In exercise of the powers conferred under Section 178 of the Electricity Act, 2003 and all other powers enabling

Issued by Central Electricity Regulatory Commission · Not Applicable

Research with AI Agent Chat with Document Generate Summary Translate Helpful Share Add to Project Create Task

Executive Summary & Key Takeaways

What it means

  • This gazette notification introduces the Central Electricity Regulatory Commission (Deviation Settlement Mechanism and Related Matters) (First Amendment) Regulations, 2024.
  • These amendments modify the original Central Electricity Regulatory Commission (Deviation Settlement Mechanism and Related Matters) Regulations, 2024, which were published on August 21, 2024.
  • The amendments primarily concern the rules for deviation settlement mechanism, particularly related to power generation capacity, open access sales, and charges for injecting infirm power.

Key Changes

  • The generating capacity of a power plant, for the purpose of deviation settlement, is limited to the quantum of connectivity granted.
  • For WS (wind seller) or MSW (municipal solid waste) sellers, or any other applicable entity, selling power to a third party through open access, deviation charges will apply.
  • For general sellers selling power to a third party through open access, deviation charges will apply.
  • Charges for injecting infirm power are set to zero.
  • If infirm power is scheduled after a successful trial run as per the Grid Code, deviation charges will apply to the extent the power deviates from the scheduled infirm power, similar to a general or WS seller.
  • When the system frequency is above 50.05 Hz, deviation charges for over-injection of scheduled infirm power by a general or WS seller will be zero.

Impact Analysis

Power Generators

  • All generators need to monitor system frequency and adjust their injection of infirm power accordingly to take advantage of the zero deviation charges when system frequency is above 50.05 Hz.

Open Access Power Consumers

  • Consumers will need to understand the implications of these changes on their power procurement costs.

System Operators

  • System operators will need to track system frequency and implement the changes to deviation charges accordingly.

Action Items

  • Conduct financial modeling to understand the impact of the changes on profitability.

Key Entities Referenced

Central Electricity Regulatory Commission (CERC): The regulatory body responsible for making and amending regulations related to the electricity sector in India. Electricity Act, 2003: The primary legislation governing the electricity sector in India, under which CERC derives its powers. Central Electricity Regulatory Commission (Deviation Settlement Mechanism and Related Matters) Regulations, 2024: The original regulations which are being amended by this gazette notification. Grid Code: The set of rules and guidelines that govern the operation and management of the electricity grid. WS Seller: Wind Seller - A power generator that generates power from Wind. MSW Seller: Municipal Solid Waste Seller - A power generator that generates power from Municipal Solid Waste.
Official Source Record View Original Source →
See Full Document Text
रजिस्ट्री स.ं डी.एल.- 33004/99 REGD. No. D. L.-33004/99 सी.जी.-डी.एल.-अ.-31122024-259728 xxxGIDHxxx CG-DL-E-31122024-259728 xxxGIDExxx असाधारण EXTRAORDINARY भाग III—खण् ड 4 PART III—Section 4 प्राजधकार स ेप्रकाजित PUBLISHED BY AUTHORITY स.ं 1030] नई दिल्ली, मगं लवार, दिसम्ब र 24, 2024/पौष 3, 1946 No. 1030] NEW DELHI, TUESDAY, DECEMBER 24, 2024/PAUSHA 3, 1946 dsUæh; fo|qr fofu;ked vk;ksx la'kks/ku ubZ fnYyh, 17 fnlEcj] 2024 फा. la- ,y&1@260@2021/lhbZvkjlh.-—dsUæh; fo|qr fofu;ked vk;ksx] fo|qr vf/kfu;e] 2003 dh /kkjk 178 vkSj bl fufeÙk lkeFkZ~;dkjh lHkh vU; 'kfä;ks a dk ç;ksx djrs gq, vkSj iwoZ çdk'ku ds ckn] dsUæh; fo|qr fofu;ked vk;ksx ¼fopyu O;oLFkkiu r=a vkSj lac) ekeys½ fofu;e] 2024 ¼ftl blds i'pkr~ ^^ewy fofu;e^^ dgk x;k gS½ dks la'kksf/kr djus ds fy, ,rn~ }kjk fuEufyf[kr fofu;e cukrk gS] vFkkZr~%& 1- laf{kIr uke rFkk fVIif.k;k¡ 1-1 bu fofu;eksa dk laf{kIr uke dsUæh; fo|qr fofu;ked vk;ksx ¼fopyu O;oLFkkiu ra= vkSj lac) ekey½s ¼çFke la'kks/ku½ fofu;e] 2024 gSA 1-2 ;s fofu;e fnukad 23-12-2024 ls ço`Ùk gksxa sA 2- ewy fofu;eksa ds fofu;e 3 dk la'kks/ku% 2-1 eyw fofu;eksa ds fofu;e ¼3½ ds [kaM ¼1½ ds mi&[kaM ¼N½ eas 'kCnksa Þtks fd fn, x, le; Cy‚d eas fo|qr dk mRiknu djus es a l{ke gSaß ds ckn fuEufyf[kr 'kCn tksM+ s tk,axs% ÞvkSj og çnku dh xbZ la;kstdrk dh ek=k rd lhfer gksxhß 2-2 eyw fofu;eksa ds fofu;e ¼3½ ds [kaM ¼1½ ds mi&[kaM ¼¥½ eas 'kCnksa Þuohdj.kh; ÅtkZ lzksrks a ij vk/kkfjr dSfIVo mRiknu la;a= ds dSfIVo miHkksx ds ekeys esßa ls igy s fuEufyf[kr 'kCnks a dks tksM+k tk,xk% ÞMCY;w,l foØsrk ;k ,e,lMCY;w foØsrk ;k ;Fkk ykxw ,slh fdlh vU; bdkbZ ds laca/k es]a fuckZ/k igqap ds ek/;e 8310 GI/2024 (1)2 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] ls r`rh; i{k dks fo|qr dh fcØh ;kß 2-3 eyw fofu;eksa ds fofu;e ¼3½ ds [kaM ¼1½ ds mi&[kaM ¼e½ eas 'kCnksa Þuohdj.kh; ÅtkZ lzksrks a ds vykok lalk/kuks a ij vk/kkfjr dSfIVo mRiknu la;a= ds dSfIVo miHkksx ds ekeys easß ls igys fuEufyf[kr 'kCnksa dks tksM+k tk,xk% ÞfuckZ/k igqap ds ek/;e ls r`rh; i{k dks fo|qr dh fcØh djus okys lkekU; foØsrk ds laca/k eas ;kß 3- ewy fofu;eksa ds fofu;e 8 ¼fopyu ds fy, çHkkj½ dk la'kks/ku% 3-1 eyw fofu;eksa ds fofu;e 8 ds [kaM ¼8½ dks fuEukuqlkj çfrLFkkfir fd;k tk,xk% Þ¼8½ v'kä fo|qr ds var%{ksi.k ds fy, çHkkj 'kwU; gksxas% ijraq ;g fd ;fn v'kä fo|qr fxzM dksM eas ;Fkk fofufnZ"V lQy pkyu ijh{k.k ds ckn vuqlwfpr dh tkrh gS] rks vuqlwfpr v'kä fo|qr ls vf/kd fopyu ds fy, çHkkj lkekU; foØsrk ;k MCY;w,l foØsrk] ;FkkfLFkfr] ds fy, ykxw gksxas% ijraq ;g vkSj fd tc ç.kkyh ÝhDoslah] f > 50-05 gVZ~t+] rks lkekU; foØsrk ;k MCY;w,l foØsrk] ;FkkfLFkfr] }kjk vf/kd var%{ksi.k ds ek/;e ls vuqlwfpr v'kä fo|qr ds fopyu ds fy, çHkkj 'kwU; gksxasAß gjçhr flag çqFkh, lfpo [जवज्ञापन-III/4/असा./847/2024-25] uksV% dsUæh; fo|qr fofu;ked vk;ksx ¼fopyu O;oLFkkiu r=a vkSj lac) ekey½s fofu;e] 2024 fnukad 21-08-2024 dks Hkkjr ds jkti= ¼vlk/kkj.k½ ds Hkkx III] [kaM 4] l-a 642 eas çdkf'kr gq, FksA CENTRAL ELECTRICIRY REGULATORY COMMISSINON AMENDMENT New Delhi, the 17th December, 2024 F. No. L-1/260/2021/CERC.—In exercise of the powers conferred under Section 178 of the Electricity Act, 2003 and all other powers enabling it in this behalf and after previous publication, the Central Electricity Regulatory Commission hereby makes the following regulations, to amend the Central Electricity Regulatory Commission (Deviation Settlement Mechanism and Related Matters) Regulations, 2024 (hereinafter referred to as the "Principal Regulations") namely: - 1. Short Title And Comments 1.1 These regulations may be called the Central Electricity Regulatory Commission (Deviation Settlement Mechanism and Related Matters) (First Amendment) Regulations, 2024. 1.2 These regulations shall come into force with effect from 23.12.2024. 2. Amendment to regulation 3 of the principal regulations: 2.1 The following words shall be inserted after the words “that are capable of generating power in a given time block” in sub-clause (g) of clause (1) of Regulation (3) of the Principal Regulations: “and shall be limited to the quantum of connectivity granted” 2.2 The following words shall be inserted before the words ‘in case of captive consumption of a captive generating plant based on renewable energy sources’ in sub-clause (j) of clause (1) of Regulation (3) of the Principal Regulations: “in respect of a WS seller or a MSW seller or such other entity as applicable, selling power through open access to a third party or” 2.3 The following words shall be inserted before the words ‘in case of captive consumption of a captive generating plant based on resources other than renewable energy sources’ in sub-clause (y) of clause (1) of Regulation (3) of the Principal Regulations: “in respect of a general seller selling power through open access to a third party or” 3. Amendment of regulation 8 (charges for deviations) of the principal regulations: 3.1 Clause (8) of Regulation 8 of the Principal Regulations shall be substituted as under:[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 3 “(8) The charges for injection of infirm power shall be zero: Provided that if infirm power is scheduled after a successful trial run as specified in the Grid Code, the charges for deviation over the scheduled infirm power shall be as applicable for a general seller or WS seller, as the case may be: Provided further that when the system frequency, f > 50.05Hz, the charges for deviation of scheduled infirm power by way of over injection by a general seller or WS seller, as the case may be, shall be zero.” . HARPREET SINGH PRUTHI, Secy. [ADVT.-III/4/Exty./847/2024-25] Note: The Central Electricity Regulatory Commission (Deviation Settlement Mechanism and Related Matters) Regulations, 2024, were published in Part III, Section 4, No. 642 of the Gazette of India (Extraordinary) dated 21.08.2024. Uploaded by Dte. of Printing at Government of India Press, Ring Road, Mayapuri, New Delhi-110064 and Published by the Controller of Publications, Delhi-110054.