Official Gazette Notification Text
Official TranscriptMinistry of Power DISCOMS DIGITALISATION प्रव तथ: 10 AUG 2026 5:40PM by PIB Delhi Electricity being a concurrent subject, distribution of electricity to consumers, including the operations of the Distribution Companies (DISCOMs) and digitalisation thereof, falls within the purview of the respective distribution utility, which functions under the guidance of the respective State Government...
Ministry of Power DISCOMS DIGITALISATION प्रव तथ: 10 AUG 2026 5:40PM by PIB Delhi Electricity being a concurrent subject, distribution of electricity to consumers, including the operations of the Distribution Companies (DISCOMs) and digitalisation thereof, falls within the purview of the respective distribution utility, which functions under the guidance of the respective State Government and State Electricity Regulatory Commission. Government of India has supplemented the efforts of the States earlier through various schemes like Integrated Power Development Scheme (IPDS), launched in December, 2014, National Smart Grid Mission (NSGM), established in 2015, and presently under the Revamped Distribution Sector Scheme (RDSS), launched in July, 2021 with the objective of improving the quality of power supply through a financially sustainable and operationally efficient distribution sector.
Under IPDS, works amounting to Rs. 58,686 crore were executed, which supported IT enablement of the distribution sector under the subsumed Restructured Accelerated Power Development and Reforms Programme (R-APDRP), which included works for Enterprise Resource Planning (ERP), SCADA/ DMS in 59 towns, Real Time-Data Acquisition System (RT-DAS) in 1,414 towns and installation of 6.54 lakh smart meters. The scheme stands closed in March 2022.
The objective of NSGM is to plan and monitor the implementation of policies and programmes related to smart grids in India. The key components of the Mission were assistance in formulation of projects including pre-feasibility studies, project appraisal, funding to projects, and training and capacity building.
Under NSGM, 1,45,343 smart meters were installed in the State of Rajasthan and 24,214 smart meters in Chandigarh. A total of Rs 72.27 Cr was released under the Mission, out of which Rs 31.85 Cr was released since FY2023. The Mission stands closed in March 2024.
Under RDSS, financial assistance is being provided to the Distribution Utilities for loss reduction infrastructure works and smart metering works. Projects worth Rs. 1.53 lakh crore for loss reduction infrastructure works and Rs. 1.31 lakh crore for smart metering works have been sanctioned under the scheme. This includes works related to digitalisation of the distribution utilities which, inter alia, include
the following:
1. Smart metering works covering 19.79 crore consumers, 2.05 lakh feeders and 52.53 lakh Distribution Transformers (DTs) and the related digital eco-system.
2. SCADA (Supervisory Control and Data Acquisition)/ DMS (Distribution Management System) works sanctioned for 394 towns amounting to Rs. 2,627 crore.
3. IT/OT works such as Enterprise Resource Planning (ERP) systems, unified billing solutions, GIS- based works and real time data acquisition systems (RT-DAS) amounting to Rs 3,999 Cr.
4. Smart distribution works amounting to Rs. 8,608 crore sanctioned for seven cities, which include SCADA and smart technology works, GIS substations, Distribution Transformer health management, undergrounding of HT/LT lines and system augmentation/ modernisation works.
The above works have been sanctioned for 28 States and 45 distribution utilities. The State-wise details of Smart Metering, IT/OT works, SCADA/ RT-DAS works and Smart Distribution works sanctioned under RDSS are at Table I-II. Till date, funds amounting to Rs. 47,124 crore have been released under RDSSsince FY2023, which includes Rs. 2,733 crore released for smart metering works.
Further , to enable the adoption of digitalisation across the country, the Government of India has initiated India Energy Stack (IES), which is envisioned to create a universal digital enablement for data exchange across the power sector.
For training and capacity building of DISCOM personnel in areas including digital systems, under RDSS, allocation of Rs. 100.9 crore was made, of which, Rs. 23.36 crore has been utilized till July, 2026, and a total of 14,853 personnel have been trained. State-wise details of personnel trained under RDSS are at Table-III.
TABLE-I State-wise details of Smart Metering and IT/OT works sanctioned under RDSS S. State/ UT Sanctioned Cost of Smart Sanctioned Cost of IT/OT No. Metering works (Rs. crore) works* (Rs. crore) 1 Andaman & Nicobar 54 - Islands 2 Andhra Pradesh 4,128 120 3 Arunachal Pradesh 184 22 4 Assam 4,050 62 5 Bihar 2,021 406 6 Chhattisgarh 4,105 121 7 Delhi 13 - 8 Goa 469 39 9 Gujarat 10,642 507 10 Haryana 0 276 11 Himachal Pradesh 1,788 82 12 Jammu & Kashmir 1,064 119 13 Jharkhand 858 83 14 Karnataka 0 -15 Kerala 8,231 238 16 Ladakh 0 - 17 Madhya Pradesh 8,911 425 18 Maharashtra 15,215 171 19 Manipur 121 40 20 Meghalaya 310 21 21 Mizoram 182 10 22 Nagaland 208 15 23 Puducherry 251 - 24 Punjab 5,769 136 25 Rajasthan 9,715 455 26 Sikkim 97 22 27 Tamil Nadu 19,235 3 28 Telangana 0 - 29 Tripura 319 44 30 Uttar Pradesh 18,956 260 31 Uttarakhand 1,106 226 32 West Bengal 12,670 96 Total 1,30,671 3,999 * Sanctioned under Loss Reduction component TABLE-II A. State-wise details of SCADA/ RT-DAS works sanctioned under RDSSS. State/ UT SCADA/ DMS towns under RT-DAS/ SFMS feeders under No. RDSS (Nos.) RDSS (Nos.) 1 Andhra Pradesh 0 - 2 Assam 0 - 3 Bihar 1 - 4 Chhattisgarh 0 - 5 Delhi 1 - 6 Goa 0 - 7 Gujarat 192 14,000 8 Haryana 2 - 9 Himachal 43 - Pradesh 10 Jammu & 0 - Kashmir 11 Jharkhand 0 - 12 Kerala 3 - 13 Madhya Pradesh 147 - 14 Maharashtra 1 - 15 Meghalaya 0 - 16 Mizoram 0 - 17 Odisha 0 - 18 Puducherry 0 - 19 Punjab 0 - 20 Rajasthan 0 -21 Tamil Nadu 0 - 22 Telangana 0 - 23 Uttar Pradesh 3 - 24 Uttarakhand 3 1,269 25 West Bengal 0 - Total 396 15,269
Note: (i) RT-DAS/ SFMS works under RDSS cover feeders in suburban and rural areas.
B. Smart Distribution works sanctioned under RDSS S. State DISCOM City Sanctioned Outlay Sanctioned Central grant No. (Rs. crore) (Rs. crore) 1 Haryana DHBVNL Gurugram 706.04 423.62 2 Haryana DHBVNL Faridabad 2,932.17 1,759.30 3 Uttar KESCO Kanpur 751.27 450.76 Pradesh 4 Uttar PVVNL NOIDA 1,333.20 799.92 Pradesh 5 Uttar PuVVNL Varanasi 1,455.18 873.11 Pradesh 6 Bihar SBPDCL Patna 873.67 524.21 7 Uttarakhand UPCL Rishikesh 556.05 500.44 Total 8,607.58 5,331.36 TABLE-III State-wise details of personnel trained under RDSSSl.No. State DISCOM Participants 1 Andaman Nicobar A&N PD 48 2 Andhra Pradesh APCPDCL 332 3 APEPDCL 754 4 APSPDCL 487 5 Arunachal Pradesh Arunachal PD 205 6 Assam APDCL 250 7 Bihar NBPDCL 176 8 SBPDCL 205 9 Chhattisgarh CSPDCL 311 10 Delhi NDMC 75 11 Goa Goa-PD 297 12 Gujarat DGVCL 306 13 MGVCL 130 14 PGVCL 309 15 UGVCL 274 16 Haryana DHBVNL 388 17 UHBVNL 195 18 Himachal Pradesh HPSEBL 531 19 Jammu & Kashmir JPDCL 186 20 KPDCL 159 21 Jharkhand JBVNL 277Sl.No. State DISCOM Participants 22 Karnataka BESCOM 170 23 CESCOM 147 24 GESCOM 39 25 HESCOM 184 26 MESCOM 40 27 Kerala TCED+CPT 180 28 KSEBL 823 29 Ladakh Ladakh PD 81 30 Madhya Pradesh MPPKVVCL-C 347 31 MPPKVVCL-E 479 32 MPPKVVCL-W 495 33 Maharashtra BEST 256 34 MSEDCL 626 35 Manipur MSPDCL 103 36 Meghalaya MePDCL 161 37 Mizoram Mizoram-PD 121 38 Nagaland DOP 42 39 Puducherry PED 214 40 Punjab PSPCL 33041 Rajasthan AVVNL 179 42 JdVVNL 364 43 JVVNL 280 44 Sikkim DoP Sikkim 144 45 Tamil Nadu TNPDCL/TANGEDCO 884 46 Telangana TSNPDCL 80 47 TSSPDCL 111 48 Tripura TSECL 366 49 Uttar Pradesh DVVNL 226 50 KESCO 309 51 MVVNL 234 52 PaVVNL 327 53 PuVVNL 238 54 Uttarakhand UPCL 130 55 West Bengal WBSEDCL 248 Total 14,853 This information was given by The Minister of State in the Ministry of Power, Shri Shripad Naik, in a written reply in the Rajya Sabha today.