STATUTORY INSTRUMENTS
2026 No. 422
INFRASTRUCTURE PLANNING
The A66 Northern Trans-Pennine Development
Consent (Amendment) Order 2026
Made - - - - 15th April 2026
Coming into force - - 16th April 2026
An application has been made under paragraph 2 of Schedule 6 to the Planning Act 2008(1) to the
Secretary of State in accordance with the Infrastructure Planning (Changes to, and Revocation of,
Development Consent Orders) Regulations 2011(2) for a non-material change to the A66 Northern
Trans-Pennine Development Consent Order 2024(3).
The Secretary of State, having considered the application and the responses to the publicity and
consultation carried out in accordance with regulations 6 and 7 of the Infrastructure Planning
(Changes to, and Revocation of, Development Consent Orders) Regulations 2011 has decided to
make this Order amending the A66 Northern Trans-Pennine Development Consent Order 2024.
The Secretary of State, in exercise of the powers in paragraph 2 of Schedule 6 to the Planning Act
2008, makes the following Order.
Citation and commencement
1. This Order may be cited as the A66 Northern Trans-Pennine Development Consent
(Amendment) Order 2026 and comes into force on 16th April 2026.
Amendment of the A66 Northern Trans-Pennine Development Consent Order 2024
2. The A66 Northern Trans-Pennine Development Consent Order 2024 is amended as follows.
(1) 2008 c. 29. Paragraph 2 of Schedule 6 was amended by paragraph 4 of Schedule 8 to the Marine and Coastal Access Act 2009
(c. 23), by paragraph 72 of Schedule 13 and paragraph 1 of Schedule 25 to the Localism Act 2011 (c. 20), by section 28 of
the Infrastructure Act 2015 (c. 7) and by section 128 of the Levelling-up and Regeneration Act 2023 (c. 55).
(2) S.I. 2011/2055, as amended by S.I. 2012/635, S.I. 2012/2654, S.I. 2012/2732, S.I. 2013/522, S.I. 2013/755, S.I. 2015/377,
S.I. 2015/760, S.I. 2015/1682, S.I. 2017/314, S.I. 2017/524, S.I. 2018/378, S.I. 2019/734, S.I. 2020/764, S.I. 2020/1534,
S.I. 2021/978, S.I. 2022/634 and S.I. 2023/1071.
(3) S.I. 2024/360, as corrected by S.I. 2025/1084.Document Generated: 2026-04-17
Status: This is the original version (as it was originally made). This
item of legislation is currently only available in its original format.
Certification of new, revised or substituted plans
3.—(1) The undertaker must, as soon as practicable after the making of this Order, submit copies
of any new, revised or substituted plans to the Secretary of State for certification that they are true
copies of the plans referred to in this Order.
(2) A plan so certified by the Secretary of State is admissible in any proceedings as evidence of
the contents of the document of which it is a copy.
Amendment to Schedule 1 (authorised development)
4.—(1) In Part 1 of Schedule 1 (authorised development), after paragraph (d) Work No. 0102-1D,
insert—
“(e) Work No. 0102-1D-A — as shown on sheet 2 of the works plans for scheme 0102
and being the construction of additional carriageway and improvements to sections of
the existing A66, to include—
(i)the improvement of the existing A66 eastbound and westbound dual carriageway
to the east of the new Kemplay Bank Junction; and
(ii)the construction of new private means of access to attenuation pond as shown on
sheet 2 of the rights of way and access plans for scheme 0102;”.
(2) Renumber what was paragraph (e) as paragraph (f).
(3) In Part 2 of Schedule 1, in—
(a) Work No. 03-9B, sub-paragraph (i), for “footpath” substitute “cycle track”;
(b) Work No. 03-9B, sub-paragraph (i), for “Countess Pillar” substitute “former Llama Karma
Kafe”; and
(c) Work No. 03-9B, sub-paragraph (ii), after “improved A66”, insert “(including the site of
the former Llama Karma Kafe)”.
(4) In Part 3 of Schedule 1 in—
(a) Work No. 0405-6C, sub-paragraph (iii), after “lane;” insert “and”;
(b) Work No. 0405-6C, omit sub-paragraph (iv); and
(c) Work No. 0405-9, paragraph (a), for “existing Footpath 336/011” substitute “Green Land
Track”.
Amendment to Schedule 2 (permanent stopping up of highways and private means of access
and provision of new highways and private means of access)
5. In the table in Part 1 of Schedule 2 (permanent stopping up of highways and private means
of access and provision of new highways and private means of access) that relates to Scheme 03
(Penrith to Temple Sowerby), in the section headed Scheme 03 – The rights of ways and access
plans – sheet 1—
(a) in row 4 in column (2) with the entry headed “Footpath”, in column (4), in the entry headed
“Reference D”, for “footpath” substitute “cycle track”;
(b) in row 5 in column (4), in the entry headed “Reference E”, for “720 metres” substitute
“690 metres”;
(c) in row 6 in column (4), in the entry headed “Reference L”, in the two places where
“footpath” occurs substitute “cycle track” and for “865 metres” substitute “740 metres”;
and
(d) in row 7 in column (4), omit the whole entry headed “Reference M”.
2Document Generated: 2026-04-17
Status: This is the original version (as it was originally made). This
item of legislation is currently only available in its original format.
6. In the table in Part 3 of Schedule 2 that relates to Scheme 03 (Penrith to Temple Sowerby) in
the section headed Scheme 03 – The rights of way and access plans – sheet 1—
(a) in row 4 in column (4), in the entry headed “Reference 5”, for “footpath Reference D and
the new cycle track Reference E” substitute “cycle track References B, D and E”; and
(b) in row 7 in column (2) with the entry headed “Reference g”, in column (4) in the entry
headed “Reference 8”, for “71 metres” substitute “10 metres”.
7. In the table in Part 1 of Schedule 2 that relates to Scheme 0405 (Temple Sowerby to Appleby)
in the section headed Scheme 0405 – The rights of way and access plans – sheets 1 and 2—
(a) in row 1 in column (2) with the entry headed “Bridleway 336/007”, in column (4), in the
entry headed “Reference A”, for “(on sheet 1)” substitute “(on sheet 1 and sheet 2)”;
(b) in row 3 in column (2) with the entry headed “Priest Lane”—
(i)in column (3), for “710 metres” substitute “587 metres”; and
(ii)in column (4) in the entry headed “Realigned Priest Lane”, for “885 metres”
substitute “351 metres” and for “720 metres” substitute “610 metres”;
(c) in row 4 in column (2) with the entry headed “Cross Street”, in column (4) in the entry
headed “The Realigned Cross Street”, for “745 metres” substitute “503 metres”;
(d) in row 5 in column (2) with the entry headed “Bridleway 336/018”—
(i)in column (3), after “Bridleway 336/018” insert “from a point 1 metre from its
junction with the existing Cross Street for a distance of 205 metres” and after
“direction” omit from “between” to the end; and
(ii)in column (4) in the entry headed “Reference B”, for “245 metre” substitute “194
metre”, for “210 metres” substitute “153 metres” and for “35 metre” substitute “41
metre”;
(e) in row 6, in column (4) in the entry headed “Reference K”, for “180 metre” substitute “188
metre” and for “Footpath 366/017” substitute “Footpath 336/017”; and
(f) in row 9, in column (4) in the entry headed “Reference D*”, for “385 metre” substitute
“320 metre”.
8. In the table in Part 1 of Schedule 2 that relates to Scheme 0405 (Temple Sowerby to Appleby)
in the section headed Scheme 0405 – The rights and way and access plans - sheets 2 and 3, in row
1 in column (2) with the entry headed “Footpath 336/017”—
(a) in column (3) for “405 metre” substitute “398 metre” and for “sheet 1” substitute “sheet
2”; and
(b) in column (4) in the entry headed “Reference C”—
(i)for “90 metres south-east” substitute “2 metres north”; and
(ii)for “the point where it connects with existing Footpath 366/013” substitute “Point
S then turning northwards from Point S for a length of 162 metres, then branching
in a westerly direction to join Footpath 336/017 and in an easterly direction to join
Footpath 336/013”.
9. In the table in Part 1 of Schedule 2 that relates to Scheme 0405 (Temple Sowerby to Appleby)
in the section headed Scheme 0405 – The rights of way and access plans – sheets 4 and 5—
(a) in row 1 in column (2) with the entry headed “Footpath 317/009 and Footpath 341/017”,
in column (4) in the entry headed “To be substituted by References E and C* (part)”, in
the section of that entry headed “Reference E”—
(i)for “a point 69 metres to the north-east of the existing junction of Footpath 341/017
with Roman Road,” substitute “Point M”; and
3Document Generated: 2026-04-17
Status: This is the original version (as it was originally made). This
item of legislation is currently only available in its original format.
(ii)for “135 metres” substitute “105 metres”;
(b) in row 3 in column (2) with the entry headed “Long Marton (Road)”, in column (3)—
(i)in the first paragraph, for “93 metres” substitute “34 metres” and for “136 metres”
substitute “191 metres”; and
(ii)in the second paragraph, for “870 metres” substitute “915 metres” and for “125
metres” substitute “130 metres”; and
(c) in row 6, in column (4) in the entry headed “Reference H*”, for “1.2 km.” substitute “1.1
km.”.
10. In the table in Part 3 of Schedule 2 that relates to Scheme 0405 (Temple Sowerby to Appleby)
in the section headed Scheme 0405 – The rights of way and access plans – sheets 1 and 2—
(a) in row 4 in column (2) with the entry headed “Reference b”, in column (4) with the entry
headed “Reference 4”—
(i)for “30 metres” substitute “43 metres”;
(ii)for “217 metres” substitute “207 metres”;
(iii)for “southerly” substitute “northerly”; and
(iv)for “67 metres” substitute “70 metres”; and
(b) in row 8 in column (2) with the entry headed “Reference d”, in column (4) in the entry
headed “Reference 8”, for “13 metres” substitute “1 metre”;
(c) in row 10, in column (4) in the entry headed “Reference 10”, for “90 metres” substitute
“50 metres” and for “north-east” substitute “south-east”; and
(d) in row 11 in column (2) with the entry headed “Reference e”, in column (4) in the entry
headed “Reference 11” for “149 metres north-east of the junction of Priest Lane with
Bridleway 336/007 (as shown on sheets 1 and 2” substitute “178 metres north-east of Point
B (as shown on sheet 2”;
(e) in row 12 in column (2) with the entry headed “Reference i”, in column (4) in the entry
headed “Reference 12”, for “198 metres north-east of the junction of Priest Lane with
Bridleway 336/007” substitute “between the proposed Priest Lane Underpass and the
realigned Station Road”;
(f) in rows 13, 14 and 15, in column (4), omit the entire entries headed “Reference 13”,
“Reference 14” and “Reference 15”;
(g) in row 16, in column (4) in the entry headed “Reference 16”, for “pond” substitute “tank”
and for “263 metres” substitute “217 metres”;
(h) in row 17 in column (2), with the entry headed “Reference l”, omit the entire entries in
columns (2), (3) and (4);
(i) in row 18 in column (2) with the entry headed “Reference k”, omit the entire entries in
columns (2), (3) and (4);
(j) in row 19 in column (4), omit the entire entry headed “Reference 19”;
(k) in row 20 in column (2) with the entry headed “Reference p”—
(i)in column (3), for “realigned” substitute “existing” and for “205 metres” substitute
“206 metres”; and
(ii)in column (4) in the entry headed “References 20 and 78”, in the two places where
“reference” occurs substitute “Reference”;
(iii)in rows 21, 22, 23 and 24, in column (4), omit the entire entries headed “Reference
21”, “Reference 22”, “Reference 24” and “Reference 26”.
4Document Generated: 2026-04-17
Status: This is the original version (as it was originally made). This
item of legislation is currently only available in its original format.
11. In the table in Part 3 of Schedule 2 that relates to Scheme 0405 (Temple Sowerby to Appleby)
in the section headed Scheme 0405 – The rights of way and access plans – sheets 2 and 3—
(a) in row 1—
(i)in column (2), for the heading “Reference q; and Reference r”, omit “; and Reference
r”;
(ii)in column (4), for the entry headed “Reference 23” substitute—
“(1) (2) (3) (4)
References 24 and 26
To be substituted by—
Reference 24: a new private
means of access (including
a right of vehicular access)
providing access to the new
footpath (Reference C);
to land lying to the north
of the new A66; and to
maintenance strips on the
north and south sides of
the new A66; and crossing
the new A66 (via a bridge)
to connect the new private
means of access (Reference
26) (as shown on sheet 2
and sheet 3 of the rights of
way and access plans for
scheme 0405); and
Reference 26: a new private
means of access (including
a right of vehicular access)
from the edge of Ashton
Lea field in a generally
north-easterly direction for
a distance of 93 metres and
joining onto another new
private means of access
(Reference 24) at Point S
and with a right of vehicular
access over new footpath
(Reference C) (as shown on
sheet 2 of the rights of way
and access plans for scheme
0405).”
(b) in row 2 in column (2), with the entry headed “Reference s”, for the entries in columns
(3) and (4)” substitute—
5Document Generated: 2026-04-17
Status: This is the original version (as it was originally made). This
item of legislation is currently only available in its original format.
“(1) (2) (3) (4)
A length of Green To be substituted by—
Lane Track from a
point 215 metres to A new private means of
the north of the access (Reference 24) from
junction of Green the edge of Ashton Lea
Lane Track with field in a generally north-
Footpath 336/011 easterly direction for a
in a north-easterly distance of 494 metres
direction for a and joining onto another
distance of 401 new private means of
metres. access (Reference 26) at
Point S, and with a right
of vehicular access over
new footpath (Reference
C) from a point 162 metres
to the west of Point U,
continuing in a generally
easterly direction to Point
T and continuing from
Point T to the junction of
the new footpath with the
existing Footpath 336/013
a total distance of 494
metres (as shown on sheets
2 and 3 of the rights of
way and access plans for
scheme 0405).”
12. In the table in Part 3 of Schedule 2 that relates to Scheme 0405 (Temple Sowerby to Appleby)
in the section headed Scheme 0405 – The rights of way and access plans – sheets 3 and 4—
(a) in row 11 in column (4), in the entry headed “Reference 49”—
(i)for “135 metres” substitute “144 metres”;
(ii)for “45 metres” substitute “292 metres to Point L”;
(iii)for “255 metres towards the new A66” substitute “78 metres”; and
(iv)for “300 metres” substitute “812 metres”; and
(b) in row 12 in column (4) in the entry headed “Reference 50”, for “85 metres” substitute
“135 metres”.
13. In the table in Part 3 of Schedule 2 that relates to Scheme 0405 (Temple Sowerby to Appleby)
in the section headed Scheme 0405 – The rights of way and access plans – sheet 5—
(a) in row 5 in column (4), in the entry headed “Reference 56”, omit the entire entry;
(b) in row 7 in column (4), in the entry headed “Reference 53”, for “as well as to maintenance
strip on the west side of the realigned Long Marton, from a point 135 metres” substitute
“11 metres”;
(c) in row 9 in column (4), in the entry headed “Reference 54”, omit “as well as to maintenance
strip on the east side of the realigned Long Marton from Point V in a generally south-
westerly direction for a distance of 548 metres”;
6Document Generated: 2026-04-17
Status: This is the original version (as it was originally made). This
item of legislation is currently only available in its original format.
(d) in row 10 in column (4), in the entry headed “Reference 58”, omit “as well as to
maintenance strip on the west side of the realigned Long Marton from a point 150 metres
north-east of the junction of the realigned Long Marton (Road) and the existing A66”;
(e) in row 11 in column (4), in the entry headed “Reference 59”—
(i)for “180 metres” substitute “15 metres”; and
(ii)omit “, in a generally north-easterly direction for a distance of 55 metres”.
Amendment to Schedule 7 (classification of roads, etc.)
14. In Part 3 (Scheme 0405 – Temple Sowerby to Appleby) of Schedule 7 (classification of roads,
etc.)—
(a) in the heading to paragraph 38, for “1.2” substitute “1.15”;
(b) in paragraph 38, for “1.2” substitute “1.15”;
(c) in paragraph 40, for “750” substitute “397”;
(d) in paragraph 46, for “860m” substitute “81 metre”; and
(e) in paragraph 46(a), for “an 89” substitute “a 41”.
Amendment to Schedule 8 (traffic regulation measures etc.)
15. In the Speed Limits table in Part 3 of Schedule 8 (traffic regulation measures etc.)—
(a) in the section for “Scheme 0405 – The traffic regulation measures (speed limits) plans –
sheets 1 and 2”, in row 1 in column (2) in the entry headed “New (realigned) Cross Street”,
for “806” substitute “721” and for “128” substitute “213”; and
(b) in the section for “Scheme 0405 – The traffic regulation measures (speed limits) plans –
sheet 5”, in row 1 in column (2) in the entry headed “Realigned Long Marton”, in the two
places where “1.2” occurs substitute “1.15”.
Amendment to Schedule 10 (documents to be certified)
16. For the table in Schedule 10 (documents to be certified) substitute the table shown in the
Schedule.
Signed by the authority of the Secretary of State for Transport
Natasha Kopala
Head of the Transport and Works Act Orders
Unit
15th April 2026 Department for Transport
7Document Generated: 2026-04-17
Status: This is the original version (as it was originally made). This
item of legislation is currently only available in its original format.
SCHEDULE Article 16
DOCUMENTS TO BE CERTIFIED
(1) (2) (3) (4)
Document Description Reference Date
submitted
Book of Book of Reference – Volume One: Scheme 0102: 5.7 (Rev P04) 16/5/2023
reference M6 Junction 40 to Kemplay Bank
Book of Reference – Volume Two: Scheme 03: 5.7 (Rev P03) 16/5/2023
Penrith to Temple Sowerby
Book of Reference – Volume Three: Scheme 5.7 (Rev P03) 16/5/2023
0405: Temple Sowerby to Appleby
Book of Reference – Volume Four: Scheme 06: 5.7 (Rev P06) 16/5/2023
Appleby to Brough
Book of Reference – Volume Five: Scheme 07: 5.7 (Rev P03) 16/5/2023
Bowes Bypass
Book of Reference – Volume Six: Scheme 08: 5.7 (Rev P03) 16/5/2023
Cross Lanes to Rokeby
Book of Reference – Volume Seven: Scheme 09: 5.7 (Rev P03) 16/5/2023
Stephen Bank to Carkin Moor
Book of Reference – Volume Eight: Scheme 11: 5.7 (Rev P03) 16/5/2023
A1(M) Junction 53 Scotch Corner
Classification Classification of Roads Plan Scheme 0102: M6 5.20 21/6/2022
of roads plans Junction 4 to Kemplay Bank
Classification of Roads Plan Scheme 03: Penrith 5.20 (Rev. 2) 21/6/2022
to Temple Sowerby
Classification of Roads Plan Scheme 0405: 5.20 (Rev. 2) 03/12/2025
Temple Sowerby to Appleby
Classification of Roads Plan Scheme 06: Appleby 5.20 (Rev 3) 16/5/2023
to Brough
Classification of Roads Plan Scheme 07: Bowes 5.20 (Rev 2) 9/5/2023
Bypass
Classification of Roads Plan Scheme 08: Cross 5.20 21/6/2022
Lanes to Rokeby
Classification of Roads Plan Scheme 09: Stephen 5.20 21/6/2022
Bank to Carkin Moor
Crown land Crown Land Plans Scheme 06: Appleby to 5.14 (Rev 4) 26/5/2023
plans Brough
Crown Land Plans Scheme 07: Bowes Bypass 5.14 21/6/2022
Design Project Design Principles 5.11 (Rev 5) 16/5/2023
principles
8Document Generated: 2026-04-17
Status: This is the original version (as it was originally made). This
item of legislation is currently only available in its original format.
(1) (2) (3) (4)
Document Description Reference Date
submitted
De-trunking De-Trunking Plans Scheme 0102: M6 Junction 40 5.21 21/6/2022
plans to Kemplay Bank
De-Trunking Plans Scheme 03: Penrith to Temple 5.21 (Rev 2) 9/5/2023
Sowerby
De-Trunking Plans Scheme 0405: Temple 5.21 21/6/2022
Sowerby to Appleby, subject to the following
substitutions—
Sheet 1 for Sheet 1 with drawing number
HE615324-BBA-HAC-004_AL_SCHEM-DR-
CH-301701, rev. P02;
Sheet 2 for Sheet 2 with drawing number
HE615324-BBA-HAC-004_AL_SCHEM-DR-
CH-301702, rev. P02;
Sheet 3 for Sheet 3 with drawing number
HE615324-BBA-HAC-004_AL_SCHEM-DR-
CH-301703, rev. P01; and
Sheet 4 for Sheet 4 with drawing number
HE615324-BBA-HAC-004_AL_SCHEM-DR-
CH-301704, rev. P02
De-Trunking Plans Scheme 06: Appleby to 5.21 (Rev 2) 9/5/2023
Brough
De-Trunking Plans Scheme 07: Bowes Bypass 5.21 (Rev 2) 9/5/2023
De-Trunking Plans Scheme 08: Cross Lanes to 5.21 21/6/2022
Rokeby
De-Trunking Plans Scheme 09: Stephen Bank to 5.21 (Rev 2) 9/5/2023
Carkin Moor
Engineering Engineering Section Drawings: Cross Sections 5.18 (Rev 2) 9/5/2023
section Scheme 0102: M6 Junction 40 to Kemplay Bank
drawings:
Engineering Section Drawings: Cross Sections 5.18 (Rev 2) 9/5/2023
cross sections
Scheme 03: Penrith to Temple Sowerby subject
to the following substitution—
Sheet 1 for Sheet 1 with drawing number
HE615323-JAC-HAC-03A_AL_SCHEM-DR-
CH-201101, rev. P03
Engineering Section Drawings: Cross Sections 5.18 (Rev 2) 9/5/2023
Scheme 0405: Temple Sowerby to Appleby
subject to the following substitutions—
9Document Generated: 2026-04-17
Status: This is the original version (as it was originally made). This
item of legislation is currently only available in its original format.
(1) (2) (3) (4)
Document Description Reference Date
submitted
Sheet 1 for Sheet 1 with drawing number
HE615324-BBA-HAC-004_AL_SCHEM-DR-
CH-301101, rev. P01;
Sheet 3 for Sheet 3 with drawing number
HE615324-BBA-HAC-004_AL_SCHEM-DR-
CH-301103, rev. P01; and
Sheet 5 for Sheet 5 with drawing number
HE615324-BBA-HAC-004_AL_SCHEM-DR-
CH-301105, rev. P02
Engineering Section Drawings: Cross Sections 5.18 (Rev 2) 9/5/2023
Scheme 06: Appleby to Brough
Engineering Section Drawings: Cross Sections 5.18 (Rev 2) 9/5/2023
Scheme 07: Bowes Bypass
Engineering Section Drawings: Cross Sections 5.18 21/6/2022
Scheme 08: Cross Lanes to Rokeby
Engineering Section Drawings: Cross Sections 5.18 (Rev 2) 9/5/2023
Scheme 09: Stephen Bank to Carkin Moor
Engineering Section Drawings: Cross Sections 5.18 21/6/2022
Scheme 11: A1(M) Junction 53 Scotch Corner
Engineering Engineering Section Drawings: Plan and 5.17 (Rev 2) 9/5/2023
section Profiles Scheme 0102: M6 Junction 40 to
drawings: plan Kemplay Bank, subject to the following
and profiles substitution—
Sheet 2 for Sheet 2 with drawing number
HE615322-KIE-HAC-002_AL_SCHEM-DR-
CH-101001, rev. P01
Engineering Section Drawings: Plan and 5.17 (Rev 2) 9/5/2023
Profiles Scheme 03: Penrith to Temple Sowerby,
subject to the following substitution—
Sheet 1 for Sheet 1 with drawing number
HE615323-JAC-HAC-03A_AL_SCHEM-DR-
CH-201001, rev. P01
Engineering Section Drawings: Plan and 5.17 (Rev 2) 9/5/2023
Profiles Scheme 0405: Temple Sowerby
to Appleby, subject to the following
substitutions—
Sheet 1 for Sheet 1 with drawing number
HE615324-BBA-HAC-004_AL_SCHEM-DR-
CH-301001, rev. P02;
10Document Generated: 2026-04-17
Status: This is the original version (as it was originally made). This
item of legislation is currently only available in its original format.
(1) (2) (3) (4)
Document Description Reference Date
submitted
Sheet 2 for Sheet 2 with drawing number
HE615324-BBA-HAC-004_AL_SCHEM-DR-
CH-301002, rev. P02;
Sheet 4 for Sheet 4 with drawing number
HE615324-BBA-HAC-004_AL_SCHEM-DR-
CH-301004, rev. P02;
Sheet 5 for Sheet 5 with drawing number
HE615324-BBA-HAC-004_AL_SCHEM-DR-
CH-301005, rev. P01;
Sheet 8 for Sheet 8 with drawing number
HE615324-BBA-HAC-004_AL_SCHEM-DR-
CH-301008, rev. P02;
Sheet 9 for Sheet 9 with drawing number
HE615324-BBA-HAC-004_AL_SCHEM-DR-
CH-301009, rev. P02;
Sheet 11 for Sheet 11 with drawing number
HE615324-BBA-HAC-004_AL_SCHEM-DR-
CH-301011, rev. P02;
Sheet 12 for Sheet 12 with drawing number
HE615324-BBA-HAC-004_AL_SCHEM-DR-
CH-301012, rev. P02;
Sheet 15 for Sheet 15 with drawing number
HE615324-BBA-HAC-004_AL_SCHEM-DR-
CH-301015, rev. P02;
Sheet 16 for Sheet 16 with drawing number
HE615324-BBA-HAC-004_AL_SCHEM-DR-
CH-301016, rev. P01;
Sheet 17 for Sheet 17 with drawing number
HE615324-BBA-HAC-004_AL_SCHEM-DR-
CH-301017, rev. P02;
Sheet 18 for Sheet 18 with drawing number
HE615324-BBA-HAC-004_AL_SCHEM-DR-
CH-301018, rev. P01;
Sheet 19 for Sheet 19 with drawing number
HE615324-BBA-HAC-004_AL_SCHEM-DR-
CH-301019, rev. P02;
11Document Generated: 2026-04-17
Status: This is the original version (as it was originally made). This
item of legislation is currently only available in its original format.
(1) (2) (3) (4)
Document Description Reference Date
submitted
Sheet 20 for Sheet 20 with drawing number
HE615324-BBA-HAC-004_AL_SCHEM-DR-
CH-301020, rev. P01;
Sheet 22 for Sheet 22 with drawing number
HE615324-BBA-HAC-004_AL_SCHEM-DR-
CH-301022, rev. P01; and
Sheet 23 for Sheet 23 with drawing number
HE615324-BBA-HAC-004_AL_SCHEM-DR-
CH-301023, rev. P01
Engineering Section Drawings: Plan and Profiles 5.17 (Rev 3) 16/5/2023
Scheme 06: Appleby to Brough
Engineering Section Drawings: Plan and Profiles 5.17 (Rev 2) 9/5/2023
Scheme 07: Bowes Bypass
Engineering Section Drawings: Plan and Profiles 5.17 21/6/2022
Scheme 08: Cross Lanes to Rokeby
Engineering Section Drawings: Plan and Profiles 5.17 (Rev 2) 9/5/2023
Scheme 09: Stephen Bank to Carkin Moor
Engineering Section Drawings: Plan and Profiles 5.17 21/6/2022
Scheme 11: A1(M) Junction 53 Scotch Corner
Environmental Environmental Management Plan 2.7 (Rev 5) 16/5/2023
management
Environmental Management Plan Annex A 2.7 21/6/2022
plan
Constraints Plan
Environmental Management Plan Annex B1 2.7 (Rev 4) 16/5/2023
Outline Landscape and Ecology Management
Plan
Environmental Management Plan Annex B2 2.7 (Rev 2) 24/1/2023
Outline Site Waste Management Plan
Environmental Management Plan Annex B3 2.7 (Rev 5) 16/5/2023
Outline Heritage Mitigation Strategy
Environmental Management Plan Annex B4 Air 2.7 (Rev 3) 16/5/2023
Quality and Dust Management Plan
Environmental Management Plan Annex B5 2.7 (Rev 3) 16/5/2023
Noise and Vibration Management Plan
Environmental Management Plan Annex B6 2.7 21/6/2022
Public Rights of Way Management Plan
Environmental Management Plan Annex B7 2.7 (Rev 2) 24/1/2023
Ground and Surface Water Management Plan
12Document Generated: 2026-04-17
Status: This is the original version (as it was originally made). This
item of legislation is currently only available in its original format.
(1) (2) (3) (4)
Document Description Reference Date
submitted
Environmental Management Plan Annex B8 2.7 21/6/2022
Materials Management Plan
Environmental Management Plan Annex B9 Soil 2.7 (Rev 2) 24/1/2023
Management Plan
Environmental Management Plan Annex B10 2.7 21/6/2022
Construction Worker Travel and Accommodation
Plan
Environmental Management Plan Annex B11 2.7 (Rev 2) 24/1/2023
Community Engagement Plan
Environmental Management Plan Annex B12 2.7 21/6/2022
Skills and Employment Strategy
Environmental Management Plan Annex B13 2.7 (Rev 2) 16/5/2023
Construction Traffic Management Plan
Environmental Management Plan Annex B14 2.7 21/6/2022
Site Establishment Plan
Environmental Management Plan Annex B15 2.7 (Rev 2) 24/1/2023
Invasive Non-Native Species (INNS)
Environmental Management Plan Annex C1 2.7 (Rev 2) 24/1/2023
Working in and Near SAC Method Statement
Environmental Management Plan Annex C2 2.7 (Rev 2) 24/1/2023
Working in Watercourses Method Statement
Environmental Management Plan Annex C3 2.7 (Rev 4) 16/5/2023
Scheduled Monuments Method Statement
Environmental Management Plan Annex C4 2.7 21/6/2022
Piling Method Statement
Environmental Management Plan Annex D 2.7 (Rev 2) 24/1/2023
Emergency Procedures
Environmental Environmental Statement Non-Technical 3.1 21/6/2022
statement Summary
Environmental Statement Volume 1 (Main 3.2 21/6/2022
Report) - Chapters 1 to 15
Environmental Statement Volume 1 (Main 3.2 (Rev 2) 6/9/2022
Report) - Chapter 16
Environmental Statement Volume 2 (Figures) – 3.3 21/6/2022
Figures 1.1, 2.3, 8.9.1, 10.8, 11.1, 12.2, 12.5 and
12.9
Environmental Statement Volume 2 (Figures) – 3.3 (Rev 2) 14/2/2023
Figure 10.9
13Document Generated: 2026-04-17
Status: This is the original version (as it was originally made). This
item of legislation is currently only available in its original format.
(1) (2) (3) (4)
Document Description Reference Date
submitted
Environmental Statement Volume 2 (Figures) – 3.3 (Rev 2) 9/5/2023
Figures 2.1 to 2.2, 2.4 to 8.8.2, 8.9.2 to 10.7, 12.1,
12.3 to 12.4, 12.6 to 12.8 and 13.1 to 15.2
Environmental Statement Volume 3 (Appendices) 3.4 21/6/2022
– Appendices 1.1 to 5.3, 6.1 to 8.9, 9.1 to 9.4 and
10.1 to 10.5
Environmental Statement Volume 3 (Appendices) 3.4 (Rev 2) 24/1/2023
– Appendix 9.5 and 13.2
Environmental Statement Volume 3 (Appendices) 3.4 (Rev 2) 14/2/2023
5.4, 8.10 and 10.6
Errata Report 6.1 (Rev 3) 16/5/2023
Environmental Statement Addendum Volume 1 8.3 9/5/2023
(Scoping)
Environmental Statement Addendum Volume 2 8.3 9/5/2023
(Detailed Assessments)
Environmental Statement Addendum Volume 3 8.3 9/5/2023
(Scheme Description)
Land plans Land Plans Scheme 0102: M6 Junction 40 to 5.13 (Rev 3) 9/5/2023
Kemplay Bank
Land Plans Scheme 03: Penrith to Temple 5.13 21/6/2022
Sowerby
Land Plans Scheme 0405: Temple Sowerby to 5.13 (Rev 2) 2/9/2022
Appleby
Land Plans Scheme 06: Appleby to Brough 5.13 (Rev 3) 26/5/2023
Land Plans Scheme 07: Bowes Bypass 5.13 (Rev 2) 16/5/2023
Land Plans Scheme 08: Cross Lanes to Rokeby 5.13 21/6/2022
Land Plans Scheme 09: Stephen Bank to Carkin 5.13 (Rev 2) 16/5/2023
Moor
Land Plans Scheme 11: A1(M) Junction 53 5.13 21/6/2022
Scotch Corner
Outline Habitats Regulation Assessment North Pennine 27/10/2023
blanket bog Moors SAC Outline Blanket Bog Management
compensation and Compensation Plan
and
maintenance
plan
Rights of way Rights of Way and Access Plans Scheme 0102: 5.19 21/6/2022
and access M6 Junction 40 to Kemplay Bank
plans
14Document Generated: 2026-04-17
Status: This is the original version (as it was originally made). This
item of legislation is currently only available in its original format.
(1) (2) (3) (4)
Document Description Reference Date
submitted
Rights of Way and Access Plans Scheme 03: 5.19 (Rev 3) 16/5/2023
Penrith to Temple Sowerby, subject to the
following substitution—
Sheet 1 for Sheet 1 with drawing number
HE615323-JAC-HAC-03A_AL_SCHEM-DR-
CH-201401, rev. P03
Rights of Way and Access Plans Scheme 0405: 5.19 21/6/2022
Temple Sowerby to Appleby, subject to the
following substitutions—
Sheet 1 for Sheet 1 with drawing number
HE615324-BBA-HAC-004_AL_SCHEM-DR-
CH-301401, rev. P02;
Sheet 2 for Sheet 2 with drawing number
HE615324-BBA-HAC-004_AL_SCHEM-DR-
CH-301402, rev. P02;
Sheet 3 for Sheet 3 with drawing number
HE615324-BBA-HAC-004_AL_SCHEM-DR-
CH-301403, rev. P02;
Sheet 4 for Sheet 4 with drawing number
HE615324-BBA-HAC-004_AL_SCHEM-DR-
CH-301404, rev. P01; and
Sheet 5 for Sheet 5 with drawing number
HE615324-BBA-HAC-004_AL_SCHEM-DR-
CH-301405, rev. P02
Rights of Way and Access Plans Scheme 06: 5.19 (Rev 2) 9/5/2023
Appleby to Brough
Rights of Way and Access Plans Scheme 07: 5.19 (Rev 2) 9/5/2023
Bowes Bypass
Rights of Way and Access Plans Scheme 08: 5.19 21/6/2022
Cross Lanes to Rokeby
Rights of Way and Access Plans Scheme 09: 5.19 (Rev 2) 9/5/2023
Stephen Bank to Carkin Moor
Rights of Way and Access Plans Scheme 11: 5.19 21/6/2022
A1(M) Junction 53 Scotch Corner
Special Special Category Land Plans Scheme 0102: M6 5.15 (Rev 2) 9/5/202
category land Junction 40 to Kemplay Bank
plans
Special Category Land Plans Scheme 0405: 5.15 21/6/2022
Temple Sowerby to Appleby
15Document Generated: 2026-04-17
Status: This is the original version (as it was originally made). This
item of legislation is currently only available in its original format.
(1) (2) (3) (4)
Document Description Reference Date
submitted
Special Category Land Plans Scheme 06: 5.15 (Rev 2) 9/5/2023
Appleby to Brough
Special Category Land Plans Scheme 07: Bowes 5.15 21/6/2022
Bypass
Traffic Traffic Regulation Measures (Clearways and 5.22 21/6/2022
regulation Prohibitions) Plans Scheme 0102: M6 Junction
measures 40 to Kemplay Bank
(clearways and
Traffic Regulation Measures (Clearways and 5.22 (Rev 2) 9/5/2023
prohibitions)
Prohibitions) Plans Scheme 03: Penrith to
plans
Temple Sowerby, subject to the following
substitution—
Sheet 1 for Sheet 1 with drawing number
HE615323-JAC-HAC-03A_AL_SCHEM-DR-
CH-201601, rev. P01
Traffic Regulation Measures (Clearways and 5.22 21/6/2022
Prohibitions) Plans Scheme 0405: Temple
Sowerby to Appleby, subject to the following
substitutions—
Sheet 1 for Sheet 1 with drawing number
HE615324-BBA-HAC-004_AL_SCHEM-DR-
CH-301601, rev. P02;
Sheet 2 for Sheet 2 with drawing number
HE615324-BBA-HAC-004_AL_SCHEM-DR-
CH-301602, rev. P02;
Sheet 3 for Sheet 3 with drawing number
HE615324-BBA-HAC-004_AL_SCHEM-DR-
CH-301603, rev. P02;
Sheet 4 for Sheet 4 with drawing number
HE615324-BBA-HAC-004_AL_SCHEM-DR-
CH-301604, rev. P01; and
Sheet 5 for Sheet 5 with drawing number
HE615324-BBA-HAC-004_AL_SCHEM-DR-
CH-301605, rev. P02
Traffic Regulation Measures (Clearways and 5.22 (Rev 2) 9/5/2023
Prohibitions) Plans Scheme 06: Appleby to
Brough
Traffic Regulation Measures (Clearways and 5.22 (Rev 2) 9/5/2023
Prohibitions) Plans Scheme 07: Bowes Bypass
16Document Generated: 2026-04-17
Status: This is the original version (as it was originally made). This
item of legislation is currently only available in its original format.
(1) (2) (3) (4)
Document Description Reference Date
submitted
Traffic Regulation Measures (Clearways and 5.22 21/6/2022
Prohibitions) Plans Scheme 08: Cross Lanes to
Rokeby
Traffic Regulation Measures (Clearways and 5.22 (Rev 2) 9/5/2023
Prohibitions) Plans Scheme 09: Stephen Bank to
Carkin Moor
Traffic Traffic Regulation Measures (Speed Limits) 5.23 (Rev 2) 9/5/2023
regulation Plans Scheme 0102: M6 Junction 40 to Kemplay
measures Bank
(speed limits)
Traffic Regulation Measures (Speed Limits) 5.23 (Rev 2) 9/5/2023
plans
Plans Scheme 03: Penrith to Temple Sowerby,
subject to the following substitution—
Sheet 1 for Sheet 1 with drawing number
HE615323-JAC-HAC-03A_AL_SCHEM-DR-
CH-201501, rev. P01
Traffic Regulation Measures (Speed Limits) 5.23 (Rev 2) 9/5/2023
Plans Scheme 0405: Temple Sowerby
to Appleby, subject to the following
substitutions—
Sheet 1 for Sheet 1 with drawing number
HE615324-BBA-HAC-004_AL_SCHEM-DR-
CH-301501, rev. P02;
Sheet 2 for Sheet 2 with drawing number
HE615324-BBA-HAC-004_AL_SCHEM-DR-
CH-301502, rev. P02;
Sheet 3 for Sheet 3 with drawing number
HE615324-BBA-HAC-004_AL_SCHEM-DR-
CH-301503, rev. P02;
Sheet 4 and Sheet 4 with drawing number
HE615324-BBA-HAC-004_AL_SCHEM-DR-
CH-301504, rev. P01; and
Sheet 5 and Sheet 5 with drawing number
HE615324-BBA-HAC-004_AL_SCHEM-DR-
CH-301505, rev. P02
Traffic Regulation Measures (Speed Limits) 5.23 (Rev 2) 9/5/2023
Plans Scheme 06: Appleby to Brough
Traffic Regulation Measures (Speed Limits) 5.23 (Rev 2) 9/5/2023
Plans Scheme 07: Bowes Bypass
17Document Generated: 2026-04-17
Status: This is the original version (as it was originally made). This
item of legislation is currently only available in its original format.
(1) (2) (3) (4)
Document Description Reference Date
submitted
Traffic Regulation Measures (Speed Limits) 5.23 21/6/2022
Plans Scheme 08: Cross Lanes to Rokeby
Traffic Regulation Measures (Speed Limits) 5.23 (Rev 2) 9/5/2023
Plans Scheme 09: Stephen Bank to Carkin Moor
Tree Tree Preservation Order Trees Location Plan 5.24 21/6/2022
preservation Scheme 0102: M6 Junction 40 to Kemplay Bank
order trees
Tree Preservation Order Trees Location Plan 5.24 (Rev 2) 9/5/2023
location plan
Scheme 06: Appleby to Brough
Tree Preservation Order Trees Location Plan 5.24 (Rev 2) 9/5/2023
Scheme 09: Stephen Bank to Carkin Moor
Works plans Works Plans Scheme 0102: M6 Junction 40 5.16 (Rev 2) 9/5/2023
to Kemplay Bank, subject to the following
substitution—
Sheet 2 for Sheet 2 with drawing number
HE615322-KIE-HAC-002_AL_SCHEM-DR-
CH-101201, rev. P02
Works Plans Scheme 03: Penrith to Temple 5.16 (Rev 2) 9/5/2023
Sowerby, subject to the following substitution—
Sheet 1 for Sheet 1 with drawing number
HE615323-JAC-HAC-03A_AL_SCHEM-DR-
CH-201201, rev. P01
Works Plans Scheme 0405: Temple Sowerby 5.16 (Rev 2) 9/5/2023
to Appleby, subject to the following
substitutions—
Sheet 1 for Sheet 1 with drawing number
HE615324-BBA-HAC-004_AL_SCHEM-DR-
CH-301201, rev. P02;
Sheet 2 for Sheet 2 with drawing number
HE615324-BBA-HAC-004_AL_SCHEM-DR-
CH-301202, rev. P02;
Sheet 3 for Sheet 3 with drawing number
HE615324-BBA-HAC-004_AL_SCHEM-DR-
CH-301203, rev. P02;
Sheet 4 for Sheet 4 with drawing number
HE615324-BBA-HAC-004_AL_SCHEM-DR-
CH-301204, rev. P01; and
18Document Generated: 2026-04-17
Status: This is the original version (as it was originally made). This
item of legislation is currently only available in its original format.
(1) (2) (3) (4)
Document Description Reference Date
submitted
Sheet 5 for Sheet 5 with drawing number
HE615324-BBA-HAC-004_AL_SCHEM-DR-
CH-301205, rev. P02
Works Plans Scheme 06: Appleby to Brough 5.16 (Rev 2) 9/5/2023
Works Plans Scheme 07: Bowes Bypass 5.16 (Rev 2) 9/5.2023
Works Plans Scheme 08: Cross Lanes to Rokeby 5.16 21/6/2022
Works Plans Scheme 09: Stephen Bank to Carkin 5.16 (Rev 2) 9/5/2023
Moor
Works Plans Scheme 11: A1(M) Junction 53 5.16 21/6/2022
Scotch Corner
EXPLANATORY NOTE
(This note is not part of the Order)
This Order amends the A66 Northern Trans-Pennine Development Consent Order 2024 (S.I.
2024/360) (“the 2024 Order”), a development consent order under the Planning Act 2008 (“the Act”).
This Order follows an application under paragraph 2 of Schedule 6 to the Act to make the following
non-material changes to the 2024 Order—
(a) article 4 provides for six amendments to the Work No. descriptions and the insertion of
new Work No. 0102-1D-A in Schedule 1 (authorised development);
(b) articles 5 to 13 provided for amendments to Schedule 2 (permanent stopping up of
highways and private means of access and provision of new highways and private means
of access). Articles 5 and 6 amend the tables in Parts 1 and 3 that relate to Scheme 03
(Penrith to Temple Sowerby) and articles 7 to 13 amend the tables in Parts 1 and 3 that
relate to Scheme 0405 (Temple Sowerby to Appleby) in Schedule 2;
(c) article 14 provides for five amendments to the measurements of highways set out in
Schedule 7 (classification of roads, etc.);
(d) article 15 provides for four amendments to the measurement of highways set out in
Schedule 8 (traffic regulation measures etc.);
(e) article 3 provides for the certification of new, revised or substituted plans required to show
the non-material changes to the 2024 Order; and
(f) article 16 provides for amendments to Schedule 10 (documents to be certified) required
due to the new, revised or substituted plans are set out in the Schedule to this Order. This
Order substitutes the table in Schedule 10 for the table in the Schedule to this Order.
19Document Generated: 2026-04-17
Status: This is the original version (as it was originally made). This
item of legislation is currently only available in its original format.
A copy of the substituted plans mentioned in this Order may be inspected free of charge during
working hours at the offices of National Highways, Three Snowhill, Snow Hill Queensway,
Birmingham, B4 4GA.
20