Home India Cabinet Committee on Economic Affairs (CCEA) Cabinet approves Upgradation of the Khagaria-Purnea Section ...
Date: 2026-06-03 Category: Press Release State: Union Government Country: India

Cabinet approves Upgradation of the Khagaria-Purnea Section of NH-31 and NH-231 to the 4-Lane Standard (143. 529 kms) at a cost of Rs.3936.05 crore in Bihar on BOT (Toll) Mode

Issued by Cabinet Committee on Economic Affairs (CCEA) · Not Applicable

Research with AI Agent Chat with Document Generate Summary Translate Helpful Share Add to Project Create Task

Executive Summary & Key Takeaways

**Executive Summary** The Cabinet Committee on Economic Affairs, chaired by Prime Minister Shri Narendra Modi, approved the 4-laning of the 143.529 km Khagaria-Purnea section of NH-31 and NH-231 in Bihar. Estimated at a cost of Rs. 3,936.05 crore, the project will be executed via the BOT (Toll) mode and includes a 6.729 km Greenfield Bypass for Purnea City. The initiative aims to reduce travel time to approximately two hours while generating over 73 lakh total person-days of employment. **Key Points / Main Content** **Project Scope and Infrastructure** * Upgradation of 143.529 km of the Khagaria-Purnea section to a 4-lane standard. * Development of a new 6.729 km Greenfield Bypass to divert traffic from Purnea City. * Rectification of severe geometric deficiencies and sharp curves to alleviate congestion in built-up areas. **Financial and Operational Details** * Total project cost: Rs. 3,936.05 crore. * Civil construction cost: Rs. 2,467.77 crore. * Land acquisition cost: Rs. 290.16 crore. * Implementation Model: Build-Operate-Transfer (BOT) Toll mode. **Connectivity and Multi-modal Integration** * Seamless connection of Khagaria, Bhagalpur, Katihar, and Purnia districts. * Integration with five PM Gati-Shakti Economic Nodes, including one Textile Cluster, two Mega Food Parks, and two Fishing Seafood Parks. * Connectivity to 11 Logistic Nodes, including Purnea Airport, four major railway stations, four National Highways, and two State Highways. **Socio-Economic Impacts** * Expected increase in average travel speeds and a reduction in travel time. * Improvement in road safety, fuel efficiency, and vehicle operating costs. * Employment generation estimated at 32.59 lakh direct person-days and 40.55 lakh indirect person-days. **Impact Analysis** **Commuters and Local Residents** **Impact** Residents in Khagaria, Bhagalpur, Katihar, and Purnia will experience reduced congestion, faster travel times, and improved safety. **Action Required** Commuters will need to utilize the new Greenfield Bypass for city-avoidance and pay applicable tolls as per the BOT model. **Logistics and Industrial Stakeholders** **Impact** Enhanced multi-modal integration facilitates faster movement of goods between economic nodes (food parks, textile clusters) and transport hubs like Purnea Airport and major railway stations. **Action Required** Logistics providers should align their transport schedules to leverage reduced travel times and enhanced regional connectivity. **Project Developers and Contractors** **Impact** The project provides a significant construction and operational opportunity with a total capital outlay of Rs. 3,936.05 crore. **Action Required** Developers must execute the upgradation to 4-lane standards and manage the subsequent tolling operations under the BOT framework.

Key Entities Referenced

Cabinet Committee on Economic Affairs (CCEA): The primary approving authority, chaired by the Prime Minister, that sanctioned the road upgradation project. Khagaria-Purnea Section of NH-31 and NH-231: The 143.529 km highway corridor in Bihar approved for expansion to a 4-lane standard to improve regional connectivity. PM Gati-Shakti: The national master plan for multi-modal connectivity whose economic nodes are integrated into this highway project. Bihar (Khagaria, Bhagalpur, Katihar, and Purnia): The state and specific districts where the infrastructure development and Greenfield Purnea Bypass will be implemented.
Official Source Record View Original Source →
See Full Document Text
Cabinet Committee on Economic Affairs (CCEA) Cabinet approves Upgradation of the Khagaria- Purnea Section of NH-31 and NH-231 to the 4- Lane Standard (143. 529 kms) at a cost of Rs.3936.05 crore in Bihar on BOT (Toll) Mode प्रव तथ: 03 JUN 2026 3:24PM by National The Cabinet Committee on Economic Affairs, chaired by the Prime Minister Shri Narendra Modi, today has approved upgradation of the Khagaria-Purnea Section of NH-31 and NH-231 to the 4-Lane Standard (143. 529 kms) in Bihar on BOT (Toll) Mode at a cost of Rs.3936.05 crore. The proposed upgradation of the Khagaria-Purnea Section of NH-31 and NH-231in Bihar will address severe geometric deficiencies, sharp curves, and congestion in built-up areas across Khagaria, Bhagalpur, Katihar and Purnia district. An extended Greenfield Bypass of Purnea City of 6.729 Km length will be developed as part of instant project. The project will increase average travel speeds, reduce travel time to about two hours, and improve overall road safety, fuel efficiency, and vehicle operating costs, thereby enhancing regional mobility and socio-economic development. The project provides seamless connectivity to key economic, social, and logistics nodes across Bihar. Additionally, the upgraded corridor will enhance multi-modal integration by connecting with 05 PM Gati- Shakti Economic Nodes (01 Textile Cluster, 02 Mega Food Park, 02 Fishing Seafood Park) and 11 Logistic Nodes (04 Major Railway Stations, 01 Airport, 04 NHs, 02 SHs), thereby facilitating faster movement of goods and passengers across the region. Map of Corridor:Appendix - I: Project Details Feature Details Project Name Upgradation of the Khagaria-Purnea Section of NH-31 and NH-231 to the 4-Lane Standard (143. 529 kms) in the State of Bihar on BOT (Toll) Mode Corridor Patna- Purnea Length (km) 143.529 Total Civil Cost (Rs in Cr.) 2467.77 Land Acquisition Cost (Rs in Cr.) 290.16 Total Capital Cost (Rs in Cr.) 3936.05 Mode BOT (Toll)Bypasses Greenfield Purnea Bypass of 6.729 Km length Major Roads Connected National Highways – NH-27, NH-13, NH-131A and NH-231 State Highways – SH-95 and SH-77 Economic / Social / Transport Nodes Airport: Purnea Connected Railway Stations: Khagaria, Bhagalpur, Katihar, Purnia Economic Nodes: 01 Textile Cluster, 02 Mega Food Park, 02 Fishing Seafood Park Major Cities / Towns Connected Khagaria, Bhagalpur, Katihar, Purnia Employment Generation Potential 32.59 lakhs person-days (direct) & 40.55 lakh person-days (indirect) *** MJPS (रलीज़ आईडी: 2268349) आगंतुक पटल : 1695 इस वज्ञ को इन भाषाओ ंम पढ़: Malayalam , Urdu , ही , Marathi , Bengali , Assamese , Punjabi , Gujarati , Tamil , Telugu , Kannad a

Continue your research