**Summary:**
In June 2025, captive and commercial coal mines in India produced 15.57 million tonnes (MT) of coal and dispatched 17.31 MT. The first quarter of the financial year 2025-26 demonstrated significant year-on-year growth, with production increasing by 16.39% and dispatches rising by 13.03% compared to the same period in the previous year. This growth is attributed to improved efficiency and better utilization of mining capacity. During June 2025, permission was granted for the opening of the Utkal A Mine, which has a Peak Rated Capacity of 25 MT. Vesting orders were issued for three additional coal blocks, bringing the total number of coal blocks allocated by the Ministry of Coal to over 200. These activities are intended to ensure a reliable coal supply for key industries, including power generation, steel manufacturing, and cement production. The Ministry of Coal emphasizes that these efforts contribute to enhancing domestic coal production and supporting a resilient and self-sustaining India.
Release ID: 2141432
Key Entities Referenced
Ministry of Coal: The Indian government ministry responsible for coal production and allocation.
June 2025: The month for which coal production and dispatch data is reported.
Utkal A Mine: A coal mine for which opening permission was granted in June 2025.
India: The country whose industrial infrastructure is being reinforced by coal production.
financial year 202526: The financial year for which coal production and dispatch data is compared.
PIB Delhi: Press Information Bureau, Delhi - the source of the posted information.
Shuhaib T: The individual associated with the release of the information.
Ministry of Coal
Monthly Production and Dispatch from Captive and
Commercial Mines in June 2025
Posted On: 02 JUL 2025 11:20AM by PIB Delhi
Coal production from captive and commercial mines for the month of June has been recorded at 15.57 million
tonnes (MT), and dispatches at 17.31 million tonnes (MT).
The first quarter of the financial year 2025–26 showed strong year-on-year growth, with production increasing
by 16.39% and dispatches by 13.03% compared to the same period last year. This reflects improved efficiency
and better utilization of mining capacity.
The attached graph clearly illustrates the consistent performance improvement across three consecutive years
of ending of Q1, with both production and dispatch showing strong gains.
Key Developments in June 2025
Mine Opening Permission was granted for Utkal A Mine, having a Peak Rated Capacity of 25 MT.
(cid:108)
Vesting orders were issued for three coal blocks, raising the total number of coal blocks allocated
(cid:108)
by the Ministry of Coal to more than 200.
This increase ensures a reliable supply of coal to key industries such as power generation, steel
manufacturing, and cement production, thereby reinforcing the backbone of India’s industrial infrastructure.
These milestones underscore the Ministry’s focused efforts to
enhance domestic coal production, contributing significantly to the vision of a resilient and self-sustaining
India.
****