GOVERNMENT OF INDIA
MINISTRY OF HEAVY INDUSTRIES
RAJYA SABHA
UNSTARRED QUESTION NO. 3279
ANSWERED ON 20.03.2026
INDIGENISATION OF MANUFACTURING UNDER FAME II
3279. DR. FAUZIA KHAN:
Will the Minister of Heavy Industries be pleased to state:
(a) the progress made in the Phased Manufacturing Programme (PMP) under FAME II
for indigenisation of EV sub-assemblies and components;
(b) the gaps identified in localisation targets for cell-module-pack integrators;
(c) whether the FAME II scheme’s operational guidelines include penalties and incentive
clawback provisions for beneficiaries failing to meet incremental domestic localisation
targets; and
(d) if so, the steps taken to strengthen enforcement and audit mechanism?
ANSWER
THE MINISTER OF STATE FOR HEAVY INDUSTRIES
(SHRI BHUPATHIRAJU SRINIVASA VARMA)
(a): Under FAME-II, the Phased Manufacturing Programme (PMP) was introduced with
the objective to promote domestic manufacturing of electric vehicles and their
assemblies/subassemblies. Only those EVs which were complying with PMP requirements
were eligible for incentives under the scheme.
(b): PMP under FAME-II required that Traction battery pack to be assembled
domestically, for which battery cells and associated thermal and battery management system
may be imported. PMP for traction battery pack in PM E-DRIVE has been further enhanced
wherein inter alia import of battery modules is no longer permitted.
(c): Yes, as per the guidelines under FAME-II, if Ministry of Heavy Industries (MHI) is
satisfied that eligibility under the scheme and/or disbursement of incentives have been
obtained by misrepresentation of facts or falsification of information or concealment or
suppression of any material information having an adverse impact on the eligibility/incentive
claim, MHI will ask the approved applicant to refund the incentives, along with applicable
interest.
(d): The FAME-II scheme ended on 31stMarch, 2024. However, to strengthen
enforcement and audit mechanisms, the Government has put in place certain measures such
as submission of integrity pact undertakings, Deed of Indemnity cum Undertaking along with
undertaking of local manufacturing by OEMs, under the PM E-DRIVE Scheme, being
implemented from 1stApril, 2024. Further, OEMs are required to get their models/variants
revalidated at least on an annual basis.
*******