Skip to content
Home India Ministry of Coal Notifications Commercial Coal Mining: Fuelling India's Journey T... (Official PDF)
Date: 2nd August 2026 Category: Press Release Jurisdiction: India, Central Government

Commercial Coal Mining: Fuelling India's Journey Towards Aatmanirbhar Bharat

Issued by Ministry of Coal

Read or download the official PDF of this gazette notification issued by the Ministry of Coal on 2nd August 2026. Classified under Press Release.

Executive Summary & Key Takeaways

Executive Summary This report details the transformation of India’s coal sector following the launch of commercial coal mining on June 18, 2020, under the Aatmanirbhar Bharat mission. It highlights the transition to a transparent, auction-based revenue-sharing model and the removal of captive-use restrictions to enhance energy security. Key objectives include accelerating mine operationalization, with shortened timelines effective from the 15th auction round, to support a production target that has already surpassed one billion tonnes annually.

Key Points / Main Content

Policy Reforms and Regulatory Framework

  • Revenue-Sharing Model: Replaced fixed charges per tonne with a percentage-based revenue share indexed to the National Coal Index.
  • Market Liberalization: Removed captive-use restrictions, allowing bidders to sell coal to any sector at market-determined prices.
  • Liberalized Entry: Eliminated the requirement for prior mining experience and permitted 100% Foreign Direct Investment (FDI) via the automatic route.
  • Legal Standing: Re-allocated blocks under the Coal Mines (Special Provisions) Act, 2015, following the 2014 Supreme Court cancellation of 204 blocks.

Production and Auction Achievements

  • Record Production: Domestic production exceeded one billion tonnes for two consecutive years, reaching 1040.08 MT in FY 2025-26.
  • Auction Success: 141 mines have been auctioned since June 2020 across 14 rounds, with an average discovered revenue share of 24.17%.
  • Private Participation: Out of the auctioned mines, 123 were secured by private players, including 44 entities with no prior coal mining experience.
  • Capacity: The auctioned mines have a combined peak rated capacity of 366.35 MT per annum.

Operational and Economic Outlook

  • Efficiency Gains: Scheduled operationalization timelines for fully explored blocks reduced from 51 to 40 months, and from 66 to 52 months for partially explored blocks.
  • Economic Impact: At full production, auctioned blocks are expected to generate Rs. 47,000 crore in annual revenue and Rs. 48,756 crore in capital expenditure.
  • Employment: The commercial mining sector is projected to generate approximately 4,75,000 jobs.

Impact Analysis

Private Sector Players and New Entrants Impact They benefit from a level playing field, no end-use restrictions, and the ability to enter the sector without prior experience. Action Required Participate in open auctions and comply with the newly shortened timelines to bring mines into production.

Central and State Governments (Exchequer) Impact Significant growth in revenue from premiums, rising from Rs. 461 crore in FY 2014-15 to Rs. 5,553 crore in FY 2025-26, accruing to both the Centre and producing States. Action Required Continue efforts toward "ease of doing business" by simplifying and reducing the time required for clearances.

Foreign Investors Impact Can now hold 100% equity in coal mining projects through the automatic route. Action Required Evaluate investment opportunities in the Indian coal sector through joint ventures or independent bids.

Industrial Consumers (Power and Steel Industries) Impact Strengthened energy security and access to a competitive coal market with prices determined by market forces rather than fixed allocations. Action Required Adjust procurement strategies to leverage coal available from commercial and private mining entities.

Key Entities Referenced

Commercial Coal Mining: A policy reform launched in 2020 permitting the sale of coal on a competitive basis by private players without captive-use restrictions. Coal Mines (Special Provisions) Act, 2015: The statutory framework enacted to ensure transparent, auction-based allocation of coal mines following the Supreme Court's cancellation of prior blocks. Aatmanirbhar Bharat: The national mission and strategic vision under which coal sector reforms were implemented to achieve self-reliance in energy. National Coal Index: The benchmark used to index the government's revenue share from coal mining, ensuring returns align with market-determined prices. Ministry of Coal: The primary central ministry responsible for managing India's coal resources and overseeing the commercial auction rounds.
Official Gazette PDF Record Download Official PDF (Commercial Coal Mining: Fuelling India's...) →

Official Gazette Notification PDF Viewer

See Full Document Text & PDF Transcript
Ministry of Coal Commercial Coal Mining: Fuelling India's Journey Towards Aatmanirbhar Bharat प्रव तथ: 02 AUG 2026 2:33PM by PIB Delhi Coal meets the larger part of India's energy requirement. It accounts for close to 55 per cent of the country's primary energy needs and fuels more than 70 per cent of the electricity generated. India holds the world's fifth largest coal resource, assessed at about 4,00,715 Million Tonnes (MT), and ranks as the second largest producer and consumer of coal. Around five lakh mine workers produce this coal across more than 350 mines. Domestic coal production has crossed one billion tonnes for two consecutive years, at 1047.52 MT in FY 2024-25 and 1040.08 MT in FY 2025-26, compared with 609.18 MT in FY 2014-15. A substantial part of this growth has come from captive and commercial blocks, whose share of national production has risen from 10.9 per cent in FY 2021-22 to 20.2 per cent in FY 2025-26. In 2014, the Supreme Court of India cancelled 204 of the 218 blocks allocated between 1993 and 2012, finding the process arbitrary for want of consistent and objective criteria, and made clear the need for a transparent, auction-based framework. In response, the Coal Mines (Special Provisions) Act, 2015 placed re-allocation on a firm statutory footing, and the first auction tranche was launched in December 2014. Between 2015 and 2020, ten tranches of auction and nine of allotment restored 76 coal mines to productive use. On 18 June 2020, under the vision of the Prime Minister Shri Narendra Modi and the Aatmanirbhar Bharat mission, commercial coal mining was formally launched, permitting the sale of coal on a competitive basis and extending participation beyond the public sector. A successful bidder may now sell coal to any consumer in any sector at market-determined prices, with no captive-use restriction and no bar on how the coal is utilised. The erstwhile fixed charge per tonne was replaced by a revenue-sharing model, under which the bidder quotes a percentage of revenue payable to the Government. That share is indexed to the National Coal Index, so that the nation's return moves with the real value of the coal. Eligibility norms were broadened considerably. Prior mining experience is no longer required, joint ventures and consortia may participate, and 100 per cent foreign direct investment is permitted through the automatic route. Since June 2020, 141 coal mines have been auctioned commercially across 14 rounds, with a combined peak rated capacity of 366.35 MT per annum. The average revenue share discovered is 24.17 per cent, six times the 4 per cent floor. Of these, 123 have gone to private players, and 44 of the successful bidders were entities that had not mined coal before. Captive and commercial blocks together produced about 210.46 MT in FY 2025-26, crossing the 200 million tonne mark for the first time. A decade earlier the figure stood at 28.83 MT, a compound annual growth of about 22 per cent over the period. Within this, commercial mines have contributed about 26.12MT in FY 2025-26, with 23 mines operational (obtained Mine Opening Permission). At full production, the blocks auctioned so far are expected to yield annual revenue of about Rs. 47,000 crore, draw capital expenditure of about Rs. 48,756 crore, and generate employment of about 4,75,000. Returns to the exchequer have grown on a similar scale. Revenue from premium generation has risen from Rs. 461 crore in FY 2014-15 to Rs. 5,553 crore in FY 2025-26, a compound annual growth of about 26 per cent, accruing to the exchequer and to the producing States. The present focus is on ensuring that every auctioned mine is brought into production. Through sustained efforts for ease of doing business, the clearances required for blocks operationalization have been reduced and simplified, thereby scheduled operationalization timelines have been shortened, from 51 months to 40 for fully explored blocks and from 66 to 52 for partially explored ones (effective from the 15th round now under way). Every commercial coal block since June 2020 has been awarded through open auction. These reforms rest on transparency, competition and a level playing field between public and private players, strengthening the country's energy security, supporting its power and steel industries, and carrying India further towards the goal of Aatmanirbhar Bharat. *** Shuhaib T (रलीज़ आईडी: 2293366) आगंतुक पटल : 2158 इस वज्ञ को इन भाषाओ ंम पढ़: Urdu , ही , Punjabi , Tamil , Telugu

Continue your research