CAQM conducts Special Industrial Inspection Drive in Nuh, Haryana; 17 - 4th September 2026 - Ministry of Environment, Forest and Climate Change - Gazette Notification PDF
Issued by Ministry of Environment, Forest and Climate Change
Read or download the official PDF of this gazette notification issued by the Ministry of Environment, Forest and Climate Change on 4th September 2026. Classified under Press Release.
Official Gazette PDF Record
Download Official PDF (CAQM conducts Special Industrial Inspection...) →
Official Gazette Notification PDF Viewer
See Full Document Text & PDF Transcript
Ministry of Environment, Forest and Climate Change
CAQM conducts Special Industrial Inspection
Drive in Nuh, Haryana; 17 out of 35 units found
non-compliant
Posted On: 04 SEP 2026 7:59PM by PIB Delhi
As part of its continuing efforts to abate air pollution from industrial activities in the National Capital
Region (NCR), the Commission for Air Quality Management in NCR and Adjoining Areas (CAQM)
conducted a Special Industrial Inspection Drive in Nuh, Haryana on 03.09.2026.
Eight Flying Squads of CAQM, along with officials of the Haryana State Pollution Control Board
(HSPCB) and the State Administration, were deployed for the special inspection drive. The teams
inspected 35 industrial units/ premises across Nuh District to assess compliance with applicable
environmental norms and the conditions stipulated under the Consent to Operate (CTO).
The inspection drive revealed significant instances of non-compliance. Out of the 35 units inspected, 17
units were found not complying, 11 units were found complying, and 7 units were found closed/ non-
operational at the time of inspection. Out of the 11 complying units, 10 units were found fully compliant,
while 1 unit was found compliant with recommendations for improvement.
During the inspections, several violations relating to air pollution abatement measures were observed. Wet
scrubbers were found defective or inadequately functioning at certain units, including cases of leakage and
inadequate water flow. Non-functional or poorly maintained Electrostatic Precipitator (ESP) systems were
also observed. In some units, inadequate stack/ chimney arrangements and insufficient stack height for
boilers/ thermic fluid heaters were noticed.
The inspection teams also found several instances of inadequate measures for controlling fugitive dust.
Conveyor belts were found without adequate covering, water sprinkling and dust suppression
arrangements were inadequate, boundary windbreakers were insufficient and internal roads were found
unpaved, resulting in generation of fugitive dust. Non-compliant DG sets were also found operating at
certain units.
Further, instances of use/ burning of wood in industrial operations and use of unapproved liquid fuel in
boilers/ thermic fluid heaters were observed. The inspection teams also observed cases where the required
Online Continuous Emission Monitoring System (OCEMS) had not been installed, while stack emission
monitoring reports were found outdated or had not been submitted.
The teams further observed instances of boilers/ thermic fluid heaters or other machinery were being
operated without being covered under the applicable CTO. In addition, dense smoke/ fumes were also
observed within industrial premises/ shed areas, during the inspections.
The preliminary assessment of the Special Industrial Inspection Drive indicates that the non-compliances
observed in the 17 units relate to inadequate air pollution control systems, fugitive dust emissions, non-
compliant DG sets, use of unapproved fuels, lack emission monitoring systems and non-adherence to CTO
conditions.The Commission has reiterated that all industrial units operating in NCR are required to strictly comply
with applicable environmental norms and prescribed regulatory requirements, including maintaining
effective air pollution control devices, ensuring adequate fugitive dust suppression, using only approved
fuels, maintaining compliant DG sets, installing and operating requisite emission monitoring systems and
adhering to applicable CTO conditions.
CAQM has further emphasized that such inspection drives are an important mechanism for assessing on-
ground compliance and identifying gaps that require timely corrective action(s). The Commission will
continue to undertake such intensive inspection drives across NCR to ensure that violations are identified
and necessary corrective and enforcement action is taken by the concerned agencies.*****
VM/TY
(Release ID: 2306808) Visitor Counter : 206
Read this release in: Urdu