Executive Summary:
SEBI circular, dated October 20, 2023, outlines guidelines for Business Continuity Plan (BCP) and Disaster Recovery (DR) for Qualified RTAs (QRTAs) to ensure the smooth functioning of the securities market. QRTAs must establish resilient systems and practices, improve recovery times, and conduct periodic drills. They are required to submit their revised BCP/DR policy to SEBI within three months of the circular date.
Key Points / Main Content:
* **Organizational Resilience and Documentation:**
* QRTAs must have a BCP and Disaster Recovery Site (DRS) to ensure operational continuity and data integrity.
* DRS manpower should have the same expertise as the Primary Data Center (PDC) and be capable of independent operation.
* QRTAs must form an Incident and Response Team (IRT)/Crisis Management Team (CMT), chaired by the MD or CTO, to declare disasters and invoke the BCP.
* The Technology Committee must review BCP/DR policy implementation quarterly.
* **Configuration of DRS/Near Site (NS) with PDC:**
* QRTAs must have a Near Site (NS) to ensure zero data loss.
* DRS should be in a different seismic zone from the PDC, with a minimum distance of 500km if seismic zone separation isn't feasible.
* Hardware and software configurations of DRS and PDC should have a one-to-one correspondence.
* Systems should allow switchover from PDC to DRS without configuration changes at the end of AMCs or regulatory entities.
* **Recovery Time and Point Objectives:**
* In the event of disruption to critical systems, QRTAs must declare a disaster within 30 minutes and restore operations from DRS within 45 minutes of the declaration.
* Recovery Time Objective (RTO) for critical systems is 45 minutes, to be implemented within 90 days from the date of the circular.
* Recovery Point Objective (RPO) should be 15 minutes.
* PDC and NS architecture must ensure high availability, fault tolerance, zero data loss, and data integrity.
* **Data Replication:**
* Updates at the PDC should be immediately reflected at DRS/NS before the end of the day.
* PDC to NS replication should be synchronous, while PDC to DRS and NS to DRS replication can be asynchronous.
* **DR Drills/Testing:**
* QRTAs must conduct periodic training programs for employees and outsourced staff.
* DR drills must be conducted quarterly, resembling real-life scenarios with minimal notice.
* Unannounced live operations from DRS must occur for at least one day every three months, with a 45-minute notice.
* PDC staff should not support DRS operations during drills.
* Drills should include running all operations from DRS for at least one full trading day.
* Drill results must be documented and presented to the Governing Board, then forwarded to SEBI within a month.
* System auditors must check the preparedness of QRTAs to shift operations unannounced.
* Live operation sessions from the DR site shall be scheduled for at least two consecutive days in every six months.
* QRTAs shall include a scenario of intraday shifting from PDC to DRS during the mock operation sessions.
* QRTAs should undertake and document Root Cause Analysis (RCA) of technical system problems.
* **BCP/DR Policy Document:**
* QRTAs must have a comprehensive BCP/DR policy document outlining disaster scenarios, standard operating procedures, escalation hierarchy, communication protocols, documentation policy, and critical system issue handling.
* The BCP/DR policy must be approved by the Governing Board and communicated to SEBI, with periodic reviews at least once every six months.
* Leasing arrangements at the DRS should not compromise system confidentiality, integrity, availability, or performance.
Impact Analysis:
* **Qualified RTAs (QRTAs):**
* Impact: QRTAs are required to enhance their BCP and DR capabilities, implement stricter recovery time objectives, conduct more frequent drills, and update their BCP/DR policies.
* Action Required: QRTAs must revise and submit their BCP/DR policy to SEBI within 3 months. They must also ensure that clause 5.8 and 6.1.5 is also included in the scope of System Audit.
* **SEBI:**
* Impact: SEBI will receive revised BCP/DR policies from QRTAs and will monitor compliance with the new guidelines.
* Action Required: SEBI will review the submitted BCP/DR policies and ensure QRTAs are adhering to the circular's requirements.
* **System Auditors:**
* Impact: System Auditors will need to include additional checks in their annual System Audit.
* Action Required: System Auditors will need to include checks to ensure that clause 5.8 and 6.1.5 is also included in the scope of System Audit.
Key Entities Referenced
Securities and Exchange Board of India (SEBI): A regulatory body for the securities market in India.
Qualified RTAs (QRTAs): Registrar and Transfer Agents having more than 2 Crore folios and are systemically important institutions.
Business Continuity Plan (BCP): A plan to ensure continuity of operations in the event of a disruption.
Disaster Recovery (DR): A plan for recovering from a disaster and restoring operations.
Recovery Time Objective (RTO): The maximum time taken to restore operations of Critical Systems from DRS after declaration of Disaster shall be 45 minutes
Recovery Point Objective (RPO): The maximum tolerable period for which data might be lost due to a major incident shall be 15 minutes.
Disaster Recovery Site (DRS): A site used for disaster recovery purposes.
Near Site (NS): A site to ensure zero data loss.
CIRCULAR
SEBI/HO/IMD/IMD-TPD-1/P/CIR/2023/173
October 20, 2023
All Qualified RTAs (QRTAs)
Dear Sir/ Madam,
Sub: Guidelines for Business Continuity Plan (BCP) and Disaster Recovery (DR)
of Qualified RTAs (QRTAs)
1. Qualified RTAs (i.e. RTAs having more than 2 Crore folios) are systemically important
institutions as they, inter-alia, provide infrastructure necessary for the smooth and
uninterrupted functioning of the securities market. As part of the operational risk
management, these QRTAs need to have high level of resiliency to provide essential
facilities and perform systemically critical functions uninterruptedly in the securities
market.
2. In view of the above, based on consultation with Technical Advisory Committee (TAC)
of SEBI, it has been decided to issue guidelines for strengthening overall resiliency,
the procedures at / governance of QRTAs for handling disruption, augmentation of
systems and practices to achieve better Recovery Time Objective (“RTO”) and
Recovery Point Objective (“RPO”), and to improve overall preparedness by
conducting periodic announced / unannounced drills. Hence, QRTAs are required to
comply with the following framework for BCP and DR:
3. Organizational Resilience and Documentation
3.1. QRTAs shall have in place Business Continuity Plan (BCP) and Disaster
Recovery Site (DRS) so as to ensure continuity of operations, maintain data and
transaction integrity.
Page 1 of 73.2. The manpower deployed at DRS/ Near Site (NS) shall have the same expertise
as available at PDC in terms of knowledge/ awareness of various technological
and procedural systems and processes relating to all operations such that
DRS/NS can function at short notice, independently. QRTAs shall have
sufficient number of trained staff at their DRS so as to have the capability of
running live operations from DRS without involving staff of the PDC.
3.3. All QRTAs shall constitute an Incident and Response team (IRT) / Crisis
Management Team (CMT), which shall be chaired by the Managing Director
(MD) of the QRTA or by the Chief Technology Officer (CTO), in case of non-
availability of MD. IRT/ CMT shall be responsible for the actual declaration of
disaster, invoking the BCP and shifting of operations from PDC to DRS
whenever required. Details of roles, responsibilities and actions to be performed
by employees, IRT/ CMT and support/outsourced staff in the event of any
Disaster shall be defined and documented by the QRTA as part of BCP-DR
Policy Document.
3.4. The Technology Committee of the QRTAs shall review the implementation of
BCP-DR policy approved by the board of the QRTA on a quarterly basis.
4. Configuration of DRS/NS with PDC
4.1. Apart from DRS, all QRTAs shall also have a Near Site (NS) to ensure zero data
loss. The DRS should preferably be set up in different seismic zones and in case
due to certain reasons such as operational constraints, change of seismic
zones, etc., minimum distance of 500 kilometre shall be ensured between PDC
and DRS so that both DRS and PDC are not affected by the same disaster.
4.2. Hardware, system software, application environment, network and security
devices and associated application environments of DRS and PDC shall have
one to one correspondence between them.
4.3. QRTAs should develop systems that do not require configuration changes at
the end of AMCs/other regulatory entities for switchover from the PDC to DRS.
Page 2 of 74.4. In the event of disruption of any one or more of the ‘Critical Systems’ (an
indicative list for QRTAs catering to AMCs is given below), the QRTA shall,
within 30 minutes of the incident, declare that incident as ‘Disaster’ and take
measures to restore operations including from DRS within 45 minutes of the
declaration of ‘Disaster’. Accordingly, the Recovery Time Objective(RTO)- the
maximum time taken to restore operations of ‘Critical Systems’ from DRS after
declaration of Disaster- shall be 45 minutes, to be implemented within 90 days
from the date of the circular.
4.5. The ‘Critical Systems’ for a QRTA catering to AMCs may include Accepting and
Processing of Transactions (end to end, including purchase, redemption,
Dividend Payment etc.), Connectivity with AMCs, NAV Calculation related
processes. The above list is indicative and not exhaustive in nature.
4.6. QRTAs to also ensure that the Recovery Point Objective (RPO) - the maximum
tolerable period for which data might be lost due to a major incident- shall be 15
minutes.
4.7. Solution architecture of PDC and NS should ensure high availability, fault
tolerance, no single point of failure, zero data loss, and data and transaction
integrity.
4.8. Solution architecture of PDC and DRS should ensure high availability, fault
tolerance, no single point of failure and data and transaction integrity.
4.9. Any updates made at the PDC should be reflected at DRS/ NS immediately
(before end of day) with head room flexibility without compromising any of the
performance metrics.
4.10. Replication architecture, bandwidth and load consideration between the DRS /
NS and PDC should be within stipulated RTO and ensure high availability, right
sizing, and no single point of failure.
Page 3 of 74.11. Replication between PDC and NS should be synchronous to ensure zero data
loss whereas, the one between PDC and DRS and between NS and DRS may
be asynchronous.
4.12. Adequate resources (with appropriate training and experience) should be
available at all times to handle operations at PDC, NS or DRS, as the case may
be, on a regular basis as well as during disasters.
5. DR drills/Testing
5.1. QRTAs shall conduct periodic training programs to enhance the preparedness
and awareness level among its employees and outsourced staff, vendors, etc.
as per BCP policy.
5.2. DR drills should be conducted on a quarterly basis. These drills should be closer
to real life scenario (trading days) with minimal notice to DRS staff involved.
5.3. Further, QRTAs should also conduct unannounced live operations from its DRS
for at least 1 day in every three months on normal working days (i.e. not on
weekends / trading holidays). Unannounced live operations from DRS of QRTAs
shall be done at a short notice of 45 minutes.
5.4. During the drills, the staff based at PDC should not be involved in supporting
operations in any manner.
5.5. The drill should include running all operations from DRS for at least 1 full trading
day.
5.6. Before DR drills, the timing diagrams clearly identifying resources at both ends
(DRS as well as PDC) should be in place.
5.7. The results and observations of these drills should be documented and placed
before the Governing Board of QRTAs. Subsequently, the same along with the
comments of the Governing Board should be forwarded to SEBI within a month
of the DR drill.
Page 4 of 75.8. The System Auditor while covering the BCP – DR as a part of mandated annual
System Audit should check the preparedness of the QRTA to shift its operations
from PDC to DRS unannounced and also comment on documented results and
observations of DR drills.
5.9. ‘Live’ operation sessions from DR site shall be scheduled for at least two
consecutive days in every six months. Such live trading sessions from the DRS
shall be organized on normal working days (i.e. not on weekends / trading
holidays). The QRTA shall ensure that staff members working at DRS have the
abilities and skills to run live operations session independent of the PDC staff.
5.10. QRTAs shall include a scenario of intraday shifting from PDC to DRS during the
mock operation sessions in order to demonstrate its preparedness to meet
RTO/RPO as stipulated above.
5.11. QRTA should undertake and document Root Cause Analysis (RCA) of their
technical/ system related problems in order to identify the causes and to prevent
reoccurrence of similar problems.
6. BCP – DR Policy Document
6.1. QRTAs shall put in place a comprehensive BCP-DR policy document outlining
the following:
6.1.1. Broad scenarios that would be defined as a Disaster for an QRTA (in addition
to definition provided in para 4.4/4.5 of this circular).
6.1.2. Standard Operating Procedure to be followed in the event of Disaster.
6.1.3. Escalation hierarchy within the QRTA to handle the Disaster.
6.1.4. Clear and comprehensive Communication Protocols and procedures for both
internal and external communications from the time of incident till resumption
of operations of the QRTA.
6.1.5. Documentation policy on record keeping pertaining to DR drills.
Page 5 of 76.1.6. Scenarios demonstrating the preparedness of QRTAs to handle issues in
Critical Systems that may arise as a result of Disaster.
6.1.7. Framework to constantly monitor health and performance of Critical Systems
in normal course of business.
6.2. The BCP-DR policy document of QRTA should be approved by Governing
Board of the QRTAs after being vetted by Technology Committee and thereafter
communicated to SEBI. The BCP-DR policy document should be periodically
reviewed at least once in six months and after every occurrence of disaster.
6.3. In case a QRTA desires to lease its premise at the DRS to other entities
including to its subsidiaries or entities in which it has stake, the QRTA should
ensure that such arrangements do not compromise confidentiality, integrity,
availability, targeted performance and service levels of the QRTA’s systems at
the DRS. The right of first use of all the resources at DRS including network
resources should be with the QRTA. Further, QRTA should deploy necessary
access controls to restrict access (including physical access) of such entities to
its critical systems and networks.
6.4. In case a QRTA desires to lease a DR premise from other entities (MII / Other
Regulated Entities / Service Providers) the QRTA should ensure that such
arrangements do not compromise confidentiality, integrity, availability, targeted
performance and service levels of the QRTA’s systems at the DRS. QRTAs
should also ensure that proper segregation and monitoring is undertaken so as
to isolate cyber events in the systems
6.5. The QRTAs should execute appropriate agreements with the corresponding
Service Providers entailing Service Level Agreements, segregation details and
obligations of the Service providers during normal operations and during
“Disaster”.
7. Considering the above, QRTAs are advised to submit their revised BCP–DR policy to
SEBI within 3 months from the date of this circular. Further, they should also ensure
Page 6 of 7that clause 5.8 and 6.1.5 mentioned above is also included in the scope of System
Audit.
8. This circular is being issued in exercise of powers conferred under Section 11 (1) of
the Securities and Exchange Board of India Act, 1992 to protect the interests of
investors in securities and to promote the development of, and to regulate the
securities market.
9. This circular is available on SEBI website at www.sebi.gov.in under the categories
“Legal Framework” and “Circulars”.
10. This circular shall supersede earlier circular no. SEBI/HO/MIRSD/DoP/CIR/P/2018/
119 dated August 10, 2018 issued on BCP-DR Policy of QRTAs.
Yours faithfully,
Rohit Saraf
Deputy General Manager
Investment Management Department
Email: rohits@sebi.gov.in
Page 7 of 7