STATUTORY INSTRUMENTS
2026 No. 736
ROAD TRAFFIC, ENGLAND
The M48 Motorway (Severn Bridge Crossing) (Temporary
Prohibition and Restriction of Traffic) Order 2026
Made - - - - 2nd July 2026
Coming into force - - 6th July 2026
The Secretary of State for Transport, being the traffic authority for the Severn Bridge Crossing on
the M48 motorway and in exercise of the powers conferred by sections 2(1), (2)(a), and (b), 4(1),
14(1)(a), (4), (5) and (7), 17 and 88 of the Road Traffic Regulation Act 1984((1)) (“the Act”), makes
the following Order.
In accordance with section 14(1)(a) of the Act, the Secretary of State is satisfied that traffic on the
lengths of road specified in this Order should be restricted because works are proposed to be executed
on the M48 motorway.
The Secretary of State has also had regard to the existence of alternative routes suitable for the traffic
which will be affected by this Order in accordance with section 14(3) of the Act.
Citation and commencement
1. This Order may be cited as the M48 Motorway (Severn Bridge Crossing) (Temporary
Prohibition and Restriction of Traffic) Order 2026 and comes into force on 6th July 2026.
Interpretation
2. In this Order—
“contraflow” means a part of a carriageway of a road where traffic is authorised to proceed in
the opposite direction to the usual direction of traffic on that part;
“first length of carriageway” means—
(a) the westbound carriageway of the M48 from a point 45 metres west of the centre line of
the circulatory carriageway at M48 Junction 1 to a point 47 metres west of the mechanical
joint at the western end of the M48 Severn Bridge Crossing; and
(1) 1984 c. 27; section 2(1) was amended by the New Roads and Street Works Act 1991 (c. 22), section 168(1) and Schedule 8,
paragraph 18(2). Section 2(2) was amended by the New Roads and Street Works Act 1991 (c. 22), section 168(1) and
Schedule 8, paragraph 18(3). Section 14 was substituted by the Road Traffic (Temporary Restrictions) Act 1991 (c. 26),
section 1(1) and Schedule 1. There are other amendments but none is relevant.Document Generated: 2026-07-06
Status: This is the original version (as it was originally made). This
item of legislation is currently only available in its original format.
(b) the eastbound carriageway of the M48 from a point 47 metres west of the mechanical
joint at the western end of the M48 Severn Bridge Crossing to a point 45 metres west of
the centre line of the circulatory carriageway at M48 Junction 1;
“outside lane” means the right hand or off side lane of a carriageway with 2 or more lanes;
“second length of carriageway” means the eastbound carriageway of the M48 from a point 320
metres west of the tip of the nosing of the eastbound exit slip road at M48 Junction 1 to a point
47 metres west of the mechanical joint at the western end of the M48 Severn Bridge Crossing;
“M48 Severn Bridge Crossing” means the Aust Viaduct, the Severn Bridge, the Beachley
Viaduct and the M48 Wye Bridge;
“the nightly works period” means each period of 10 hours starting at 20:00 hours on each day
during “the works period”;
“the works period” means the period starting at 00:01 hours on Monday 6th July 2026 and
ending when the works have been completed or after 18 months, whichever is sooner;
“tip of the nosing” means the first point where an entry slip road joins the carriageway of a
motorway or the last point where an exit slip road leaves the carriageway of a motorway;
“works” means waterproofing, resurfacing, inspections and associated maintenance activities.
Motorway restrictions
3. Subject to Article 6 and Article 7, no person may, during the works period cause or permit any
vehicle to be driven at a speed exceeding 30 miles per hour on the first length of carriageway;
4. Subject to Article 6 and Article 7, during the works period a contraflow will be in operation on
the second length of carriageway and no person may cause or permit any vehicle to enter or proceed
in the outside lane of the second length of carriageway in any direction other than westbound;
5. Subject to Article 6 and Article 7, no person may, during the nightly works period, cause or
permit any vehicle to enter or proceed in the first length of carriageway.
Use of traffic signs to implement the motorway restrictions
6. Articles 3, 4 and 5, will apply only at such times and to such extent as indicated from time to
time by traffic signs, as prescribed under section 64 of the Act.
Exemptions
7. The provisions of—
(a) Articles 3, 4 and 5 do not apply to a vehicle—
(i)being used for police, ambulance, fire and rescue authority emergency response
purposes; or
(ii)proceeding at the direction of, or with the permission of, a police constable;
(b) Article 3 does not apply to vehicles falling within regulation 3(4) of the Road Traffic
Exemptions (Special Forces) (Variation and Amendment) Regulations 2011(2) where a
vehicle is used in accordance with regulation 3(5) of those Regulations;
(c) Article 5 does not apply to any vehicle—
(i)being used in connection with the works;
(ii)being driven by, or at the direction of, a traffic officer in uniform; or
(2) S.I. 2011/935.
2Document Generated: 2026-07-06
Status: This is the original version (as it was originally made). This
item of legislation is currently only available in its original format.
(iii)being used for maintenance purposes.
Signed by authority of the Secretary of State for Transport
Samantha Collins-Hill
A Senior Civil Servant in the Department for
2nd July 2026 Transport
3Document Generated: 2026-07-06
Status: This is the original version (as it was originally made). This
item of legislation is currently only available in its original format.
EXPLANATORY NOTE
(This note is not part of the Order)
This Order authorises the temporary prohibition and restriction of traffic on specified lengths of the
M48 motorway (Severn Bridge Crossing) from 6th July 2026 and ending when the works have been
completed or after 18 months, whichever is sooner, because works are proposed to be carried out.