See Full Document Text
रजिस्ट्री स.ं डी.एल.- 33004/99 REGD. No. D. L.-33004/99
सी.जी.-डी.एल.-अ.-18052024-254248
xxxGIDHxxx
CG-DL-E-18052024-254248
xxxGIDExxx
असाधारण
EXTRAORDINARY
भाग III—खण् ड 4
PART III—Section 4
प्राजधकार स ेप्रकाजित
PUBLISHED BY AUTHORITY
स.ं 364] नई दिल्ली, िुक्रवार, मई 17, 2024/विै ाख 27, 1946
No. 364] NEW DELHI, FRIDAY, MAY 17, 2024/VAISAKHA 27, 1946
ubZ fnYyh] 19 vçSy] 2024
fnukad 03-11-2020 ds la'kk/s ku ds lkFk ifBr **dks;yk vk/kkfjr
FkeZy ikoj ifj;kstukvkas ls ikoj ds lkFk laiwjd] fxzM lac) uohdj.kh; ÅtkZ fo|rq ifj;kts ukvks a ls
jkm.M fn DykWd fo|qr dh izkfIr ds fy, VSfjQ vk/kkfjr izfrLi/kkZRed ckys h izfØ;k ds fy, ekxZfunsZ'k**
ij fnukad 22-07-2020 ls lacaf/kr fo|qr e=a ky; ds izLrko ds iSjkxzkQ 5-1 vkSj iSjkxzkQ 6-4 ds vuqlj.k
eas dsUnzh; fo|qr fofu;ked vk;kxs ckys h eYw ;kda u ds ç;kts u ds fy, fuEufyf[kr njks a vkSj vU; ekin.Mks a
dk s vf/klwfpr djrk gSA
I:
%
1- Lons'kh dk;s yk ds fy, o`f) nj 3.59
2- Lons'kh xSl ds fy, o`f) nj 2.66
3- dk;s ys ds varnsZ'kh; ifjogu çHkkj gsrq o`f) njs a
3-1 125 fdykes hVj dh nwjh rd 11.56
3090 GI/2024 (1)2 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4]
3-2 500 fdykes hVj dh nwjh rd 7.22
3-3 1000 fdykes hVj dh nwjh rd 6.44
3-4 2000 fdykes hVj dh nwjh rd 4.39
3-5 2000 fdykes hVj dh nwjh ls vkxs 3.87
4- xSl ds varnsZ'kh; ifjogu çHkkj grs q o`f) nj 4.80
5- vk;kfrr dks;ys ds fy, o`f) nj 3.05
6- vk;kfrr xSl ds fy, o`f) nj (-)3.97
7- vk;kfrr dks;ys ds ifjogu ds fy, o`f) nj (-)6.53
8- vk;kfrr xSl ds ifjogu ds fy, o`f) nj (-)6.53
9- ckys h eYw ;kda u ds fy, ç;qDr dh tkus okyh NwV nj 9.25
gjizhr Çlg izqFkh] lfpo
[जवज्ञापन-III/4/असा./133/2024-25]
CENTRAL ELECTRICITY REGULATORY COMMISSION
NOTIFICATION
New Delhi, the 19th April, 2024
No. Eco-E/2024-CERC.—In pursuance of paragraph 5.1 and paragraph 6.4 of the Ministry of Power’s
Resolution dated 22.07.2020 on “Guidelines for Tariff Based Competitive Bidding Process for Procurement of
Round-The-Clock Power from Grid Connected Renewable Energy Power Projects, complemented with Power from
Coal Based Thermal Power Projects” read with amendment dated 03.11.2020, the Central Electricity Regulatory
Commission notifies the following rates and other parameters for the purpose of bid evaluation.
I: Annual Escalation Rates for Bid Evaluation (for bid opening up to 31.03.2025)
Sr. Description Annual Escalation Rates for Bid
No. Evaluation (%)
1 Escalation rate for domestic coal 3.59
2 Escalation rate for domestic gas 2.66
3 Escalation rate for inland transportation charges for coal
3.1 Up to 125 Km distance 11.56
3.2 Up to 500 Km distance 7.22
3.3 Up to 1000 Km distance 6.44
3.4 Up to 2000 Km distance 4.39
3.5 Beyond 2000 Km distance 3.87
4 Escalation rate for inland transportation charges for gas 4.80
5 Escalation rate for imported coal 3.05
6 Escalation rate for imported gas (-)3.97
7 Escalation rate for transportation of imported coal (-)6.53
8 Escalation rate for transportation of imported gas (-)6.53
9 Discount rate to be used for bid evaluation 9.25
HARPREET SINGH PRUTHI, Secy.
[ADVT.-III/4/Exty./133/2024-25]