Home India Cabinet Committee on Economic Affairs (CCEA) Cabinet approves Construction of 4-lane Sahebganj-Areraj-Bet...
Date: 2025-09-24 Category: Not Applicable State: Union Government Country: India

Cabinet approves Construction of 4-lane Sahebganj-Areraj-Bettiah section of the NH-139W in Bihar on Hybrid Annuity Mode (HAM) with a total project length of 78.942 km worth Rs.3,822.31 crore

Issued by Cabinet Committee on Economic Affairs (CCEA) · Not Applicable

Research with AI Agent Chat with Document Generate Summary Translate Helpful Share Add to Project Create Task

Executive Summary & Key Takeaways

On September 24, 2025, the Cabinet Committee on Economic Affairs (CCEA), chaired by Prime Minister Shri Narendra Modi, approved the construction of the 4-lane Sahebganj-Areraj-Bettiah section of the NH-139W in Bihar on Hybrid Annuity Mode (HAM). The total project length is 78.942 km with a capital cost of Rs.3,822.31 crore. The project aims to improve connectivity between Patna and Bettiah, connecting the North Bihar Districts of Vaishali, Saran, Siwan, Gopalganj, Muzaffarpur, East Champaran, and West Champaran up to the Indo-Nepal border. It will support long-distance freight traffic, improve access to key infrastructure, and facilitate regional economic development. The project will connect seven PM Gati Shakti economic Nodes, six Social Nodes, eight Logistic Nodes, and nine Major Tourism and Religious Centers. It will improve access to heritage and Buddhist tourist sites including the Kesariya Buddha Stupa (Sahebganj), Someshwarnath Mandir (Areraj), Jain Mandir and Vishwa Shanti Stupa (Vaishali), and Mahavir Temple (Patna). The NH-139W will provide high-speed connectivity to alternate routes and serve as an important link to the NH-31, NH-722, NH-727, NH-27, and NH-227A. The greenfield alignment will support average vehicular speeds of 80 km/h (design speed of 100 km/h), reducing travel time between Sahebganj and Bettiah from 2.5 hours to 1 hour. The project is expected to generate 14.22 lakh man-days of direct employment and 17.69 lakh man-days of indirect employment. Release ID: 2170572

Key Entities Referenced

NH-139W: National Highway 139W, the road section being constructed/improved by the project. Sahebganj-Areraj-Bettiah: The specific section of NH-139W between Sahebganj, Areraj, and Bettiah that will be improved. Bihar: The state where the road construction project is located. Hybrid Annuity Mode (HAM): The financial model used for the construction project. Cabinet Committee on Economic Affairs (CCEA): The government body that approved the project.
Official Source Record View Original Source →
See Full Document Text
Cabinet Committee on Economic Affairs (CCEA) Cabinet approves Construction of 4-lane Sahebganj- Areraj-Bettiah section of the NH-139W in Bihar on Hybrid Annuity Mode (HAM) with a total project length of 78.942 km worth Rs.3,822.31 crore Posted On: 24 SEP 2025 3:07PM by PIB Delhi The Cabinet Committee on Economic Affairs chaired by the Prime Minister Shri Narendra Modi today has approved the Construction of 4-lane Sahebganj-Areraj-Bettiah section of the NH-139W in Bihar on Hybrid Annuity Mode (HAM) with a total project length of 78.942 km and total capital cost of Rs.3,822.31 crore. The proposed four-lane greenfield project is to improve connectivity between the State Capital Patna with Bettiah connecting the North Bihar Districts of Vaishali, Saran, Siwan, Gopalganj, Muzaffarpur, East Champaran and West Champaran up to the areas along the Indo-Nepal border. The project will support the movement of long-distance freight traffic, improve access to key infrastructure and facilitate regional economic development by improving connectivity to agricultural zones, industrial areas, and cross-border trade routes. The project will connect seven PM Gati Shakti economic Nodes, six Social Nodes, eight Logistic Nodes, nine Major Tourism and Religious Centers by improving access to key heritage and Buddhist tourist sites including the Kesariya Buddha Stupa (Sahebganj), Someshwarnath Mandir (Areraj), Jain Mandir and Vishwa Shanti Stupa (Vaishali), and Mahavir Temple (Patna), thereby strengthening the Buddhist circuit and international tourism potential of Bihar. The NH-139W has been planned to provide a high-speed connectivity to alternate routes that are presently congested and geometrically deficient, and pass-through built-up areas and will serve as an important link to the NH-31, NH-722, NH-727, NH-27 and NH-227A. The proposed greenfield alignment will support average vehicular speeds of 80 km/h against the design speed of 100 km/h. This will reduce the overall travel time between Sahebganj and Bettiah, from 2.5 hours to 1 hours, compared to existing alternatives, while offering safe, fast and uninterrupted connectivity for both passenger and freight vehicles. The proposed project with length of 78.94 km will generate close to 14.22 lakh man-days of direct employment and 17.69 lakh man-days of indirect employment. The project will also induce additional employment opportunities due to increase in economic activity in the vicinity of the proposed corridor. Project Alignment Map for Sahebganj-Areraj-Bettiah section of NH-139W*** MJPS/SKS (Release ID: 2170572)

Continue your research