Home India Ministry of Environment, Forest and Climate Change Whereas the Municipal Solid Wastes Management and Handling R...
Date: 2016-04-27 Category: Extra Ordinary State: Union Government Country: India

Whereas the Municipal Solid Wastes Management and Handling Rules 2000 published vide notification number SO 908

Issued by Ministry of Environment, Forest and Climate Change · Not Applicable

Research with AI Agent Chat with Document Generate Summary Translate Helpful Share Add to Project Create Task

Executive Summary & Key Takeaways

**Executive Summary:** This document notifies the Construction and Demolition Waste Management Rules, 2016, superseding the Municipal Solid Wastes Management and Handling Rules, 2000. The rules aim to improve the management of construction and demolition waste, focusing on collection, segregation, recycling, treatment, and disposal. The rules came into force on April 27, 2016, the date of their publication in the Official Gazette. **Key Points / Main Content:** * **Short Title and Commencement:** * These rules are called the Construction and Demolition Waste Management Rules, 2016. * They came into force on the date of their publication in the Official Gazette (April 27, 2016). * **Application:** * These rules apply to every waste resulting from construction, remodeling, repair, and demolition of any civil structure. * **Duties of the Waste Generator:** * Responsible for collection, segregation, and storage of construction and demolition waste. * Ensure no mixing of other waste with construction and demolition waste. * Generators of more than 20 tons/day or 300 tons/project/month must segregate waste into concrete, soil, steel, wood/plastics, and bricks/mortar, and submit a waste management plan to the local authority. * Keep waste within the premise or deposit it at collection centers or hand it over to authorized processing facilities. * Pay charges for collection, transportation, processing, and disposal. * **Duties of Service Provider and Their Contractors:** * Prepare a waste management plan within six months from notification. * Remove waste and clean the area daily or within a reasonable timeframe. * Tie up with authorized agencies for waste removal if they lack logistics support. * **Duties of Local Authority:** * Issue directions for proper management of construction and demolition waste. * Chalk out stages, methodology, and equipment for overall activity and final cleanup. * Seek assistance for safe disposal of contaminated waste. * Arrange containers for waste collection and remove waste regularly. * Transport collected waste to processing and disposal sites. * Provide incentives for salvaging, processing, or recycling. * Examine and sanction waste management plans within one month. * Track waste generation and establish a database, updating it annually. * Devise measures for managing waste, including processing facilities. * Create information, education, and communication systems for waste management. * Provide incentives for using materials made from construction and demolition waste. * **Criteria for Storage, Processing, or Recycling Facilities:** * Site selection criteria are in Schedule I. * Facility operators must apply in Form I for authorization from the State Pollution Control Board or Pollution Control Committee. * The operator must submit an annual report to the State Pollution Control Board in Form II. * Application of materials made from construction and demolition waste in sanitary landfills must follow Schedule II. * **Duties of State Pollution Control Board or Pollution Control Committee:** * Monitor rule implementation by local bodies and competent authorities. * Send annual reports to the Central Pollution Control Board and the State Government/Union Territory. * Grant authorization to construction and demolition waste processing facilities using Form III. * Prepare an annual report in Form IV and forward it to the Central Pollution Control Board before July 31st each year. * **Duties of State Government or Union Territory Administration:** * Prepare a policy document for waste management within one year. * Provide suitable sites for storage, processing, and recycling facilities. * Incorporate the site into the approved land use plan. * Mandate the procurement of materials made from construction and demolition waste in municipal and Government contracts. * **Duties of the Central Pollution Control Board:** * Prepare operational guidelines for environmental management of construction and demolition waste. * Analyze data from State Pollution Control Boards or Pollution Control Committees to review the rules. * Coordinate with State Pollution Control Boards and Pollution Control Committees for environmental standards. * Forward annual compliance reports to the Central Government before August 30th each year. * **Duties of Bureau of Indian Standards and Indian Roads Congress:** * Prepare codes of practice and standards for using recycled materials in construction activities. * **Duties of the Central Government:** * The Ministry of Urban Development, the Ministry of Rural Development, and the Ministry of Panchayat Raj shall facilitate local bodies in complying with these rules. * The Ministry of Environment, Forest and Climate Change will review the implementation of these rules. * **Timeframe for Implementation:** * The timeline for implementation is specified in Schedule III. * **Accident Reporting:** * Accidents during waste processing must be reported in Form V to the local authority. **Impact Analysis:** * **Waste Generators:** * *Impact:* Responsible for segregating, storing, and disposing of construction and demolition waste properly; must pay relevant charges; may need to create and adhere to waste management plans. * *Action Required:* Understand segregation requirements, develop waste management plans (if applicable), arrange for proper waste storage and disposal, and pay associated fees. * **Service Providers and Their Contractors:** * *Impact:* Must create and implement waste management plans, remove waste, and potentially partner with authorized agencies for waste removal. * *Action Required:* Develop comprehensive waste management plans and establish logistics for waste removal, including partnerships with authorized agencies. * **Local Authorities:** * *Impact:* Responsible for issuing directions for waste management, arranging for waste collection and transport, providing incentives for recycling, tracking waste generation, and educating the public. * *Action Required:* Develop and enforce waste management guidelines, establish waste collection systems, create public awareness programs, and monitor waste generation. * **State Pollution Control Boards or Pollution Control Committees:** * *Impact:* Must monitor rule implementation, grant authorization to waste processing facilities, and prepare annual reports. * *Action Required:* Establish monitoring programs, review and approve applications for waste processing facilities, and prepare and submit annual reports to the Central Pollution Control Board. * **State Government or Union Territory Administration:** * *Impact:* Responsible for preparing a policy document for waste management, providing suitable sites for facilities, and mandating the procurement of recycled materials. * *Action Required:* Develop waste management policies, allocate land for waste facilities, and implement mandates for recycled material procurement. * **Central Pollution Control Board:** * *Impact:* Must prepare operational guidelines, analyze data, coordinate with State Boards, and forward compliance reports to the Central Government. * *Action Required:* Develop operational guidelines for waste management and analyze data from State Boards to review the effectiveness of these rules. * **Bureau of Indian Standards and Indian Roads Congress:** * *Impact:* Responsible for preparing codes and standards for the use of recycled materials in construction. * *Action Required:* Develop codes of practice and standards for the use of recycled materials. * **Central Government (Various Ministries):** * *Impact:* The Ministry of Urban Development, the Ministry of Rural Development, and the Ministry of Panchayat Raj shall facilitate local bodies in complying with these rules; The Ministry of Environment, Forest and Climate Change will review the implementation of these rules. * *Action Required:* Support local bodies in complying with these rules and review the implementation of these rules.

Key Entities Referenced

Environment Protection Act, 1986: A law enacted by the Parliament of India to provide for the protection and improvement of the environment Municipal Solid Wastes Management and Handling Rules, 2000: A set of regulations previously in place for managing municipal solid waste in urban areas of India, now superseded. Solid Waste Management Rules, 2015: Draft rules published by the Central Government in the Ministry of Environment, Forest and Climate Change related to solid waste management, including a section on construction and demolition waste. Central Pollution Control Board: An organization responsible for monitoring the implementation of environmental regulations related to pollution control at the national level. State Pollution Control Board: An organization responsible for monitoring the implementation of environmental regulations related to pollution control at the state level. New Delhi: The location where the notification was issued. Ministry of Environment, Forest and Climate Change: The ministry responsible for reviewing the implementation of the Construction and Demolition Waste Management Rules, 2016. Construction and Demolition Waste Management Rules, 2016: The primary subject of the text, these rules govern the management of waste from construction, remodeling, repair, and demolition activities.
Official Source Record View Original Source →
See Full Document Text
jftLVªh laö Mhö ,yö&33004@99 REGD. NO. D. L.-33004/99 vlk/kj.k EXTRAORDINARY Hkkx II—[k.M 3—mi&[k.M (i) PART II—Section 3—Sub-section (i) izkf/dkj ls izdkf'kr PUBLISHED BY AUTHORITY la- 288] ubZ fnYyh] cq/okj] vizSy 27] 2016@oS'kk[k 7] 1938 No. 288] NEW DELHI, WEDNESDAY, APRIL 27, 2016/VAISAKHA 7, 1937 पपपपययययाााावव(cid:4)(cid:4)वव(cid:4)(cid:4) ररररणणणण,,,, ववववनननन औऔऔऔरररर जजजजललललववववाााायययय ुु ुुपपपप(cid:14)(cid:14)(cid:14)(cid:14)ररररववववततततनन(cid:4)(cid:4)नन(cid:4)(cid:4) मममम(cid:18)(cid:18)ंं(cid:18)(cid:18)ंं ााााललललयययय अअअअििििधधधध सस स सचचूूचचूू ननननाााा नई (cid:4)द(cid:6)ली, 29 माच,(cid:12) 2016 ससससाााा....ककककाााा....ििििनननन.... 444444445555((((अअअअ))))....----भारत सरकार के त(cid:14)कालीन पया(cid:12)वरण एवं वन मं(cid:23)ालय (cid:24)ारा (cid:4)दनाकं 25 िसत(cid:29)बर, 2000 क(cid:31) अिधसूचना स.ं का.आ.908(अ) के अधीन कािशत नगरपािलका ठोस अपिश& ट ( बंधन और ह,त न) िनयम, 2000 म - दशे म -उ(cid:14)प 0न नगरपािलका ठोस अपिश&ट के बधं न के िलए एक िविनयामक ढांचे का ावधान (cid:4)कया गया ह;ै इन िनयम5 को अिधक भावकारी ढंग स ेलागू करन ेऔर पयाव(cid:12) रण क(cid:31) दिृ9 से ,व , थ प;ित के (cid:24)ारा ठोस अपिश& ट के सं<हण, पृथ>क करण, पुनच@(cid:12) ण, शोधन और िनपटान म- सधु ार करन े के िलए के0 A सरकार ने वत(cid:12)मान िनयम5 क(cid:31) समीBा क(cid:31) थी, िनयम5 का एक ढांचा तैयार करना आवD यक समझा गया था िजसम - अपिश& ट उ(cid:14) पादक5 और िविभ0 न िहतधारक5 क(cid:31) भिू मका और जवाबदहे ी पर बल (cid:4)दया जाए, Gोत पर पृथ>क रण, पनु : ािI, पनु : उपयोग, पनु च(cid:12)@ण पर जोर (cid:4)दया जाए और िनमा(cid:12)ण और िवJव ंस अपिश&ट के बंधन का िव, तारपूवक(cid:12) समाधान (cid:4)कया जाए। भारत सरकार के पया(cid:12)वरण और वन मं(cid:23)ालय (cid:24)ारा (cid:4)दनाकं 3 जून, 2015 के सा.का.िन.451(अ) के तहत िनमा(cid:12)ण एवं िवJव ंस अपिश&ट संबंधी एक अलग अJय ाय के साथ मसौदा िनयम अथा(cid:12)त ठोस अपिश& ट बंधन िनयम, 2015 कािशत (cid:4)कए गए थ े िजनम - उ>त अिधसूचना के जारी होने क(cid:31) तारीख स े साठ (cid:4)दन के अंदर आम जनता से आपिTया ं और सझु ाव आमंि(cid:23)त (cid:4)कए गए थे; िनधाU(cid:12) रत अविध के भीतर ाVत आपिTय5 या UटV पिणय5 पर के0 A सरकार (cid:24)ारा स(cid:29) यक Wप से िवचार (cid:4)कया गया था; 2004GI/2016 (1)2 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(i)] अब, इसिलए, पया(cid:12)वरण (संरBण) अिधिनयम, 1986 (1986 का 29) क(cid:31) धारा 6, 25 का योग करत े [ए और अिध@मण से पूव(cid:12) (cid:4)कए गए या (cid:4)कए जाने के िसवाय नगरपािलका ठोस अपिश& ट बंधन एवं ह, तन िनयम, 2000 का अिध@मण करते [ए के0A सरकार िनमाण(cid:12) एवं िवJ वंस अपिश&ट के बधं न हते ु िन(cid:29) निलिखत िनयम अिधसिू चत करती ह ै- 1111.... ससससििंंििंं(cid:21)(cid:21)(cid:21)(cid:21)(cid:22)(cid:22)(cid:22)(cid:22)तत तत ननननाााामममम औऔऔऔरररर (cid:23)(cid:23)(cid:23)(cid:23)ााााररररंंंभभंभभ....---- (1)इन िनयम5 को िनमाण(cid:12) एवं िवJ वंस अपिश& ट बंधन िनयम, 2016 कहा जाएगा । (2) ये राजप(cid:23) म -इनके कािशत होने क(cid:31) तारीख स े व(cid:14)ृ त ह5गे। 2222.... ललललाााागगगग ूू ूूहहहहोोोोननननाााा....---- य ेिनयम (cid:14)य ेक ऐसे \य ि9 या संगठन या ािधकरण के अपिश& ट पर लागू ह5गे जो (cid:4)कसी िसिवल ढाचं े के िनमाण(cid:12) , पुन: ितWपण, मर(cid:29)म त और िवJ वंस के फल, वWप िब^(cid:6)डग मUे टUरयल, मलबा और रोड़ी वाले अपिश& ट उ(cid:14) प0न करते ह।‘ 3333.... पपपप(cid:14)(cid:14)(cid:14)(cid:14)ररररभभभभााााषषषषााााएएएएं.ं.ं.ं.---- (1) इन िनयम5 म -जब तक संदभ(cid:12) स ेअ0य था अपेिBत न हो,- (क) ''अिधिनयम'' से पया(cid:12)वरण (सरं Bण) अिधिनयम, 1986 (1986 का 26) अिभ ेत ह;ै (ख) ''''''''ससससंिंिंिंिननननममममााााणण(cid:4)(cid:4)णण(cid:4)(cid:4) '''''''' से भवन या िनaमत सिु वधा या अ0 य संरचना या अवसंरचना के िनमाण(cid:12) , िजसम- इन त(cid:14) व5 म- पUरवतन(cid:12) भी शािमल ह,ै के पUरिनमा(cid:12)ण क(cid:31) (cid:4)@या अिभ ते ह,ै; (ग) ''''''''ससससंिंिंिंिननननममममााााणण(cid:4)(cid:4)णण(cid:4)(cid:4) ओओओओरररर ििििवववव(cid:30)(cid:30)(cid:30)(cid:30)वव वव ससंंससंं अअअअपपपपििििशशशश!!!!टट टट '''''''' स े ऐसा अपिश&ट अिभ ते ह ै िजसम - भवन सामि<यां, मलबा और रोड़ी जो संिनमा(cid:12)ण, पनु : ितWपण, मर(cid:29)म त तथा (cid:4)कसी िसिवल सरं चना के J वंस स ेउcभूत होता हो; (घ) ''''''''ििििववववससससररंंररंं चचचचननननाााा'''''''' स े ऐसा िनयोिजत चयना(cid:14)म क िवJ वसं अिभ ते ह ै िजसम - िवJ वांिसत संरचना का उ;ारण, पनु : उपयोग तथा पनु च(cid:12)@ण अिधकतम (cid:4)कया जाता ह;ै (ड.) ''''''''ििििवववव(cid:30)(cid:30)(cid:30)(cid:30) वव ववससंंससंं '''''''' से भवन5 और अ0य सरं चनाd को या तो हाथ से या यािं (cid:23)क(cid:31) बल (िविभ0 न उप, कर5) का उपयोग करके या िव,फ ोटक5 का उपयोग करके अतं : िव, फोट (cid:24)ारा तोड़ा जाना या िगराया जाना अिभ ते ह।ै ((((चचचच)))) ''''''''(cid:23)(cid:23)(cid:23)(cid:23)####पपपप'''''''' सससस ेे ेेइइइइनननन ििििननननययययमममम&&&& ककककेेेे ससससााााथथथथ उउउउपपपपााााबबबब++++ (cid:23)(cid:23)(cid:23)(cid:23)####पपपप अअअअििििभभभभ(cid:23)(cid:23)(cid:23)(cid:23)ततेेततेे हहहह;;ैै;;ैै (छ) '''''''',,,,थथ थथ ााााननननीीीीयययय (cid:23)(cid:23)(cid:23)(cid:23)ााााििििधधधधककककररररणणणण'''''''' स े िविभ0न नाम प;ितय5 के शहरी , थानीय ािधकरण अिभ ते ह ‘ जैसे (cid:4)क नगर िनगम, (cid:29)य ुिनिसपिै लUट, नगरपािलका, नगर िनगम, नगर पचं ायत, (cid:29) यिु निसपल काउंिसल, इनम- अिधसूिचत Bे(cid:23) सिमित ह ‘ और जो <ाम पचं ायत जैस े ससु ंगत काननू 5 के अधीन गUठत अ0य , थानीय ािधकरण या इनके अितUर>त भी शािमल ह,‘ जहां ऐसे अिभकरण को सिं नमाण(cid:12) और िवJ वंस अपिश& ट का बंधन सfपा जाता ह;ै (ज) '''''अअअअननननससुुससुु चचूूचचूू ीीीी'''''''' स ेइन िनयम5 से उपाब; अनुसचू ी अिभ ते ह;ै (झ) ''''''''ससससेवेवेवेवाााा (cid:23)(cid:23)(cid:23)(cid:23)ददददाााातततताााा'''''''' से ऐसा ािधकरण अिभ ते ह ै जो जल, मल \ यव, था, िबजली, टेलीफोन, सड़क-, जल िनकास आ(cid:4)द जैसी सेवाएं दान करत ेह ‘और अपने कायक(cid:12) लाप5 के दौरान ाय: सिं नमा(cid:12)ण और िवJ वंस अपिश& ट उ(cid:14) प0न करते ह,‘ िजसम -खुदाई, िवJव ंस और िसिवल काय(cid:12) सि(cid:29)मिलत ह;‘ (ञ) ''''''''अअअअपपपपििििशशशश!!!!टट टट उउउउ0000पप पप 1111नननन ककककतततताााा'''(cid:4)(cid:4)'(cid:4)(cid:4)'''' सससस ेे ेेऐऐऐऐससससाााा (cid:23)(cid:23)(cid:23)(cid:23)0000यय यय ेेककेकेक 2222यय यय िििि3333,,,, 2222ययय य िििि3333यययय&&&& ककककाााा ससससममममहहहूूहूू या सं, था, आवासीय और वािणिgयक , थापनाए ं अिभ ते ह ै और इनम- भारतीय रेल, िवमानप(cid:14) तन, बंदरगाह एवं प(cid:14) तन तथा रBा , थापनाएं शािमल ह ‘ जो (cid:4)कसी िसिवल संरचना का संिनमाण(cid:12) और िवJ वंस करते ह ‘और संिनमा(cid:12)ण तथा िवJ वंस अपिश& ट उ(cid:14)प 0 न करत ेह।‘ (2) इसम- यु>त शhद 5 और पद5 के जो इसम -पUरभा िषत नहj ह,ै वही अथ(cid:12) ह5ग ेजो उनके इस अिधिनयम म -ह।‘ 4444.... अअअअपपपपििििशशशश!!!!टट टट उउउउ0000पप पप 1111नन नन ककककतततताााा (cid:4)(cid:4) (cid:4)(cid:4)ककककेेेे ककककतततत22(cid:4)(cid:4)22(cid:4)(cid:4) ययय य ---- (1) (cid:14)य के अपिश&ट उ(cid:14)प 0न कता (cid:12) थम-द&ृ टया इन िनयम5 के अनWु प संबिं धत , थानीय ािधकरण (cid:24)ारा यथा िनदिे शत या अिधसूिचत कं@(cid:31)ट, िमkी और अ0य सामि<य5 के सं<हण, पथृ >क रण और उ(cid:14) प0 न [ए सिं नमाण(cid:12) एवं िवJ वंस अपिश&ट के भंडारण के िलए उ(cid:14)त रदायी होगा। (2) उ(cid:14)प 0न कता (cid:12) यह सिु निlत करेगा (cid:4)क अ0 य अपिश& ट (जैस े (cid:4)क ठोस अपिश& ट) इस अपिश& ट के साथ िमिmत न हो सके और उसका पृथक भंडारण और िनपटान (cid:4)कया जाए।¹Hkkx IIµ[k.M 3(i)º Hkkjr dk jkti=k % vlk/kj.k 3 (3) एक (cid:4)दन म- 20 टन या इससे अिधक या एक माह म- ित पUरयोजना 300 टन अपिश& ट उ(cid:14)प 0 न करने वाला अपिश&ट उ(cid:14)प 0न कता (cid:12) अपिश&ट को चार भाग5 जसै े कं@(cid:31)ट, िमkी, इ, पात, का& ठ तथा V लाि,टक, nट और मोटा(cid:12)र म- पृथक करेगा और िनमा(cid:12)ण या िवJव ंस या Uरमोड^ेलग काय (cid:12) करने से पूव(cid:12) अपिश& ट बंधन योजना , तुत करेगा तथा , थानीय ािधकरण स े समिु चत अनमु ोदन ाVत करेगा और सबं िं धत ािधकरण5 को योजना अव,थ ा स े लके र काया0(cid:12) व यन अव,थ ा तक कायक(cid:12) लाप5 क(cid:31) सूचना दगे ा और ऐसा पUरयोजना दर पUरयोजना (cid:4)कया जाएगा। (4) (cid:14)य के अपिश&ट उ(cid:14)प ादनकता (cid:12) संिनमा(cid:12)ण और िवJ वंस अपिश& ट को पUरसर के भीतर रखेगा या अपिश& ट को ,थ ानीय िनकाय (cid:24)ारा िनaमत सं<हण के0A पर िनBिे पत करेगा या संिनमा(cid:12)ण और िवJ वंस अपिश& ट क(cid:31) सं, करण सिु वधा के िलए ािधकृत के0A को सfप दगे ा; और यह सिु निlत करेगा (cid:4)क सिं नमा(cid:12)ण और िवJ वसं अपिश& ट, का कोई िनBेप या ऐस े नहj डाला जाए (cid:4)क वह यातायात या जनता या नाल5 को को बािधत न करे। (5) (cid:14)य के अपिश&ट उ(cid:14)प 0न कता (cid:12) स<ं हण, पUरवहन, सं, करण और िनपटान के िलए संबिं धत ािधकरण (cid:24)ारा यथा अिधसूिचत सुसंगत भार का भुगतान करेगा; एक (cid:4)दन म - 20 टन स े अिधक या एक माह म - ित पUरयोजना 300 टन अपिश&ट उ(cid:14)प 0न करने वाला अपिश&ट उ(cid:14)प 0 नकता (cid:12) सिं नमाण(cid:12) तथा िवJ वंस अपिश& ट के सं, करण और िनपटान के िलए संदाय करेगा, इसके अितUर>त भंडारण, सं<हण और पUरवहन के िलए संदाय करेगा। सदं ाय क(cid:31) दर का िनधा(cid:12)रण सबं ंिधत ,थ ानीय ािधकरण या राgय सरकार (cid:24)ारा पदािभिहत (cid:4)कसी अ0 य ािधकरण (cid:24)ारा (cid:4)कया जाएगा। (5) ससससववेेववेे ाााा (cid:23)(cid:23)(cid:23)(cid:23)ददददाााातततताााा औऔऔऔरररर उउउउननननककककेेेे ससससििंंििंं ववववददददााााककककाााारररर&&&& ककककेेेे ककककतततत22(cid:4)(cid:4)22(cid:4)(cid:4) यय यय ---- (1) सेवा दाता इन िनयम5 के अिधसिू चत होन े क(cid:31) तारीख से छह माह के अंदर एक \ यापक अपिश& ट बंध योजना तैयार करेगा िजसम - पृथ>क रण भंडारण, सं<हण, पुन: योग, पुन: च@, पUरवहन और उनके अिधकार Bे(cid:23) म- उ(cid:14) प0न संिनमा(cid:12)ण और िवJव ंस अपिश&ट का िनपटान सि(cid:29)मिलत होगा। (2) सेवा दाता सभी संिनमाण(cid:12) और िवJ वंस अपिश& ट को हटायग- े और य(cid:4)द संभव हो तो (cid:14)य के (cid:4)दन Bे(cid:23) को साफ कर-गे या काय(cid:12) क(cid:31) अविध पर िनभ(cid:12)र रहते [ए, अपिश& ट उ(cid:14) पादन क(cid:31) मा(cid:23)ा और कार, समिु चत भंडारण तथा संचयन पर िनभ(cid:12)र रहते [ए, संबंिधत ,थ ानीय नगरीय िनकाय के परामश(cid:12) स े समिु चत भंडारण और स<ं हण क(cid:31) एक यिु pयु>त समय अविध तैयार क(cid:31) जाएगी। (3) ऐसा दशा म - जब ऐसा सेवा दाता उप िनयम (1) और (2) म- िनqद& ट काय(cid:12) को पूरा करने के िलए संभार-तं(cid:23) नहj रखते ह,‘ तब व े (cid:4)कसी ािधकृत अिभकरण के साथ संिनमाण(cid:12) एवं िवJ वंस अपिश& ट को हटाने के िलए संपक(cid:12) कर-गे और उस े ,थ ानीय नगरीय िनकाय (cid:24)ारा यथा अिधसिू चत युिpयु> त भार का संदाय कर-ग।े ((((6666)))) ,,,,थथ थथ ााााननननीीीीयययय (cid:23)(cid:23)(cid:23)(cid:23)ााााििििधधधधककककररररणणणण ककककेेेे ककककतततत22(cid:4)(cid:4)22(cid:4)(cid:4) यय यय ---- ,थ ानीय ािधकरण, - (1) अपन े अिधकार Bे(cid:23) के भीतर इन िनयम5 के उपबंध5 के अनWु प संिनमाण(cid:12) और िवJ वंस अपिश& ट के उिचत बंध के संबंध म- िव,त तृ िनदशे जारी करेगा और ,थ ानीय ािधकरण सिं नमाण(cid:12) और िवJ वंस अपिश& ट के उ(cid:14) प0 नकता(cid:12) से िव, तृत योजना और यथा लागू वचनब;ता क(cid:31) मांग करेगा; (2) सम< कायक(cid:12) लाप म- अ0त वि(cid:12) लत चरण5, प;ित तथा उप, कर5, साम<ी और सिं नमाण(cid:12) तथा िवJ वंस के पणू (cid:12) होन े के पDच ात अंितम सफाई क(cid:31) Wपरेखा तैयार करेगा; (3) औrोिगक पUरसंकटमय या िवषैल े पदाथ (cid:12) या नािभक(cid:31)य अपिश& ट स े सदं िूषत सिं नमाण(cid:12) तथा िवJ वंस अपिश&ट के सुरिBत िन,त ारण के िलए संबंिधत ािधकरण5 से सहायता क(cid:31) मांग करेगा; (4) अपिश&ट के सं<हण क(cid:31) \य व, था करेगा और इसके िलए उिचत आधान रखेगा और िनयिमत अंतराल पर या उनके भर जान ेपर या तो अपन ेसंसाधन5 के माJय म से या िनजी चालक5 क(cid:31) िनयुिp करके हटाया जाएगा; (5) एक सं<हीत अपिश&ट को अपने ससं ाधन5 के माJ यम से या िनजी चालक5 क(cid:31) िनयुिp करके सं,क रण एव ं िन,त ारण के िलए समिु चत ,थ ल5 तक भेजेगा;4 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(i)] (6) उ;ारण, सं,क रण और अथवा अिधमानत: ,व , थान ेपनु च(cid:12)@ण के िलए उ(cid:14)प 0 नकता (cid:12)को समुिचत ो(cid:14)स ाहन दगे ा; (7) इसके ,त तु (cid:4)कए जाने क(cid:31) तारीख अथवा भवन योजना के अनुमोदन क(cid:31) तारीख से एक महीन ेक(cid:31) अविध के अंदर, जो भी पहल ेहो, उ(cid:14)प 0न कता(cid:12) के अपिश&ट बंध योजना का परीBण करेगा और उसक(cid:31) मंजरू ी दगे ा; (8) अपन े Bे(cid:23)ािधकार के अंदर संिनमाण(cid:12) तथा िवJ वसं अपिश& ट के उ(cid:14) पादन क(cid:31) जानकारी रखगे ा और एक डाटाबेस ,थ ािपत करेगा तथा वष(cid:12) म -एक बार इस ेअrतन करेगा; (9) िवशेषs सं,थ ाd के परामश (cid:12) करने, उ(cid:14) पा(cid:4)दत सिं नमाण(cid:12) और िवJ वंस अपिश& ट िजसके अंतग(cid:12)त सं, करण सुिवधा और सवt(cid:14)त म संभािवत रीित स े पुन:च@त पदाथu के योग के िलए योजना बनाना भी ह,ै के समिु चत बधं क(cid:31) योजना बनाएगा; (10) िवशेषs सं,थ ाd और िसिवल सोसाइUटय5 के साथ सहयोग के जUरए संिनमाण(cid:12) एवं िवJ वंस अपिश& ट सूचना, िशBा एवं संचार क(cid:31) दीघ(cid:12)कािलक णाली सिृ जत करेगा तथा साथ ही अपने िनजी वेबसाइट के माJ यम से इसका चार- सार करेगा; (11) गैर अवसंरचना(cid:14)म क कं@(cid:31)ट, hल ॉक5, सड़क के पेवम-ट के िनचले सं, तर5, कॉलोनी और <ामीण सड़क5 के िनमाण(cid:12) सिहत संिनमाण(cid:12) कायक(cid:12) लाप म - सिं नमा(cid:12)ण तथा िवJ वंस अपिश& ट से बनी साम<ी के योग हते ु ो(cid:14)स ाहन (cid:4)दए जाने का ावधान बनाएगा। 7777.... ससससििंंििंंननननममममााााणण(cid:4)(cid:4)णण(cid:4)(cid:4) ततततथथथथाााा ििििवववव(cid:30)(cid:30)(cid:30)(cid:30)वव वव ससंंससंं अअअअपपपपििििशशशश!!!!टटट ट ककककेेेे ििििललललएएएए भभभभडडडंंडंं ााााररररणणणण,,,, (cid:23)(cid:23)(cid:23)(cid:23)ससससं,ं,ं,ं,ककक क ररररणणणण ययययाााा पपपपननुुननुु चचचच99(cid:4)(cid:4)99(cid:4)(cid:4) णणणण ससससििुुििुुववववधधधधााााएएएए ंं ंं औऔऔऔरररर ससससििंंििंंननननममममाााा(cid:4)ण(cid:4)ण(cid:4)ण(cid:4)ण ततततथथथथाााा ििििवववव(cid:30)(cid:30)(cid:30)(cid:30)वव वव ससंंससंं अअअअपपपपििििशशशश!!!!टट टट एएएएवववव ंं ंंइइइइससससककककेेेे उउउउ0000पपप प ाााादददद ककककेेेे अअअअनननन(cid:23)(cid:23)ुु(cid:23)(cid:23)ुु ययययोोोोगगगग ककककेेेे ममममााााननननददददडडंंडडंं ---- (1) संिनमा(cid:12)ण तथा िवJव ंस अपिश&ट के िलए भंडारण तथा सं,क रण सुिवधाd हते ु ,थ ल का चयन अअअअननननससुुससुु चचूूचचूू ीीीी IIII म - (cid:4)दए गए मानदडं के अनुसार (cid:4)कया जाएगा; (2) राgय दषू ण िनयं(cid:23)ण बोड (cid:12) अथवा दषू ण िनयं(cid:23)ण सिमित स े ािधकार के िलए उप-िनयम (1) म- यथा िनqद& ट सुिवधा का चालक (cid:23)(cid:23)(cid:23)(cid:23)####पपपप IIII म -आवेदन करेगा। ((((3333)))) सुिवधा का चालक (cid:23)(cid:23)(cid:23)(cid:23)<<<<पपपप IIIIIIII मममम == ==राgय दषू ण िनयं(cid:23)ण बोड (cid:12)को वाaषक Uरपोट(cid:12) , तुत करेगा। (4) सैनीटरी ल‘ड(cid:4)फल के चालन म -संिनमा(cid:12)ण तथा िवJ वंस अपिश&ट से िनaमत सामि<य5 का अन ु योग अअअअननननससुुससुु चचूूचचूू ीीीी IIIIIIII म - (cid:4)दए गए मानदडं के अनसु ार होगा। 8888.... रररराााा>>>>यय यय (cid:23)(cid:23)(cid:23)(cid:23)ददददषषषषूूूू णणणण ििििननननयययय(cid:18)(cid:18)ंं(cid:18)(cid:18)ंं णणणण बबबबोोोोडडडड (cid:4)(cid:4) (cid:4)(cid:4)ययययाााा (cid:23)(cid:23)(cid:23)(cid:23)ददददषषषूूषूू णणणण ििििननननयययय(cid:18)(cid:18)ंं(cid:18)(cid:18)ंं णणणण ससससििििममममिििितततत ककककेेेे ककककतततत22(cid:4)(cid:4)22(cid:4)(cid:4) ययय य ---- (1) राgय दषू ण िनयं(cid:23)ण बोड (cid:12) या दषू ण िनय(cid:23)ं ण सिमित, संबिं धत , थानीय िनकाय5 और सBम ािधकाUरय5 (cid:24)ारा इन िनयम5 के (cid:4)@या0व यन को मॉनीटर कर-ग े और के0A ीय दषू ण िनयं(cid:23)ण बोड (cid:12) और राgय सरकार या सघं राg य Bे(cid:23) या राgय सरकार या सघं राgय Bे(cid:23) शासन (cid:24)ारा पUरलिBत राg य , तरीय नोडल अिभकरण को राg य , तरीय \ यापक डाटा उ(cid:14)प 0न करन े के िलए वाaषक Uरपोx भेजी जाएगी, ऐसी Uरपोट(cid:12) म- टीका-UटV पणी और राय भी अ0 तaव& ट होगी जो कोई टीका-UटVप णी या पUरवत(cid:12)न स ेसंबंिधत राgय दषू ण िनयं(cid:23)ण बोड (cid:12)या दषू ण िनयं(cid:23)ण सिमित के अपिे Bत हो; (2) राgय दषू ण िनयं(cid:23)ण बोड (cid:12) या दषू ण िनयं(cid:23)ण सिमित (cid:23)(cid:23)(cid:23)(cid:23)####पपपप IIII म- ाVत आवेदन प(cid:23) क(cid:31) जाचं करने के पD चात इन िनयम5 के अतं ग(cid:12)त यथा िनqद&ट (cid:23)(cid:23)(cid:23)(cid:23)####पपपप IIIIIIIIIIII म- सिं नमाण(cid:12) और िवJ वंस अपिश& ट क(cid:31) सं,क रण सिु वधा का ािधकार दान करेगी;¹Hkkx IIµ[k.M 3(i)º Hkkjr dk jkti=k % vlk/kj.k 5 (3) राgय दषू ण िनयं(cid:23)ण बोड (cid:12) या दषू ण िनयं(cid:23)ण सिमित (cid:23)(cid:23)(cid:23)(cid:23)####पपपप IIIIVVVV म- वाaषक Uरपोट(cid:12) को इन िनयम5 के अनुपालन क(cid:31) ि,थित पर िवशेष बल दते े [ए तैयार करेगा और (cid:14)य ेक िव(cid:14)त ीय वष (cid:12) के 31 जुलाई के पहले के0 Aीय दषू ण िनयं(cid:23)ण बोड (cid:12)को Uरपोट(cid:12) अ<ेिषत करेगी। 9999.... रररराााा>>>>यय यय ससससररररककककाााारररर ययययाााा ससससघघघंंघंं रररराााा>>>>ययय य (cid:21)(cid:21)(cid:21)(cid:21)(cid:18)(cid:18)(cid:18)ेे(cid:18)ेे (cid:23)(cid:23)(cid:23)(cid:23)शशशशााााससससनननन ककककेेेे ककककतततत22(cid:4)(cid:4)22(cid:4)(cid:4) यय यय ---- (1) राgय सरकार या सघं राgय Bे(cid:23) शासन के िवकास का भारी सिचव इन िनयम5 क(cid:31) अंितम अिधसूचना क(cid:31) तारीख स ेएक वष(cid:12) के भीतर इन िनयम5 के अनWु प सिं नमाण(cid:12) और िवJ वंस अपिश& ट के बंध क(cid:31) बाबत नीित द, तावेज तैयार करेगा। (2) राgय सरकार का सबं ंिधत िवभाग भिू म स ेसंबंिधत िवभाग सिं नमाण(cid:12) तथा िवJ वसं अपिश& ट के भंडारण, सं, करण और पुनच@(cid:12) ण सुिवधाd क(cid:31) ,थ ापना के िलए उपय>ु त ,थ ल उपलh ध करान ेके िलए िज(cid:29)म ेदार होगा। (3) शहरी तथा <मीण आयोजना िवभाग अनमु ो(cid:4)दत भूिम योग योजना म- , थल को शािमल करेगा ता(cid:4)क दीघा(cid:12)विधक आधार पर सं,क रण सिु वधा म -कोई ह,त Bेप न हो। (4) नगरीय तथा सरकारी सिं वदाd म- संिनमाण(cid:12) तथा िवJ वंस अपिश& ट से िनaमत सामि<य5 क(cid:31) अिध ािI को सyत गुधवता िनयं(cid:23)ण के अJय धीन कुछ ितशत तक (10-20%) अिनवाय (cid:12)बनाया जाएगा। ((((11110000)))) ककककेेेे1111@@ @@ ीीीीयययय (cid:23)(cid:23)(cid:23)(cid:23)ददददषषषषूूूू णणणण ििििननननयययय(cid:18)(cid:18)ंं(cid:18)(cid:18)ंं णणणण बबबबोोोोडडडड (cid:4)(cid:4) (cid:4)(cid:4)ककककतततत22(cid:4)(cid:4)22(cid:4)(cid:4) यय यय ---- (1) के0A ीय दषू ण िनय(cid:23)ं ण बोड,(cid:12)- (क) संिनमा(cid:12)ण तथा िवJव ंस अपिश&ट के पया(cid:12)वरणीय बंधन से सबं ंिधत चालना(cid:14)म क (cid:4)दशा-िनदशz तैयार करना; (ख) राgय दषू ण िनयं(cid:23)ण बोडu या दषू ण िनयं(cid:23)ण सिमित स े ाV त आकं ड़ -िवD लिे षत और एकि(cid:23)त करना िजसे िनयत समय पर संशोिधत (cid:4)कया जा सके; (ग) पया(cid:12)वरण मानक5 के िवकास से संबंिधत (cid:4)क0 हj मामल5 के िलए सभी राg य दषू ण िनय(cid:23)ं ण बोडu और दषू ण िनयं(cid:23)ण सिमितय5 के साथ सम0व य करना; (घ) (cid:14)य के िव(cid:14)त ीय वष(cid:12) के 30 अग,त स े पहले राg य दषू ण िनय(cid:23)ं ण बोडu अथवा दषू ण िनयं(cid:23)ण सिमितय5 (cid:24)ारा दी गई Uरपोटu के आधार पर वाaषक अनुपालन Uरपोट(cid:12) के0A ीय सरकार को अ<िे षत करना। ((((11111111)))) भभभभााााररररततततीीीीयययय ममममााााननननकककक AAAAयय यय ररूूररूू ोोोो औऔऔऔरररर भभभभााााररररततततीीीीयययय ररररोोोोडडडड ककककााााBBंंBBंं ससेेससेे ककककेेेे ककककतततत22(cid:4)(cid:4)22(cid:4)(cid:4) यय य य---- भारतीय मानक hय ूरो और भारतीय रोड कां<से \य वहार का कोड तयै ार करन े और सिं नमा(cid:12)ण (cid:4)@याकलाप5 के संबंध म - सिं नमाण(cid:12) और िवJ वंस अपिश& ट के पुन:च(cid:4)@त सामि<य5 और उ(cid:14)प ाद5 के योग के िलए \ यवहार5 का कोड और मानक5 को तैयार करन े के िलए उ(cid:14) तरदायी ह5ग े और भारतीय रोड कां<से क(cid:31) भिू मका सड़क5 के िनमा(cid:12)ण संबंधी मानक5 तथा \य वहार5 के िविश& ट होगी। ((((11112222)))) ककककेेेे1111@@ @@ ीीीीयययय ससससररररककककाााारररर ककककेेेे ककककतततत22(cid:4)(cid:4)22(cid:4)(cid:4) यय यय ---- (1) शहरी िवकास मं(cid:23)ालय और <ामीण िवकास मं(cid:23)ालय, पंचायत राज मं(cid:23)ालय इन िनयम5 के अनुपालन म - , थानीय िनकाय5 को सुिवधा दान करने के िलए उ(cid:14)त रदायी ह5गे; (2) पया(cid:12)वरण, वन और जलवाय ुपUरवत(cid:12)न मं(cid:23)ालय इन िनयम5 के (cid:4)@या0 वयन जसै े और जब अपिे Bत हो, क(cid:31) समीBा के िलए उ(cid:14)त रदायी होगा। 11113333.... इइइइनननन ििििननननययययमममम&&&& ककककेेेे उउउउपपपपबबबबधधंंधधंं &&&& ककककेेेे ककककााााययययाााा11(cid:4)(cid:4)11(cid:4)(cid:4)वव वव ययययनननन हहहहततेेततेे ुु ुुससससममममयययय ससससीीीीममममाााा- इन िनयम5 के काया(cid:12)0व यन हते ु काल@म अअअअननननससुुससुु चचूूचचूू ीीीी IIIIIIIIIIII म -यथा िनqद&ट होगा : 11114444.... ससससििंंििंंननननममममााााणण(cid:4)(cid:4)णण(cid:4)(cid:4) एएएएवववव ंं ंं ििििवववव(cid:30)(cid:30)(cid:30)(cid:30)वव वव ससंंससंं अअअअपपपपििििशशशश!!!!टट टट (cid:23)(cid:23)(cid:23)(cid:23)सससस,,ंं,,ंं कक कक ररररणणणण ससससिििुुिुुववववधधधधााााCCCC DDDDाााारररराााा ददददघघघुुघुु टट(cid:4)(cid:4)टट(cid:4)(cid:4) ननननाााा ककककEEEE (cid:14)(cid:14)(cid:14)(cid:14)ररररपपपपोोोोटटटट(cid:4)(cid:4) (cid:4)(cid:4) ददददननेेननेे ाााा- जब (cid:4)कसी सिं नमाण(cid:12) एव ं िवJव ंस सं,क रण या शोधन या िनपटान सिु वधा पर कोई दघु ट(cid:12) ना हो जाती ह ैतो ,थ ानीय ािधकरण म -सिु वधा का भारी अिधकारी या सिु वधा का चालक, जसै ा लागू हो, त(cid:14)क ाल (cid:23)(cid:23)(cid:23)(cid:23)####पपपप VVVV म - दघु (cid:12)टना क(cid:31) सूचना, , थानीय ािधकरण को दगे ा। ,थ ानीय िनकाय (cid:24)ारा समीBा क(cid:31) जाएगी और सुिवधा के भारी को अनुदशे , य(cid:4)द कोई हो, जारी (cid:4)कया जाएगा।6 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(i)] अअअअननननससुुससुु चचूूचचूू ीीीी I ससससििंंििंंननननममममााााणण(cid:4)(cid:4)णण(cid:4)(cid:4) औऔऔऔरररर ििििवववव(cid:30)(cid:30)(cid:30)(cid:30) वव ववससंंससंं अअअअपपपपििििशशशश!!!!टट टट ककककेेेे ििििललललएएएए भभभभडडंंडडंं ााााररररणणणण ययययाााा (cid:23)(cid:23)(cid:23)(cid:23)सससस,,ंं,,ंं कक कक ररररणणणण ययययाााा पपपपनननुुनुु ::::चचचच9999णणणण ससससुिुिुिुिववववधधधधााााCCCC ककककेेेे चचचचययययनननन हहहहततेेततेे ुु ुुममममााााननननददददंडंडंडंड [[[[ििििननननययययमममम 7777((((1111)))) ददददखखेेखखेे ]]==]]== (1) राgय सरकार म - भिू म स े संबिं धत िवभाग सिं नमाण(cid:12) तथा िवJ वंस अपिश& ट के िलए भंडारण, सं, करण और पुनच(cid:12)@ण सिु वधाd क(cid:31) ,थ ापना हते ु उपयु>त , थल5 क(cid:31) \ यव, था करन े के िलए िज(cid:29)म ेदार होगा और िवकास, चालन तथा रख-रखाव के िलए संबिं धत ,थ ानीय ािधकरण को सfपेगा िजस े अंतत: सBम ािधकारी (cid:24)ारा सचं ालक को सfपा जाएगा तथा जहां कहj भी उपयु(cid:12)>त अिधकारी उपलh ध न हो, तो यह संबंिधत , थानीय ािधकरण के पास रहगे ी। (2) ,थ ानीय ािधकरण चालक5 को आवD यक अनमु ोदन और ,व ीकृितया ं दान करन े के िलए ,थ ानीय संबंिधत संगठन5 के (राgय अथवा संघ राgय Bे(cid:23) के शहरी िवकास िवभाग के परामश(cid:12) स)े साथ सम0व य करेगा। (3) इस िनयम क(cid:31) अनसु ूची IIII म- यथा उि(cid:6)लिखत शहर या Bे(cid:23) के नगरीय ठोस अपिश& ट के िलए, , व{ छता भिू म भरण म - सिं नमाण(cid:12) तथा िवJव ंस अपिश&ट का योग (cid:4)कया जाएगा। सिं नमा(cid:12)ण तथा िवJ वंस अपिश& ट सं, करण या पनु च@(cid:12) ण उrोग5 स े ाVत अवशषे 5 को नगरीय ठोस अपिश& ट हते ु , व{ छता भिू म भरण म- भिू म भUरत (cid:4)कया जाएगा। (4) सं,क रण या पुनच(cid:12)@ण 20-25 वषu (, थल पनु :च@ण सिु वधाd पर आधाUरत पUरयोजना) क(cid:31) लंबी अविध तक चलेगा। (5) सं,क रण या पुन:च@ण ,थ ल िनवास ,थ ान समूह5, वन B(cid:23)े 5, जल िनकाय5, ,म ारक5, रा&x ीय उrान5, नमभूिमय5 और मह(cid:14)व पणू (cid:12) सां,क ृितक, ऐितहािसक अथवा धाaमक मह(cid:14) व के , थल5 स ेदरू होगा। (6) पांच टन ित(cid:4)दन स े अिधक स,ं थ ािपत Bमता क(cid:31) सं, करण तथा िन, तारण सुिवधा के आस-पास एक बफर 'जोन ऑफ नो डवे लपम-ट' इसका रख-रखाव ठोस अपिश& ट सं, करण तथा िन, तारण सुिवधा के कुल B(cid:23)े के अंदर (cid:4)कया जाएगा। बफर जोन का िनधा(cid:12)रण ,थ ानीय ािधकरण (cid:24)ारा सबं ंिधत राg य दषू ण िनयं(cid:23)ण बोड (cid:12) के परामश(cid:12) से मामला दर मामला आधार पर (cid:4)कया जाएगा। (7) सं,क रण या पुनच(cid:12)@ण ,थ ल क चार5 ओर चारदीवारी या घेरा होगा ओर आन े वाले वाहन5 या पUरवहन के अ0य साधन5 क(cid:31) मॉनीटरी करने के िलए उपयु>त दरवाजा उपलh ध कराया जाएगा। (8) प[चं माग (cid:12)और या आंतUरक सड़क- कं@(cid:31)ट क(cid:31) ह5गी या ऐसी बनाई जाएंगी (cid:4)क वाहन5 क(cid:31) आवाजाही के कारण धलू कण पैदा होने से बचा जासके और इस कार िडजाइन क(cid:31) जाएगं ी ता(cid:4)क वाहन5 और अ0 य मशीनरी क(cid:31) म>ु त संचलन हो सके। (9) अपिश&ट क(cid:31) मा(cid:23)ा के मापन हते ु धमक(cid:12) ांटा जैसी \ यव, थाएं, अि(cid:127) सरु Bा उपकरण और अ0 य सिु वधाएं, जो भी अपेिBत ह5, उपलhध कराई जाएंगी। (10) रात के समय सुगम ल‘ड(cid:4)फल चालन5 के िलए पेयजल तथा , \ { छता सिु वधाए ं (वरीयत: काaमक5 के िलए धोन/ेनहान े क(cid:31) सिु वधाएं) तथा रोशनी क(cid:31) सिु वधाएं उपलhध कराई जाएंगी और ल‘ड(cid:4)फल , थल5 पर ,व ा, (cid:129) य जांच सिहत सुरBा के ावधान (cid:4)कए जाएगं ।े (11) सं,क रण या पुनच(cid:12)@ण चालन5 से उ(cid:14) प0न दषू ण क(cid:31) सम, याd को रोकने के िलए िन(cid:29) निलिखत ावधान (cid:4)कए जाए ंअथा(cid:12)त : (क) सतही जल क(cid:31) ि,थरता को रोकने के िलए तूफान जल नािलय5 क(cid:31) \य व, था करना; (ख) ,थ ल पर धलू और Bित कम करने के िलए सं, करण या पनु च(cid:12)@ण सुिवधा म- चु^नदा Bे(cid:23)5 म - खडजं ा या कं@(cid:31)ट क(cid:31) सतह क(cid:31) \य व,थ ा करना; (ग) सं,क रण और पनु च(cid:12)@ण संय(cid:23)ं से उ(cid:14)प 0न होन ेवाले J विन दषू ण का िनवारण;¹Hkkx IIµ[k.M 3(i)º Hkkjr dk jkti=k % vlk/kj.k 7 (घ) पया(cid:12)वरण (संरBण) िनयम, 1986 के अनसु ार-संगत मानक5 के अनसु ार बिहGाव, य(cid:4)द कोई हो, के शोधन हते ु ावधान। (12) सं,क रण या पुनच(cid:12)@ण ,थ ल पर काय(cid:12) Bे(cid:23) वायु गुणव(cid:14)त ा और उसके पUरवेश म - पUरवेशी वायु गुणव(cid:14) ता क(cid:31) मॉनीटरी क(cid:31) जाएगी। (13) सुिवधा के आंतUरक भाग सिहत आस-पास के Bे(cid:23) अथा(cid:12)त सयं ं(cid:23) क(cid:31) चारदीवारी के पास पUरवेशी J विन का मापन (cid:4)कया जाएगा। (14) िन(cid:29)न िलिखत पUरयोजनाd को धूल और J विन से उ(cid:14) प0 न उपयु(cid:12)> त दषू ण के िलए मानक5 म -छूट ाV त होगी : जहां ,थ ल पर उ(cid:14)प 0न होने वाल े िनमाण(cid:12) और मलबा अपिश&ट के 0 यूनतम 80% को उसी , थल पर पनु च(cid:12)(cid:4)@त या पुन: योग (cid:4)कया जाता हो और आस-पास के पया(cid:12)वास को (cid:4)कसी द&ु भाव से सुरिBत रखने के िलए पया(cid:12)V त बफर Bे(cid:23) उपलhध ह।ै (15) बफर जोन को सुदढ़ृ बनाने के िलए सं, करण या पुनच(cid:12)@ण संयं(cid:23) या , थल के चार5 ओर एक वान, पितक चारदीवारी बनाई जाए। अअअअननननससुुससुु चचूूचचूू ीीीी II ससससििंंििंंननननममममााााणण(cid:4)(cid:4)णण(cid:4)(cid:4) ततततथथथथाााा ििििवववव(cid:30)(cid:30)(cid:30)(cid:30)वव वव ंंसससंंस अअअअपपपपििििशशशश!!!!टट टट औऔऔऔरररर इइइइससससककककेेेे उउउउ0000पपप प ाााादददद&&&& सससस ेे ेेबबबबननननीीीी ससससााााममममििििBBBBयययय&&&& ककककाााा अअअअनननन(cid:23)(cid:23)ुु(cid:23)(cid:23)ुु ययययोोोोगगगग [[[[ििििननननययययमममम 7777((((3333)))) ददददखखेेखखेे ]]==]]== @.सं. मापदडं अनुपालन मानदडं 1. ,व {छ ता भिू म भरण के तल म - मोटी रेत के आकार क(cid:31) mणे ीकृत (2 िममी-4.75 िममी मानक छ0न ी िनBालक एक(cid:23)ण णाली म - जल आकार) वाली केवल कुचली [ई और mेणीकृत सy त साम<ी (प(cid:14) थर, िनकास परत और ,व {छ ता भिू म भरण बजरी आ(cid:4)द) का ही योग (cid:4)कया जाएगा। के शीष (cid:12) पर अपिश&ट के ऊपर गसै एक(cid:23)ण परत और चूं(cid:4)क मोटी रेत के कण, कोणीय आकार के ह5ग े (और नदी तल क(cid:31) रेत क(cid:31) तरह गोल नहj), इसिलए समीपवत(cid:131) परत5 या घटक5 म - छेद ,व {छ ता भिू म भरण क(cid:31) गैस एक(cid:23)ण होने से रोकन ेके िलए, जहा ं भी आवDय कता हो, िबना बुन े भ-ू व,(cid:23) 5 परत के ऊपर शीष (cid:12)कवर णाली म- जल क(cid:31) सुरBा बनाई जानी चािहए। िनकास परत ,व {छ ता भूिम भरण या कचरा , थल को ढकन ेहते ु शीष(cid:12) पर जल िनकास परत 2. ित(cid:4)दन ढकना 2 िममी तक आकार वाल े सिं नमाण(cid:12) तथा िवJ वंस सं, करण (cid:4)कए गए अपिश& ट का उपयोग ताज े अपिश& ट को ित(cid:4)दन ढकने के िलए (cid:4)कया जाएगा। जहां ऐसी साम<ी उपलhध ह ै वहां भूिम भरण , थल को ढकने के िलए िनमा(cid:12)ण और मलबा का उपयोग करना अिनवाय(cid:12) होगा। ऐस े , थान5 के िलए ताजी मदृ ा (, वीट अथ)(cid:12) का योग नहj (cid:4)कया जाएगा और यहा ं ग(cid:132)े करन े क(cid:31) अनमु ित नहj होगी। अपवाद - उसी भिू म भरण ,थ ल के िनमाण(cid:12) के दौरान मृदा उ(cid:14) खनन। गम(cid:131) के महीन5 म - ल ू वाल े (cid:4)दन5 के दौरान अ(cid:6) पकािलक धलू स े कुछ सम, याएं हो सकती ह।‘ जहां भी उपलh ध ह5, , थानीय मदृ ा को8 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(i)] िमिmत करके सीिमत अविध के िलए इन सम, याd को कम (cid:4)कया जा सकता ह।ै 3. ,व {छ ता भूिम भरण म- िसिवल िनमा(cid:12)ण गैर-ढांचागत अन ु योग5 अथा(cid:12)त फुटपाथ प(cid:14) थर, नािलय5 को ढकं ना, पैदल या(cid:23)ी Bे(cid:23)5 म- खडजं ा खंड़ आ(cid:4)द। अअअअननननससुुससुु चचूूचचूू ीीीी III आआआआययययोोोोजजजजननननाााा ओओओओरररर ककककााााययययाााा11(cid:4)(cid:4)11(cid:4)(cid:4)वव वव ययययनननन हहहहततेेततेे ुु ुुससससममममयययय ससससीीीीममममाााा [[[[ििििननननययययमममम 11113333 ददददखखेेखखेे ]]==]]== @.स.ं अनुपालन मानदडं 01 िमिलयन और 0.5-01 िमिलयन 0.5 िमिलयन से कम उसस े अिधक जनसyं या वाल ेशहर जनसyं या वाल ेशहर जनसंy या वाल ेशहर 1. राgय सरकार (cid:24)ारा नीित िनमाण(cid:12) 12 महीने 12 महीने 12 महीने 2. एक(cid:23)ण और सं,क रण सुिवधा हते ु 18 महीन े 18 महीन े 18 महीन े ,थ ल5 क(cid:31) पहचान करना 3. सुिवधा को शुW करना और उसका 18 महीन े 24 महीन े 36 महीन े काया0(cid:12) व यन करना 4. राgय दषू ण िनयं(cid:23)ण बोडu (cid:24)ारा वष(cid:12) म - 3 बार - 4 माह वष(cid:12) म - 2 बार - 6 माह वष(cid:12) म - 2 बार - 6 माह मॉनीटरी म -एक बार म -एक बार म -एक बार ****ससससममममयययय अअअअननननसससुुसुु चचूूचचूू ीीीी,,,, इइइइनननन ििििननननययययमममम&&&& ककककEEEE अअअअििििधधधधससससचचूूचचूू ननननाााा ककककEEEE ततततााााररररीीीीखखखख सससस ेे ेे(cid:23)(cid:23)(cid:23)(cid:23)भभभभााााववववीीीी हहहहोोोोगगगगीीीी।।।। (cid:23)(cid:23)(cid:23)(cid:23)####पपपप I ददददखखेेखखेे == ==[[[[ििििननननययययमममम 7777((((2222))))]]]] (cid:23)(cid:23)(cid:23)(cid:23)ााााििििधधधधककककाााारररर (cid:23)(cid:23)(cid:23)(cid:23)ाााा(cid:22)(cid:22)(cid:22)(cid:22)तत तत ककककररररनननन ेे ेेककककेेेे ििििललललएएएए आआआआववववददेेददेे नननन----पपपप(cid:18)(cid:18)(cid:18)(cid:18) सेवा म-, सद,य सिचव, ____________________________ नगरपािलका ािधकारी (cid:24)ारा िनयु>त , थानीय ािधकारी अथवा एजस- ी का नाम : प(cid:23)ाचार का पता दरू भाष संyय ा फै>स संyय ा नोडल अिधकारी एव ं पदनाम ( सं,क रण या पनु च(cid:12)@ण अथवा िनपटान सिु वधा का चालन करने के िलए उ(cid:14)त रदायी सBम ािधकारी या एज-सी (cid:24)ारा ािधकृत अिधकारी)¹Hkkx IIµ[k.M 3(i)º Hkkjr dk jkti=k % vlk/kj.k 9 (cid:4)कस काम के िलए ािधकार हते ु आवेदन (cid:4)कया गया ह ै िनमा(cid:12)ण और िवJ वंस अपिश& ट के सं,क रण या पुनच(cid:12)@ण क(cid:31) सिु वधा (कृपया सही का िनशान लगाएं) , थािपत करना िन(cid:29)न िलिखत को शािमल करन े के िलए िविनमाण(cid:12) और िवJ वंस सं,क रण या पुनच(cid:12)@ण सिु वधा का िव,त ृत , ताव सBम ािधकारी (cid:24)ारा अनुमो(cid:4)दत और आवUं टत , थल क(cid:31) अवि,थित। िविश&ट ,थ ल पर हि,तत (cid:4)कए जान ेवाल ेसंिनमाण(cid:12) और िवJव ंस अपिश&ट क(cid:31) औसत मा(cid:23)ा (टन ित (cid:4)दन म-) और संघटन। योग म- लाई जान ेवाली सिं नमा(cid:12)ण और िवJ वंस अपिश& ट सं,क रण या पुनच(cid:12)@ण ौrोिगक(cid:31) का h यौरा। ित(cid:4)दन सं,क रण (cid:4)कए जान े वाल े िनमाण(cid:12) एवं िवJ वंस अपिश&ट क(cid:31) मा(cid:23)ा। िनधाU(cid:12) रत ािधकारी स े,थ ल , वीकृित। सBम ािधकरण या ,थ ानीय िनकाय तथा चालनकता (cid:12) अिभकरण के बीच करार क(cid:31) मुख िवशेषताए ं (संगत द,त ावेज संल(cid:133)न कर-)। पुनच(cid:12)(cid:4)@त उ(cid:14)प ाद के उपयोग हते ु योजना। सं,क रण हते ु बेकार अविश&ट 5 क(cid:31) अनमु ािनत मा(cid:23)ा तथा इनके िनपटान हते ु योजना (अथात(cid:12) ठोस अपिश&ट हते ु सैनीटरी ल‘ड(cid:4)फल)। पया(cid:12)वरणीय दषू ण के िनवारण और िनयं(cid:23)ण हते ु (cid:4)कए जान ेवाले उपाय। पUरयोजना पर िनवेश और अनमु ािनत लाभ। सं,क रण या पुनच(cid:12)@ण सयं ं(cid:23) म - काय(cid:12)रत mिमक5 क(cid:31) सुरBा हते ु (cid:4)कए गए उपाय। सं,क रण और पनु च(cid:12)@ण सिहत एक(cid:23)ण, पUरवहन और शोधन के दौरान दघु (cid:12)टना के िलए कोई िनवारक योजना हो तो उसके बारे म - सBम ािधकारी (,थ ानीय ािधकरण) या िनधाU(cid:12) रत ािधकारी को सिू चत (cid:4)कया जाना चािहए। NNNNददददननननााााककंंककंं :::: ननननोोोोडडडडलललल अअअअििििधधधधककककााााररररीीीी ककककेेेे हहहह,,,,तत तत ाााा(cid:21)(cid:21)(cid:21)(cid:21)रररर10 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(i)] (cid:134)प II [िनयम (7)(3) देख-] चालनकता(cid:12) को ािधकार जारी करने के िलए (cid:134)प फाइल स.ं : _________ (cid:4)दनाकं : ____________ सेवा म-, ______________ ______________ ______________ ससससददंंददंं भभभभ (cid:4)(cid:4) (cid:4)(cid:4):::: आआआआपपपपककककाााा आआआआववववददेेददेे नननन सससस..ंं..ंं _____________________ (cid:4)दनाकं ____________ _______ राgय दषू ण िनयं(cid:23)ण बोड (cid:12) या दषू ण िनयं(cid:23)ण सिमित (cid:24)ारा , ताव का परीBण करने के पD चात _______ को िजनका शासिनक कायाल(cid:12) य _______ म- ह,ै इस ािधकार--प(cid:23) के साथ सलं (cid:133) न िनबंधन और शतu (अनुपालनाथ (cid:12) मानदडं 5 सिहत) के अJय धीन _______ पर िनमाण(cid:12) और िवJ वंस अपिश& ट सं, करण सिु वधा , थािपत और चािलत करन े के िलए ािधकृत (cid:4)कया जाता ह।ै 1. यह ािधकार _______ तक वैध होगा। वैधता अविध समाV त होन े के पD चात, ािधकार का नवीकरण कराना होगा। 2. _______ राgय दषू ण िनयं(cid:23)ण बोड/(cid:12) दषू ण िनयं(cid:23)ण सिमित (cid:24)ारा (cid:4)कसी भी समय, समिु चत कारण5 से, ािधकार के अंतग(cid:12)त लागू (cid:4)कसी शत(cid:12) को र(cid:135) (cid:4)कया जा सकता ह ैऔर इसक(cid:31) िलिखत सचू ना दी जाएगी। 3. िनमा(cid:12)ण और िवJव ंस अपिश&ट बंधन िनयम, 2016 के उपबंध का उ(cid:6) लघं न होने पर पया(cid:12)वरण (सरं Bण) अिधिनयम, 1986 (1986 का 29) के दंडा(cid:14)म क उपबंध लागू ह5गे। NNNNददददननननााााककंंककंं :::: ((((ससससदददद,,,,यय यय ससससििििचचचचवववव)))) ,,,,थथ थथ ाााानननन :::: रररराााा>>>>यय यय (cid:23)(cid:23)(cid:23)(cid:23)ददददषषषषूूूू णणणण ििििननननयययय(cid:18)(cid:18)ंं(cid:18)(cid:18)ंं णणणण बबबबोोोोडडडड///(cid:4)(cid:4)/(cid:4)(cid:4) (cid:23)(cid:23)(cid:23)(cid:23)ददददषषषषूूूू णणणण ििििननननयययय(cid:18)(cid:18)ंं(cid:18)(cid:18)ंं णणणण ससससििििममममिििितततत¹Hkkx IIµ[k.M 3(i)º Hkkjr dk jkti=k % vlk/kj.k 11 (cid:23)(cid:23)(cid:23)(cid:23)####पपपप III [[[[ििििननननययययमममम 8888((((2222)))) ददददखखेेखखेे ]]==]]== रररराााा>>>>यय यय (cid:23)(cid:23)(cid:23)(cid:23)ददददषषषषूूूू णणणण ििििननननयययय(cid:18)(cid:18)ंं(cid:18)(cid:18)ंं णणणण बबबबोोोोडडडड (cid:4)(cid:4) (cid:4)(cid:4)ककककोोोो ,,,,थथ थथ ााााननननीीीीयययय (cid:23)(cid:23)(cid:23)(cid:23)ााााििििधधधधककककररररणणणण DDDDाााारररराााा (cid:23)(cid:23)(cid:23)(cid:23),,,,तत तत ततुुततुु ककककEEEE जजजजाााानननन ेे ेेववववााााललललीीीी ववववााााPPPPषषषषकककक (cid:14)(cid:14)(cid:14)(cid:14)ररररपपपपोोोोटटटट(cid:4)(cid:4) (cid:4)(cid:4) ककककाााा (cid:23)(cid:23)(cid:23)(cid:23)####पपपप (i) शहर या नगर का नाम ................................... (ii) जनसyं य ा ...................................... (iii) ,थ ानीय ािधकरण या सBम ािधकारी का नाम और पता दरू भाष सं. : ...................................... फै>स : ............................................. ई-मेल आईडी : ................................... वेबसाइट : .......................................... (iv) संिनमा(cid:12)ण तथा िवJव ंस अपिश&ट बंधन से संबिं धत भारी अथवा नोडल अिधकारी का नाम और पदनाम......................................................................................................... 1111.... NNNNककककससससीीीी भभभभीीीी (cid:23)(cid:23)(cid:23)(cid:23)ककककाााारररर ककककेेेे ििििननननममममााााणण(cid:4)(cid:4)णण(cid:4)(cid:4) ककककोोोो ििििगगगगरररराााानननन ेे ेेसससस ेे ेेउउउउ0000पप पप 1111नननन अअअअपपपपििििशशशश!!!!टट टट ससससििििहहहहतततत ससससििंंििंंननननममममााााणण(cid:4)(cid:4)णण(cid:4)(cid:4) ततततथथथथाााा ििििवववव(cid:30)(cid:30)(cid:30)(cid:30) वव व वससंंससंं अअअअपपपपििििशशशश!!!!टट टट ककककEEEE ममममाााा(cid:18)(cid:18)(cid:18)(cid:18)ाााा औऔऔऔरररर ससससघघंंघघंं टटटटनननन (क) पूरे वष (cid:12)के दौरान उ(cid:14)प 0न िनमाण(cid:12) एवं िवJ वंस अपिश& ट क(cid:31) मUे xक टन म- कुल मा(cid:23)ा लीन अविध और पीक अविध म - ित(cid:4)दन उ(cid:14)प 0 न अपिश& ट स ेसबं ंिधत कोई आंकड़ े............ संिनमा(cid:12)ण तथा िवJव ंस अपिश&ट (टीपीडी) का औसत उ(cid:14)प ादन ित(cid:4)दन एकि(cid:23)त िनमा(cid:12)ण एवं िवJ वंस अपिश& ट क(cid:31) कुल मा(cid:23)ा ........... नगर म -,थ ािपत कोई सं,क रण/पुनच@(cid:12) ण सुिवधा सुिवधा क(cid:31) ि,थित (ख) सं,क ृत/पनु च(cid:12)(cid:4)@त िनमा(cid:12)ण और िवJ वंस अपिश& ट क(cid:31) कुल मा(cid:23)ा (मेUxक टन म-) गैर-ढांचागत कुल कं@(cid:31)ट : िविनaमत बाल ू: पूव(cid:12)-िमिmत कं@(cid:31)ट (आरएमसी) : पे^वग hल ॉ>स : जीएसबी : अ0य , य(cid:4)द कोई हो, तो कृपया दशा(cid:12)एं : (ग) सं,क रण (cid:4)कए िबना भराई (cid:24)ारा (अंितम िवक(cid:6)प ) या िन(cid:29) न, थ Bे(cid:23)5 म- भराई (cid:24)ारा िनपटाए गए िनमा(cid:12)ण और िवJव ंस अपिश&ट क(cid:31) कुल मा(cid:23)ा योग म -लाए गए भराई ,थ ल5 क(cid:31) सyं य ा : उपयोग म- लाया गया Bे(cid:23) : >य ा मा(cid:23)ा आकलन के िलए भारण सिु वधा का योग (cid:4)कया गया? : हां नहj12 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(i)] (घ) >य ा अनुसूची III के अनुसार सेनेxी (ठोस अपिश& ट हते ु) म - िनमा(cid:12)ण और िवJ वंस अपिश& ट योग म - लाया गया? : हां नहj 2222.... भभभभंडंडंडंडााााररररणणणण ससससििुुििुुववववधधधधााााएएएए ंंंं (क) िनमा(cid:12)ण और िवJव ंस अपिश&ट के एक(cid:23)ण हते ुशािमल Bे(cid:23) या , थल या भूखंड या सिमितयां (ख) शािमल क(cid:31) गई बड़ी पUरयोजनाd (सड़क पUरयोजनाd सिहत) क(cid:31) सyं या (ग) >य ा Bे(cid:23) या ,थ ल या भूखंड या सिमित , तर पर एक(cid:23)ण (cid:4)कया जाता ह ै (य(cid:4)द हां, तो >य ा यह सBम ािधकारी या , थानीय ािधकरण या िनजी अिभकरण या गैर-सरकारी संगठन (cid:24)ारा (cid:4)कया जाता ह)ै : (घ) भंडारण िबन : िवशेष िवrमान भिव& य म - िववरण संy या , तािवत (आकार और पUरमाण) (i) िडhब ा या पा(cid:23) (Bमता) : (ii) अ0य , कृपया उ(cid:6)ल खे कर- : (ड.) >य ा सभी भंडारण िडhब 5/एक(cid:23)ण ,थ ल5 से कचरा रोज : हां नहj उठाया जाता ह ै (च) >य ा भंडारण िडhब 5 स े िनमाण(cid:12) और िवJ वंस अपिश& ट हाथ5 स ेया मशीन5 (cid:24)ारा उठाया जाता ह ै(कृपया सही का हाथ5 स े मशीन5 अ0 य िच0ह लगाए)ं कृपया योग म - लाए गए उपकरण तथा (cid:24)ारा प;ित का उ(cid:6)ल ेख कर- (कृपया उपकरण का उ(cid:6)ल ेख कर-)¹Hkkx IIµ[k.M 3(i)º Hkkjr dk jkti=k % vlk/kj.k 13 ................................................ 3333.... पपपप(cid:14)(cid:14)(cid:14)(cid:14)ररररववववहहहहनननन : िवrमान, वा, तिवक Wप से अपेिBत/ , तािवत संy या ................................................ xक : xक-हाइ(cid:136)ॉिलक : टै>ट र-xेलर : ड(cid:29)प र-Vल ेसर : xाईसाइ(cid:4)कल : रे(cid:137)यूज->ल े>ट र : अ0य (कृपया उ(cid:6)ल ेख कर-) : 4444.... QQQQयय यय ाााा ििििननननममममााााणण(cid:4)(cid:4)णण(cid:4)(cid:4) औऔऔऔरररर ििििवववव(cid:30)(cid:30)(cid:30)(cid:30)वव वव ससंंससंं अअअअपपपपििििशशशश!!!!टट टट (cid:23)(cid:23)(cid:23)(cid:23)बबबबधधंंधधंं नननन ककककााााययययRRRR मममम == ==ससससधधुुधधुु ाााारररर हहहहततेेततेे ुु ुुककककोोोोईईईई (cid:23)(cid:23)(cid:23)(cid:23),,,,तत तत ाााावववव NNNNककककययययाााा गगगगययययाााा हहहह ैै ैै 5555.... QQQQयय यय ाााा ििििननननममममाााा(cid:4)ण(cid:4)ण(cid:4)ण(cid:4)ण औऔऔऔरररर ििििवववव(cid:30)(cid:30)(cid:30)(cid:30)वव वव ससंंससंं अअअअििििपपपपशश शश !!!! टट ट ट ककककेेेे (cid:23)(cid:23)(cid:23)(cid:23)सससस,,ंं,,ंं कक कक ररररणणणण मममम == ==पपपपीीीीपपपपीीीीपपपपीीीी ककककोोोो शशशशााााििििममममलललल ककककररररनननन ेे ेेककककेेेे ििििललललएएएए ककककोोोोईईईई (cid:23)(cid:23)(cid:23)(cid:23)ययययाााासससस NNNNककककययययाााा गगगगययययाााा हहहह ैै ैै:::: ययययNNNNदददद हहहहाााा,,ंं,,ंं ततततोोोो ककककौौौौनननन ससससीीीी (cid:23)(cid:23)(cid:23)(cid:23)ौौौौVVVVोोोोििििगगगगककककEEEE (((((cid:23)(cid:23)(cid:23)(cid:23)ौौौौVVVVोोोोििििगगगगNNNNककककययययाााा))ंं))ंं (cid:23)(cid:23)(cid:23)(cid:23)ययययोोोोगगगग मममम == ==ललललााााईईईई जजजजाााा ररररहहहहीीीी हहहह,,ैै,,ैै जजजजससैैससैै ेे ेेNNNNकककक :::: सं,क रण/पुनच@(cid:12) ण ौrोिगक(cid:31) उठाए गए कदम ( सं,क रण क(cid:31) जाने वाली क(cid:31) मा(cid:23)ा) (i) शु&क सं,क रण : (ii) नम सं,क रण : (iii) अ0य , य(cid:4)द कोई हो, तो कृपया : उ(cid:6)ल ेख कर- 6666.... ििििननननWWWWननन न ििििललललििििखखखखतततत ककककेेेे अअअअ(cid:23)(cid:23)(cid:23)(cid:23)ााााििििधधधधककककृृृृतततत ककककााााययययRRRR ककककEEEE जजजजााााचचंंचचंं हहहहततेेततेे ुु ुुउउउउपपपपललललAAAAधध धध (cid:23)(cid:23)(cid:23)(cid:23)ााााववववधधधधाााानननन ककककौौौौनननन सससस ेे ेेहहहह YY YY:::: नदी तट5/नम िनकाय5 पर अित@मण : िन(cid:29)न ,थ Bे(cid:23)5 क(cid:31) अ ािधकृत भराई : ठोस अपिश&ट के साथ िमmण : उrोन5, पटUरय5 इ(cid:14)य ा(cid:4)द पर अित@मण : 7777.... NNNNककककततततननननीीीी ममममििििललललनननन बबबबिििि,,,,ततततयययय&&&& मममम == ==ििििननननममममााााणणण(cid:4)(cid:4)ण(cid:4)(cid:4) ततततथथथथाााा ििििवववव(cid:30)(cid:30)(cid:30)(cid:30) वव व वससंंससंं अअअअपपपपििििशशशश!!!! टट टट पपपपाााा(cid:18)(cid:18)(cid:18)(cid:18) ससससििुुििुु ववववधधधधााााएएएए ंं ंंउउउउपपपपललललAAAAधध धध ककककररररााााईईईई गगगगईईईई हहहह::YY::YY 8888.... QQQQयय यय ाााा इइइइनननन ििििननननययययमममम&&&& ककककEEEE गगगगररैैररैै ----अअअअननननपपुुपपुु ााााललललननननाााा ककककेेेे ििििललललएएएए ददददडडंंडडंं ाााा0000मम मम कककक ककककाााारररर(cid:4)(cid:4)(cid:4)वव(cid:4)ववााााईईईई ककककररररनननन ेे ेे ककककेेेे ििििललललएएएए ककककोोोोईईईई ननननगगगगररररपपपपााााििििललललककककाााा 1111यय यय ााााययययधधधधीीीीशशशश ििििननननययययQQुुQQुु तत तत NNNNककककएएएए गगगगएएएए हहहह YY YY:::: हहहहाााा ंं ंं ननननहहहहZZZZ (य(cid:4)द हां, तो गत तीन वषu (वष(cid:12) वार hय ौरा) के दौरान मामल ेपंजीकृत (cid:4)कए और िनपटाए गए) NNNNददददननननााााककंंककंं :::: ननननगगगगररररपपपपााााििििललललककककाााा आआआआययययQQुुQQुु तत तत ककककेेेे हहहह,,,,ततत त ाााा(cid:21)(cid:21)(cid:21)(cid:21)रररर14 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(i)] (cid:23)(cid:23)(cid:23)(cid:23)####पपपप IV [[[[ििििननननययययमममम ((((8888))))((((3333)))) ददददखखेेखखेे ]]==]]== रररराााा>>>>यय यय (cid:23)(cid:23)(cid:23)(cid:23)ददददषषषषूूूू णणणण ििििननननयययय(cid:18)(cid:18)ंं(cid:18)(cid:18)ंं णणणण बबबबोोोोडडडड///(cid:4)(cid:4)/(cid:4)(cid:4)ससससििििममममििििततततयययय&&&& DDDDाााारररराााा ककककेेेे1111@@@ @ ीीीीयययय (cid:23)(cid:23)(cid:23)(cid:23)ददददषषषषूूूू णणणण बबबबोोोोडडडड (cid:4)(cid:4) (cid:4)(cid:4)ककककोोोो (cid:23)(cid:23)(cid:23)(cid:23),,,,तत तत ततुुततुु ककककEEEE जजजजाााानननन ेे ेेववववााााललललीीीी ववववााााPPPPषषषषकककक (cid:14)(cid:14)(cid:14)(cid:14)ररररपपपपोोोोटटटट(cid:4)(cid:4) (cid:4)(cid:4) ककककाााा (cid:23)(cid:23)(cid:23)(cid:23)पपपप(cid:18)(cid:18)(cid:18)(cid:18) सेवा म- अJय B, के0A ीय दषू ण िनय(cid:23)ं ण बोड,(cid:12) पUरवेश भवन, पूव(cid:131) अजु(cid:12)न नगर, (cid:4)द(cid:6)ल ी-110032 1. राgय /संघ राgय Bे(cid:23) का नाम : 2. राgय दषू ण िनयं(cid:23)ण बोड/(cid:12) दषू ण िनयं(cid:23)ण सिमित का नाम : और पता 3. इन िनयम5 के अंतग(cid:12)त राgय /संघ राg य Bे(cid:23) म- नगरीय ठोस : अपिश&ट 5 के बधं न के िलए उ(cid:14) तरदायी नगरपािलका ािधकरण5 क(cid:31) संyय ा 4. अअअअननननससुुससुु चचूूचचूू ीीीी IIIIIIIIIIII के (cid:4)@या0व यन के संबंध म - नगरपािलका : कृपया अनुबंध-I के Wप म - संल(cid:133)न ािधकरण5 (cid:24)ारा क(cid:31) गई गित का सिं BV त िववरण कर- 5. अअअअननननससुुससुु चचूूचचूू ीीीी IIIIVVVV के (cid:4)@या0व यन के संबंध म - नगरपािलका : कृपया अनुबंध-II के Wप म- संल(cid:133)न ािधकरण5 (cid:24)ारा क(cid:31) गई गित का सिं BV त िववरण कर- ततततााााररररीीीीखखखख :::: अअअअ(cid:30)(cid:30)(cid:30)(cid:30)यय यय (cid:21)(cid:21)(cid:21)(cid:21) ययययाााा ससससदददद,,,,यय यय ससससििििचचचचवववव ,,,,थथ थथ ाााानननन :::: रररराााा>>>>यय यय (cid:23)(cid:23)(cid:23)(cid:23)ददददषषषषूूूू णणणण ििििननननयययय(cid:18)(cid:18)ंं(cid:18)(cid:18)ंं णणणण बबबबोोोोडडडड////(cid:4)(cid:4)(cid:4)(cid:4) (cid:23)(cid:23)(cid:23)(cid:23)ददददषषषषूूूू णणणण ििििननननयययय(cid:18)(cid:18)ंं(cid:18)(cid:18)ंं णणणण ससससििििममममिििितततत¹Hkkx IIµ[k.M 3(i)º Hkkjr dk jkti=k % vlk/kj.k 15 (cid:23)(cid:23)(cid:23)(cid:23)####पपपप V [[[[ििििननननययययमममम 11114444 ददददखखेेखखेे ]]==]]== ददददघघघघुुुु टट(cid:4)(cid:4)टट(cid:4)(cid:4) ननननाााा ककककाााा (cid:23)(cid:23)(cid:23)(cid:23)ििििततततववववददेेददेे नननन 1. दघु (cid:12)टना क(cid:31) तारीख और समय : 2. दघु (cid:12)टना के िलए कारण घटनाd का अन@ु म : 3. दघु (cid:12)टना म -शािमल सिं नमाण(cid:12) तथा िवJ वंस अपिश& ट का कार : 4. यातायात, िनकास णाली और पया(cid:12)वरण पर दघु (cid:12)टनाd के : भाव5 का आकलन 5. (cid:4)कए गए आपातकालीन उपाय : 6. दघु (cid:12)टनाd के भाव5 को कम करने के िलए उठाए गए कदम : 7. ऐसी (cid:4)कसी दघु (cid:12)टना क(cid:31) पनु रावृिT को रोकन ेके िलए उठाए गए : कदम 8. सं,क रण/पुनच@(cid:12) ण ,थ ल पर कमक(cid:12) ार5 क(cid:31) िनिय मत मािसक : ,व ा,(cid:129) य जांच क(cid:31) जाएगी 9. सं,क रण और पनु च(cid:12)@ण सिहत एक(cid:23)ण, पUरवहन और शोधन : के दौरान (cid:4)कसी दघु (cid:12)टना के बारे म - सBम ािधकारी (, थानीय ािधकारी) या िविनqद&ट ािधकारी को सिू चत (cid:4)कया जाना चािहए ािधकृत ह, ताBरकता(cid:12) तारीख : पदनाम ,थ ान : [फा.स.ं18-6/2014-एचएसएमडी] िवD वनाथ िस0 हा, संयु> त सिचव16 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(i)] MINISTRY OF ENVIRONMENT, FOREST AND CLIMATE CHANGE NOTIFICATION New Delhi, the 29th March, 2016 G.S.R. 445(E).-Whereas the Municipal Solid Wastes (Management and Handling) Rules, 2000 published vide notification number S.O. 908(E), dated the 25th September, 2000 by the Government of India in the erstwhile Ministry of Environment and Forests, provided a regulatory frame work for management of Municipal Solid Waste generated in the urban area of the country; And whereas, to make these rules more effective and to improve the collection, segregation, recycling, treatment and disposal of solid waste in an environmentally sound manner, the Central Government reviewed the existing rules and it was considered necessary to revise the existing rules with a emphasis on the roles and accountability of waste generators and various stakeholders, give thrust to segregation, recovery, reuse, recycle at source, address in detail the management of construction and demolition waste. And whereas, the draft rules, namely, the Solid Waste Management Rules, 2015 with a separate chapter on construction and demolition waste were published by the Central Government in the Ministry of Environment, Forest and Climate Change vide G.S.R. 451 (E), dated the 3rd June, 2015 inviting objections or suggestions from the public within sixty days from the date of publication of the said notification; And Whereas, the objections or suggestions received within the stipulated period were duly considered by the Central Government; Now, therefore, in exercise of the powers conferred by sections 6, 25 of the Environment (Protection) Act, 1986 (29 of 1986), and in supersession of the Municipal Solid Wastes (Management and Handling) Rules, 2000, except as respect things done or omitted to be done before such supersession, the Central Government hereby notifies the following rules for Management of Construction and Demolition Waste – 1. Short title and commencement.-(1) These rules shall be called the Construction and Demolition Waste Management Rules, 2016. (2) They shall come into force on the date of their publication in the Official Gazette. 2. Application.-The rules shall apply to every waste resulting from construction, re-modeling, repair and demolition of any civil structure of individual or organisation or authority who generates construction and demolition waste such as building materials, debris, rubble. 3. Definitions –(1) In these rules, unless the context otherwise requires,- (a) “ ACT’ means the Environment ( Protection) Act, 1986 (29 of 1986); (b) "construction" means the process of erecting of building or built facility or other structure, or building of infrastructure including alteration in these entities,; (c) "construction and demolition waste" means the waste comprising of building materials, debris and rubble resulting from construction, re-modeling, repair and demolition of any civil structure; (d) “de-construction” means a planned selective demolition in which salvage, re-use and recycling of the demolished structure is maximized; (e) “demolition” means breaking down or tearing down buildings and other structures either manually or using mechanical force (by various equipment) or by implosion using explosives. (f) “form” means a Form annexed to these rules; (g) “local authority” means an urban local authority with different nomenclature such as municipal corporation, municipality, nagarpalika, nagarnigam, nagarpanchayat, municipal council including notified area committee and not limited to or any other local authority constituted under the relevant statutes such as gram panchayat, where the management of construction and demolition waste is entrusted to such agency;¹Hkkx IIµ[k.M 3(i)º Hkkjr dk jkti=k % vlk/kj.k 17 (h) “ schedule” means a schedule annexed to these rules; (i) “service provider’ means authorities who provide services like water, sewerage, electricity, telephone, roads, drainage etc. often generate construction and demolition waste during their activities, which includes excavation, demolition and civil work; (j) “waste generator” means any person or association of persons or institution, residential and commercial establishments including Indian Railways, Airport, Port and Harbour and Defence establishments who undertakes construction of or demolition of any civil structure which generate construction and demolition waste. (2) Words and expressions used but not defined herein shall have the same meaning defined in the ACT. (4) Duties of the waste generator - (1) Every waste generator shall prima-facie be responsible for collection, segregation of concrete, soil and others and storage of construction and demolition waste generated, as directed or notified by the concerned local authority in consonance with these rules. (2) The generator shall ensure that other waste (such as solid waste) does not get mixed with this waste and is stored and disposed separately. (3) Waste generators who generate more than 20 tons or more in one day or 300 tons per project in a month shall segregate the waste into four streams such as concrete, soil, steel, wood and plastics, bricks and mortar and shall submit waste management plan and get appropriate approvals from the local authority before starting construction or demolition or remodeling work and keep the concerned authorities informed regarding the relevant activities from the planning stage to the implementation stage and this should be on project to project basis. (4) Every waste generator shall keep the construction and demolition waste within the premise or get the waste deposited at collection centre so made by the local body or handover it to the authorised processing facilities of construction and demolition waste; and ensure that there is no littering or deposition of construction and demolition waste so as to prevent obstruction to the traffic or the public or drains. (5) Every waste generator shall pay relevant charges for collection, transportation, processing and disposal as notified by the concerned authorities; Waste generators who generate more than 20 tons or more in one day or 300 tons per project in a month shall have to pay for the processing and disposal of construction and demolition waste generated by them, apart from the payment for storage, collection and transportation. The rate shall be fixed by the concerned local authority or any other authority designated by the State Government. (5) Duties of service provider and their contractors - (1) The service providers shall prepare within six months from the date of notification of these rules, a comprehensive waste management plan covering segregation, storage, collection, reuse, recycling, transportation and disposal of construction and demolition waste generated within their jurisdiction. (2) The service providers shall remove all construction and demolition waste and clean the area every day, if possible, or depending upon the duration of the work, the quantity and type of waste generated, appropriate storage and collection, a reasonable timeframe shall be worked out in consultation with the concerned local authority. (3) In case of the service providers have no logistics support to carry out the work specified in sub- rules (1) and (2) , they shall tie up with the authorised agencies for removal of construction and demolition waste and pay the relevant charges as notified by the local authority. (6) Duties of local authority-The local authority shall,- (1) issue detailed directions with regard to proper management of construction and demolition waste within its jurisdiction in accordance with the provisions of these rules and the local authority shall seek detailed plan or undertaking as applicable, from generator of construction and demolition waste;18 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(i)] (2) chalk out stages, methodology and equipment, material involved in the overall activity and final clean up after completion of the construction and demolition ; (3c) seek assistance from concerned authorities for safe disposal of construction and demolition waste contaminated with industrial hazardous or toxic material or nuclear waste if any; (4) shall make arrangements and place appropriate containers for collection of waste and shall remove at regular intervals or when they are filled, either through own resources or by appointing private operators; (5) shall get the collected waste transported to appropriate sites for processing and disposal either through own resources or by appointing private operators; (6) shall give appropriate incentives to generator for salvaging, processing and or recycling preferably in-situ; (7) shall examine and sanction the waste management plan of the generators within a period of one month or from the date of approval of building plan, whichever is earlier from the date of its submission; (8) shall keep track of the generation of construction and demolition waste within its jurisdiction and establish a data base and update once in a year; (9) shall device appropriate measures in consultation with expert institutions for management of construction and demolition waste generated including processing facility and for using the recycled products in the best possible manner; (10) shall create a sustained system of information, education and communication for construction and demolition waste through collaboration with expert institutions and civil societies and also disseminate through their own website; (11) shall make provision for giving incentives for use of material made out of construction and demolition waste in the construction activity including in non-structural concrete, paving blocks, lower layers of road pavements, colony and rural roads. (7) Criteria for storage, processing or recycling facilities for construction and demolition waste and application of construction and demolition waste and its products- (1) The site for storage and processing or recycling facilities for construction and demolition waste shall be selected as per the criteria given in Schedule I; (2) The operator of the facility as specified in sub- rules (1) shall apply in Form I for authorization from State Pollution Control Board or Pollution Control Committee. (3) The operator of the facility shall submit the annual report to the State Pollution Control Board in Form II. (4) Application of materials made from construction and demolition waste in operation of sanitary landfill shall be as per the criteria given in Schedule II. (8) Duties of State Pollution Control Board or Pollution Control Committee- (1) State Pollution Control Board or Pollution Control Committee shall monitor the implementation of these rules by the concerned local bodies and the competent authorities and the annual report shall be sent to the Central Pollution Control Board and the State Government or Union Territory or any other State level nodal agency identified by the State Government or Union Territory administration for generating State level comprehensive data. Such reports shall also contain the comments and suggestions of the State Pollution Control Board or Pollution Control Committee with respect to any comments or changes required; (2) State Pollution Control Board or Pollution Control Committee shall grant authorization to construction and demolition waste processing facility in Form-III as specified under these rules after examining the application received in Form I; (3) State Pollution Control Board or Pollution Control Committee shall prepare annual report in Form IV with special emphasis on the implementation status of compliance of these rules and forward report to Central Pollution Control Board before the 31stJuly for each financial year.¹Hkkx IIµ[k.M 3(i)º Hkkjr dk jkti=k % vlk/kj.k 19 (9) Duties of State Government or Union Territory Administration- (1) The Secretary in-charge of development in the State Government or Union territory administration shall prepare their policy document with respect to management of construction and demolition of waste in accordance with the provisions of these rules within one year from date of final notification of these rules. (2) The concerned department in the State Government dealing with land shall be responsible for providing suitable sites for setting up of the storage, processing and recycling facilities for construction and demolition waste. (3) The Town and Country planning Department shall incorporate the site in the approved land use plan so that there is no disturbance to the processing facility on a long term basis. (4) Procurement of materials made from construction and demolition waste shall be made mandatory to a certain percentage (say 10-20%) in municipal and Government contracts subject to strict quality control. (10) Duties of the Central Pollution Control Board - (1) The Central Pollution Control Board shall,- (a) prepare operational guidelines related to environmental management of construction and demolition waste management; (b) analyze and collate the data received from the State Pollution Control Boards or Pollution Control Committee to review these rules from time to time; (c) coordinate with all the State Pollution Control Board and Pollution Control Committees for any matter related to development of environmental standards; (d) forward annual compliance report to Central Government before the 30thAugust for each financial year based on reports given by State Pollution Control Boards of Pollution Control Committees. (11) Duties of Bureau of Indian Standards and Indian Roads Congress -The Bureau of Indian Standards and Indian Roads Congress shall be responsible for preparation of code of practices and standards for use of recycled materials and products of construction and demolition waste in respect of construction activities and the role of Indian Road Congress shall be specific to the standards and practices pertaining to construction of roads. (12) Duties of the Central Government - (1) The Ministry of Urban Development, and the Ministry of Rural Development, Ministry of Panchayat Raj, shall be responsible for facilitating local bodies in compliance of these rules; (2) The Ministry of Environment, Forest and Climate Change shall be responsible for reviewing implementation of these rules as and when required. 13. Timeframe for implementation of the provisions of these rules -The timeline for implementation of these rules shall be as specified in Schedule III: 14. Accident reporting by the construction and demolition waste processing facilities-In case of any accident during construction and demolition waste processing or treatment or disposal facility, the officer in charge of the facility in the local authority or the operator of the facility shall report of the accident in Form- V to the local authority. Local body shall review and issue instruction if any, to the in- charge of the facility. Schedule I Criteria for Site Selection for Storage and Processing or Recycling Facilities for construction and demolition Waste [See Rule 7(1)] (1) The concerned department in the State Government dealing with land shall be responsible for providing suitable sites for setting up of the storage, processing and recycling facilities for construction and demolition and hand over the sites to the concerned local authority for development, operation and maintenance, which shall ultimately be given to the operators by Competent Authority and wherever above Authority is not available, shall lie with the concerned local authority.20 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(i)] (2) The Local authority shall co-ordinate (in consultation with Department of Urban Development of the State or the Union territory) with the concerned organizations for giving necessary approvals and clearances to the operators. (3) Construction and demolition waste shall be utilized in sanitary landfill for solid waste of the city or region as mentioned at Schedule I of thse rule. Residues from construction and demolition waste processing or recycling industries shall be land filled in the sanitary landfill for solid waste. (4) The processing or recycling shall be large enough to last for 20-25 years (project based on-site recycling facilities). (5) The processing or recycling site shall be away from habitation clusters, forest areas, water bodies, monuments, National Parks, Wetlands and places of important cultural, historical or religious interest. (6) A buffer zone of no development shall be maintained around solid waste processing and disposal facility, exceeding five Tonnes per day of installed capacity. This will be maintained within the total area of the solid waste processing and disposal facility. The buffer zone shall be prescribed on case to case basis by the local authority in consultation with concerned State Pollution Control Board. (7) Processing or recycling site shall be fenced or hedged and provided with proper gate to monitor incoming vehicles or other modes of transportation. (8) The approach and or internal roads shall be concreted or paved so as to avoid generation of dust particles due to vehicular movement and shall be so designed to ensure free movement of vehicles and other machinery. (9) Provisions of weigh bridge to measure quantity of waste brought at landfill site, fire protection equipment and other facilities as may be required shall be provided. (10) Utilities such as drinking water and sanitary facilities (preferably washing/bathing facilities for workers) and lighting arrangements for easy landfill operations during night hours shall be provided and Safety provisions including health inspections of workers at landfill sites shall be carried out made. (11) In order to prevent pollution from processing or recycling operations, the following provisions shall be made, namely: (a) Provision of storm water drains to prevent stagnation of surface water; (b) Provision of paved or concreted surface in selected areas in the processing or recycling facility for minimizing dust and damage to the site. (c) Prevention of noise pollution from processing and recycling plant: (d) provision for treatment of effluent if any, to meet the discharge norms as per Environment (Protection) Rules, 1986. (12) Work Zone air quality at the Processing or Recycling site and ambient air quality at the vicinity shall be monitored. (13) The measurement of ambient noise shall be done at the interface of the facility with the surrounding area, i.e., at plant boundary. (14) The following projects shall be exempted from the norms of pollution from dust and noise as mentioned above: For construction work, where at least 80 percent construction and demolition waste is recycled or reused in-situ and sufficient buffer area is available to protect the surrounding habitation from any adverse impact. (15) A vegetative boundary shall be made around Processing or Recycling plant or site to strengthen the buffer zone.¹Hkkx IIµ[k.M 3(i)º Hkkjr dk jkti=k % vlk/kj.k 21 Schedule II Application of materials made from construction and demolition waste and its products. [See Rule 7(3)] Sl. No. Parameters Compliance Criteria Drainage layer in leachate collection Only crushed and graded hard material (stone, system at bottom of Sanitary Landfill concrete etc.) shall be used having coarse sand size Gas Collection Layer above the waste at graded material (2mm – 4.75mm standard sieve size). 1 top of Sanitary Landfill and Since the coarse sand particles will be angular in Drainage Layer in top Cover System shape (and not rounded as for riverbed sand), above Gas Collection Layer of Sanitary protection layers of non-woven geo-textiles may be Landfill provided, wherever required, to prevent puncturing of For capping of sanitary landfill or adjacent layers or components. dumpsite, drainage layer at the top 2 Daily cover Fines from construction and demolition processed waste having size up to 2 mm shall be used for daily cover over the fresh waste. Use of construction and demolition fines as landfill cover shall be mandatory where such material is available. Fresh soil (sweet earth) shall not be used for such places and borrow-pits shall not be allowed. Exception – soil excavated during construction of the same landfill. During hot windy days in summer months, some fugitive dust problems may arise. These can be minimised by mixing with local soil wherever available for limited period. 3 Civil construction in a sanitary landfill Non-structural applications, such as kerb stones, drain covers, paving blocks in pedestrian areas.22 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(i)] SCHEDULE III Timeframe for Planning and Implementation [See Rule 13] Cities with Cities with Cities with Sl. No. Compliance Criteria population of 01 population of 0.5-01 population of less million and above million than 0.5 million 1 Formulation of policy by State 12 months 12 months 12 months Government 2 Identification of sites for 18 months 18 months 18 months collection and processing facility 3 Commissioning and 18 months 24 months 36 months implementation of the facility 4 Monitoring by SPCBs 3 times a year – once 2 times a year – once 2 times a year – once in 4 months in 6 months in 6 months *The time Schedule is effective from the date of notification of these rules. FORM – I See [Rule 7 (2)] Application for obtaining authorisation To, The Member Secretary ______________________Name of the local authority or Name of the agency : appointed by the municipal authority Correspondence address Telephone No. Fax No. Nodal Officer and designation (Officer authorized by the competent authority or agency responsible for operation of processing or recycling or disposal facility) Authorisation applied for (Please tick mark) Setting up of processing or recycling facility of construction and demolition waste Detailed proposal of construction and demolition waste processing or recycling facility to include the following Location of site approved and allotted by the Competent Authority. Average quantity (in tons per day) and composition of construction and demolition waste to be handled at the specific site.¹Hkkx IIµ[k.M 3(i)º Hkkjr dk jkti=k % vlk/kj.k 23 Details of construction and demolition waste processing or recycling technology to be used. Quantity of construction and demolition waste to be processed per day. Site clearance from Prescribed Authority. Salient points of agreement between competent authority or local authority and operating agency (attach relevant document). Plan for utilization of recycled product. Expected amount of process rejects and plan for its disposal (e.g., sanitary landfill for solid waste). Measures to be taken for prevention and control of environmental pollution. Investment on project and expected returns. Measures to be taken for safety of workers working in the processing or recycling plant. Any preventive plan for accident during the collection, transportation and treatment including processing and recycling should be informed to the Competent Authority (Local Authority) or Prescribed Authority Date: Signature of Nodal Officer Form-II See [Rule (7) (3)] Format for Issue of Authorisation to the Operator File No.: ____________ Date : ______________ To, ____________________ ____________________ ____________________ Ref : Your application number _________________________Dt. ………… The _________________ State Pollution Control Board or Pollution Control Committee after examining the proposal hereby authorizes ________________ having their administrative office at _______________________________________ to set up and operate construction and demolition waste processing facility at___________________ on the terms and conditions (including the standards to comply) attached to this authorisation letter. 1. The validity of this authorisation is till ________________. After expiry of the validity period, renewal of authorisation is to be sought.24 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(i)] 2. The ____________________ State Pollution Control Board or Pollution Control Committee may, at any time, for justifiable reason, revoke any of the conditions applicable under the authorisation and shall communicate the same in writing. 3. Any violation of the provision of the construction and demolition Waste Management Rules, 2016 shall attract the penal provision of the Environment (Protection) Act, 1986 (29 of 1986). Date: (Member Secretary) Place: State Pollution Control Board/ Pollution Control Committee Form –III See [Rule 8(2) ] Format of Annual Report to be submitted by Local Authority to the State Pollution Control Board (i) Name of the City or Town……………………. (ii) Population………………… (iii) Name and address of local authority or competent authority Telephone No. : ……………………………… Fax : …………………………………………. Email ID: ……………………………………. Website: …………………………………….. (iv) Name of In-charge or Nodal Officer dealing with construction and demolition wastes management with designation ……………………………………………… 1. Quantity and composition of construction and demolition waste including any deconstruction waste (a) Total quantity of construction and demolition waste generated during the whole year in metric ton Any figures for lean period and peak period generation per day ………………….. Average generation of construction and demolition waste (TPD) Total quantity of construction and demolition waste collected per day Any Processing / Recycling Facility set up in the city …………………………… Status of the facility (b) Total quantity of construction and demolition waste processed / recycled (in metric ton) Non-structural concrete aggregate : Manufactured sand : Ready-mix concrete (RMC) : Paving blocks : GSB : Others, if any, please specify :¹Hkkx IIµ[k.M 3(i)º Hkkjr dk jkti=k % vlk/kj.k 25 (c) Total quantity of Construction & Demolition waste disposed by land filling without processing (last option) or filling low lying areas No of landfill sites used : Area used : Whether weigh-bridge : Yes No facility used for quantity estimation? (d) Whether construction and demolition waste used in sanitary landfill (for solid waste) as per Schedule III : Yes No 2. Storage facilities (a) Area orlocation or plot or societies covered for collection of Construction and Demolition waste (b) No. of large Projects (including roadways project) covered (c) Whether Area or location or plot or societies collection is Practiced (if yes, whether done by Competent Authority or Local Authority or through Private Agency or Non-Governmental Organization) : (d) Storage Bins : -------------------------------------------------------- Specifications Existing Proposed (Shape & Size) Number for future --------------------------------------------------------- (i) Containers or receptacle (Capacity) : (ii) Others, please specify : (e) Whether all storage bins/collection spots are attended for daily lifting : Yes No (e) Whether lifting of Construction & Demolition Waste from Storage bins is manual or mechanical (please tick mark) please specify mode : Manual Mechanical Others, and equipment used (specify equipment) 3. Transportation ------------------------------------------------- Existing Actually Required/Proposed number ------------------------------------------------- Truck : Truck-Hydraulic : Tractor-Trailer : Dumper-placers : Tricycle : Refuse-collector : Others (Please specify) : 4. Whether any proposal has been made to improve Construction and Demolition waste management practices26 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(i)] 5. Have any efforts been made to involve PPP for processing of Construction & Demolition waste : If yes, what is (are) the technologies being used, such as: -------------------------------------------------------------------------------------------------- Processing / recycling Steps taken Technology (Quantity to be processed) ------------------------------------------------------------------------------------------------- Dry Process : Wet Process : Others, if any, Please specify : 6. What provisions are available to check unauthorized operations of: Encroachment on river bank or wet bodies : Unauthorized filling of low line areas : Mixing with solid waste : Encroachment in Parks, Footpaths etc. : 7. How many slums are provided with construction and demolition waste receptacles facilities: 8. Are municipal magistrates appointed for taking penal action for non-compliance with these rules: Yes No [ If yes, how many cases registered & settled during last three years (give year wise details)] Dated: Signature of Municipal Commissioner Form –IV See [Rule (8)(3)] Format of Annual Report to be submitted by the State Pollution Control Board / Committees to the Central Pollution Control Board To, The Chairman, Central Pollution Control Board, Parivesh Bhawan, East Arjun Nagar, Delhi-110032 1. Name of the State/Union territory : 2. Name & address of the State Pollution Control Board/Pollution Control Committee : 3. Number of municipal authorities responsible for management of municipal solid wastes in the State/Union territory under these rules :¹Hkkx IIµ[k.M 3(i)º Hkkjr dk jkti=k % vlk/kj.k 27 4. A Summary Statement on progress made by municipal authorities in respect of implementation of Schedule III] : Please attach as Annexure-I 5. A Summary Statement on progress made by municipal authorities in respect of implementation of Schedule IV : Please attach as Annexure-II Date: Chairman or the Member Secretary State Pollution Control Board/ Place: Pollution Control Committee Form –V See [ Rule14] Accident Reporting 1. Date and time of accident : 2. Sequence of events leading to accident : 3. The type of construction and demolition waste involved in accident : 4. Assessment of the effects of the accidents a. on traffic, drainage system and the environment : 5. Emergency measures taken : 6. Steps taken to alleviate the effects a. of accidents : 7. Steps taken to prevent the recurrence a. of such an accident : 8. Regular monthly health checkup of workers at a. Processing / recycling site shall be made 9. Any accident during the collection, a. transportation and treatment including b. processing and recycling should be informed c. to the Competent Authority (Local Authority) or d. Prescribed Authority Date : Authorized Signatory Place: Designation [F. No. 18-6/2014-HSMD] BISHWANATH SINHA, Jt. Secy. Uploaded by Dte. of Printing at Government of India Press, Ring Road, Mayapuri, New Delhi-110064 and Published by the Controller of Publications, Delhi-110054.

Continue your research