See Full Document Text
रजिस्ट्री स.ं डी.एल.- 33004/99 REGD. No. D. L.-33004/99
सी.जी.-डी.एल.-अ.-20102023-249599
xxxGIDHxxx
CG-DL-E-20102023-249599
xxxGIDExxx
असाधारण
EXTRAORDINARY
भाग III—खण् ड 4
PART III—Section 4
प्राजधकार स ेप्रकाजित
PUBLISHED BY AUTHORITY
स.ं 717] नई दिल्ली, बहृ स्ट्प जतवार, अक्त बू र 19, 2023/आजव न 27, 1945
No. 717] NEW DELHI, THURSDAY, OCTOBER 19, 2023/ASVINA 27, 1945
dsUnzh; fo|qr fofu;ked vk;ksx
'kqf)i=
UkbZ fnYYkh] 28 flrEcj] 2023
Qk- l-a,y&1@250@2019@dsfofovk.—fnukda 01-03-2023 dk s Hkkjr ds jkti= vlk/kkj.k ¼Hkkx-
III] [k.M 4] la- 149½ es a izdkf'kr dsUæh; fo|qr fofu;ked vk;kxs ¼varj&jkfT;d ikj"sk.k izHkkjks a vkSj gkfu;kas dh
'k;s fjxa ½ ¼izFke la'kks/ku½ fofu;e] 2023 ds lac/a k esa vf/klwpuk la-&,y&1@250@2019&dsfofovk] fnukda 07-02-
2023 esa] fuEufyf[kr la'kqf);k a dh xbZ gSa%
1- fofu;e 13 ds [k.M ¼2½ ds mi&[k.M ¼p½ ds v/khu lkj.kh I vkSj II dh izFke iafDr ds vafre dkWye es a
**pj.k-1 ds v/khu** 'kCnk sa dk foyksi fd;k tk,xkA
2- vuqca/k III [k.M ¼1½ ds mi&[k.M ¼p½ dh vafre iafDr es]a **fofu;e 15 ds [k.M ¼2½ ds
mi[k.M ¼[k½** 'kCnks a dks **fofu;e 15 ds [k.M ¼2½ ds mi&[k.M ¼d½** 'kCnks a ls izfrLFkkfir
fd;k tk,xkA
3- vuqca/k-III ds [k.M ¼2½ ds v/khu mi&[k.M ¼[k½¼i½ ds v/khu QkeZwyk esa] *Vh* ds foLrkfjr vFkZ
dks fuEukuqlkj i<+k tk,xk%
**Vh** ekg esa le; Cykd dh la[;k gS ftlds fy, Vh&th,u, çnku fd;k x;k gSA
4- vuqca/k-III ds [k.M ¼2½ ds mi&[k.M ¼[k½¼ii½ ds v/khu QkewZyk esa] **vf/kR;kx** 'kCn ds
foLrkfjr vFkZ dks fuEukuqlkj i<+k tk,xk%
6679 GI/2023 (1)2 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4]
“vf/kR;kx (%) = 100 X (ekg esa le; CykWdksa ds fy, ,lMhvkjVhth dk ;ksx ftlds fy,
Vh-th,u,
vkjbZ
esa iznku fd;k x;k gS)/(ekg esa le; CykWdksa dh dqy la[;k ftlds fy, Vh-
th,u, vkjbZ çnku fd;k x;k gS X 0.3 X Vh-th,u, vkjbZ)”
gjçhr flag izqFkh] lfpo
[जवज्ञापन-III/4/असा./500/2023-24]
CENTRAL ELECTRICITY REGULATORY COMMISSION
CORRIGENDUM
New Delhi, the 28th September, 2023
F. No. L-1/250/2019/CERC.—In the notification No. L-1/250/2019/CERC dated 07.02.2023
regarding the Central Electricity Regulatory Commission (Sharing of Inter-State Transmission
Charges and Losses) (First Amendment) Regulations, 2023, published in the Gazette of India
Extraordinary (Part-III, Section-4, No. 149) on 01.03.2023, the following corrections are made:
1. The words “under Step-1” in the last column of the first row of Table I and Table II under sub-
clause (f) of Clause (2) of Regulation 13 shall be deleted.
2. In the last line of sub-clause (f) of Clause (1) of Annexure III, the words “subclause (b) of Clause
(2) of Regulation 15” shall be substituted with the words “sub-clause (a) of Clause (2) of
Regulation 15”.
3. In the formula under sub-clause (b)(i) under Clause (2) of Annexure-III, the expanded meaning of
‘T’ shall be read as under:
“T” is the number of time blocks in a month for which T-GNA has been granted
4. In the formula under sub-clause (b)(ii) of Clause (2) of Annexure-III, the expanded meaning of
the word “Waiver” shall be read as under:
“Waiver (%) = 100 X (sum of SDRTG for the time blocks in the month for which T-GNA has
RE
been granted) / (total number of time blocks for which T-GNA has been granted in the month
RE
X 0.3 X T-GNA )”
RE
HARPREET SINGH PRUTHI, Secy.