Date: 2026-03-10Category: Press ReleaseState: Union GovernmentCountry: India
Cabinet approves two multitracking projects covering 5 Districts of West Bengal and Jharkhand, increasing the existing network of Indian Railways by about 192 Kms
**Executive Summary**
The Cabinet Committee on Economic Affairs has approved two multitracking projects for Indian Railways, costing approximately Rs 4,474 crore and scheduled for completion by 2030-31. These projects, Sainthia-Pakur 4th line and Santragachi-Kharagpur 4th line, aim to increase railway network capacity by 192 Kms across five districts in West Bengal and Jharkhand, enhancing mobility and operational efficiency.
**Key Points / Main Content**
* **Project Approvals:**
* Two multitracking projects for Indian Railways have been approved.
* The total estimated cost is Rs 4,474 crore.
* Projects are expected to be completed by 2030-31.
* **Specific Projects:**
* Sainthia - Pakur 4th line.
* Santragachi – Kharagpur 4th line.
* **Objectives and Benefits:**
* Increase line capacity, enhancing mobility, operational efficiency, and service reliability.
* Streamline operations and alleviate congestion.
* Align with the Prime Minister's Vision of a New India, promoting regional development and employment opportunities.
* Enhance multi-modal connectivity and logistic efficiency through integrated planning, aligned with the PM-Gati Shakti National Master Plan.
* Provide seamless connectivity for people, goods, and services.
* Increase the existing railway network by approximately 192 Kms across five districts in West Bengal and Jharkhand.
* Improve connectivity to approximately 5,652 villages with a population of about 147 lakhs.
* Enhance rail connectivity to prominent tourist destinations.
* Facilitate the transportation of essential commodities like coal, stone, dolomite, cement, slag, gypsum, iron and steel, foodgrains, POL, and containers.
* Augment capacity, resulting in an additional freight traffic of 31 MTPA.
* Promote environmentally friendly and energy-efficient transportation.
* Contribute to achieving climate goals by reducing oil import by 6 crore litres and lowering CO2 emissions by 28 crore Kg (equivalent to planting 1 crore trees).
**Impact Analysis**
* **Indian Railways**
* **Impact:** Improved operational efficiency, enhanced mobility, increased service reliability, and significant capacity augmentation for freight and passenger movement. Expansion of the railway network and improved connectivity to villages and tourist destinations.
* **Action Required:** Implement the approved multitracking projects, manage the construction and associated works, and operationalize the increased capacity.
* **Residents of West Bengal and Jharkhand (across 5 Districts)**
* **Impact:** Enhanced connectivity, improved access to transportation for people and goods, potential for increased employment and self-employment opportunities due to regional development. Improved access to tourist destinations.
* **Action Required:** Benefit from improved transportation services and infrastructure once the projects are completed.
* **Industries and Businesses (Transportation of Commodities)**
* **Impact:** Enhanced efficiency and capacity for transporting essential commodities, potentially leading to reduced logistics costs and increased economic activity.
* **Action Required:** Utilize the expanded rail network for freight transportation.
* **Environment and Country**
* **Impact:** Contribution to climate goals through reduced oil imports and lower CO2 emissions, promoting sustainable transportation.
* **Action Required:** Realize the environmental benefits derived from the shift towards more efficient rail transport.
Key Entities Referenced
Cabinet Committee on Economic Affairs: Approving body for the multitracking projects.
PM-Gati Shakti National Master Plan: Framework guiding the planning and execution of the multitracking projects.
Ministry of Railways: The government ministry responsible for the projects and the railway network.
Sainthia - Pakur 4th line: One of the two approved multitracking projects.
Santragachi – Kharagpur 4th line: The second approved multitracking project.
Ministry of Railways
Cabinet approves two multitracking projects
covering 5 Districts of West Bengal and
Jharkhand, increasing the existing network of
Indian Railways by about 192 Kms
The total estimated cost of the projects is Rs 4,474 crore and
will be completed up to 2030-31
Posted On: 10 MAR 2026 4:20PM by PIB Delhi
The Cabinet Committee on Economic Affairs, chaired by the Prime Minister Shri Narendra Modi, today
has approved 02 (Two) projects of Ministry of Railways with total cost of Rs. 4,474 crore (approx.). These
projects include:
a. Sainthia – Pakur 4th line
b. Santragachi – Kharagpur 4th line
The increased line capacity will significantly enhance mobility, resulting in improved operational
efficiency and service reliability for Indian Railways. These multi-tracking proposals are poised to
streamline operations and alleviate congestion. The projects are in line with the Prime Minister Shri
Narendra Modiji’s Vision of a New India which will make people of the region “Atmanirbhar” by way of
comprehensive development in the area which will enhance their employment/ self-employment
opportunities.
The projects are planned on PM-Gati Shakti National Master Plan with focus on enhancing multi-modal
connectivity & logistic efficiency through integrated planning and stakeholder consultations. These
projects will provide seamless connectivity for movement of people, goods, and services.
The 02 (Two) projects covering 05 Districts across the states of West Bengal and Jharkhand will increase
the existing network of Indian Railways by about 192 Kms.
The approved multi-tracking project will enhance connectivity to approx. 5,652 villages, which are having
a population of about 147 lakhs.
The proposed capacity enhancement will improve rail connectivity to several prominent tourist
destinations across the country, including Bolpur-Shantiniketan, Nandikeshwari Temple (Shaktipeeth),
Tarapith (Shaktipeeth), Patachitra Gram, Dhadika Forest, Bhimbandh Wildlife Sanctuary, Rameshwar
Kund, etc.
The approved projects are essential routes for transportation of commodities such as coal, stone, dolomite,
cement, slag, gypsum, iron and steel, foodgrains, POL, container, etc. The capacity augmentation works
will result in additional freight traffic of magnitude 31 MTPA (Million Tonnes Per Annum). The Railwaysbeing environment friendly and energy efficient mode of transportation, will help both in achieving
climate goals and minimizing logistics cost of the country, reduce oil import (06 Crore Litres) and lower
CO2 emissions (28 Crore Kg) which is equivalent to plantation of 01 (One) Crore trees.
****
MJPS/ST
(Release ID: 2237564) Visitor Counter : 365
Read this release in: Urdu , Marathi , ही , Gujarati , Malayalam