): 11. Configuration of insulators (I/ V/ Y/ tension): 12. No. of insulators per string and no. of strings per phase: 13. Year of construction/ commissioning: 14. Executing agency: 15. Weather condition on the date of failure: 16. Terrain category: 17. Reliability level: 18. Wind zone (1/2/3/4/5/6) and velocity of wind: 19. Details of earthing of tower (pipe type/ counter poise): 20. Line designed as per IS:802 (1977/1995/2015 any other code): 21. The agency who designed the line: 22. Any special consideration in design: 23. Details of last maintenance activity along with date: 24. Power flow in the line prior to failure: 25. Any missing member found before/ after failure of towers: 26. Condition of foundation after failure: 27. Brief description of failure: [Along with photographs (if available), other related information like tower schedule, newspaper clipping for cyclone / wind storm etc.] 28. Probable cause of failure: 29. Details of previous failure of the line/ tower: 30. Whether line will be restored on ERS or spare tower will be used: 31. Likely date of restoration: 32. Present status: 33. Details of any tests carried out after failure (attach test reports): 34. Wind speed data of date & time of failure from nearby authorised observatory: 35. Location of failed tower: a. Location Coordinates: b. Nearest Airport: c. District and State: 36. Single line diagram/ clearance diagram of failed tower(s) with all dimensions (horizontal & vertical dimensions including base width of tower): 37. Tower weight: 38. Tower spotting data: 39. Tower schedule of affected section: 40. Sag-tension calculation considered for design of tower: 41. Design document of failed towers: 42. Any other relevant information: Date:178 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] (Signature and name of Manager/Executive Engineer/ Incharge of the installation) Contact details (Address /Mobile No./Phone No./Email) To, The Secretary Central Electricity Authority Sewa Bhawan, R.K. Puram New Delhi-110066 Schedule VIII A Minimum clearance in air above ground and across road surface of Highways or roads or railway corridors or navigational or non-navigational rivers for lowest conductor of an alternating current overhead lines, including service lines of nominal voltage system. [See sub-regulation (1) of regulation (60)] Nominal Clearance above ground Clearance Clearance between conductor Clearance above HFL for River voltage of between and rail level across Railway crossing system conductor Corridor and road (m) surface Across Along Elsewhere across Normal High rise OHE Navigational Non- Street Street Highway OHE (where for running of navigatiional (m) river no double double stack river (m) (m) (m) stack containers on (m) (m) containers railway tracks. are to be run on railway tracks.) Up to 650 5.80 5.50 4.60 U/G Cable U/G Cable U/G Cable 16.50 5.80 V 11 kV 6.50 5.80 4.60 U/G Cable U/G Cable U/G Cable 19.00 6.50 22 kV 6.50 5.80 5.20 U/G Cable U/G Cable U/G Cable 19.00 6.50 33 kV 6.50 5.80 5.20 11.60 or U/G Cable U/G Cable 19.00 6.50 U/G Cable 66 kV 6.50 6.10 5.50 11.60 or U/G Cable U/G Cable 19.00 6.50 U/G Cable 110 kV 6.50 6.10 6.10 11.60 15.56 17.56 19.00 6.50 132 kV 6.50 6.10 6.10 11.60 15.56 17.56 19.22 6.50 220 kV 7.02 7.02 7.02 12.52 16.46 18.46 20.10 7.02 400 kV 8.84 8.84 8.84 14.00 18.26 20.26 21.90 8.84 765 kV 18.00* 18.00* 18.00* 18.80 21.86 23.86 25.55 18.00 1200 kV 24.00* 24.00* 24.00* 30.00 25.46 27.46 29.90 24.00 For navigable rivers, clearances shall be fixed in relation to the tallest mast in consultation with the concerned navigational/port authorities. * Higher clearance due to predominantly induction effects and time varying electric field (ICNIRP limit: 10kV/m for occupational exposure) at voltage exceeding 400 kV.[भाग III—खण्‍ड 4] भारत‍का‍राजपत्र‍:‍असाधारण 179 Schedule VIII B The minimum clearance in air above ground and across road surface of Highways, or Minimum clearance between conductor and Rail Level or navigational or non-navigational rivers for lowest conductor of high voltage direct current overhead line of nominal voltage system [See sub- regulation (2) of regulation (60)] Sl. DC Ground Clearance Minimum Clearance above HFL for River crossing No. Voltage Clearance between clearance Navigational Non-navigatiional River (m) conductor and between road surface conductor and River (m) across Rail Level (m) Highway (m) (m) 1. 100 kV 6.50 11.25 # 19.00 6.50 2. 200 kV 7.30 12.05 # 19.90 7.30 3. 300 kV 8.50 13.25 # 20.90 8.50 4. 400 kV 9.40 14.15 # 21.90 9.40 5. 500 kV 12.50 17.25 21.23 22.90 12.50 7. 800 kV 18.00 22.75 25.74 25.90 18.00 1. Highway clearances required 4.75 m higher then ground clearances (considering the vehicle hight is 4.75, as mentioned in the Indian Road Congress documents, 1983). 2. # Railway clearances required 10% higher value than HVAC values ( HVAC values are mentioned in Indian Railway document: IRSOD, 2004). 3. Navigational River clearances as mentioned in the Regulation of Inland Waterways Authority of India (Classification of Inland Waterways in India), Regulation, 2006.180 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] Schedule VIII C Ground, Vertical and Horizontal clearances [See sub-regulation (1) of regulation 60, sub-regulation (5) of regulation 62 and sub-regulation (5) of regulation 63] M a x . S Maximum Deflection a g Maximum Deflection VCL M a x . S a g Conductor portions HCL M a x VCL . S a g Minimum Building structure Clearance Line . C GCL GCL GROUND GCL: Ground Clearance as per regulation 60 VCL: Vertical Clearance as per regulation 62 and 63 HCL: Horizontal Clearance as per regulation 62 and 63 Schedule IX FORM OF ANNUAL RETURN FOR MINES [See sub-regulation (1) of regulation 98] This form must be correctly filled up by the owner, agent, manager or engineer and sent to the Electrical Inspector of mines not later than the first day of February every year. Part A Year ending: ____ Name of Mine: State: Situation of Mine: District: Postal address of Mine: Name and address of owner: Name of agent:[भाग III—खण्‍ड 4] भारत‍का‍राजपत्र‍:‍असाधारण 181 Name of manager: Name of engineer: Name of Electrical Supervisor: Part B (1) System of supply (whether direct current or alternating current): Voltage of supply: Periodicity (if alternating current): Source of supply: (2) Voltage at which electricity is used for: - Lighting: Power: (3) Particulars of motor etc.: - POWER (a) On Surface Type of Motor (HP/KW)/ Type of control gear Location Purpose for which used apparatus and voltage (b) In Mine Type of Motor (HP/KW)/ Type of Location Purpose for Ventilation Percentage of apparatus and voltage control which used inflammable gas or gear vapour (c) Lighting Type of light fitting Wattage Location Percentage of inflammable gas or vapor Schedule X FORM OF ANNUAL RETURN FOR OIL-FIELDS [See sub-regulation (1) of regulation 98] This form must be correctly filled up by the owner, agent, manager or engineer and sent to the Electrical Inspector of mines not later than the first day of February every year. Part A Year ending: ____ Name of Oil-field: State: Situation of Oil-field: District: Postal address of Oil-field: Name and address of owner:182 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] Name of agent: Name of manager: Name of engineer: Name of Electrical Supervisor: Part B (1) System of supply (whether direct current or alternating current): Voltage of supply: Periodicity (if alternating current): Source of supply: (2) Voltage at which electricity is used for: - Lighting: Power: (3) Particulars of motor etc.: - (a) On wells No. or other identifying mark of Drilling or Type and H.P of No. of lamps Other electrical well pumping motor and type appliances 1 2 3 4 5 (b) Not on wells Type and rating of motor Purpose for which used Identifying mark on map 1 2 3 (4) Other electrical appliances, not including in item 3, in use on the field: - Appliances type and size in KW Purpose for which used Identifying mark on map Schedule XI LOG SHEET FOR MINES AND OIL-FIELDS [See sub-regulation (9) of regulation 112, sub-regulation (9) of regulation (117)] Daily log sheet for: (1) Name of Electrical Supervisor (2) Report as to:- (a) Condition of the insulation of the system. (b) Specified defects of insulation (particulars of each failure of apparatus should be given). (c) Accidents or dangerous occurrence (including any cases of electric shock and any cases of open sparking in apparatus in use in places where regulation 112 applies. (d) Disconnection and reconnection of supply as required by sub-regulation (9) of regulation 112. (e) Examination of earth fault detectors or recorders as provided by sub-regulation (3) of regulation 102. (f) Examinations of apparatus as provided by regulation 117.[भाग III—खण्‍ड 4] भारत‍का‍राजपत्र‍:‍असाधारण 183 (i) Routine examinations as required by of sub-regulation (9) of regulation 117. (ii) Special examination* as required by of sub-regulation (9) of regulation 117. (3) Remarks: - Signed Examined by Electrical Supervisor: Engineer: Manager. *State which apparatus has been examined or tested and its result. Note: - This log sheet should be filled in as completely as possible. If, for instance, there are no defects of insulation to report, the word „none‟ should be written in the vacant space. RAKESH GOYAL, Secy. [ADVT.-III/4/Exty./154/2023-24] Uploaded by Dte. of Printing at Government of India Press, Ring Road, Mayapuri, New Delhi-110064 and Published by the Controller of Publications, Delhi-110054.

Continue your research