See Full Document Text
© [Regd. No. TN/CCN/467/2012-14.
GOVERNMENT OF TAMIL NADU [R. Dis. No. 197/2009.
2024 [Price: Rs. 8.80 Paise
TAMIL NADU
GOVERNMENT GAZETTE
PUBLISHED BY AUTHORITY
No. 43] CHENNAI, WEDNESDAY, OCTOBER 30, 2024
Aippasi 13, Kurothi, Thiruvalluvar Aandu–2055
Part III—Section 2
Statutory Notifications and Orders issued by
Heads of Departments.
NOTIFICATIONS BY HEADS OF DEPARTMENTS, ETC.
CONTENTS
Pages.
CHENNAI PORT AUTHORITY, CHENNAI
The Proposal for Revision of Scale of Rates of CITPL .. .. .. .. 174-193
DTP—III-2 (43) [173]174 TAMIL NADU GOVERNMENT GAZETTE [Part III—Sec. 2
NOTIFICATIONS BY HEADS OF DEPARTMENTS, ETC.
CHENNAI PORT AUTHORITY, CHENNAI
(Ministry of Ports, Shipping & Waterways)
No. 1, Rajaji Salai, Chennai - 600 001.
NOTIFICATION.
The Proposal for Revision of Scale of Rates of CITPL
(No.SOR/CITPL/Revision of SOR/2024/F, Dt.14.10.2024)
No. SRO C-24/2024.
1. Ministry of Ports, Shipping and Waterways (MOPSW) vide letter dt. 09.05.2023, directed Major Ports under
Section 53 of MPA Act 2021, to consider fixing tariff in respect of the existing PPP concessionaries governed by
the erstwhile Tariff Guidelines of 2005, 2008, 2013 and 2019 as mentioned in the respective agreement with the
approval of the Boards concerned.
2. Board vide BR No.32 of 2023-24 dt. 13.6.2023 approved to comply with the directions issued by MoPSW
vide letter dated 09.05.2023 and to inform the BOT operators, M/s.Chennai Container Terminal Pvt. Ltd. (CCTPL)
and M/s. Chennai International Terminal Pvt. Ltd. (CITPL) (who are governed under Tariff Guidelines 2019 for BOT
operators) that henceforth they shall file their proposals for revision of tariff with Chennai Port Authority (ChPA).
3. As per the Board’s approval, M/s. CITPL was requested (via letter dt. 24.06.2023) to submit their proposal
for revision of the Scale of Rates to ChPA. CITPL submitted its proposal on 07.09.2023 for tariff revision as per
Tariff Guidelines 2019 / Working Guidelines 2019 for BOT Operators governed by the erstwhile Tariff Guidelines
2005. Based on preliminary scrutiny of the proposal, certain additional information / clarifications were sought from
CITPL (vide letter dt.22.11.2023) and CITPL submitted a revised proposal on 17.01.2024, along with response to
queries raised by ChPA.
4. The revised proposal filed by CITPL was placed before Tariff Fixation Committee (TFC) constituted by the
Board of ChPA and based on the recommendations of the TFC, Board of ChPA vide Resolution No. 163 dated
08.03.2024, in accordance with the consultative procedure prescribed, approved to host a copy of the Revised
CITPL proposal dt. 17.01.2024 (comprising of Form – 1,3,5,6A,6B,7 and draft SoR) on the ChPA website inviting
user comments as per the provisions of Tariff Policy, 2021.
5. Accordingly, the revised proposal submitted by the CITPL for general revision of SOR was hosted on
the Port website on 07.06.2024 (post the Model Code of Conduct period which was ended on 04.06.2024) and
was forwarded seeking comments from the users / stakeholders by giving 15 days time, i.e. upto 21.06.2024.
In response, comments have been received from only two users, viz., The Chennai and Ennore Ports Steamer
Agents Association (CHENSAA) & Evergreen Shipping Agency (I) Pvt. Ltd.
The comments received were forwarded to CITPL for its feedback/comments and the response of CITPL
thereon are tabulated below:
Sl.No. Comments of users / user organisations Response of CITPL
1. CHENSAA
(i) The terminal M/s.CITPL vide their Trade advisory CITPL’s Tariff falls under TAMP guidelines 2019
dated 07.05.2024 stated that considering the which requires periodic review every 3 years and the
Wholesale Price Index (“WPI”) occurring between current proposal for revision is within the provisions
01 Jan 2023 and 01 Jan 2024, Tariff Authority of the guidelines.
of Major Ports (“TAMP”) has declared annual
Further, despite suffering huge losses, CITPL did not
WPI indexation as “NIL” for the period from
increase its tariff except marginal increase in few
01 May 2024 and shall be valid till 30 April 2025.
line items and appropriate rational provided along
Therefore, the existing SOR of 01 May 2023 will
with our application.
remain valid till 30 April 2025, subject to further
update/ intimation by relevant approving authorities.
(ii) Based on terminal confirmation circular, understand
most of the liners did not revise the agreement
charges with their customers & any further revision
between 5 to 15% in Electricity and miscellaneous
charges will not be accepted by the trade which
result in huge loss to the lines.Oct. 30, 2024] TAMIL NADU GOVERNMENT GAZETTE 175
(iii) Implementing new charges i.e., Container turning The charges are not applicable to all the containers
activity and other charges are not acceptable by and the same are only chargeable based on the
the Trade. request from the customer and actual services
provided by CITPL. Hence, customer may choose
not to avail this service.
(iv) Reefer volumes are increasing / Red Sea crisis All the provisions to supply electricity to the reefer
leading to heavy congestion in SIN/WPK - unpredicted containers made despite all the odds. With recent
vessels schedule / late arrival of vessels - Imports increases in electricity tariff by Tamil Nadu Generation
and exports have impact / shippers have to wait & Distribution Company Limited (“TANGEDCO”), the
long after stuffing to move the containers to the cost per KWH is more than INR 15 (Including 20%
terminals and all these issues already encountering surcharge levied by Chennai Port Authority) and with
with losses by the trade and shipping lines. existing rate, CITPL incurred huge loss on reefer
monitoring. Hence the increase is justified.
2 Evergreen Shipping Agency (I) Pvt. Ltd.
When other terminal CCTL is not going for rate CITPL made its application based on its own tariff
increase on above mentioned, charge items, how can along with proper justification for each revision and
we maintain two different Terminal Handling Charges we have nothing to do with tariff charged by CCTL.
for collection from customer with two quantum.
Chennai Port Authority can only comment if there is
any update on CCTL tariff.
When we approached both the terminal, CCTL &
CITPL, they have confirmed, this year there will Further, we have already clarified on the trade
be no increase in tariff but CITPL have already advisory on S#1 above.
approached your office for tariff increase.
ChPA response :
It will be more helpful to us and the trade, if
CCTPL has submitted their proposal for revision of
they postpone this proposal to next year. Also,
SoR which is being processed separately by ChPA
request you to maintain uniformity in container
related charges between&CCTL&& CITPL without
any difference as both terminals are operating
under your premises.
6. A summary position of Annual Revenue Requirement (ARR) computation furnished by CITPL vide letter dt.
17.01.2024 is tabulated below:
Sl. Details 2020-21 2021-22 2022-23
No.
(Rs. in lakhs)
(1) Total Expenses as per audited Annual Accounts 31,854 31,910 31,954
(2) Less: Adjustments
(i) Actual Revenue share / Royalty paid to the Port 14,915 14,963 14,710
(ii) Interest on loans 2,042 1,535 2,438
Sub total (2) 16,957 16,498 17,148
(3) Total Expenses after adjustments 14,896 15,412 14,806
(4) Average of Expenses (2020-21 to 2022-23) 15,038
(5) Capital employed as on 31.03.2023 including capital work in progress 96,392
as on 31.03.2023 and working capital
(6) Return on Capital Employed @ 16% 15,423
(7) Annual Revenue Requirement (ARR) as on 31.03.2023 (4 + 6) 30,461
(8) Indexation in the ARR @ 100% of WPI applicable for the year 34,152
2023-24 (12.12%)
(9) Ceiling Indexed Annual Revenue Requirement 34,152176 TAMIL NADU GOVERNMENT GAZETTE [Part III—Sec. 2
(10) Revenue Estimation at proposed SOR as per Form-4 (Traffic volume 33,466
of 8,43,363 TEUs is considered for revenue estimation which is
average of actual traffic handled during the last 3 years, i.e., 2020-
21, 2021-22 and 2022-23)
7. Subsequently, a Port Users Hearing was held on 08.07.2024 at 11:00 Hrs. in ChPA’s premises. The proceedings
of the Port Users Hearing and list of users / stakeholders present is available in the records of ChPA.
8. After the Port Users Hearing, Tariff Fixation Committee in the meeting held on 02.09.2024, finalized the
revised SOR of CITPL and recommended to submit the same to the Board for its approval.
9. The CITPL has proposed certain modifications / changes/additions/deletions in the existing SOR which was
recommended by TFC, is summarized below:
a. Schedule 3.5 – Charges for Hazardous Cargo Containers / Over-dimensional Cargo Containers
9% increase in the charges of Hazardous Cargo Container and Over-Dimensional Cargo Container, i.e., increasing
the premium from 37.5% to 50% as proposed by CITPL, is accepted as the same is found to be in line with
Clause 9.9.3 of the Working Guidelines 2019 to operationalize the Tariff Guidelines, 2019.
b. Schedule 3.9 (d) - Reefer related and other General Services - Supply of electricity
15% increase in charges of supply of electricity (including connection and disconnection, monitoring of temperature
at reefer yard) per container per 4 hours shift or part thereof as proposed by CITPL, is accepted by recognizing
the increase in electricity charges by TANGEDCO put forth by CITPL.
c. Schedule 3.12 - Miscellaneous Charges
5% increase of Miscellaneous Charges in Item (i) to (xv) as proposed by CITPL is accepted based on the
justification furnished regarding increase in operational cost put forth by CITPL.
d. Schedule 3.12 - Miscellaneous Charges
The following 2 new tariff items has been proposed to include under Sl.No.3.12 Miscellaneous Charges as
(xvi) and (xvii)
3.12(xvi) Container Turning Activity
(Rate per container in Rs.)
Particular Upto 20’ Above 20’ and 40’ Above 40’
Container Turning Activity 431.58 647.39 863.14
3.12 (xvii) DPD/DPE Facility Charges
DPD / DPE FACILITY CHARGES : Additional charges for those RMS Container marked for seal
verification or open inspection by Customs inside PSA Chennai yard.
Particular Upto 20’ Above 20’ and 40’
A. Seal Verification (Rate per container in Rs.)
On wheel Customs Inspection 535.32 535.32
Documentation Charges 133.83 133.83
B. Open Examination (Rate per container in Rs.)
On wheel Customs Inspection 535.32 535.32
Documentation Charges 133.83 133.83
Lift On/Off in CY 861.21 1291.8
Shifting Within Terminal 1174.37 1761.55
Fixing Removal of Seal 267.67 267.67
Forklift Charges at INR 347.61 per Hour if required during open examination.Oct. 30, 2024] TAMIL NADU GOVERNMENT GAZETTE 177
Since, the CITPL has stated that these services are optional services and shall be offered at the request of
users, the same are accepted.
e. The CITPL has also proposed certain changes made in Definition and Notes stating that the changes are
intended to give better clarity to the users and considering that no objections/comments from users was received,
the same are accepted and tabulated below:
Schedule Existing Modified
Clause 1(ii) “CITPL” means Chennai International Terminals “PSA Chennai” means Chennai International Terminals
Private Limited, a company incorporated in Private Limited, a company incorporated in India, its
India, its successors and assigns. successors and assigns.
3.4 A transhipment container sent to CFS, ICD A transhipment container sent to CFS, ICD or taken
are taken delivery locally shall be charge the delivery locally shall be charged the local container
Note (i)
local container rate. rate.
3.6 Wharfage will be charged on all containers Wharfage will be charged on all containers including
including ICDs, transhipment, Laden and empty ICDs, transhipment, FCL , LCL and empty containers.
Note (iv)
containers
3.12 Non-Declaration / Mis-declaration of The Customer has to declare the hazardous nature
Hazardous Container of the cargo as per the IMCO rules and furnish the
Note 7
relevant hazardous details to PSA Chennai. The
The Customer has to declare the hazardous
charges are for non-declaration / mis-declaration of the
nature of the cargo as per the IMCO rules and
hazardous nature and also for not furnishing the full
furnish the relevant hazardous details to PSA
particulars of the hazardous nature including the IMCO
Chennai. The charges are for non-declaration /
class, UN NO, EPS, MFAG, correct technical name,
mis-declaration of the hazardous nature and
contact details of the person in case of emergency.
also for not furnishing the full particulars of
The liabilities and cost towards the consequences
the hazardous nature including the IMCO
arising due to non-declaration or mis-declaration shall,
class, UN NO, EPS, MFAG, correct technical
however, be on the customers account
name, contact details of the person in case
of emergency
3.12 Weighment of Trailer with or without Note 8: Weighment of Containers and Container
Containers / Cargo Turning Activity:
Note 8
The service of weighment of trailers / trucks The service of Weighment of Containers (Sl.No.
is an optional service and shall be offered at xv) and Container Turning Activity (Sl.No. xvi) are
the request of the users. The charge includes optional services and shall be offered at the request
issuing of the requisite certificate with the of the users.
weight indicated on it.
10. Certain modifications/changes/additions/deletions in the existing SOR which was recommended by TFC, while
finalizing the SOR of CITPL is summarized below
a. Schedule 3.14 - Charges for Clearance of Garbage on-board
The Charges for Clearance of Garbage on-board (Schedule 3.14) from the Scale of Rates of CITPL is deleted
as CITPL has not rendered any such service in the recent past and since as per Deputy Conservator’s circular
No. G2/866/2022/M dt. 05.04.2024 vendors empanelled by ChPA are only allowed to collect garbage from ships
at Chennai Port and to collect the charges prescribed in the circular, the same is accepted and the following
Note has been added:
“Refer to Deputy Conservator’s circular No. G2/866/2022/M dt. 05.04.2024 in ChPA’s website as amended
from time to time.”
b. Further, the following clauses have been modified in line with enactment of MPA Act, 2021 and Clause
5.5.1 in Tariff Guidelines,2019178 TAMIL NADU GOVERNMENT GAZETTE [Part III—Sec. 2
Clause Existing Modified
Clause The delay in payments by the users will be The delay in payments by the users will be
2(iii)(d) counted beyond 10 days after the date of counted beyond 10 days after the date of
raising the bills by the PSA Chennai. This raising the bills by the PSA Chennai. This
provision shall, not apply to the cases where provision shall, not apply to the cases where
payment is to be made before availing the payment of charges in advance is prescribed
services as stipulated in the Major Port Trust as a condition in this Scale of Rates
Act, 1963, and / or where payment of charges
in advance is prescribed as a condition in this
Scale of Rates
Clause 2(v) Container-related charges denominated in US Container-related charges denominated in US
dollar terms shall be collected in equivalent to dollar terms shall be collected in equivalent to
Indian rupees. For this purpose, the market Indian rupees. For this purpose, the Reference
buying rate notified by the Reserve Bank of rate notified by the Reserve Bank of India
India, State Bank of India or its subsidiaries or or the market buying rate notified by State
any public sector bank as may be prescribed Bank of India as may be specified from
from time to time prevalent on the date of time to time prevalent on the date of entry
entry of the vessels into the Terminal (in case of the vessels into the Terminal (in case of
of import containers) and on the date of arrival import containers) and on the date of arrival
of containers in the Terminal premises (in case of containers in the Terminal premises (in
of export containers) shall be applied for re- case of export containers) shall be applied
conversion of the dollar-denominated charges for re-conversion of the dollar-denominated
into Indian rupees charges into Indian rupees
c. Note 8 of Schedule 3.12 referred to in Para 9(e) has been modified to indicate Container Turning Activity
as an optional activity as stated by CITPL.
11. Based on the recommendation of TFC, the Board of Chennai Port Authority has approved the revised Scale
of Rates and conditionalities of the CITPL vide Board Resolution No.102 in its meeting held on 27.09.2024.
12.1 Before proceeding to consider the revised SOR of CITPL, it is pertinent to state that Tariff Authority
for Major Ports (TAMP) while approving the revised SOR for CITPL vide Order No.TAMP/51/2011-CITPL dated
06 January 2012 effected a reduction of 12.23% over the then prevailing tariff of CITPL which was approved
vide order No.TAMP/10/2009-CITPL dated 3 November 2010. CITPL challenged the above tariff order by its Writ
Petition Nos. 11010 and 11011 of 2012 filed in the Hon’ble High Court of Madras. The Hon’ble High Court vide
interim order dt. 26.04.2012 stayed the operation of the TAMP Order dt. 06.01.2012 and has permitted CITPL to
charge at the (higher) rates as per earlier Tariff Order, i.e. the tariff prevailing before reduction.
12.2 In the meanwhile, the Ministry of Shipping (MOS), has issued Tariff Guidelines, 2019, with respect to BOT
operators who were previously governed by 2005 Tariff Guidelines. In terms of Clause 1.9 of these guidelines,
CITPL has agreed and entered into a separate agreement with Chennai Port Authority and filed its proposal with
TAMP for general revision of its SOR, following Tariff Guidelines, 2019. TAMP vide order No.TAMP/36/2019-CITPL
dt. 29.11.2019 approved the revised SOR of CITPL which was notified on 23.12.2019 and came into effect from
24.01.2020, valid for a period of 3 years.
12.3 TAMP in the above order has recorded at Para 13.2 that the tariff of the CITPL has been fixed based
on the prevailing information and without considering any adjustment of past period surplus relating to the period
of litigation. Therefore, whenever the Hon’ble High Court of Madras passes Order disposing of the Writ Petition
nos. 11010 and 11011 of 2012 paving a way for treatment of surplus / deficit or a decision from the MOS is
received on the treatment of surplus/ (deficit) arising over and above the admissible costs and permissible return
during the period of litigation whichever is earlier, as stipulated in Clause 3.1.1 of the Tariff Guidelines, 2019, the
tariff of CITPL approved now would be subject to review then, so as to capture the impact of the surplus that
has accrued to CITPL during the period of litigation.
12.4 The Hon’ble High Court of Madras vide Order dt. 23.07.2024 disposed the Writ Petitions filed by CITPL
referred in Para 12.1 and has referred the matter to the Conciliation and Settlement Committee (CSC) constituted
under the aegis of the Cabinet Committee of Economic affairs for resolution of the issue within an outer time
frame of 3 months, i.e., 23.10.2024 for CSC to pass a speaking order and stated that Petitioner (CITPL) is also
at liberty to take appropriate steps to challenge any adverse order passed by the CSC, in accordance with law.Oct. 30, 2024] TAMIL NADU GOVERNMENT GAZETTE 179
12.5 In view of the above portion, the tariff now approved by the Board is subject to the speaking order
to be passed by CSC on the treatment of surplus/ (deficit) arising over and above the admissible costs and
permissible return during the period of litigation, as per the Order dt. 23.07.2024 of the Hon’ble High Court of
Madras referred in Para 12.4.
13 In the result and as stated above, the Board of ChPA approves the revised Scale of Rates and conditionalities
of the CITPL attached as Annexure which shall come into force after expiry of 30 days from the date of notification
and shall be in force for a period of 3 years (as per clause 2.13 of the Tariff Guidelines 2019), subject to annual
indexation as mentioned in clause 2.12 of the Tariff Guidelines 2019. The approval accorded will automatically
lapse thereafter unless specifically extended by this Authority.
14 An analysis of variation will also be made at the time of the next general review of tariff of CITPL at the
end of the tariff validity period and adjustment of additional surplus will be made in the tariff to be fixed for the
next cycle, in line with the stipulation contained in Clauses 3.2.1 and 3.2.2 of the Tariff Guidelines, 2019.
15 The CITPL shall furnish to ChPA, annual reports on container traffic handled, average moves by crane per
hour and average dwell time for containers. The annual reports shall be submitted by the CITPL within 90days
following the end of each of the year. Any other information which may be required by ChPA from time to time
shall also be furnished by CITPL.
16 The tariff of the CITPL has been fixed relying on the information furnished by CITPL. If ChPA, at any time,
during the prescribed tariff validity period, finds that the actual position varies substantially from the estimates
considered or there is deviation from the assumptions accepted herein, ChPA may require CITPL to file a proposal
ahead of the schedule to review its tariff and to setoff the advantage as per the revised tariff guidelines accrued
on account of such variations in the revised tariff.
17 The existing tariff of CITPL approved by TAMP vide order No.TAMP/36/2019-CITPL dt.29.11.2019, expired
on 23.01.2023. The validity of the existing Scale of Rates of the CITPL is deemed to have been extended
beyond 23 January 2023 till the effective date of implementation of the revised Scale of Rates notified herewith.
MALLA SRINIVASA RAO,
Financial Advisor & Chief Accounts Officer.
ANNEXURE
CHENNAI INTERNATIONAL TERMINALS PRIVATE LIMITED
S.NO TABLE OF CONTENT PAGE NO
1 Preface / Definitions 2
2 General 3-4
3 Charges For Container Operations 5
Charges for handling FCL import and export containers and empty containers.
3.1 5
3.1.1 Handling by Quay Crane including lashing/unlashing charges. 5
3.1.2 Transportation from QC to Yard & Vice Versa 5
Handling at Container Yard lift on/off onto/from the Internal Transfer Vehicle
3.1.3 (a) 5
Handling at Container Yard lift on/off for delivery / receipt to and from customers
3.1.3 (b) 6
3.2 Charges for handling LCL import and export container 6
3.2.1 Handling by Quay Crane including lashing/unlashing charges 6
3.2.2 (a) Transportation of container from QC to Container Yard and Vice Versa 6
Handling at Container Yard lift on / off, onto / from the Internal Transfer Vehicle
3.2.2 (b) 6180 TAMIL NADU GOVERNMENT GAZETTE [Part III—Sec. 2
Handling at container yard including lift on / lift off for delivery / receipt to and
3.2.2 (c) 7
from customer
3.3 Charges for handling ICD import and export container 7
3.3.1 Handling by Quay Crane including lashing/unlashing charges 7
3.3.2 Transportation from QC to container Rail Yard & Vice Versa 7
Handling at Container Yard lift on/off onto / from the Internal Transfer Vehicle
3.3.3 (a) 8
3.3.3 (b) Handling at Container rail yard lift on / off while giving delivery for Rail 8
Charges for handling Transhipment Containers including handling by on board
3.4 8
stevedoring labour at Quay side, lashing/unlashing charges
Charges for Hazardous Cargo Containers / Over-dimensional Cargo
3.5 9
Containers
3.6 Charges for Wharfage 9
Charges for handling hatch covers for one operation (both opening and closing)
3.7 9
3.8 Charges for shifting containers within vessel (Restows) 9-10
3.9 Reefer related and other General Services 10
3.10 Charges for a shut out container/ renomination of containers 10
3.11 Charges For Storage Of Containers. 11-13
3.12 Miscellaneous Charges 13-15
Charges for supply of Fresh Water to shipping alongside the container berths
3.13 15
3.14 Charges for clearance of Garbage on board 15
CHENNAI INTERNATIONAL TERMINAL PRIVATE LIMITED
SCALE OF RATES
DEFINITIONS AND CONDITIONS
PREFACE
This Scale of Rates sets out the charges payable to Chennai International Terminals Private Limited from time
to time for the use of services and facilities provided by Chennai International Terminals Private Limited.
1. DEFINITIONS
In this Scale of Rates, unless the context otherwise requires, the following definitions shall apply:
(i) “Accredited Clients Programme” means a programme introduced by the Customs Department whereby
importers registered by them as “Accredited Clients” will form a separate category to which assured facilitation
will be provided. Except for a small percentage of consignments selected on random basis by the RMS, or cases
where specific intelligence is available or where a specifically observed pattern of non-compliance is required to
be addressed, accredited clients will be allowed clearance on the basis of self-assessment i.e., as a matter of
course, clearance will be allowed on the basis of their declaration and without examination of goods. Further this
benefit will be available to Accredited Clients at all ports in the country where EDI and RMS are operational.
It is expected that this programme will bring reduction in the dwell time of cargo and transaction cost of such
importers. Commissioners of Customs are also required to work with the custodians for earmarking separate
storage space, handling facility and expeditious clearance procedures for these clients. Further IMG has also
recommended ‘faster delivery system by creating separate area in the port premises clearly earmarked for delivery
of cargo to specified accredited importers.’ This programme has been defined in detail in Customs Circular No.
42/2005 – cus dated 24th November 2005
(ii) “PSA Chennai” means Chennai International Terminals Private Limited, a company incorporated in India,
its successors and assigns.
(iii) “Coastal Vessel” means any vessel exclusively employed in trading between any port or place in India
to any other port or place in India and / or having a valid coastal license issued by the Director General of
Shipping/ competent authority.
(iv) “Container” means the standard ISO container, suitable for the transport and stacking of cargo and
must be capable of being handled as a unit and lifted by a crane with a container spreader.Oct. 30, 2024] TAMIL NADU GOVERNMENT GAZETTE 181
(v) “DPD/DPE” means Direct Port Delivery (DPD) and Direct Port Entry (DPE) is a trade facilitation introduced
by Government of India to expedite clearance of goods directly from/to the port thereby reducing transaction time
and cost.
DPD container shall refer to those containers which comply to the norms set by CBEC, Chennai vide facility
circular No 05/2017 dated 28 Feb 2017.
DPE container shall refer to those containers which comply to the norms set by CBEC, Chennai vide facility
circular No 26/2017 dated 18 Nov 2017.
(vi) “FCL” means containers said to contain Full Container Load.
(vii) “Foreign-going Vessel” means any vessel other than a coastal vessel.
(viii) “Fumigation Facility” means facilitating decontamination of cargo which are prone to be affected by
pests and which requires pesticides to decontaminate by way of fumigation or degassing or both.
(ix) “Hazardous container” means a Container containing hazardous goods as classified under IMO.
(x) “ICD” means Inland Container Depot.
(xi) “ICD Container” means containers discharged from a vessel and placed in the custody of the PSA
Chennai for the purposes of loading on a Train, inside the Terminal. Also “ICD Container” means containers
discharged from a Train inside the Terminal and placed in the custody of the PSA Chennai for the purposes of
shipment on a vessel.
(xii) “LCL” means containers said to contain Less than Full Container Load (Container having cargo of more
than one importer/exporter).
(xiii) “Over Dimensional Container” means a Container carrying over dimensional cargo beyond the normal
size of standard containers and needing special devices like slings, shackles, lifting beam, etc. Damaged Container
and Container requiring special devices for lifting is also classified as Over-Dimensional Container.
(xiv) “Per Day” means per calendar day or part thereof.
(xv) “Per Shift” means per period of 8 (eight) hours.
(xvi) “Port” means the Chennai Port Authority (ChPA) whereas “Terminal” means the Container Terminal
operated by Chennai International Terminal Private Limited.
(xvii) “Reefer” means any Container for the purpose of the carriage of goods, which require power supply
to maintain the desired temperature.
(xviii) “Shut Out Container” means a container, which has entered in to the terminal for export for a vessel
as indicated by VIAN and is not connected to the vessel for whatsoever reason.
(xix) “Tonne” means one metric Tonne of 1,000 kilograms or one cubic metre.
(xx) “Transhipment Container” means container discharged from a vessel and placed in the custody of
the PSA Chennai for the purposes of shipment on another vessel declared on a Transshipment manifest with
the ultimate port destination marked on each container lodged with prior to or at the time of such a container
is placed in its custody.
(xxi) “VIAN” means Vessel Identification Advise Number.
2. GENERAL
(i) Status of a vessel as borne out by its certification issued by Director General of Shipping is the relevant
factor for deciding whether the vessel is ‘foreign-going’ or ‘coastal’. Foreign going vessels permitted to undertake
coastal voyages and the cargo / container carried by them will also qualify for the concession in respect of such
permissible voyages:
A. A foreign-going vessel of Indian Flag having a General Trading License can convert to coastal run on the
basis of a Customs Conversion Order.182 TAMIL NADU GOVERNMENT GAZETTE [Part III—Sec. 2
B. A foreign-going vessel of Foreign Flag can convert to coastal run on the basis of a Coastal Voyage License
issued by the Director General of Shipping.
C. In case of such conversions, coastal rates shall be chargeable by the load port from the time the vessel
starts loading coastal goods.
D. In case of such conversions, coastal rates shall be chargeable only till the vessel completes coastal cargo
discharging operations; immediately thereafter, foreign going rates shall be chargeable by the discharge ports.
E. For dedicated Indian coastal vessels having a Coastal License from the Director General of Shipping, no
other documents will be required to be entitled to coastal rates.
(ii) All charges worked out shall be rounded off to the next higher rupee on the grand total of each bill.
(iii) (a) Users shall pay penal interest on delayed payments of any charge under this Scale of Rates.
Likewise, the PSA Chennai shall pay penal interest on delayed refunds.
(b) The rate of simple interest will be 15% p.a. The penal interest will apply to both the PSA Chennai
and the users equally.
(c) The delay in refunds by the PSA Chennai will be counted beyond 20 days from the date of
completion of services or on production of all the documents required from the users, whichever is later.
(d) The delay in payments by the users will be counted beyond 10 days after the date of raising the
bills by the PSA Chennai. This provision shall, not apply to the cases where payment of charges in advance is
prescribed as a condition in this Scale of Rates.
(e) A premium of 50% will be levied in case of Hazardous Cargo Containers / Over Dimensional
Containers over the applicable handling charges prescribed for respective categories of containers.
(iv) Containers less than and up to 20’ in length will be reckoned as one TEU for the purpose of tariff.
(v) Container-related charges denominated in US dollar terms shall be collected in equivalent to Indian
rupees. For this purpose, the Reference rate notified by the Reserve Bank of India or the market buying rate
notified by State Bank of India as may be specified from time to time prevalent on the date of entry of the
vessels into the Terminal (in case of import containers) and on the date of arrival of containers in the Terminal
premises (in case of export containers) shall be applied for re-conversion of the dollar-denominated charges into
Indian rupees
(vi) A regular review of exchange rate shall be made once in thirty days from date of arrival of the vessels
in cases of vessels staying in the Port for more than thirty days. In such cases the basis of billing shall change
prospectively with reference to the appropriate exchange rate prevailing at the time of review.
(vii) (a) Users will not be required to pay charges for delays beyond a reasonable level attributable to
the port.
(b) In case vessel idles due to non-availability or breakdown of the shore based facilities of PSA
Chennai or any other reasons attributable to the PSA Chennai, rebate equivalent to berth hire charges payable
to ChPA accrued during the period of idling of vessel shall be allowed.
(viii) The charges prescribed in the Scale of Rates are exclusive of all applicable taxes. All applicable
taxes will be collected at actual.
(ix) All LCL containers coming in and going out of PSA Chennai as a unit load will be treated as FCL
for the purpose of levying charges.
(x) All Invoices are issued as due on presentation. Failure to pay may cause a lien to be placed on the
goods handled at the terminal and the responsible party may be denied further use of the terminal unless all
dues together with interest @ 15 % is paid from the date of discharge of cargo till the date of payment.
(xi) Container other than that of standard size requiring special devices /sling handling will be charges as
per 3.5 below. Such containers will also include damage containers and any other type requiring special devices.
(xii) If a terminal user provides with prior consent of PSA Chennai, lashing/unlashing gang for lashing operation
of all containers in the vessel, then a rebate of INR 38.23/- per container in handling charges prescribed in section
3.1.1,3.2.1,3.3.1, and 3.4 shall be allowed subject to the terminal user agreeing to follow safety regulation.Oct. 30, 2024] TAMIL NADU GOVERNMENT GAZETTE 183
CHARGES FOR CONTAINER OPERATIONS
3.1 Charges for handling FCL import and export and empty containers.
3.1.1 Handling by Quay Crane including lashing/unlashing charges.
Foreign-going Coastal Vessel
Vessel
US$ INR
Per FCL Container
- Not exceeding 20’ in length 26.11 657.87
- Exceeding 20’ and upto 40’ in length 39.13 986.37
- Over 40’ in length 52.20 1,315.44
Per Empty Container
- Not exceeding 20’ in length 26.11 657.87
- Exceeding 20’ and upto 40’ in length 39.13 986.37
- Over 40’ in length 52.20 1,315.44
Note: Services include handling by quay crane and lashing/unlashing
3.1.2 Transportation from Quay Side to Yard & Vice Versa
Foreign-going Coastal Vessel
Vessel
INR INR
Per FCL Container
- Not exceeding 20’ in length 743.78 446.29
- Exceeding 20’ and upto 40’ in length 1115.64 669.40
- Over 40’ in length 1487.57 892.54
Per Empty Container
- Not exceeding 20’ in length 368.35 221.02
- Exceeding 20’ and upto 40’ in length 552.54 331.51
- Over 40’ in length 736.70 442.02
Note: Services include transport to and from the quayside.
3.1.3.(a) Handling at Container Yard including lift on/off onto/from the Internal Transfer Vehicle
Foreign-going Coastal Vessel
Vessel
INR INR
Per FCL Container
- Not exceeding 20’ in length 411.03 246.62
- Exceeding 20’ and upto 40’ in length 616.56 369.94
- Over 40’ in length 822.04 493.22
Per Empty Container
- Not exceeding 20’ in length 203.56 122.13
- Exceeding 20’ and upto 40’ in length 305.32 183.20
- Over 40’ in length 407.10 244.25
Note: Services include lifts at container yard for storage.184 TAMIL NADU GOVERNMENT GAZETTE [Part III—Sec. 2
3.1.3.(b) Handling at Container Yard including lift on/off for delivery / receipt to and from customers
Foreign-going Coastal Vessel
Vessel
INR INR
Per FCL Container
- Not exceeding 20’ in length 411.03 411.03
- Exceeding 20’ and upto 40’ in length 616.56 616.56
- Over 40’ in length 822.04 822.04
Per Empty Container
- Not exceeding 20’ in length 203.56 203.56
- Exceeding 20’ and upto 40’ in length 305.32 305.32
- Over 40’ in length 407.10 407.10
Note: Services include lifts at container yard for landing or loading the container from or to customer’s vehicle.
3.2 Charges for handling LCL import and export container
3.2.1 Handling by Quay Crane including lashing/unlashing
Foreign-going Coastal Vessel
Vessel
US$ INR
Per LCL Container
- Not exceeding 20’ in length 26.11 657.87
- Exceeding 20’ and upto 40’ in length 39.13 986.37
- Over 40’ in length 52.20 1,315.44
3.2.2(a). Transporation from Quay side to Yard and Vice Versa
Foreign-going Coastal Vessel
Vessel
INR INR
Per LCL Container
- Not exceeding 20’ in length 706.63 423.96
- Exceeding 20’ and upto 40’ in length 1059.87 635.92
- Over 40’ in length 1413.19 847.90
Note: Services include transportation of container from quay to yard and vice versa
3.2.2. (b) Handling at Container Yard including lift on / off, onto / from the Internal Transfer Vehicle
Foreign-going Coastal Vessel
Vessel
INR INR
Per LCL Container
- Not exceeding 20’ in length 411.03 246.62
- Exceeding 20’ and upto 40’ in length 616.56 369.94
- Over 40’ in length 822.04 493.22
Note: Services include lifts at Container Yard for storageOct. 30, 2024] TAMIL NADU GOVERNMENT GAZETTE 185
3.2.2. (c). Handling at container yard including lift on / lift off for delivery / receipt to and from customer
Foreign-going Coastal Vessel
Vessel
INR INR
Per LCL Container
- Not exceeding 20’ in length 411.03 411.03
- Exceeding 20’ and upto 40’ in length 616.56 616.56
- Over 40’ in length 822.04 822.04
Per Empty Container
- Not exceeding 20’ in length 203.56 203.56
- Exceeding 20’ and upto 40’ in length 305.32 305.32
- Over 40’ in length 407.10 407.10
Note: Services include lifts at container yard for landing or loading the container from or to customer’s vehicle.
3.3 Charges for handling ICD import and export container
3.3.1 Handling by Quay Crane including lashing/unlashing charges
Foreign-going Coastal Vessel
Vessel
US$ INR
Per Loaded Container
- Not exceeding 20’ in length 26.11 657.87
- Exceeding 20’ and upto 40’ in length 39.13 986.37
- Over 40’ in length 52.20 1,315.44
Per Empty Container
- Not exceeding 20’ in length 26.11 657.87
- Exceeding 20’ and upto 40’ in length 39.13 986.37
- Over 40’ in length 52.20 1,315.44
Note: Services include handling by quay crane and lashing/unlashing.
3.3.2 Transportation from Quay side to container Rail Yard & Vice Versa
Foreign-going Coastal Vessel
Vessel
INR INR
Per Loaded Container
- Not exceeding 20’ in length 706.63 423.96
- Exceeding 20’ and upto 40’ in length 1059.89 635.93
- Over 40’ in length 1413.20 847.92
Per Empty Container
- Not exceeding 20’ in length 349.95 209.97
- Exceeding 20’ and upto 40’ in length 524.87 314.92
- Over 40’ in length 699.88 419.93
Note: Services include transport to container rail yard, stowage planning on vessel and yard, data handling,
processing and transfer between vessel, PSA Chennai and Shipping line.186 TAMIL NADU GOVERNMENT GAZETTE [Part III—Sec. 2
3.3.3.(a) Handling at Container Rail Yard lift on / off, onto / from the Internal Transfer Vehicle
Foreign-going Coastal Vessel
Vessel
INR INR
Per Loaded Container
- Not exceeding 20’ in length 411.03 246.62
- Exceeding 20’ and upto 40’ in length 616.56 369.94
- Over 40’ in length 822.04 493.22
Per Empty Container
- Not exceeding 20’ in length 203.56 122.13
- Exceeding 20’ and upto 40’ in length 305.32 183.20
- Over 40’ in length 407.10 244.25
Note Services include lifts at container yard for storage
3.3.3.(b) Handling at Container rail yard lift on / off while giving delivery for Rail
Foreign-going Coastal Vessel
Vessel
INR INR
Per Loaded Container
- Not exceeding 20’ in length 411.03 411.03
- Exceeding 20’ and upto 40’ in length 616.56 616.56
- Over 40’ in length 822.04 822.04
Per Empty Container
- Not exceeding 20’ in length 203.56 203.56
- Exceeding 20’ and upto 40’ in length 305.32 305.32
- Over 40’ in length 407.10 407.10
Note: Services include lift at container rail yard, data handling, processing and transfer between Vessel, PSA
Chennai and Shipping Line
3.4 Charges for handling Transhipment Containers
Foreign-going Coastal Vessel
Vessel
US$ INR
Per Loaded Container
- Not exceeding 20’ in length 31.31 788.96
- Exceeding 20’ and upto 40’ in length 46.98 1,183.75
- Over 40’ in length 62.62 1,578.24
Per Empty Container
- Not exceeding 20’ in length 31.31 788.96
- Exceeding 20’ and upto 40’ in length 46.98 1,183.75
- Over 40’ in length 62.62 1,578.24
Note: Services include handling by quay crane (discharge and loading), transport and, lifts, stowage planning on vessel
and yard, data handling, processing and transfer between Vessel, PSA Chennai and Shipping line.
Note:
i. A transhipment container sent to CFS, ICD or taken delivery locally shall be charged the local container rate.
ii. A Shut out charge as per Section 3.10 shall apply ifOct. 30, 2024] TAMIL NADU GOVERNMENT GAZETTE 187
a) The vessel nomination is changed
b) If the vessel nomination is changed from a later vessel to an earlier vessel after the earlier
vessel is berthed.
3.5 Charges for Hazardous Cargo Containers / Over-dimensional Cargo Containers
A premium of 50% will be levied over the applicable handling charges prescribed above for respective categories
of containers.
3.6 Charges for Wharfage
Foreign-going Coastal Vessel
Vessel
US$ INR
Per Container (box only)
- Not exceeding 20’ in length 1.48 37.67
- Exceeding 20’ and upto 40’ in length 2.25 56.64
- Over 40’ in length 2.98 75.04
Per Containerised Cargo Rs. Rs.
- Not exceeding 20’ in length 820.20 492.12
- Exceeding 20’ and upto 40’ in length 1230.29 738.19
- Over 40’ in length 1640.38 984.23
Note:
(i) The charge for containerised cargo in all cases will be in Rupee terms.
(ii) The charge for containers in cases of ‘foreign arrival’ and ‘foreign departure’ will be in Dollar terms.
(iii) The charges for containers in cases of ‘coastal arrival’ and ‘coastal departure’ will be in Rupee terms.
(iv) Wharfage will be charged on all containers including ICDs, transhipment, FCL, LCL and empty containers.
3.7 Charges for handling hatch covers for one operation (both opening and closing)
Foreign-going Coastal Vessel
Vessel
US$ Rs.
Without landing hatch cover on quay 20.87 526.17
With landing hatch cover on quay 52.20 1,315.44
Note: Half the rate shall be charged if there is only one activity, i.e. either an opening or closing operation.
3.8 Charges for shifting containers within vessel (Restows)
Foreign-going Coastal Vessel
Vessel
US$ Rs.
Within hatch (without landing and
reshipping) per container
- Not exceeding 20’ in length 12.69 319.74
- Exceeding 20’ and upto 40’ in length 19.02 479.15
- Over 40’ in length 25.35 638.89
Via Quay (shifted by landing on Quay &
reshipping) per container
- Not exceeding 20’ in length 37.29 939.64188 TAMIL NADU GOVERNMENT GAZETTE [Part III—Sec. 2
- Exceeding 20’ and upto 40’ in length 55.93 1,409.46
- Over 40’ in length 74.56 1,878.98
Note: No Wharfage will be levied on the restow containers and containerised cargo
3.9 . Reefer related and other General Services
Foreign going
Particulars Coastal Vessel (Rs)
Vessel (US $)
a) Pre-trip inspection (PTI) including supply
38.23 963.60
of electricity
b) Connection or disconnection
2.54 64.24
Services On board a Vessel
c) Cleaning of Container
- Not exceeding 20’ in length 1.92 48.19
- Exceeding 20’ and upto 40’ in
3.83 96.36
length
- Over 40’ in length 5.74 144.55
d) Supply of electricity (including
connection and disconnection,
monitoring at reefer point) Per container
per 4 hours shift or part there of
- Not exceeding 20’ in length 5.16 130.77
- Exceeding 20’ and upto 40’ in 7.79
196.13
length
- Over 40’ in length 10.38 261.51
Note:
(i) Above tariff does not include parameter setting or repair & maintenance of malfunctioning reefers. Above
charges are also applicable to restow reefer containers.
(ii) Pre-trip inspection of the reefer containers, connection or disconnection services on board the vessel and
cleaning of containers are optional services and shall be rendered when requested.
(iii) Haz reefer cargo will incur premium as per clause 3.5.
3.10 Charges for a shut out container/ renomination of containers
Foreign going Vessel
Coastal Vessel (Rs)
(US $)
Per Container
- Not exceeding 20’ in length 28.33 1,189.88
- Exceeding 20’ and upto 40’ in length 42.50 1,785.52
- Over 40’ in length 56.67 2,380.26
Note: Above charge shall apply where –
(i) An export container or a transhipment container or a re-export container is shut out and subsequently
delivered out of PSA Chennai.
(ii) A container is shut out by one vessel and subsequently shipped on another vessel, in addition to the
charges for handling by quay crane charges. In this case, the free storage period will be given to the Container in
accordance with section 3.11 from the time the container is first received. If the free storage period is exceeded,
storage charges shall be calculated after the expiry of the free period up to the time of lift on.Oct. 30, 2024] TAMIL NADU GOVERNMENT GAZETTE 189
3.11 Charges Ffor Storage Of Containers.
1. Import - loaded and Empty Containers – (INCLUDES DPD / CFS)
Foreign going vessel Coastal Vessel
Rate per container per day or Rate per container per day or
part thereof ( in US$) part thereof ( in Rs)
S.No Particulars
Above Above Upto Above 20’
Upto 20’ Above 40’
20’and 40’ 40’ 20’ and 40’
(a) First 3 days Free Free Free Free Free Free
(b) From 4 to 15 days 6.37 12.74 19.13 267.66 535.32 802.98
(c) From 16 to 30 days 12.74 25.49 38.23 535.32 1070.64 1605.98
(d) Beyond 30 days 25.49 50.99 76.48 1070.64 2141.3 3211.94
(1A) Import –Loaded DPD (Direct to Factory).
Foreign going vessel Coastal Vessel
Rate per container per day or Rate per container per day or part
part thereof ( in US$) thereof (in Rs)
S.No Particulars
Above Above
Upto 20’ Above 40’ Upto 20’ Above 40’
20’and 40’ 20’and 40’
(a) First 5 days Free Free Free Free Free Free
(b) From 6 to 15 days 6.37 12.74 19.13 267.66 535.32 802.98
(c) From 16 to 30 days 12.74 25.49 38.23 535.32 1070.64 1605.98
(d) Beyond 30 days 25.49 50.99 76.48 1070.64 2141.3 3211.94
2. Export – FCL, LCL and Empty Containers
Foreign going vessel Coastal Vessel
Rate per container per day or Rate per container per day or part
S.No Particulars part thereof ( in US$) thereof in Rs)
Above Above
Upto 20’ Above 40’ Upto 20’ Above 40’
20’and 40’ 20’and 40’
(a) First 7 days Free Free Free Free Free Free
(b) From 8 to 15 days 6.37 12.74 19.13 267.66 535.32 802.98
(c) From 16 to 30 days 12.74 25.49 38.23 535.32 1070.64 1605.98
(d) Beyond 30 days 25.49 50.99 76.48 1070.64 2141.3 3211.94
(2A) DPE –(Direct Port Entry Export)
Foreign going vessel Coastal Vessel
Rate per container per day or Rate per container per day or part
S.No Particulars part thereof ( in US$) thereof (in Rs)
Above Above
Upto 20’ Above 40’ Upto 20’ Above 40’
20’and 40’ 20’and 40’
(a) First 15 days Free Free Free Free Free Free
(b) From 16 to 30 days 12.74 25.49 38.23 N.A N.A N.A
(c) Beyond 30 days 25.49 50.99 76.48 N.A N.A N.A190 TAMIL NADU GOVERNMENT GAZETTE [Part III—Sec. 2
3. ICD Containers –Import & Export Loaded and Empty
Foreign going vessel Coastal Vessel
Rate per container per day or Rate per container per day or
S.No Particulars part thereof (in US$) part thereof (in Rs)
Above Above
Upto 20’ Above 40’ Upto 20’ Above 40’
20’and 40’ 20’and 40’
(a) First 10 days Free Free Free Free Free Free
(b) From 11 to 30 days 6.37 12.74 19.13 267.66 535.32 802.98
(c) From 31 to 45 days 12.74 25.49 38.23 535.32 1070.64 1605.98
(d) Beyond 45 days 25.49 50.99 76.48 1070.64 2141.3 3211.94
4. Transhipment Containers – Loaded and Empty
Foreign going vessel Coastal Vessel
Rate per container per day or Rate per container per day or
part thereof ( in US$) part thereof ( in Rs)
S.No Particulars
Above
Above
Upto 20’ Above 40’ Upto 20’ 20’and Above 40’
20’and 40’
40’
(a) First 30 days Free Free Free Free Free Free
(b) From 31 to 45 days 6.37 12.74 19.13 267.66 535.32 802.98
(c) From 46 to 60 days 12.74 25.49 38.23 535.32 1070.64 1605.98
(d) Beyond 60 days 25.49 50.99 76.48 1070.64 2141.3 3211.94
5. Shut Out Containers – Loaded and Empty
Foreign going vessel Coastal Vessel
Rate per container per day or Rate per container per day or part
part thereof (in US$) thereof (in Rs)
S.No Particulars
Above Above Above 20’
Upto 20’ Upto 20’ Above 40’
20’and 40’ 40’ and 40’
(a) From 1 to 15 days 6.37 12.74 19.13 267.66 535.32 802.98
(b) From 16 to 30 days 12.74 25.49 38.23 535.32 1070.64 1605.98
(c) Beyond 30 days 25.49 50.99 76.48 1070.64 2141.3 3211.94
Notes:
3.11.1. Storage period for a container shall be reckoned from the day following the day of landing up to
the day of loading / delivery/ removal of containers.
3.11.2. For the purpose of calculation of free time, Sundays, Customs notified holidays and the Terminal’s
non-operating days shall be excluded.
3.11.3. Storage charge shall not accrue for the period during which PSA Chennai is not in a position to
deliver / shift the containers when requested by the users.
3.11.4. Transhipment containers whose status is subsequently changed to local FCL / LCL or ICD container
shall be levied storage charges at par with the relevant import containers.
3.11.5. Hazardous containers shall attract 1.50 times the normal applicable charges.
3.11.6. Over-High and Over-Dimensional Containers including the windmill boxes the storage charges shall
be based on the actual no of ground slots the respective container occupies under the respective slabs
given above.Oct. 30, 2024] TAMIL NADU GOVERNMENT GAZETTE 191
3.11.7. If boxes meant for delivery under the “Accredited Client Programme” (ACP) as explained 1(i) above
are not moved out with in three days of its landing into the terminal these boxes would be shifted to
the normal import stack area from the designated ACP import stack area in which case extra Lift on/
off and are shifting charges would be charged.
3.11.8. The free and storage rates prescribed in case of ICD containers are applicable only for Movement of
containers to /from ICDs going by rail.
3.11.9. Normal import containers subsequently changing the mode to LCL or ICD containers enjoy the free
period applicable to local FCL
3.11.10 Total storage period for shut out container shall be calculated from the day when the container has
entered the terminal till the day of shipment / delivery.
3.11.11 The storage charges on abandoned containers / shipper owned containers shall be levied up to the date
of receipt of intimation of abandonment in writing or 75 days from the day of landing of the container,
whichever is earlier subject to the following conditions:
(i) The consignee can issue a letter of abandonment at any time.
(ii) If the consignee chooses not to issue such letter of abandonment, the container Agent / MLO can
also issue abandonment letter subject to following:
(a) the Line shall resume custody of container along with cargo and either take it back or remove
it from the port premises; and
(b) the Line shall pay all port charges accrued on the cargo and container before resuming custody
of the container.
(iii). The container Agent / MLO shall observe the necessary formalities and bear the cost of transportation
and destuffing. In case of their failure to take such action within the stipulated period, the storage charge on the
container shall be continued to be levied till such time all necessary actions are taken by the shipping lines for
destuffing the cargo.
(iv). Where the container is seized / confiscated by the Customs Authorities and the same cannot be
destuffed within the prescribed time limit of 75 days, the storage charges will cease to apply from the day the
Customs order release of the cargo subject to Lines observing the necessary formalities and bearing the cost of
transportation and destuffing. Otherwise, seized/confiscated containers should be removed by the Line / consignee
from the terminal premises to the Customs bonded area and in that case, the storage charge shall cease to
apply from the day of such removal.
3.11.12. The ground slots for export containers will be reserved for 7 days weekly call of the Vessel and
5 days for bi-weekly call of vessel.
3.12. Miscellaneous Charges.
(Rate per container in Rs.)
Sl. Above 20’
Particulars Upto 20’ Above 40’
No. and 40’
(i) Fixing/ removal of seal 267.67 267.67 267.67
(ii) Lift on / Lift off in the Container Yard 861.21 1291.8 1722.4
(iii) Charges for shifting of container within the Terminal
1174.37 1761.55 2348.73
(iv) POD Charges 1174.37 1761.55 2348.73
Additional Movement- Terminal to Rail or rail to
(v)
Terminal/ charges for extra movement/ transportation.
1174.37 1761.55 2348.73
Change of status of Container from Rail to Road
(vi)
or vice-versa 1174.37 1761.55 2348.73192 TAMIL NADU GOVERNMENT GAZETTE [Part III—Sec. 2
Sl. Above 20’
Particulars Upto 20’ Above 40’
No. and 40’
Charges for export containers arriving in the terminal
(vii)
after the gate cut-off for the particular VIAN
1174.37 1761.55 2348.73
Fixing/removal of Hazardous Sticker
(viii)
(per container) 133.83 133.83 133.83
(xi) One door open charge Per container 802.99 802.99 802.99
(x) Cancellation of Document (per EIR) 133.83 133.83 133.83
Non-declaration / Mis-declaration of Hazardous
(xi)
containers and Over dimensional container
4014.94 4014.94 4014.94
(xii) On Wheel customs Inspection (per container) 535.32 535.32 535.32
(xiii) Fumigation Charges 2676.62 2676.62 2676.62
Fork lift charges for movement of lashing, bins
(xiv)
within the terminal (per lashing bin) 133.83 133.83 133.83
(xv) Weighment of Containers 133.83 133.83 133.83
(xvi) Container Turning Activity 431.58 647.39 863.14
(xvii) DPD / DPE FACILITY CHARGES
Additional charges for those RMS Container marked for seal verification or open inspection by Customs inside
PSA Chennai Yard.
(Rate per container in Rs.)
Particulars Upto 20’ Above 20’and 40’
A. Seal Verification
On wheel Customs Inspection 535.32 535.32
Documentation Charges 133.83 133.83
B. Open Examination
On wheel Customs Inspection 535.32 535.32
Documentation Charges 133.83 133.83
Lift On/Off in CY 861.21 1291.8
Shifting Within Terminal 1174.37 1761.55
Fixing Removal of Seal 267.67 267.67
• Forklift Charges at INR 347.61 per Hour if required during open examination.
Notes.
1. Cancellation charge for EIR applies when EIR is cancelled at the request of customer.
2. “One Door Open” Charge is applicable for handling containers which require only one door to be kept
open and when door opening and securing is carried by the terminal.
3. Fixing / Removal of Seal
Bottle seals shall be fixed on every container arriving at the terminal - by rail / road / sea - without
a proper bottle seal on it, prior to allowing its entry. The terminal staff shall be at liberty to do this
without having to obtain prior consent of the shipping lines. The list of such containers on which a seal
is affixed by the terminal shall be intimated to the lines. Seals shall be removed at the request of the
customer.Oct. 30, 2024] TAMIL NADU GOVERNMENT GAZETTE 193
4. Fixing / Removal of ‘Hazardous Sticker’
Hazardous stickers indicating the IMCO class only shall be affixed on a container (Four Stickers) carrying
hazardous cargo. Similarly old stickers on the container shall be removed from a container carrying non-
hazardous cargo. In either case, the customer has to intimate in writing to PSA Chennai to undertake
the said activity, within the terminal.
5. Customs Inspection
The inspection of a container shall be allowed at a nominated point only, on the written request of the
customer. The container doors can be opened only under customs supervision.
6. Additional Movement- From terminal to Rail siding or rail siding to terminal will be applicable for
ICD container moved by PSA Chennai.
7. Non-Declaration / Mis-declaration of Hazardous Container
The Customer has to declare the hazardous nature of the cargo as per the IMCO rules and furnish
the relevant hazardous details to PSA Chennai. The charges are for non-declaration / mis-declaration of
the hazardous nature and also for not furnishing the full particulars of the hazardous nature including
the IMCO class, UN NO, EPS, MFAG, correct technical name, contact details of the person in case
of emergency. The liabilities and cost towards the consequences arising due to non-declaration or mis
declaration shall, however, be on the customers account.
8. Weighment of Containers and Container Turning Activity
The service of Weighment of Containers (Sl.No.xv) and Container Turning Activity (Sl.No.xvi) are optional
services and shall be offered at the request of the users.
3.13. Charges for supply of fresh water to shipping alongside the container berths
Foreign-going Coastal
US $ Rs.
Per 1000 liters or part thereof 8.65 363.54
3.14. Charges for clearance of Garbage on board
Refer to Deputy Conservator’s circular No. G2/866/2022/M dt. 05/04/2024 on ChPA’s website, as amended
from time to time.
MALLA SRINIVASA RAO,
Financial Advisor & Chief Accounts Officer,
Chennai Port Authority.
PRINTED AND PUBLISHED BY THE COMMISSIONER OF STATIONERY AND PRINTING, CHENNAI
ON BEHALF OF THE GOVERNMENT OF TAMIL NADU