Berthing Policy for Dry Bulk Cargo for Major Ports

Issued by Ministry of Ports, Shipping and Waterways · Not Applicable

Research with AI Agent Chat with Document Generate Summary Translate Helpful Share Add to Project Create Task

Executive Summary & Key Takeaways

**Executive Summary** This policy paper outlines standardized guidelines for calculating performance norms for dry bulk commodities at major ports. It mandates the institution of performance-based penalties and incentives. It also provides methods for re-rating berth capacity and levying anchorage charges, aiming to improve port productivity and reduce turnaround times. **Key Points / Main Content** * **Standardized Guidelines for Performance Norms:** * All major ports must compute performance norms for different dry bulk commodities, considering available infrastructure. * Ports are required to adapt the guidelines and institute penalties and incentives tied to performance norms as part of their berthing policy. * The document provides a method for re-rating berth capacity and guidelines for levying anchorage charges. * **Objective of the Policy:** * Provide a standardized framework for calculating performance norms. * Design norms to drive higher productivity and achieve near-design capacity. * Reduce berthing time and overall turnaround time. * Improve utilization of port assets without significant capital investment. * Increase competitiveness by reducing logistics costs. * Re-assess berth capacity based on expected equipment and vessel performance. * Standardize anchorage charges to reduce turnaround time. * **Calculating Performance Norms for Unloading Dry Bulk Cargo:** * Norms should be calculated for unloading different dry bulk cargo. * Compute normative productivity (tonnes unloaded per berth day). * Consider variables like commodity density, grab size, picking factor, cycles per hour, non-working time per shift, % of cargo in full/partial load operations, and vessel profile. * Stepwise illustration of commodity-specific performance norms calculation. * Norms consider % of cargo used in full vs. half-load operations (varies by vessel size) * Ports directed to maximize berth productivity with HMCs. * **Calculating Performance Norms for Loading Dry Bulk Cargo:** * Compute normative mechanized loading (tonnes loaded per berth day). * Consider existing berth infrastructure, actual loading rate (varies by ship size), and non-working time. * Gross productivity = Parcel size/ (# of working hours + # of non working hours). * **Rerating Berth Capacity:** * Use productivity norms to recalculate berth capacity. * Calculate norms for each commodity/infrastructure type. * Methods for calculating berth capacity for different scenarios are provided, including handling multiple types of commodities, equipment, or both. * **Levying Anchorage Charges:** * Levy anchorage charges to reduce pre-berthing delay and improve vessel turnaround. * Create multiple slab rates based on waiting time in anchorage. * Provide a free waiting period (up to 48 hours). * Post-free period, levy normal (10-25% of berth hire) and high (comparable to daily charter rates) anchorage charges. * Anchorage charges should not exceed 50% of berth hire. * Exemptions possible under exceptional circumstances (e.g., port service failures). * **Rolling Out Performance Norms:** * Ports must use the detailed approach to calculate norms. * Encouraged to roll out norms in a phased manner to reach target levels. * Share target norms with end customers and agents at the beginning of the first quarter. * Chairman can relax norms if over 70% of ships cannot meet them. * Notify stevedores and shore handling agents. * Explore scope for sharing of berth facilities to improve performance. * **Linking Incentives and Penalties:** * Performance norms will be used to create a productivity-linked incentive/disincentive structure. * Incentive/disincentive tied to actual berth stay vs. stipulated berth stay. * No penalty/incentive for stays within 5% of stipulated time. * Additional hours exceeding stipulated time will be penalized 3X berth hire; hours saved incentivized 1X berth hire. * Penalties to maintain at least 5% of total cost per metric tonne to customer to ensure adherence to norms. * Traffic Manager responsible for data recording and analysis. **Impact Analysis** **Major Ports** *Impact* Required to adopt and implement standardized guidelines for calculating performance norms, instituting penalties/incentives, and recalculating berth capacities. Subject to performance monitoring and reporting. *Action Required* Calculate and implement performance norms, penalty/incentive structures, re-rate berth capacity, and ensure appropriate data collection and reporting mechanisms are in place. **Port Chairmen / Boards** *Impact* Authority to relax performance norms under certain conditions. Oversight and responsibility for ensuring effective implementation. *Action Required* Review and approve performance norms, provide oversight on implementation, and consider relaxation of norms when justified. **Customers/Vessels/Agents** *Impact* Subject to performance-based penalties and incentives related to berth stay. Need to align with performance norms to optimize logistics costs. *Action Required* Review and understand performance norms. Optimize vessel operations to meet the targets. **Stevedores and Shore Handling Agents** *Impact* Expected to adhere to performance norms in their operations and track adherence in daily performance reports. *Action Required* Adjust stevedoring operations to meet the performance norms and maintain proper records of performance.

Key Entities Referenced

Berthing Policy for Dry Bulk Cargo for Major Ports: The primary focus of the document is to establish guidelines for calculating performance norms and incentivizing efficient operations for dry bulk cargo handling at major ports. Major Ports: The policy is applicable to all major ports, influencing their operational practices related to dry bulk cargo. Anchorage Charges: The document provides guidelines for standardizing anchorage charges across major ports to reduce turnaround time of vessels. Stevedoring & Shore Handling Policy (2016): Referenced policy document for calculating productivity norms for stevedoring & shore handling.
Official Source Record View Original Source →
See Full Document Text
BERTHING POLICY FOR DRY BULK CARGO FOR MAJOR PORTS 11. INTRODUCTION 1.1 The present policy paper lays down standardized guidelines for all major ports to compute performance norms for different dry bulk commodities, taking into account the infrastructure available at ports. It also recommends penalties & incentive structures to be instituted by all major ports based on the performance norms calculated. All major ports are required to adapt these guidelines for their own specific ports and institute penalties & incentives tied to the performance norms as part of the overall berthing policy. In addition, the paper also describes a method for re-rating capacity of berths as well as guidelines for levying anchorage charges to reduce turn-around times. 2. BACKGROUND 2. 1 Dry bulk cargo currently makes up >26% of the cargo handled at the 12 major ports. Furthermore growth in coastal shipping is expected to add ~100-150 MMTPA of additional dry bulk cargo at ports by 2020-25. Recent benchmarking of ports' performance across key dry bulk commodities has identified significant scope for improvement of productivities in-comparison to best-in-class peers. The low productivity has contributed to high turn-around times in addition to resulting in higher berth occupancy levels across major ports. Furthermore, low productivity prevents ports from being able to utilize the full capacity of exiting assets, thereby directly diminishing return on investment for ports. Significant productivity improvements are therefore necessary at major ports not only to ensure additional dry bulk cargo throughput, but also for avoidance of CAPEX in additional capacity creation. 2.2 Performance norms and penalties linked to performance norms are used by most international ports to improve overall productivity of operations. For instance, major international coal loading ports such as Newcastle and Dalrymple Bay specify number of hatch changes and draft surveys, de-ballasting rates as well as overall productivity with provisions for denied berthing and/or penalties. Penalties linked to non-compliance with productivity norms are also levied by ports to create the right incentive/dis-incentive structure and improve performance. Shown below are select examples of international ports that have penalties for ships not meeting productivity related norms. Operational control enforced Penalties for non-compliance Norms imposed to reduce NWT $1000 per hour penal charges for non e lts • Max. 2 passes / hatch compliance with loading a • 2 trim passes not less than 1000MTs / c w pass Repeat offenders can be denied e N • Max. 1 interim draft survey berthing Vessel size –wise avg. prod. norms Norms to control NWT Loading declined upon non- tn io • Hatch pours compliance to norms P • De-ballasting rate y a Non-acceptance of vessels for H Vessel size wise productivity norms future trips 2.3 Currently, however in mCaanrgyo smtoappjoagr ep dourritnsg oitp ehraatiso nb een ob$s7e90r vpeerd h otuhrfaotr sptoeprpfoagrems abenycoend norms a r beyond 2 hrs penalized 2 hrs on vessel account ared not being used optimally to improve productivity. Furthermore, currently, there is no n stau Mndardized, systematicN omrmest fhoro ldoa dfoinrg /aurnrliovaidningg eantf onrocerdms foDre -dbeifrftheinreg unpto cn ofamilurme too dmieteiet pso.r tA lso, in norms cases where norms have been prescribed, it is observed that these norms do not utilize the entire capacity of the best available equipment on berth. A guideline for calculation of performance norms for different commodities, taking into account the infrastructure available, is therefore important for enabling ports to use performance norms as a key lever to drive productivity improvement across ports. 23. OBJECTIVE 3.1 The berthing policy is drafted to regulate performance of vessels at berth with an intention to meet the objectives as stated below:  Provide a standardized framework for calculation of norms, specific to the commodity handled and the infrastructure available on the berth  Design norms with the objective of driving higher productivity and achieving near-design capacity of the available equipments/infrastructure in order to:  Reduce berthing time & overall turn-around time of ships; drive higher cargo throughput using the available infrastructure in the Major Ports  Improve utilization of port assets and create additional capacity without any significant capital investment.  Increase competitiveness of the Major Port by creating value for the trade through reduced logistics cost  Re-assess the capacity of the berths based on the expected performance of the berth equipments and vessels derived from the performance norms  Standardize anchorage charges across major ports to reduce turnaround time 3.2 The policy paper detailed below is intended to describe, amongst other aspects of berthing performance improvement, a standardized method for computation of performance norms for different dry bulk commodities through illustrative examples. The actual norms for each port will need to be calculated at a commodity level (eg: steam coal, coking coal etc.) taking into account the berth infrastructure available at each port. 4. GUIDELINES FOR CALCULATION OF PERFORMANCE NORMS 4.1 Performance norms calculation for unloading of dry bulk cargo 4.1.1 A method for calculation of normative unloading performance for different kinds of dry bulk cargo (coal, fertilizers, iron-ore, minerals, food-grains etc.) is described in detail below and in Annexure-I. All the ports are required to use the same approach for calculation of productivity norms for dry bulk unloading at their respective ports. 4.1.2 The approach, computes the normative productivity of unloading operations of dry bulk cargo (defined as tonnes of cargo unloaded per berth day) at a commodity specific level. The model calculates the normative productivity level for each dry bulk commodity by taking into the following variables:  Density of commodity  Size of grab available (in cbm)  Picking factor for the particular commodity  Number of cycles per hour: This value depends on the size and type of crane (ship/shore/HMC) and stage of operation (full-load vs. partial-load)  Non-working time per shift  % of total cargo that is covered by full-load or partial-load operation  Vessel profile i.e. Size of the vessel, geared vs. gearless 3A step-by-step illustration for calculation of performance norms are presented below with assumptions for crane/ vessel parameters detailed in Annexure 1. 4.1.3 Stepwise illustration of commodity specific performance norms calculation: i. First, tonnes per grab lift is calculated for each commodity based on the density of commodity, grab-size and picking factor. Quantity/lift = Grab size (cbm) *Commodity density (tonnes/m3) *Grab pick % For example, for coking coal (density =0.85) transported through a 100 MT HMC with a grab-size of 37 cbm and picking factor of ~90% the quantity per lift is estimated as: 0.9*37*0.9= 28.3 T per lift The prescribed grab-sizes for different commodities-crane combinations are detailed in Annexure-1. Ports can use the grab sizes available at their ports currently to compute norms. However, it is expected that ports will engage with crane operators to use optimal grab size for commodities. ii. Second, tonnes moved per hour of crane operation is calculated by multiplying # of cycles for crane per hour and the quantity per lift. The cycles per hour of crane operation will vary based on whether the crane is working at full-load or partial load. Quantity per hour = Cycles/hour*Quantity per cycle For example, for coking coal transported through 100 HMC with 37 cbm grab, the quantity per hour for full-load operations i.e 30 cycles per hour will be 28.3T per lift * 30 cycles = 849 T per hour. For half-load operations this would be 566 T per hour- 28.3 T per lift * 20 cycles Prescribed cycles per hour for full-load and partial load operations are detailed in Annexure-1.The amount of time for half-load vs. full-load depends on type of ship as detailed in Annexure I. iii. Tonnes moved per hour of crane operation is next extrapolated to tonnes moved by crane per day by multiplying tonnes per hour calculated above with the number of working hours. It is assumed that typically 0.5 hr per shift will be idle translating to number of working hours of 22.5 per day. Quantity per day = Quantity per hour * # of hours per day For coking coal example, the tonnes per day = 849 T/hour *22.5 = 19,102 tonnes per day. Similarly for half-load operations, this would be 12,735 T per day 4iv. Ship-specific performance norms for each commodity are calculate by taking into account the % of cargo used in full-load vs. half-load operations. This will depend on the size of ships, the nature of infrastructure at port i.e. availability of payloaders etc. and the type of cargo that is being unloaded. For example for Panamax vessels carrying coking coal, 70% of cargo is assumed to be used in full-load operations and balance in partial-load operations. For this, the number of hours used up in both partial-load and full-load operations are calculated as: # of hours (full-load) = % of full-load * Parcel size/Tonnes per day for full-load # of hours (partial-load) = % of partial-load * Parcel size/Tonnes per day for partial-load Productivity = Parcel size/ (# of full-load hrs + # of partial- load hours) Averaging of full load (top cargo) and half load (bottom cargo) is done to incorporate lower productivity at the time of half load. The % of cargo to be used for half-load and full-load operation as per size of vessel is specified below. Figure 1: Full load & Half- load ratio across vessel classes Class of vessel % of cargo for full- % of cargo for load half- load Panamax & above 70% 30% Supramax 60% 40% Handymax 55% 45% As an example for coking coal, for a Panamax vessel size of 70,000 MT, # of hours for full-load operation will be 70%* 70000 MT/19102 MT per day= 61.55 hours. Similarly, for partial load this would be 39.6 hours adding to a total operational time of 101 hours. Therefore, the productivity for a Panamax vessel for 1 HMC operation would be70000/ 101hours * 24 = 16633 T per day per HMC. Different scenarios commodity wise berth-day output per crane in Annexure 1.4. v. Finally, norms are calculated by taking into account the best infrastructure that is available at the berth to determine commodity-wise productivity norms. This is to ensure that ports are able to maximize berth productivity, reduce TAT for customers and improve RoCE for ports assets. Furthermore, ports are directed to ensure that berth productivity is not reduced because of in-efficiency of ships discharging with ship-cranes through mandated use of HMCs wherever available. For berths across several ports, 2 HMCs per ship are routinely used whereas in the case of ship- cranes 4 cranes are used in conjunction. 5For coking coal example, assuming 2 100 MT HMCs are used for ship un- loading, the berth day output would be 2*16633= ~33000 TPD. In case of combination of cranes (say 1 60MT and 1 100 MT HMC), the individual summative productivities will be used. Different scenarios for crane-commodity combinations are detailed in Annexure 1.5. Process followed here has been used in detail to calculate berth-day outputs for different dry bulk commodities for certain commodity/ship/crane combinations as described in Annexure -1. vi. For the calculation of berth-day productivities for different commodities, major ports are required to calculate based on the best available berth infrastructure so as to maximize productivity possible. 4.2 Performance norms calculation for loading of dry bulk cargo 4.2.1 A method for calculation of normative mechanized loading performance for coal is described in detail below. All the ports are directed to adapt the same approach for calculation of productivity norms for dry bulk loading at their respective ports. 4.2.2 The approach, computes the normative productivity of mechanized loading operations of dry bulk cargo (defined as tonnes of cargo loaded per berth day) based on:  Existing berth infrastructure (loading rate possible)  Actual loading rate during working time at berth (depending on ship-size): This is the rate at which coal is loaded into the ship. It has to be lower than rated capacity at berth and varies by ship-class. However, ports should over time make all efforts to ensure that loading rates are matched to existing capacity.  Non-working time for loading (hatch-changes, draught surveys & pre-/post- loading) 4.2.3 The gross productivity is then calculated as Productivity = Parcel size/ (# of working hours + # of non working hours) Where: # of working hours = Parcel size/ Loading rate requested # of non-working hours is defined as the sum of time spent in hatch changes, draught surveys and pre/post commencement delays. Detailed benchmarks for non-working time for coal is described in the Annexure 2. 4.2.4 Prescribed berth-day productivities for different ship-classes for mechanized coal loading are shown below. All major ports are required to use this approach to calculate performance norms for dry bulk loading. 6Figure 2: Ship-wise berth day productivity for mechanized coal loading Suprama Parameter Unit Panamax x Handymax Vessel Capacity MT 70,000 60,000 50,000 Theoretical berth capacity MT/Hr 4,000 4,000 4,000 Loading Rate MT/Hr 3,250 2,750 2,500 Working time expected Hrs 21.53 21.82 20 Non Working time expected Hrs 8.13 7.00 6.50 Total time a t berth Hrs 29.66 28.82 26.50 Target Gross Productivity MT/day 56,635 49,968 45,283 4.2.5 Productivity for mechanized loading of bulk can be improved substantially through dual loading. Dual loading of dry bulk cargo utilizes two loaders at a time on a single vessel thus increasing productivity for the vessel. Second berth can be used to de-ballast subsequent ship. Ports should incentivize vessels with a de- ballasting rate of 1500 MT/ hr or higher to employ dual loading. For dual loading vessels the performance norms are calculated following the same method as describe above. Figure 3: Ship-wise berth day productivity for dual loading Dual loading Parameter Unit capable vessel Vessel Capacity MT 70,000 Theoretical capacity through 1 loader MT/Hr 4,000 # of loaders employed # 2 Loading Rate MT/Hr 5,000 Working time expected Hrs 14 Non Working time expected Hrs 3.5 Total time a t berth Hrs 17.5 Target Gross Productivity MT/day 96,000 5. GUIDELINES FOR RERATING OF BERTH CAPACITY 5.1 All major ports are required to use the productivity norms derived from the abovementioned approach to recalculate or rerate the capacity of available infrastructure at berth, thereby rerating the capacity of the berth itself. Norms will be calculated for each commodity for each type of infrastructure available at berth. These norms will then be used to define the capacity of the infrastructure available at the berth. 75.2 Method of calculating berth capacity  Method for calculating the capacity of different berths under different scenarios are given hereunder- Scenario 1: If there is one type of commodity and equipment Norm for a commodity * no of cranes * (days * 80% occupancy) Scenario 2: If there is one type of commodity and multiple types of equipment The following will be calculated for each type of equipment – (Norm for a commodity * no of cranes * (days * 80% occupancy)* Multiple equipment ratio Where, Multiple equipment ratio is the estimated % of usage for each type of equipment. Sum of capacity for all equipments will equal to the capacity of the berth. Scenario 3: If there are multiple types of commodity and one type of equipment Norm for a commodity * no of cranes * (days * 80% occupancy)* Multiple volume ratio Where Multiple volume ratio is the estimated volume distribution for each commodity. Sum of capacity for all commodities will equal to the capacity of the berth Scenario 4: If there are multiple types of commodity and multiple types of equipment In case of multipurpose berths, capacity calculation will be a combination of all of the above. Norm for a commodity * no of cranes * (days * 80% occupancy)* Multiple equipment ratio * Multiple volume ratio Sum of capacity for all equipments & all commodities will equal to the capacity of the berth. The following table illustrates method of calculation of berth capacities for multiple commodity & multiple equipment berths. Figure 4: Multiple commodities and multiple equipments 100/120 MT Particulars Crane 60/80 MT Crane Ship Crane Cargo Type Coal Fertilizer Salt Coal Fertilizer Salt Coal Fertilizer Salt a. Norm for lowest 11500 9000 11500 7500 5500 7500 3972 2886 4089 incentive range b. No of Cranes 1 1 4 c. Days (365) * 80% 292 292 292 occupancy: d. Multiple equipment ratio 50% 25% 25% e. Multiple volume ratio 50% 30% 20% 50% 30% 20% 50% 30% 20% f. Capacity for crane- 839,50 394,200 335,800 273,750 120,450 109,500 579,912 252,814 238,798 commodity (a *b*c *d *e) 0 g. Total Capacity at berth (MT) (Summation 3,144,723 of f.) 85.3. Multiple commodity ratio should be calculated as the ratio of volumes of commodity handled in the past three years. Following points may also be factored in the ratio in case there is an anticipation of change in ratio due known market conditions like:  Ban on some commodity,  Upcoming new plant/industry,  Gain/loss of large customer,  Increase/decrease in demand/supply of some commodity etc.  Others The ratio should be aligned for each berth may be revised annually basis average of the past 3 year data. 6. GUIDELINES FOR LEVYING ANCHORAGE CHARGES 6.1 Anchorage charges are to be levied across all major ports for the purpose of reducing pre-berthing delay and hence the overall turn-around time for vessels. This will help streamline vessel scheduling for customers and lead to efficient usage of port anchorage 6.2 Ports are to create multiple slab rates for anchorage charges based on the time of waiting of the vessel in the anchorage. The slabs and the respective anchorage charges applicable in those slabs will adhere to the following guidelines i. Ports are to provide a free waiting period for vessels during which no anchorage charges will be levied. The free waiting period should not exceed 48 hours of waiting in the anchorage. ii. Post the free waiting period, a normal anchorage charge ranging from 10% to 25% of the berth hire charges is to be levied on the vessel for a period of 48- 96 hours post expiry of the free period. Berth hire charges as per SoR are to be considered for the same. iii. Post a waiting period of 96-144 hours, ports are to charge a high anchorage charge comparable to the daily charter rates of the vessel. iv. Anchorage charges should not be higher than 50% of the berth hire charges at any point of time. v. Anchorage charges will be higher for foreign vessels mirroring the berth hire charges for foreign vessels in the port 6.3 Port can exempt vessels from paying anchorage charges in exceptional circumstances including but not limited to lapses in port provided services (e.g. crane or equipment failure, unavailability of pilot etc.) causing waiting of vessels. Chairman of the Port Trust or an equivalent authority will require approving of any waivers in anchorage charges 7. GUIDELINES FOR ROLLING OUT PERFORMANCE NORMS 7.1 All major ports will have to use the approach detailed above adapting it based on their existing infrastructure to calculate performance norms for different dry bulk cargo commodities. 7.2 During the first year, ports are encouraged to roll out performance norms in a 9phased manner to reach the target levels achievable for each commodity given infrastructure available at berths. To this end, performance norms for different commodities along with anchorage charges will have to be computed every quarter by all ports in the first year until target norms are reached. Subsequently, the norms can be calculated every year or upon upgradation of infrastructure at berth, whichever is earlier. It is expected that in the case of ideal norms, most of ships will be able to achieve the norms with some ships performing better than norms. As a guideline, if more than 70% of ships are achieving the set-norms then the port should increase the norms. Ports are required to share target norms (1 yr targets) with end customers & agents at the beginning of the first quarter to allow them time to incorporate them into charter parties. 7.3 Performance norms have to be calculated as per the approach detailed above. In the exception that more than 70% of ships cannot meet norms, the Chairman in consultation with Board can relax the performance norms. 7.4 Performance norms calculated above will have to be notified by ports to each of the stevedores & shore handling agents at the respective ports wherever such parties are engaged in loading/unloading operations. The stevedores & shore handling agents will, as part of the daily performance report, track adherence to the performance norms as per the guidelines set in the Stevedoring & Shore Handling Policy (2016). 7.6 Ports will update the customers with performance norms for different commodity- crane combination upon every revision of the norm 7.7 In cases where performance norms are not met, ports are to explore scope for sharing of berth facilities (pipelines, cranes, storage facilities etc.) owned by the port or private operators among multiple users to improve performance or utilization of facilities 8. LINKING INCENTIVES AND PENALTIES WITH NORMS 8.1 The performance norms calculated by each port will be used to create a productivity linked incentive/dis-incentive structure for end-customers. The objective of the performance linked incentive/ dis-incentive structure is to continuously drive productivity improvements across ports and reward the vessels/customers that are exceeding the norms, thus creating value for the port in addition to allowing customers and trade to bring down the cost of logistics. 8.2 The performance norm calculated for any particular commodity-infrastructure combination will be used as the base for the performance linked incentive/dis- incentive scheme. For each arrival ship, the actual berth stay is calculated based on the time between "end of inward pilotage" to sailing time. This berth stay is then compared to the stipulated berth stay for that ship-commodity combination (based on commodity specific productivity norm and parcel size of vessel). i. If a ship stays within 5% (higher or lower) of the stipulated time for that commodity, then no penalty/incentive will be levied/paid. ii. In cases where actual berth stay is more than 5% higher than the stipulated time, number of additional hours spent at berth will be penalized at 3X berth hire. iii. In cases where actual berth stay is more than 5% lower than the stipulated time, number of additional hours saved will be incentivized at 1X berth hire. 10As a guideline, ports should maintain penalty of at least 5% of the total cost per metric tonne to customer to ensure adherence to norms. The process described above is to be used for calculation of the actual penalty/incentive as illustrated below: Figure 5: lustration of penalty calculation Illustrative example for a Supramax vessel carrying steam coal Parcel size (MT) 55000 Productivity norm for steam coal (TPD) 25000 Stipulated berth time (hrs) 53 Scenario I: Actual berth stay (hrs) as measured for ship 60 % variation from stipulated berth stay 13% Berth hire slab to be used 3X berth hire Hours to be charged at 3 X berth hire 7 Scenario II: Actual berth stay (hrs) as measured for ship 45 % variation from stipulated berth stay -15% Berth hire slab to be used 1X berth hire Hours to be refunded at 1 X berth hire 8 For vessels employing dual loading, the performance norms shall be calculated assuming two loaders are simultaneously loading a single vessel as described in Figure 3. The incentives/ penalties will be levied as below. i. If a ship stays within 5% (higher or lower) of the stipulated time for dual loading, then no penalty/incentive will be levied/paid. ii. In cases where actual berth stay is more than 5 % higher than the stipulated time, number of additional hours spent at berth will be penalized at 1X berth hire. iii. In cases where actual berth stay is more than 5% lower than the stipulated time, number of additional hours saved will be incentivized at 2X berth hire. 8.3 The Traffic manager of each major Port Trust will be responsible for setting up data recording and analysis mechanisms to identify adherence to norms and variations from norms. In addition, the Traffic department is responsible for co-coordinating collection of penalties and provision of incentives as per the policy designed at their respective ports. 8.4 In computing actual performance achieved by each ship for the purpose of calculating penalty/incentive, any stoppage of operations on account of port- related or weather- related issues will be discounted. Such exclusions will be limited to:  Break-down/ non-availability of port provided equipment at berth  Weather related stoppages  Foreign material in manual shifting of cargo 11 Shifting of ships between berths on account of port. Port is required to maintain a record of a historical data of the frequency of such cases.  Any delays in sailing post vessel readiness to sail on account of port i.e. pilot/tug unavailability, tidal conditions  Draft surveys within the prescribed norms for ships. As a guideline, maximum 30 mins per party for interim draft survey should be allowed. Any additional time incurred in draft surveys will be considered in berth stay. Ports should also make all attempts to ensure that in case of multi-party consignments, common surveyors are appointed so as to reduce time lost during interim draft surveys. Any stoppages because of other reasons are not to be excluded for calculation of performance norms, unless specifically approved by Board of the Port. 8.5 Performance norms will be revised every quarter during the first year till target norms for commodity are reached. Subsequent revisions will be done yearly or upon upgradation of berth infrastructure. Ports are required to send a yearly update to IPA on status of performance norms & linked penalty/incentive structure in place including # of revisions to performance norms in year, % of ships paying penalties and total amount of penalties levied & collected. 8.6 All major ports are directed to roll-out a performance norms linked penalty/incentive structure as described above. However, in the exceptional case that the Chairman and Board of a major port trust feel that introduction of the penalty/incentive structure will adversely affect ability of the port to retain business, then the Port, can be a given a temporary relaxation from the penalty/incentive structure. Ports are expected to create a clear argument of the rationale for norms relaxation covering the following points:  Illustrating the potential impact of suggested incentive structure vis-à-vis the recommended structure on ₹/MT for end –customer  Demonstrating expected effect on competitiveness of the major port vis-à-vis private competitors for suggested penalty/incentive structure over recommended structure  Highlighting the specific steps to be taken by port to ensure roll-out of incentives/penalties within 6 months 8.7 Port Trusts are responsible for sharing with the Ministry, on a monthly basis, summary of the ships under-performing and over-performing the stipulated norms in addition to total amount of penalties and incentives 9. SCOPE OF BERTHING POLICY 9.1 As described, one of the primary purposes of the berthing policy paper is to improve productivity of dry bulk loading/ un-loading operations at ports. To that effect, performance norms calculated here for different commodities will be used to design a productivity linked penalty & incentive structure for each port. 9.2 In addition, performance norms calculated as per approach detailed in section 4 will also be used for other productivity improvement measures including priority berthing, forced de-berthing, berthing denial to repeat offenders etc. For instance, in the case of loading of dry bulk, priority berthing can be accorded to vessels promising a load rate that is closer to the best-available equipment productivity available at berth. Similarly, in case of unloading operations, vessels not meeting a particular productivity target can be de- berthed or denied permission for future 12visits to ports as has been observed in other private ports in India and outside (refer Annexure 3) 9.3 Furthermore, ports are required to use performance norms calculated as per approach detailed in section 4 for calculating productivity norms for stevedoring & shore handling policy as detailed in Stevedoring & Shore Handling Policy (2016). 9.4 Ports are also asked to use the approach for performance norms detailed above for stipulating performance norms in future concession agreements for PPP/BOT projects. 9.5 Ports are to compute berth capacity for new BoT and PPP (captive) projects as per the performance norms. The capacity would also be considered for calculation of minimum guaranteed cargo for the BOT and PPP projects 13Annexure-1: ASSUMPTIONS FOR DRY BULK UNLOADING PERFORMANCE NORMS A1.1 Prescribed grab-size for different commodity-crane combinations is shown below. Ports may use the actual grab size available if it differs and plan for optimal grab procurement at a later stage in case available grab is lower than prescribed below. Grab -size in cbm Commodity Density 100 MT 60MT-80MT Ship- 16 MT 12 MT HMC HMC Cranes 25 MT ELL ELL ELL Coal 0.85 35 22 12 18 11 9 Fertilizer (DAP+UREA) 0.8 35 22 12 18 12 9 Salt 1.2 28 18 10 14 9 7 Food Grains, Kaolin 0.6 35 22 12 22 14 10 Iron Ore, Mill Scale 2 20 12 8 10 6 5 Other Minerals 1.12 28 18 10 15 10 7 Dolomite 0.7 35 22 12 20 13 10 A1.2 Cycles per hour for full-load and partial load operations for HMC cranes & ship-cranes are provided. For ELL cranes, full load moves per hr. of 25 and partial load of 18 moves per hr. Ports are advised to measure actual performance of their ELL/ship-cranes and take steps to meet prescribed norms here HMC Ship Crane # of cycles per hour Full Load Half Load Full Load Half Load Coal 30.0 20.0 18.0 12.0 Fertilizer (DAP+UREA) 30.0 20.0 18.0 12.0 Salt 30.0 20.0 18.0 12.0 Food Grains, Kaolin 30.0 20.0 18.0 12.0 Iron Ore 30.0 20.0 18.0 12.0 Gypsum, Mill Scale, MOP 30.0 20.0 18.0 12.0 Dolomite 30.0 20.0 18.0 12.0 14A1.3 Non working time for shift is assumed to be 0.5 hours per shift A1.4 Commodity wise berth-day output per crane Tonnes per day per crane 100MT HMC 60/80 MT HMC Ship Crane Coal 15000 9500 3000 Fertilizer (DAP+UREA) 11500 7500 2500 Salt 14000 9000 3000 Food Grains , Kaolin 8500 5500 2000 Iron Ore 17500 10500 4000 Gypsum, Mill Scale, MOP 13000 8500 3000 Dolomite 10500 6500 2000 # of cranes at berth 2.0 4.0 A1.5 Berth-day outputs for different crane-commodity combinations. Ports are directed to set productivity norms at the best available berth infrastructure Crane combinations Berth-day 1 100T 60 MT HMC output (TPD) 2 100 MT 2 60/80T Ship- HMC + + Ship- HMCs HMCs cranes 1 60T HMC cranes Coal 30000 19000 24500 12000 21500 Fertilizer (DAP+UREA) 23000 15000 19000 10000 17500 Salt 28000 18000 23000 12000 21000 Food Grains, Kaolin 17000 11000 14000 8000 13500 Iron Ore 35000 21000 28000 16000 26500 Gypsum, Mill Scale, MOP 26000 17000 21500 12000 20500 Dolomite 21000 13000 17000 8000 14500 A1.6 Pre-commencement and post-commencement non-working time are prescribed to be less than 1.5 hours each. This includes non-working time due to activities like waiting for pilot, draft check, documentation, hatch opening & closing, documentation & clearances, operations like gangway lowering. 15Annexure-2: ASSUMPTIONS FOR DRY BULK LOADING PERFORMANCE NORMS A2.1 Detailed assumptions for different contributors to non-working time at berth during coal loading are detailed below. Major ports can adopt same approach to calculate loading performance norms for different bulk commodities A2.2 For hatch change times, a maximum of 2 hatch changes per hold plus 1 was used to calculate total number of hatch changes allowed. Average time per hatch change was assumed to be 15. NWT due to hatch change Unit Panamax Supramax Handymax No. of hatches # 7 6 5 Normative hatch changes allowed # 15 13 11 Time per hatch change mins 15 15 15 Expected hatch change time hrs 3.75 3.25 2.75 A2.3 A maximum of 2 draught surveys are allowed during loading NWT due to draft check Unit Panamax Supramax Handymax No of interim draft surveys # 2 2 2 Ti me per draught survey mins 30 30 30 Expected draught survey time hrs 1.00 1.00 1.00 A2.5 Maximum of 1 hr is allowed for pre-commencement and post-loading activities NWT before & after loading Unit Panamax Supramax Handymax Target pre-commencement time mins 1 1 1 Target post-commencement time mi ns 1 1 1 A2.6 Maximum of 40 mins was allowed per ship call for stoppages related to stockpile changes 16