## Report on Special Railway Project Notification S.O. 5775(E)
**1. Executive Summary:**
This report analyzes Notification S.O. 5775(E) issued by the Ministry of Railways on December 10, 2022, which designates the "Construction of Energy Corridor 4th line project between Bhilai Nagar Durg Link Cabin 2.80 km situated in Chhattisgarh State" as a Special Railway Project under the Railway Act of 1989. The notification aims to facilitate national infrastructure development for public purposes within the state of Chhattisgarh. This designation allows the project to leverage specific provisions within the Railway Act, likely related to land acquisition, environmental clearances, and dispute resolution, to expedite its completion.
**2. Introduction:**
This report provides an overview of Notification S.O. 5775(E) pertaining to Special Railway Projects, as published in the Gazette of India. The report's purpose is to inform stakeholders about the core objectives, key provisions, and potential implications of this notification based solely on the information presented in the provided text.
**3. Policy Overview:**
* **Core Objective(s):** Based on the provided text, the core objective of this notification is to designate a specific railway project, the "Construction of Energy Corridor 4th line project between Bhilai Nagar Durg Link Cabin 2.80 km situated in Chhattisgarh State," as a "Special Railway Project." This designation is intended to facilitate the provision of national infrastructure for a public purpose within the state of Chhattisgarh.
**4. Background and Rationale:**
* **New Policy:** The notification appears to be a new policy designation applied to a specific project. The policy likely addresses the need to expedite the development of critical railway infrastructure by streamlining regulatory processes. The designation of the project as a "Special Railway Project" suggests that it is considered strategically important for energy transportation.
**5. Key Provisions / Changes:**
* **New Policy:** This notification establishes the following:
* **Project Designation:** The "Construction of Energy Corridor 4th line project between Bhilai Nagar Durg Link Cabin 2.80 km situated in Chhattisgarh State" is officially designated as a "Special Railway Project."
* **Legal Basis:** This designation is made under the authority of clause 37A of section 2 of the Railway Act, 1989.
* **Geographic Scope:** The project is located in the state of Chhattisgarh.
* **Purpose:** The project serves the purpose of "providing national infrastructure for a public purpose."
* **Effective Date:** The designation is effective from the date of publication of the notification in the Official Gazette (December 12, 2022, as indicated in the document header).
**6. Target Audience and Stakeholders:**
Based on the provided text, the directly affected stakeholders and target audience include:
* **S.E.C. Railway:** As the notifying authority, the South East Central Railway is a key stakeholder.
* **Construction Companies:** Construction companies involved in the "Construction of Energy Corridor 4th line project between Bhilai Nagar Durg Link Cabin" are directly affected.
* **Chhattisgarh State Government:** The state government has a stake in the project's development and its impact on the state's infrastructure.
* **Energy Sector:** The notification explicitly mentions an "Energy Corridor," thus companies and entities involved in the energy sector will directly benefit from the project.
* **General Public:** As the intended beneficiaries of the "public purpose" served by the project, the general public in Chhattisgarh and potentially beyond are stakeholders.
**7. Implementation Aspects (Inferred):**
* **Responsible Agency/Bodies:** The Ministry of Railways, specifically through S.E.C. Railway, is the responsible agency. The Chief Administrative Officer Construction, H.P. Tripathi, is directly involved in the notification process.
* **Timelines or Procedures:** The notification takes effect upon publication in the Official Gazette. While specific timelines are not provided in the text, the "Special Railway Project" designation suggests a prioritization and acceleration of the project's approval and implementation processes. Clause 37A of section 2 of the Railway Act, 1989 likely contains procedures relevant to the project's implementation, though the text does not explicitly detail them.
* **Note:** Further investigation of Clause 37A is needed to fully understand these procedures.
**8. Expected Outcomes / Impact of Changes:**
* **New Policy:** The likely intended outcomes based on the notification's stated provisions are:
* **Expedited Project Completion:** Streamlined processes and prioritized attention should lead to faster completion of the "Construction of Energy Corridor 4th line project."
* **Enhanced Energy Transportation Infrastructure:** The project will contribute to improved infrastructure for transporting energy resources.
* **Economic Benefits:** Improved infrastructure may lead to economic growth and development in the region.
**9. Conclusion:**
Notification S.O. 5775(E) designates the "Construction of Energy Corridor 4th line project between Bhilai Nagar Durg Link Cabin 2.80 km situated in Chhattisgarh State" as a Special Railway Project. This designation, enacted under the Railway Act of 1989, aims to expedite the development of critical energy transportation infrastructure in Chhattisgarh. This notification is significant because it signals the government's commitment to prioritizing and accelerating railway infrastructure projects deemed essential for national development.
Key Entities Referenced
Ministry of Railways: The government ministry responsible for railways.
Railway Act, 1989: A law pertaining to railways, specifically clause 37A of section 2.
Central Government: The union government.
Special Railway Project: A railway project designated as 'special' under the Railway Act.
Chhattisgarh State: The state in India where the railway project is located.
Construction of Energy Corridor 4th line project between Bhilai Nagar Durg Link Cabin: The name of the specific railway project.
Bhilai Nagar: A location in Chhattisgarh, India
Durg: A location in Chhattisgarh, India
H. P. Tripathi: Chief Administrative Officer Construction
रजिस्ट्री स.ं डी.एल.- 33004/99 REGD. No. D. L.-33004/99
सी.जी.-सी.जी.-अ.-12122022-241006
xxxGIDHxxx
CG-CG-E-12122022-241006
xxxGIDExxx
असाधारण
EXTRAORDINARY
भाग II—खण् ड 3—उप-खण्ड (ii)
PART II—Section 3—Sub-section (ii)
प्राजधकार स ेप्रकाजित
PUBLISHED BY AUTHORITY
स.ं 5539] नई ददलली, सोमर्ार, ददसम् िर 12, 2022/अग्रहायण 21, 1944
No. 5539] NEW DELHI, MONDAY, DECEMBER 12, 2022/AGRAHAYANA 21, 1944
रेल मत्रं ालय
(दजिण पर्ू वमध्य रेलर्)े
अजधसचू ना
जिलासपुर, 10 ददसम् िर, 2022
का.आ. 5775(अ).—केंद्रीय सरकार, रेलर्े अजधजनयम, 1989, (1989 का 24) की धारा 2 के खण्ड (37 ए) द्वारा
प्रदत्त िजियों का प्रयोग करत े हुए, सार्विजनक उद्देश्य स े राष्ट्रीय अर्संरचना मुहयै ा करान े के जलए छत्तीसगढ़ राज्य म ें
जर्िेष रेल पररयोिना के रूप म ें नीचे दी गई सारणी के कॉलम (2) में उजललजखत जनम्नजलजखत पररयोिना को अजधसूजचत
करती ह ैिो दक सरकारी रािपत्र म ें इस अजधसूचना की प्रकािन की जतजि स े प्रभार्ी होगी।
सारणी
क्रम.सं. पररयोिना का नाम
(1) (2)
1. दजिण पूर् व मध्य रेलर् े के अतं गतव छत्तीसगढ़ राज्य म ें जस्ट्ित जभलाई नगर-दगु व ललंक केजिन (2.80 दक.मी.) के िीच
एनिी कॉररडोर (चिै ी लाईन) पररयोिना का जनमावण।
[फा. स.ं डी.सी. ई/सी/आर/िी.क्य.ू आर.-डी.एल.िी.एस./37ए]
एच. पी. जत्रपाठी, मुख्य प्रिासजनक अजधकारी (जनमावण)
8239 GI/2022 (1)2 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)]
MINISTRY OF RAILWAYS
(S.E.C. Railway)
NOTIFICATION
Bilaspur, the 10th December, 2022
S.O. 5775(E).—In exercise of the powers conferred by clause (37A ) of section 2 of the Railway Act, 1989
(24 of 1989), the Central Government hereby notifies the following project as mentioned in Column (2) of the table
below as Special Railway Project in the state of Chhattisgarh for providing national infrastructure for a public
purpose with effect from the date publication of this notification in the Official Gazette.
TABLE
Sl. No. Name of Project
(1) (2)
1. Construction of Energy Corridor (4th line) project between Bhilai Nagar -Durg Link Cabin (2.80 km)
situated in Chhattisgarh State.
[F. No. DCE/C/R/BQR-DLBS/37A]
H. P. TRIPATHI, Chief Administrative Officer (Construction)
Uploaded by Dte. of Printing at Government of India Press, Ring Road, Mayapuri, New Delhi-110064
and Published by the Controller of Publications, Delhi-110054.