Executive Summary & Key Takeaways
**Executive Summary**
This document presents guidelines for clean and safe construction in Greater Chennai Corporation (GCC), effective June 20, 2025. The guidelines aim to mitigate air pollution from construction activities. High-significance violations require rectification within 15 days, followed by a grace period of 7 days; failure to comply leads to a stop-work order.
**Key Points / Main Content**
**General Guidelines**
* Construction sites must prevent dust and debris spillage to exterior locations.
* Sites must cover structures to prevent dust resuspension, using high-density fabric, tarpaulin, or double-layered green nets.
* Continuous water sprinkling or water fogging is required to prevent dust emissions during dust-generating activities.
* Construction materials and C&D waste must be stored on-site, not on public roads, covered with at least 200 GSM high-density polyethylene sheets/tarpaulin.
* Regular housekeeping of sites is required multiple times daily.
* Waste materials must be transported in covered trays or dust chutes. Covered lift shafts can be used as dust chutes.
* Leftover material and C&D waste must be segregated and transported according to GCC guidelines.
* Vehicles transporting materials must not be overloaded and must be covered to prevent dust resuspension.
* Manual/mechanical wheel washing is mandatory for vehicles exiting the site.
* Entry/exit points and approach roads must be periodically cleaned.
**Monitoring and Equipment**
* High-rise projects (above 18.5m) require CCTV monitoring and personnel must follow air pollution mitigation measures.
* High-rise projects (above 18.5m) must deploy sensor-based air pollution monitors.
* DG sets must use clean fuels or emission control devices, in line with MoEFCC guidelines.
* Security measures are required in large apartments and commercial complexes.
* Vehicles transporting materials must have valid PUC certification.
**Personnel and Training**
* A designated site engineer/environmental engineer/project manager must develop and oversee an air pollution mitigation plan.
* Site personnel must be sensitized to air pollution reduction. Informational posters are required on-site.
* Workers must be provided with proper PPE (masks, goggles, protective gear).
**Enforcement**
* GCC may conduct spot inspections. Access to the site and project records must be provided upon demand.
**Penalties**
* Penalties are assessed based on the area of the project site and the significance of the violation.
* Violation penalties range from Rs. 1,000 to Rs. 5,00,000, depending on the area and violation type.
**Impact Analysis**
**Constructors/Construction Companies**
* **Impact:** Required to adhere to new guidelines for clean and safe construction to mitigate air pollution on construction sites.
* **Action Required:** Implement all guidelines, including site barricading, dust suppression, waste management, monitoring, and training, and be prepared for inspections by GCC authorities. Rectify violations within the given timeframe to avoid penalties or a stop-work order.
**Construction Workers**
* **Impact:** Reduced exposure to air pollution from construction activities due to the implementation of new guidelines.
* **Action Required:** Follow all new site procedures, use provided PPE, and attend training sessions to understand measures for reducing air pollution.
**Greater Chennai Corporation (GCC)**
* **Impact:** Responsible for enforcing the new guidelines and conducting inspections to ensure compliance.
* **Action Required:** Conduct regular spot inspections to ensure mitigation measures are followed, enforce penalties for violations, and ensure constructors provide access to sites and project records.
Key Entities Referenced
Guidelines for Clean and Safe Construction for Greater Chennai Corporation : A set of rules developed by the Greater Chennai Corporation (GCC) to mitigate air pollution from construction activities.
Greater Chennai Corporation (GCC) : The municipal corporation responsible for implementing and enforcing the clean construction guidelines.
C&D Waste Management guidelines of the GCC : Guidelines that the Greater Chennai Corporation refers to regarding construction and demolition waste.
See Full Document Text
© [Regd. No. TN/CCN/467/2012-14.
GOVERNMENT OF TAMIL NADU [R. Dis. No. 197/2009.
2025 [Price: Rs. 2.40 Paise.
TAMIL NADU
GOVERNMENT GAZETTE
EXTRAORDINARY
PUBLISHED BY AUTHORITY
No. 311] CHENNAI, FRIDAY, JUNE 20, 2025
Aani 6, Visuvaavasu, Thiruvalluvar Aandu-2056
Part III—Section 2
Statutory Notifications and Orders issued by
Heads of Departments.
NOTIFICATIONS BY HEADS OF DEPARTMENTS, ETC.
MUNICIPAL ADMINISTRATION AND WATER SUPPLY DEPARTMENT
GREATER CHENNAI CORPORATION, CHENNAI-600 003.
GUIDELINES FOR CLEAN AND SAFE CONSTRUCTION FOR GREATER CHENNAI CORPORATION
(S.W.M.C. No. A7/2618/2025)
No. SRO C-28(a)/2025.
Construction activities such as demolition, excavation, hammering, crushing, mixing, material handling, vehicle
movement, etc. are known to emit various pollutants, most commonly dust-containing particulate matter (PM10 and
PM2.5), that, when resuspended, go on to affect air quality. Recognizing the significant impact of construction activities
on air quality within Chennai, the Greater Chennai Corporation (GCC) has developed the Guidelines for Clean and
safe Construction to mitigate air pollution, safeguard public health and ensure sustainable urban development. These
guidelines are designed to mitigate air pollution arising from building constructions, Ready-Mix Concrete (RMC) or
batching plants, and other construction works in Chennai.
The guidelines are as follows:
1. At project sites of site area up to one acre, the perimeter of the site shall be barricaded with tin/metal sheets
of height 6 m to prevent spillage of dust and debris to exterior locations. (High significance)
2. At project sites of site area greater than one acre or buildinggreater than 70 m and all RMC plants, the perimeter
of the site shall be barricaded with tin/metal sheets of height 10 m to prevent spillage of dust and debris to exterior
locations. (High significance)
3. All structure(s) to be demolished/ constructed shall be covered with high-density fabric/ tarpaulin/double-layered
green net to prevent spillage of resuspended dust particles. Adequate sprinkling/ anti-smog guns focused on the
dust-emitting source shall also be undertaken to control dust generation during demolition/ construction activities.
(High significance)
4. There shall be continuous manual /mechanical water sprinkling /water fogging focused towards activity to prevent
dust emissions during critical dust-generating activities like demolition, excavation,cutting, drilling, polishing, mixing and
any similar dust-generating activity to prevent resuspension of dust. (High significance)
III-2 Ex. (311) [ 1 ]2 TAMIL NADU GOVERNMENT GAZETTE EXTRAORDINARY
5. All construction material, excavated earth and C&D waste shall be stored on the site, not dumped on public
roads or pavements and shall be covered with high-densitypolyethylene sheet/ tarpaulinof at least 200 GSM to avoid
wind-blown dust resuspension. (High significance)
6. The constructor shall undertake regular housekeeping of the site multiple times throughout the day by brooming,
cleaning, and sprinkling to ensure minimization of dust particles. (Medium significance)
7. Any waste materials generated during construction may be transported to designated areas on sites by use
of covered trays, dust chutes etc. to prevent resuspension by exposure to wind. Properly covered lift shafts under
construction shall also be alternatively used as dust chutes. (High significance)
8. All leftover construction material/ construction and demolition waste generated on-site may be treated in accordance
with C&D Waste Management guidelines of the GCC and be segregated and transported to GCC-designated C&D
Waste Management facilities as soon as possible as directed by the C&D waste management guidelines of GCC.
(High significance)
9. All vehicles transporting materials and C&D waste shall not be overloaded to avoid spillage and shall have their
storage areas completely covered from top and sides with tarpaulin to prevent resuspension of dust by exposure to
wind. Ensure covering remains secured in place during transport. (High significance)
10. Manual /mechanical wheel washing shall be undertaken for all vehicles immediately before their exit from the
site. Periodic cleaning of entry/exit points and approach roads shall be undertaken to prevent the spread of dust/muck
by vehicles onto adjoining roads. (High significance)
11. The constructor shall deploy CCTV monitoring at high-rise building project sites (building height above 18.5m)
to ensure that personnel are following appropriate air pollution mitigation measures. CCTV footage shall be made
available to GCC authorities for inspection as and when required.(High significance)
12. The constructor shall deploy sensor-based air pollution monitors at high-rise building project sites (building height
above 18.5 m), with at least two sensors placed on the perimeters in upwind and downwind directions respectively.
The constructor shall act immediately upon recording high pollution levels on sites. Monitoring records shall be made
available to GCC authorities for inspection as and when required. (High significance)
13. DG sets operational zed on sites shall run on clean fuels such as LPG/ PNG / Electricity, dual fuel mode, or be
equipped with Emission Control Devices, and be operated in accordance with MoEFCC guidelines. (High significance)
14. Security measures (Alarm System, Safety measures) must be in place in constructions sites like large apartments,
commercial complexes. (High significance)
15. All vehicles transporting materials and/or C&D waste shall possess valid Pollution under Control (PUC) certification.
(High significance)
16. The constructor shall designate a site engineer/ environment engineer/ project manager or any other appropriate
site personnel at the managerial level to develop an air pollution mitigation plan for the lifecycle of the project and
oversee its implementation. (Medium significance)
17. Site personnel, labour, and any other staff shall be sensitized by the constructor towards the reduction of air
pollution by careful conduct of all construction-related activities. The constructor shall also install informational boards/
posters at the site for visual reference of workers on site. (Low significance)
18. Proper Personal Protective Equipment (PPE), such as respiratory masks, goggles, and protective gear, should
be made available to protect workers from breathing in dangerous airborne particles. (Medium significance)
Penalties for violators:
a) GCC may undertake spot inspections at sites to ensure mitigation measures are being adhered to, and the
constructor shall endeavour to provide access to site and project records as and when demanded.TAMIL NADU GOVERNMENT GAZETTE EXTRAORDINARY 3
b) Any constructor found violating aforementioned guidelines shall be penalized as given below:
Penalties for
Penalties for Low & Medium
High Significant
S No Area of Project Significant Category
Category
violators
violators
1 Violations for built-up area (BUA) above 20,000 sq m Rs. 5,00,000/- Rs.1,00,000
Violations for Built up area (BUA) above 500 sq m and
2 Rs. 25,000/- Rs.10,000
up to 20,000 sq m BUA
Violations for plot Built up area (BUA) 300 sq m and
3 Rs. 10,000/- Rs.1000
upto 500 sq m
In case of Medium/ Low significant violations, notice for rectification of violations will be issued to the construction
site and 15 days of time will be given to rectify issues. If repairs are not rectified after 15 days, a fine will be imposed
according to the Construction site area. After that, a grace period of 7 days will be given to them after which, if the
repairs are not rectified, the notice will be issued to stop the construction activities in the site.
In case of high significant violations, notice for rectification of violations will be issued to the construction site
and 15 days of time will be given to rectify issues. If repairs are not rectified after 15 days, a fine will be imposed
according to the Construction site area. After that, a grace period of 7 days will be given to them after which, if the
repairs are not rectified, the notice will be issued to stop the construction activities in the site.
J. KUMARAGURUBARAN,
Chennai - 600 003, Commissioner,
20th June 2025. Greater Chennai Corporation.
பெபெெெருருநநககரர பெபெெென்ன்னைனை�� மாமாாாநநககரராாட்ட்சிசி,, பெபெெென்ன்னைனை�� -- 660000 000033..
பெபெெெருருநநககரர பெபெெென்ன்னைனை�� மாமாாாநநககரராாட்ட்சிசிக்க்ககாா�� சுசுத்த்ததமாமாாா�� மாமாற்ற்றுறும்ம் ெொாதுதுககாாப்ப்ெொா�� ககட்ட்டுடுமாமாாா��த்த்திதிற்ற்ககாா�� வவழிழிககாாட்ட்டுடுததல்ல்ககள்ள்
(S.W.M.C. No. A7/2618/2025)
சுத்தமாா� மாற்றும் ொதுகாப்ொ� கட்டுமாா�த்திற்கா� வழிகாட்டுதல்கள் மூலம் பெென்னை�யில் நனைைபெெறும் அனை�த்து கட்டிை
கட்டுமாா�ங்கள், பெரடி-மிக்ஸ் கான்கிரீட் (RMC) ஆனைலகள் மாற்றும் பிற கட்டுமாா�ப் ெணிகளாால் எற்ெடும் சுற்றுச்சூழல் மாாசு
அனைைதல் மாற்றும் பிற இதர ொதிப்புகளில் இருந்து தவிர்க்க முடியும். மேமாலும் இந்த வழிகாட்டுதல்கள் மூலம், காற்று மாாசுொட்னைைக்
குனைறத்தல், பெொது சுகாதாரத்னைதப் ொதுகாத்தல் மாற்றும் நினைலயாா� நகர்ப்புற வளார்ச்சினையா உறுதி பெெய்யா முடியும். காற்று
மாாசுப்ெட்னைை ஏற்ெடுத்தும் கட்டுமாா� நைவடிக்னைககள் மாற்றும் காற்று மாாசுப்ொட்னைை எற்ெடுத்தும் முக்கியா பெொருள்கலா� தூசி
பெகாண்ை துகள்கள் (PM10 மாற்றும் PM2.5) மேொன்றவற்னைற இந்த வழிகாட்டுதல்கள் மூலம் தவிர்க்க முடியும். கட்டுமாா�ங்களாால்
காற்றின் தரத்தில் ஏற்ெடும் தாக்கம் மாற்றும் பிற கட்டுமாா� பெொருட்கள், மீண்டும் காற்றில் கலக்கப்ெடும்மேொது, காற்றின் தரத்தில்
குறிப்பிைத்தக்க தாக்கத்னைத ஏற்ெடுத்துகின்ற� இந்த வழிகாட்டுதல்கள் மூலம் இனைவ அனை�த்தும் தவிர்க்கப்ெடும்.
காற்று மாாசுொட்னைைத் குனைறப்ெதற்காக கட்டிை கட்டுமாா�ப் ெணிகளுக்கு இந்த வழிகாட்டுதல்கள் ெரிந்துனைரக்கப்ெடுகிறது.
பெெருநகர பெென்னை� மாாநகராட்சிப் ெகுதியில் மேமாற்பெகாள்ளாப்ெடும் கட்டிைக் கட்டுமாா�ங்கள், RMC/ Batching Plants மாற்றும் இதர
கட்டுமாா�ப் ெணிகளுக்கு இனைவ பெொருந்தும்.
1. ஒரு ஏக்கர் வனைர ெரப்ெளாவு பெகாண்ை திட்ைத் தளாங்களில், பெவளிப்புற இைங்களில் தூசி மாற்றும் குப்னைெகள் ெரவுவனைதத்
தடுக்க, தளாத்னைத சுற்றி 6 மீ உயாரமுள்ளா தகரம்/உமேலாகத் தடுப்புகள் அனைமாக்கப்ெை மேவண்டும். ((அஅதிதிகக முமுக்க்கிகியாயாத்த்துதுவவம்ம்))
2. ஒரு ஏக்கருக்கும் அதிகமாா� தளாப் ெரப்பு பெகாண்ை திட்ைத் தளாங்களில் அல்லது 70 மீட்ைருக்கும் உயாரமாா� கட்டிைங்கள்
மாற்றும் அனை�த்து RMC ஆனைலகளிலும், பெவளிப்புற இைங்களில் தூசி மாற்றும் குப்னைெகள் ெரவுவனைதத் தடுக்க, தளாத்னைத சுற்றி
10 மீ உயாரமுள்ளா தகரம்/உமேலாகத்தடுப்புகள் அனைமாக்கப்ெை மேவண்டும். ((அஅதிதிகக முமுக்க்கிகியாயாத்த்துதுவவம்ம்))
3. புதியா கட்டுமாா�ம் அல்லது இடிக்கப்ெடும் அனை�த்துக் கட்ைனைமாப்புகளியிருந்து பெவளிவரும் தூசித் துகள்கள்
ெரவுவனைதத் தடுக்க அதிக அைர்த்தி பெகாண்ை துணி/ தார்ப்ொய்/இரட்னைை அடுக்கு ெச்னைெ வனைலயாால் மூைப்ெட்டிருக்க மேவண்டும்.
தூசிகள் உருவாகும் ெகுதிகளில் தண்ணீர் பெதளிப்ொன்கள் மூலம் தண்ணீர் பெதளித்து தூசி உற்ெத்தினையாக் கட்டுப்ெடுத்தமேவண்டும்.
((அஅதிதிகக முமுக்க்கிகியாயாத்த்துதுவவம்ம்))
4. இடித்தல், மேதாண்டுதல், பெவட்டுதல், துனைளாயிடுதல், பெமாருகூட்டுதல், கலக்குதல் மேொன்ற ெணிகளின் மேொது உருவாகும்
தூசிகள் தடுக்கும் மேநாக்கில் பெதாைர்ந்து தா�ாக இயாங்கும் பெதளிப்ொன்கள்/இயாந்திர பெதளிப்ொன்கள் மூலம் தண்ணீர் பெதளித்து
தூசி மாற்றும் குப்னைெகள் ெரவுவனைதத் தடுக்க மேவண்டும். ((அஅதிதிகக முமுக்க்கிகியாயாத்த்துதுவவம்ம்))
5. அனை�த்து கட்டுமாா�ப் பெொருட்களும், மேதாண்ைப்ெட்ை மாண் மாற்றும் கட்டிை இடிப்ொட்டுக் கழிவுகள் தளாத்தில் தனியாாக,
அதற்காக ஓதுக்கப்ெட்ை இைத்தில் மேெமிக்கப்ெை மேவண்டும், அனைவ ொனைலகள் அல்லது நனைைொனைதகளில் பெகாட்ைப்ெைக்கூைாது
மாற்றும் அவற்றிலிருந்து காற்றி�ால் ெரவும் தூசிகனைளாத் தவிர்க்க குனைறந்தெட்ெம் 200 GSM உயார் அைர்த்தி ொலிஎதிலீன் தாள் /
தார்ொலி�ால் மூைப்ெட்டிருக்க மேவண்டும். ((அஅதிதிகக முமுக்க்கிகியாயாத்த்துதுவவம்ம்))4 TAMIL NADU GOVERNMENT GAZETTE EXTRAORDINARY
6. தூசித் துகள்கனைளாக் குனைறப்ெனைத உறுதி பெெய்யும் வனைகயில் கட்டுமாா� தளாங்களில் உருவாகும் தூசி மாற்றும் குப்னைெகனைளா
வாருதல், சுத்தம் பெெய்தல், தண்ணீர் பெதளித்தல் மாற்றும் துனைைத்தல் மேொன்றவற்றின் மூலம் தளாத்தில் வழக்கமாா� ெராமாரிப்னைெ நாள்
முழுவதும் கட்டுமாா� ெணி புரிெவர் மேமாற்பெகாள்ளா மேவண்டும். (( நநடுடுத்த்ததரர முமுக்க்கிகியாயாத்த்துதுவவம்ம்))
7. கட்டுமாா�த்தின் மேொது உருவாகும் எந்தபெவாரு கழிவுப் பெொருட்கனைளாயும் திறந்த பெவளியில் காற்றில் ெரவுவனைத /
கலப்ெனைத தவிர்க்க மூைப்ெட்ை தட்டுகள், தூசிச் ெட்டிகள் மேொன்றவற்னைறப் ெயான்ெடுத்தி அதற்காக ஒதுக்கப்ெட்ை ெகுதிகளுக்கு
பெகாண்டு பெெல்ல மேவண்டும். முனைறயாாக மூைப்ெட்ை லிப்ட் ஷாாஃப்ட்களும் தூசி மேெமிப்ொ�ாக ெயான்ெடுத்தப்ெை மேவண்டும்.
((அஅதிதிகக முமுக்க்கிகியாயாத்த்துதுவவம்ம்))
8. எஞ்சியிருக்கும் அனை�த்து கட்டுமாா�ப் பெொருட்கள்/ கட்டுமாா�ம் மாற்றும் இடிொடு கழிவுகள் மாாநகராட்ச்சியின் கட்டுமாா�
மாற்றும் இடிொட்டு (C&D) கழிவு மேமாலாண்னைமா வழிகாட்டுதல்களின்ெடி பிரிக்கப்ெட்டு வாக�ங்களில் பெகாண்டு பெெல்லப்ெை மேவண்டும்,
மேமாலும் பெெருநகர பெென்னை� மாாநகராட்சியின் கட்டுமாா� மாற்றும் இடிொட்டு (C&D) கழிவு மேமாலாண்னைமா வழிகாட்டுதல்களின்ெடி
பெெருநகர பெென்னை� மாாநகராட்சியாால் உருவாக்கப்ெட்ை கட்டுமாா� மாற்றும் இடிொட்டு (C&D) கழிவு மேமாலாண்னைமா தளாங்களுக்கு
பிரிக்கப்ெட்ை நினைலயில் பெகாண்டு பெெல்லப்ெை மேவண்டும். ((அஅதிதிகக முமுக்க்கிகியாயாத்த்துதுவவம்ம்))
9. பெொருட்கள் கட்டிை, இடிப்ொடு கழிவுகள் மாற்றும் அனைத ொர்ந்த கழிவுகனைளா ஏற்றிச் பெெல்லும் அனை�த்து வாக�ங்களும்
காற்று மாாசுெடுவனைத தவிர்ப்ெதற்காக அதிக சுனைமாகனைளா ஏற்றிச்பெெல்லக் கூைாது, மேமாலும் தூசிகள் ெரவுவனைதத் தடுக்க அவற்றின்
மேெமிப்புப் ெகுதிகள் சுற்றி மேமால் மாற்றும் ெக்கவாட்டில் உள்ளா திறந்த ெகுதிகள் முற்றிலும் தார்ொலின் மூலம் மூைப்ெட்டிருக்க
மேவண்டும். மேொக்குவரத்தின் மேொது தார்ொலின்கள் ெரியாாக கட்ைப்ெட்டு ொதுகாப்ொக இருப்ெனைத உறுதி பெெய்யா மேவண்டும்.
((அஅதிதிகக முமுக்க்கிகியாயாத்த்துதுவவம்ம்))
10. அனை�த்து வாக�ங்களும் தளாத்தில் இருந்து பெவளிமேயாறும் முன் தா�ாக இயாங்கும் இயாந்திரம்/ னைகமுனைறயாாக
வாக�ங்களின் ெக்கரங்கனைளா கழுவுதல் மேமாற்பெகாள்ளா மேவண்டும். நுனைழவு/பெவளிமேயாறும் இைங்கள் மாற்றும் அணுகுச் ொனைலகனைளா
அவ்வப்மேொது சுத்தம் பெெய்வது, வாக�ங்களாால் தூசி/மேெறுகள் அனைத ஒட்டிவுள்ளா ொனைலகளில் ெரவுவனைதத் தடுக்க மேவண்டும்.
((அஅதிதிகக முமுக்க்கிகியாயாத்த்துதுவவம்ம்))
11. காற்று மாாசுொட்னைைத் தணிக்கும் நைவடிக்னைககனைளாப் ெணியாாளார்கள் பின்ெற்றுவனைத உறுதி பெெய்வதற்காக, உயாரமாா�
கட்டிைத் தளாங்களில் (18.5 மீட்ைருக்கு மேமால்) CCTV கண்காணிப்னைெ கட்ைைம் கட்டுெவர் ெயான்ெடுத்த மேவண்டும். CCTV காட்சிகள்
பெெருநகர பெென்னை� மாாநகராட்சி அதிகாரிகளுக்கு மேதனைவப்ெடும் ெட்ெத்தில் ஆய்வுக்கு ெமார்பிக்க மேவண்டும். ((அஅதிதிகக முமுக்க்கிகியாயாத்த்துதுவவம்ம்))
12. கட்டுமாா� நிறுவ�ம், உயாரமாா� கட்டிைத் திட்ை இைங்களில் (கட்டிை உயாரம் 18.5 மீட்ைருக்கு மேமால்) பெென்ொர்
அடிப்ெனைையிலா� காற்று மாானைெ கண்ைறியும் கண்காணிப்பு கருவிகனைளா ெயான்ெடுத்த மேவண்டும், குனைறந்தெட்ெம் இரண்டு
பெென்ொர்கள் முனைறமேயா ஒரு கருவி மேமால்மேநாக்கியும் மாற்பெறாரு கருவி கீழ்மேநாக்கியும் சுற்றளாவுக்மேகற்ெ னைவக்கப்ெை மேவண்டும்.
கட்டுமாா� நிறுவ�ம், தங்கள் தளாங்களில் அதிக அளாவிளாா� காற்று மாாசு ெதிவுகனைளா கண்ைாறிந்தால் உை�டியாாகச் பெெயால்ெை
மேவண்டும். பெெருநகர பெென்னை� மாாநகராட்சி அதிகாரிகளுக்குத் மேதனைவப்ெடும்மேொது ஆய்வுக்காகக் கண்காணிப்பு கருவிகளின்
ெதிவுகனைளா காண்பிக்க மேவண்டும். ((அஅதிதிகக முமுக்க்கிகியாயாத்த்துதுவவம்ம்))
13. தளாங்களில் பெெயால்ெடும் DG பெெட்கள், LPG/ PNG/ மின்ொரம், எரிபெொருள் ெயான்முனைற மேொன்ற சுத்தமாா� எரிபெொருளில்
இயாங்குதல் மேவண்டும். மேமாலும் அவற்றில் மாாசு கட்டுப்ொட்டு ொத�ங்கள் பெொருத்தப்ெட்டிருக்க மேவண்டும், மேமாலும் அனைவ MoEFCC
வழிகாட்டுதல்களின்ெடி இயாக்கப்ெடுதல் மேவண்டும். ((அஅதிதிகக முமுக்க்கிகியாயாத்த்துதுவவம்ம்))
14. பெெரியா அடுக்குமாாடி குடியிருப்புகள், வணிக வளாாகங்கள் மேொன்ற கட்டுமாா�ங்களில் ொதுகாப்பு நைவடிக்னைககள் (Alarm
System, Safety measures) கண்டிப்ொக இருத்தல் மேவண்டும் ((அஅதிதிகக முமுக்க்கிகியாயாத்த்துதுவவம்ம்))
15. கட்டுமாா� பெொருட்கள், கட்டிை இடிப்ொடு கழிவுகள் மாற்றும் அனைத ொர்ந்த கழிவுகளாக் பெகாண்டு பெெல்லும் அனை�த்து
வாக�ங்களும் கட்ைாயாம் மாாசு கட்டுப்ொட்டு ொன்றிதழ் னைவத்திருக்க மேவண்டும். ((அஅதிதிகக முமுக்க்கிகியாயாத்த்துதுவவம்ம்))
16. கட்டிைம் கட்டுெவர் தளாத்தில் ஒரு தளாப் பெொறியாாளார்/சுற்றுச்சூழல் பெொறியாாளார்/திட்ை மேமாலாளார் அல்லது நிர்வாக
மாட்ைத்தில் பெொருத்தமாா� தளா ெணியாாளார்கனைளா நியாமித்து, திட்ைத்தின் வாழ்க்னைகச் சுழற்சிக்கா� காற்று மாாசுொட்னைைத் தணிக்கும்
வனைகயில் திட்ைத்னைத உருவாக்கி, திட்ைத்தின் கால சுழற்சிக்கு ஏற்றார்மேொல் பெெயால்ெடுத்திை மேவண்டும். (( நநடுடுத்த்ததரர முமுக்க்கிகியாயாத்த்துதுவவம்ம்))
17. தளாத்தில் உள்ளா ெணியாாளார்கள், பெதாழிலாளார்கள் மேொன்ற அனை�த்து ஊழியார்களுக்கு கட்டிைம் கட்டுெவர் காற்று
மாாசுெடுதனைல தவிர்ப்ெது ெற்றியா புரிதனைல/விழிப்புணர்னைவ ஏற்ெடுத்தியிருக்க மேவண்டும். கட்டிைம் கட்டுெவர் ஊழியார்களுக்கு
இது பெதாைர்ொ� புரிதல் ஏற்ெடுத்தும் வனைகயில் அது ெம்மாந்தமாா� விழிப்புணர்வு ெதானைககள்/ெைங்கள் மேொன்றவற்னைற தளாத்தில்
நிறுவியிருக்க மேவண்டும். ((குகுனைனைறறந்ந்தத முமுக்க்கிகியாயாத்த்துதுவவம்ம்))
18. மாாசுெட்ை காற்றில் உள்ளா துகள்கனைளா சுவாசிப்ெதில் இருந்து பெதாழிலாளார்கனைளாப் ொதுகாக்க, சுவாெ முகமூடிகள்,
கண்ணாடிகள் மாற்றும் ொதுகாப்பு கவெங்கள் மேொன்ற முனைறயாா� தனிப்ெட்ை ொதுகாப்பு உெகரணங்கள் (PPE) கினைைக்கச் பெெய்யா
மேவண்டும். (( நநடுடுத்த்ததரர முமுக்க்கிகியாயாத்த்துதுவவம்ம்))
வவழிழிககாாட்ட்டுடுததல்ல்ககனைனைளாளா மீமீறுறுெெவவர்ர்ககளுளுக்க்ககாா�� அஅெெரராாததம்ம்::
a) பெெருநகர பெென்னை� மாாநகராட்சி அதிகாரிகள் காற்று மாாசுொட்னைை தவிர்க்கும் நைவடிக்னைககள் கனைைபிடிக்கப்ெடுவனைத
உறுதி பெெய்வதற்காக, பெெருநகர பெென்னை� மாாநகராட்சி ெகுதிகளில் ஆய்வுகனைளா மேமாற்பெகாள்ளாலாம், மேமாலும் கட்ைைம் கட்டுெவர்,
பெெருநகர பெென்னை� மாாநகராட்சி அதிகாரிகள் மேகட்கும் ெட்ெத்தில் மேதனைவயாா� ஆவணங்கனைளா ெமார்ப்பிக்க மேவண்டும், மேமாலும்
தளாத்திற்குள் ஆய்வுகள் மேமாற்பெகாள்ளா பெெருநகர பெென்னை� மாாநகராட்சி அலுவலர்கனைளா அனுமாதிக்க மேவண்டும்.TAMIL NADU GOVERNMENT GAZETTE EXTRAORDINARY 5
b) மேமாற்கூறியா வழிகாட்டுதல்கனைளா மீறுெவர்களுக்கு கீழ் உள்ளாவாறு அெராதம் விதிக்கப்ெடும்:
குனைறந்த மாற்றும் நடுத்தர
வரினைெ அதிக முக்கியாத்துவம் வாய்ந்த
திட்ைத்தின் ெரப்ெளாவு முக்கியாத்துவம் வாய்ந்த
எண் இ�ங்களுக்கு அெராதம்
இ�ங்களுக்கு அெராதம்
1 20,000 ெ.மீட்ைருக்கு (BUA) அதிகமாா� ெரப்ெளாவு Rs. 5,00,000/- Rs.1,00,000
உள்ளா தளாங்களில் வழிகாட்டு விதிமீறுதலுக்கு
2 500 ெ.மீ க்கு மேமால் 20,000 ெ.மீ-வனைர ெரப்ெளாவில் Rs. 25,000/- Rs.10,000
(BUA) அனைமாந்துள்ளா தளாங்களில் வழிகாட்டு
விதிமீறுதலுக்கு
3 300 ெ.மீ முதல் 500 ெ.மீ ெரப்ெளாவில் (BUA) Rs. 10,000/- Rs.1000
அனைமாந்துள்ளா தளாங்களில் வழிகாட்டு விதிமீறுதலுக்கு
நடுத்தர/குனைறந்த முக்கியாத்துவம் பெகாண்ை வழிகாட்டுதல்களில் விதி மீறல்கள் ஏற்ெட்ைால், மீறல்கனைளா ெரிபெெய்வதற்கா�
எச்ெரிக்னைக அறிவிப்பு வழங்கப்ெட்டு அனைத ெரி பெெய்வதற்கு 15 நாட்கள் அவகாெம் அளிக்கப்ெடும். 15 நாட்களுக்கு பிறகும்
ெரிபெெய்யாாவிட்ைால் ெரப்ெளாவிற்கு ஏற்றவாறு அெராதம் விதிக்கப்ெடும். அதன் பிறகு 7 நாட்கள் அவகாெம் அளிக்கப்ெடும் அதன்
பிறகும் ெரிபெெய்யாாவிட்ைால் கட்டுமாா� நைவடிக்னைககள் நிறுத்த உத்தரவு பிறப்பிக்கப்ெடும்.
அதிக முக்கியாத்துவம் வாய்ந்த விதிமீறல்கள் ெரிபெெய்வதற்கா� அறிவிப்பு வழங்கப்ெட்டு அனைத ெரி பெெய்வதற்கு 15 நாட்கள்
அவகாெம் அளிக்கப்ெடும். 15 நாட்களுக்கு பிறகும் ெரிபெெய்யாாவிட்ைால் ெரப்ெளாவிற்கு ஏற்றவாறு அெராதம் விதிக்கப்ெடும். அதன்
பிறகு 7 நாட்கள் அவகாெம் அளிக்கப்ெடும் அதன் பிறகும் ெரிபெெய்யாாவிட்ைால் கட்டுமாா� நைவடிக்னைககள் நிறுத்த உத்தரவு
பிறப்பிக்கப்ெடும்.
J. KUMARAGURUBARAN,
பெென்னை� - 600 003, ஆனைணயார்,
2025 ஜூூன் 20. பெெருநகர பெென்னை� மாாநகராட்சி.
PRINTED AND PUBLISHED BY THE COMMISSIONER OF STATIONERY AND PRINTING, CHENNAI
ON BEHALF OF THE GOVERNMENT OF TAMIL NADU