Date: 2025-11-13Category: Extra OrdinaryState: Union GovernmentCountry: India
In the notification No L 1 261 2021 CERC dated 31 08 2025 regarding the Central Electricity Regulatory Commission Connectivity and General Network Access to the inter State Transmission System Third Amendment Regulations
**Executive Summary**
This document is a corrigendum issued by the Central Electricity Regulatory Commission (CERC) on November 4, 2025. It addresses errors in the notification regarding the Central Electricity Regulatory Commission (Connectivity and General Network Access to the inter-State Transmission System) (Third Amendment) Regulations, 2025, which was initially published on September 9, 2025. The corrigendum outlines specific textual corrections in the original notification.
**Key Points / Main Content**
* **Regulation 9.3.1:**
* Change: The phrase "effective date of GNA" should be read as "firm Start date of Connectivity".
* **Regulation 11A (6):**
* Change: In the title, insert "or Renewable power park developer" after "ESS (excluding PSP)".
* **Regulation 11C (1)(b):**
* Change: The phrase "effective date of GNA" should be read as "firm Start date of Connectivity".
* **Regulation 11C (1)(d):**
* Change: The phrase "start date of Connectivity of 'Y'" should be read as "firm start date of Connectivity of 'Y'".
* **Regulation 25.1 (b-i):**
* Change: The phrase "and Conn-BG3 shall be encashed" should be read as "and Conn-BG3 shall be encashed corresponding to relinquished quantum".
**Impact Analysis**
**Stakeholder: Inter-State Transmission System Participants, Connectivity Applicants, General Network Access Applicants**
* **Impact:** The corrigendum ensures clarity and accuracy in the interpretation and implementation of the CERC regulations related to connectivity and access to the inter-State transmission system. It specifically clarifies the meaning of "effective date of GNA" and other key phrases to prevent misinterpretations.
* **Action Required:** Review the corrected regulations and adjust any processes or plans based on the updated wording. Ensure all stakeholders are aware of the corrections.
Key Entities Referenced
Central Electricity Regulatory Commission (Connectivity and General Network Access to the inter-State Transmission System) (Third Amendment) Regulations, 2025: Regulations being amended regarding connectivity and general network access to the inter-State Transmission System.
Central Electricity Regulatory Commission: The regulatory body issuing the corrigendum.
रजिस्ट्री स.ं डी.एल.- 33004/99 REGD. No. D. L.-33004/99
सी.जी.-डी.एल.-अ.-14112025-267683
xxxGIDHxxx
CG-DL-E-14112025-267683
xxxGIDExxx
असाधारण
EXTRAORDINARY
भाग III—खण् ड 4
PART III—Section 4
प्राजधकार स ेप्रकाजित
PUBLISHED BY AUTHORITY
स.ं 734] नई दिल्ली, बृहस्ट्प जतवार, नवम्ब र 13, 2025/कार्तकि 22, 1947
No. 734] NEW DELHI, THURSDAY, NOVEMBER 13, 2025/KARTIKA 22, 1947
dsUæh; fo|qr fofu;ked vk;ksx
'kqf)i=
नई दिल्ली, 4 नवम् बर, 2025
फा. स.ं ,y&1@261@2021@lhbZvkjlh.— fnukad 09-09-2025 dks Hkkjr ds vlk/kkj.k jkti=
¼Hkkx III] [kaM 4] la[;k 622½ eas çdkf”kr dsUnzh; fo|qr fofu;ked vk;ksx ¼varj&jkfT;d ikj"sk.k ç.kkyh dh la;kstdrk
vkSj lkekU; uVs odZ igqap½ ¼rhljk la”kks/ku½ fofu;e] 2025 ds laca/k eas vf/klwpuk la[;k ,y&1@261@2021@lhbZvkjlh
fnukad 31-08-2025 eas] fuEufyf[kr 'kqf);k a dh xbZ gSa%
1- ist 14 ea s & fofu;e 9-3-1 ds v/khu] 'kCnks a Þth,u, dh çHkkoh rkjh[kß dks 'kCnks a Þla;kstdrk dh fuf'pr
vkjHa k rkjh[kß ds :Ik eas i<k+ tk,xkA
2- ist 20 es a & fofu;e 11d ds [kaM ¼6½ ds “kh’kZd es]a **;k uohdj.kh; ikoj ikdZ fodkldrkZ** “kCnks a dks
ÞbZ,l,l ¼ih,lih dks NkMs +dj½** 'kCnksa ds ckn varosZf”kr fd;k tk,xkA
3- ist 22 eas & fofu;e 11x ds [kaM ¼1½¼[k½ ds çFke ijra qd ds v/khu] 'kCnks a Þth,u, dh çHkkoh rkjh[kß dks
'kCnksa Þla;kstdrk dh fuf'pr vkjHa k rkjh[kß ds :Ik eas i<k+ tk,xkA
4- ist 22 eas & fofu;e 11x ds [kaM ¼1½¼?k½ ds v/khu] 'kCnks a Þe dh la;kstdrk dh vkjaHk rkjh[kß dks **”kCnksa e
dh la;kstdrk dh fuf'pr vkjHa k rkjh[kß ds :Ik es a i<k+ tk,xkA
7590 GI/2025 (1)2 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4]
5. ist 28 eas & fofu;e 25-1 ds [kaM ¼[k&i½ ds eq[; iSjkxzkQ ds v/khu] 'kCnksa ÞvkSj du&chth3 dks uxnhÑr
fd;k tk,xk** dks “kCnksa ÞvkSj du&chth3 dks vf/kR;kx dh xbZ ek=k ds le:i uxnhÑr fd;k tk,xkß ds :Ik
eas i<k+ tk,xkA
gjçhr flag çqFkh] lfpo
[जवज्ञापन-III/4/असा./470/2025-26]
CENTRAL ELECTRICITY REGULATORY COMMISSION
CORRIGENDUM
New Delhi, the 4th November, 2025
F. No. L-1/261/2021/CERC — In the notification No. L-1/261/2021/CERC dated 31.08.2025 regarding the
Central Electricity Regulatory Commission (Connectivity and General Network Access to the inter-State
Transmission System) (Third Amendment) Regulations, 2025, published in the Gazette of India Extraordinary (Part-
III, Section-4, No. 622) on 09.09.2025, the following corrections are made:
1. At Page 58 – Under Regulation 9.3.1, the words “effective date of GNA” shall be read as “firm Start date of
Connectivity”.
2. At Page 66- In Title of Clause (6) of Regulation 11A, the words “or Renewable power park developer” shall
be inserted after the words “ESS (excluding PSP)”.
3. At Page 67 – Under the first proviso of clause (1)(b) of Regulation 11C, the words “effective date of GNA”
shall be read as “firm Start date of Connectivity”.
4. At Page 68 – Under clause (1)(d) of Regulation 11C, the words “start date of Connectivity of ‘Y’” shall be
read as “firm start date of Connectivity of ‘Y’”.
5. At Page 76 – Under the main paragraph of clause (b-i) of Regulation 25.1, the words “and Conn-BG3 shall
be encashed” shall be read as “and Conn-BG3 shall be encashed corresponding to relinquished quantum”.
HARPREET SINGH PRUTHI, Secy.
[ADVT.-III/4/Exty./470/2025-26]
Uploaded by Dte. of Printing at Government of India Press, Ring Road, Mayapuri, New Delhi-110064