Home India Ministry of New and Renewable Energy Notification regarding Implementation of Quality Control Ord...
Date: 2022-07-29 Category: Extra Ordinary State: Union Government Country: India

Notification regarding Implementation of Quality Control Order for SPV Systems Components Devices Order 2017

Issued by Ministry of New and Renewable Energy · Not Applicable

Research with AI Agent Chat with Document Generate Summary Translate Helpful Share Add to Project Create Task

Executive Summary & Key Takeaways

## Policy Analysis Report: Extension of Quality Control Order Implementation for SPV Inverters **1. Executive Summary:** This report analyzes a notification from the Ministry of New and Renewable Energy regarding an amendment to the Solar Photovoltaics (SPV) Systems, Devices and Components Goods Requirements for Compulsory Registration Order, 2017. The core purpose of this amendment is to extend the deadline for the implementation of the Quality Control Order (QCO) for SPV inverters (item 45) from June 30, 2022, to December 31, 2022. This extension is based on self-certification, subject to specific conditions regarding valid IEC certificates and accredited test lab reports. This report details the background, rationale, key provisions, stakeholders, and expected outcomes of this amendment, as derived solely from the provided text. **2. Introduction:** The purpose of this report is to provide information and analysis regarding a specific amendment to the Solar Photovoltaics (SPV) Systems, Devices and Components Goods Requirements for Compulsory Registration Order, 2017, as detailed in the provided government notification. The analysis is based solely on the information contained within the given text. **3. Policy Overview:** * **Original Policy:** Solar Photovoltaics, Systems, Devices and Components Goods Requirements for Compulsory Registration Order, 2017 (S.O. 2920 E dated 5.9.2017). * **Core Objective(s) (as inferred from text):** To ensure the quality and standardization of Solar Photovoltaic (SPV) systems, devices, and components through compulsory registration and quality control orders, as implied by the title and the extension of implementation for SPV inverters. The objective is also to facilitate smooth implementation of the order. **4. Background and Rationale:** This report analyzes an amendment to the 2017 order. The rationale for this specific amendment (extension of the implementation deadline) appears to be driven by two key factors, as explicitly stated in the text: * "Availability of limited test facilities" * "Providing more time for compliance" These suggest that there were constraints preventing manufacturers from meeting the original deadline, necessitating an extension to ensure continued compliance and market stability. **5. Key Provisions / Changes:** This is an *amendment*, therefore the focus is on the changes it introduces: * **Specific Part of Original Policy Affected:** The implementation deadline for the Quality Control Order, 2017 concerning SPV inverters (item 45). * **New Rule/Provision:** The implementation of the Quality Control Order, 2017 for SPV inverters (item 45) is extended from June 30, 2022, to December 31, 2022. * **Difference/Effect of the Change:** This extension allows manufacturers of SPV inverters additional time to comply with the Quality Control Order. However, this extension is conditional. Manufacturers can self-certify until December 31, 2022, *provided* they possess valid IEC certificates corresponding to IS standards (IS 16221Part 2:2015IEC 621092:2011 for item No 4 and IS 16169:2014IEC 62116:2008 for item No. 5) and test reports from accredited test labs. This maintains a certain level of quality assurance during the extended self-certification period. **6. Target Audience and Stakeholders:** Based on the text, the primary target audience and stakeholders are: * Manufacturers of Solar Photovoltaic (SPV) inverters (specifically item 45). * Accredited test labs * Certification bodies issuing IEC certificates. These are the entities directly affected by the extension of the implementation deadline and the associated conditions. **7. Implementation Aspects (Inferred):** * **Responsible Agency/Bodies:** The Ministry of New and Renewable Energy is the responsible agency, as indicated by the notification's source. * **Timelines:** The key timeline specified is the extension of the implementation deadline to December 31, 2022. * **Procedure related to the Change:** During the extended period, manufacturers must self-certify, provided they possess valid IEC certificates corresponding to the IS standards outlined in the notification (IS 16221Part 2:2015IEC 621092:2011 for item No 4 and IS 16169:2014IEC 62116:2008 for item No. 5) and test reports from accredited test labs. **8. Expected Outcomes / Impact of Changes:** The likely intended outcomes of this amendment are: * **Increased Compliance:** Allowing more time and permitting self-certification (under specific conditions) likely aims to increase overall compliance with the Quality Control Order, 2017, for SPV inverters. * **Reduced Disruption:** The extension is likely intended to prevent disruption in the supply chain of SPV inverters that could have resulted from strict enforcement of the original deadline given the limitation in testing facilities. * **Continued Quality Assurance:** The requirement for valid IEC certificates and accredited test lab reports during the self-certification period ensures a base level of quality control is maintained. **9. Conclusion:** The amendment to the Solar Photovoltaics, Systems, Devices and Components Goods Requirements for Compulsory Registration Order, 2017, extends the implementation deadline for the Quality Control Order for SPV inverters (item 45) to December 31, 2022, under specific conditions. This extension addresses limitations in testing facilities and provides manufacturers with more time to comply, facilitating smoother implementation of the order while ensuring a degree of continued quality assurance through self-certification requirements. This amendment is significant as it directly impacts manufacturers of SPV inverters and contributes to the overall quality standards within the renewable energy sector.

Key Entities Referenced

NEW DELHI: Capital of India; place of publication for the notification. MINISTRY OF NEW AND RENEWABLE ENERGY: The ministry that issued the notification. Central Government: The governing body that issued the order regarding solar photovoltaics. Solar Photovoltaics, Systems, Devices and Components Goods Requirements for Compulsory Registration Order, 2017: The original order related to the compulsory registration of solar photovoltaic products. S.O. 2920 E: The original order number of Solar Photovoltaics, Systems, Devices and Components Goods Requirements for Compulsory Registration Order, 2017. S.O. 5259E: Order number of the modification of Solar Photovoltaics, Systems, Devices and Components Goods Requirements for Compulsory Registration Order, 2017. Gazette of India: Official government gazette where notifications are published. SPV inverters: Solar Photovoltaic inverters, the items to which the extension applies. S.O. 513E: Order number extending self certification for SPV inverters items. Quality Control Order, 2017: Order for SPV inverters items. IEC: International Electrotechnical Commission certificates. IS 16221Part 2:2015IEC 621092:2011: Standard for item No 4. IS 16169:2014IEC 62116:2008: Standard for item No. 5 ARUN K. TRIPATHI: AdviserScientist G at the Ministry of New and Renewable Energy. Government of India Press, Ring Road, Mayapuri, New Delhi: Location of the printing press. Controller of Publications, Delhi: Publisher of the gazette.
Official Source Record View Original Source →
See Full Document Text
रजजस्ट्री स.ं डी.एल.- 33004/99 REGD. No. D. L.-33004/99 सी.जी.-डी.एल.-अ.-29072022-237716 xxxGIDHxxx CG-DL-E-29072022-237716 xxxGIDExxx ऄसाधारण EXTRAORDINARY भाग II—खण् ड 3—ईप-खण्ड (ii) PART II—Section 3—Sub-section (ii) प्राजधकार स ेप्रकाजित PUBLISHED BY AUTHORITY स.ं 3370] नइ ददल्ली, िुक्रवार, जुलाइ 29, 2022/श्रावण 7, 1944 No. 3370] NEW DELHI, FRIDAY, JULY 29, 2022/SHRAVANA 7, 1944 नवीन और नवीकरणीय उजा ामत्रं ालय ऄजधसचू ना नइ ददल्ली, 28 जुलाइ, 2022 का.अ. 3535(ऄ).—यतः केन्द्र सरकार न े ऄनुसूची म ें सजममजलत छह ईत्पादों हते ु ददनांक 05.09.2017 के का.अ. 2920 (ऄ) के तहत “सौर प्रकािवोल्टीय, प्रणाजलयााँ, ईपकरण और घटक वस्ट्तुएं (ऄजनवाया पंजीकरण की अवश्यकता) अदेि, 2017” जारी दकया था, जजसके प्रभावी होने की तारीख 05.09.2018 थी और आसे ददनांक 12.10.2018 को भारत के राजपत्र में प्रकाजित का.अ. 5259(ऄ) के तहत संिोजधत दकया गया था। और यतः ददनांक 02.02.2022 को भारत के राजपत्र में प्रकाजित का.अ. 513(ऄ) के तहत एसपीवी आन्द्वटारों (मद 4-5) के जलए स्ट्व- प्रमाणन को ददनांक 30.06.2022 तक बढाया गया था। 2. और यतः सीजमत परीक्षण सुजवधाओं की ईपलब्धता और ऄनपु ालन के जलए ऄजधक समय की मांग को ध्यान में रखत े हुए, एसपीवी आन्द्वटार (मद 4-5) के गणु वत्ता जनयंत्रण अदेि, 2017 के कायाान्द्वयन को स्ट्व-प्रमाणन के अधार पर आस ित ा के ऄध्यधीन ददनांक 30.06.2022 से 31.12.2022 तक बढाया जाता ह ै दक ऐसे जवजनमााताओं के पास आन मदों के जलए ईक्त अदेि में जवजनर्ददष्ट अइएस [मद सं. 4 के जलए अइएस 16221 (भाग 2): 2015/अइइसी 62109-2 : 2011 और मद सं. 5 के जलए अइएस 16169 : 2014/अइइसी 62116 : 2008] के ऄनरूु प वैध अइइसी प्रमाणपत्र हो और मान्द्यताप्राप्त परीक्षण प्रयोगिालाओं से परीक्षण ररपोटा हो, तादक अदेिों का सुचारु कायाान्द्वयन हो सके। [फा. सं. 223/140/2017-अर एंड डी (गुणवत्ता जनयंत्रण)] डॉ. ऄरुण कुमार जत्रपाठी, सलाहकार/वैज्ञाजनक ‘जी’ 5132 GI/2022 (1)2 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] MINISTRY OF NEW AND RENEWABLE ENERGY NOTIFICATION New Delhi, the 28th July, 2022 S. O. 3535(E).—Whereas the Central Government had issued “Solar Photovoltaics, Systems, Devices and Components Goods (Requirements for Compulsory Registration) Order, 2017” vide S.O. 2920 (E) dated 5.9.2017 for six products included in the Schedule with the date of coming into force with effect from 5.9.2018 and the same was modified vide S.O. 5259(E) published in Gazette of India dated 12.10.2018. And whereas, self- certification for SPV inverters (items 4-5) was extended up to 30.06.2022 vide S.O. 513(E) published in Gazette of India dated 02.02.2022. 2. And whereas, in view of the availability of limited test facilities and providing more time for compliance, the implementation of Quality Control Order, 2017 for SPV inverters (items 4-5) stands extended from 30.06.2022 to 31.12.2022 based on self-certification, subject to the condition that such manufacturers have valid IEC certificates corresponding to IS (IS 16221(Part 2):2015/IEC 62109-2:2011 for item No 4 and IS 16169:2014/IEC 62116:2008 for item No. 5), specified in the said order for these items and test reports from accredited test labs, for smooth implementation of the order. [F. No. 223/140/2017-R&D (Quality Control)] Dr. ARUN K. TRIPATHI, Adviser/Scientist G Uploaded by Dte. of Printing at Government of India Press, Ring Road, Mayapuri, New Delhi-110064 and Published by the Controller of Publications, Delhi-110054.

Continue your research