Home India Ministry of New and Renewable Energy Parliament Question: Accelerated renewable energy expansion ...
Date: 2026-03-17 Category: RAJYASABHA_QNA State: Union Government Country: India

Parliament Question: Accelerated renewable energy expansion and energy transition

Issued by Ministry of New and Renewable Energy · Not Applicable

Research with AI Agent Chat with Document Generate Summary Translate Helpful Share Add to Project Create Task
Official Source Record View Original Source →
See Full Document Text
GOVERNMENT OF INDIA MINISTRY OF NEW AND RENEWABLE ENERGY RAJYA SABHA UNSTARRED QUESTION NO. 2866 ANSWERED ON 17.03.2026 ACCELERATED RENEWABLE ENERGY EXPANSION AND ENERGY TRANSITION 2866. SHRI BABUBHAI JESANGBHAI DESAI Will the Minister of New and Renewable Energy be pleased to state: (a) the State-wise current status of India’s installed renewable energy capacity, including solar, wind, green hydrogen and bio-energy and the progress made towards achieving the 2030 clean energy targets; (b) the initiatives undertaken to promote domestic manufacturing under the Production Linked Incentive scheme for solar modules and battery storage systems in the country; (c) whether Government has introduced policy measures to strengthen grid integration, storage solutions and round-the-clock renewable power supply; and (d) the manner in which these initiatives are contributing to energy security, reduction in carbon emissions and generation of green employment opportunities across the country? ANSWER THE MINISTER OF STATE FOR NEW & RENEWABLE ENERGY AND POWER (SHRI SHRIPAD YESSO NAIK) (a) Ministry of New and Renewable Energy (MNRE) is working towards achieving 500 GW of installed electricity capacity from non-fossil fuel-based sources by 2030. As on 28.02.2026, a total of 266.68 GW renewable energy capacity has been installed in the country. The source-wise and State- wise details are given at Annexure-I. Further, the Government is implementing the National Green Hydrogen Mission (NGHM) with an objective to make India a global hub of production, usage and export of green hydrogen and its derivatives. The Mission aims to establish green hydrogen production capacity of 5 Million Metric tonnes per annum by 2030. As per available information, around 8000 tonnes per annum of green hydrogen production capacity has been commissioned in the country till February 2026. The location- wise details are given at Annexure-II. (b) The Government is implementing the Production Linked Incentive (PLI) Scheme for High Efficiency Solar PV Modules, for achieving domestic manufacturing capacity of Giga Watt (GW) scale in High Efficiency Solar PV modules, with an outlay of Rs. 24,000 crore. Under the Scheme, Letters of Award have been issued for setting up of 48,337 MW of fully/ partially integrated solar PV module manufacturing units. Further, Ministry of Heavy Industries is having a Production Linked Incentive (PLI) scheme, ‘National Programme on Advanced Chemistry Cell (ACC) Battery Storage’ for implementation of giga-scale ACC manufacturing facilities in India, for 50 GWh with a total budgetary outlay of ₹18,100 crore. (c) Government has taken various initiatives for development of the Energy Storage capacity in the country which include, inter alia, the following: (i) Notified Guidelines for Procurement and Utilization of Battery Energy Storage System (BESS) as part of Generation, Transmission and Distribution assets, along with Ancillary Services.(ii) Issued National Framework to promote Energy Storage Systems in the country. (iii) Issued Guidelines to promote Pumped Storage Projects (PSP). (iv) Granted 100% waiver of Inter-State Transmission System (ISTS) charges for PSP for which construction work is awarded on or before June 30, 2028 (v) Granted 100% ISTS charges waiver for co-located BESS projects, commissioned on or before 30th June 2028, with certain conditions. (vi) Approved a Viability Gap Funding (VGF) Scheme for the development of large-scale BESS with an outlay of ₹3,760 crore for the development of 13,220 MWh. Approved another VGF Scheme for 30 GWh, funded through ₹5,400 crore from the Power System Development Fund (PSDF. (vii) Issued an Advisory on ‘Co-locating Energy Storage Systems with Solar Power Projects to enhance grid stability and cost efficiency’. Further, the various measures taken to strengthen grid integration are as under: (i) Central Electricity Authority (CEA) has published a plan for Transmission System for Integration of over 500 GW renewable energy capacity by 2030 covering all renewable energy rich States. (ii) Ministry of New & Renewable Energy is implementing Green Energy Corridor scheme in two phases, i.e. Phase-I & Phase-II, in ten States, viz., Andhra Pradesh, Gujarat, Himachal Pradesh, Karnataka, Kerala, Madhya Pradesh, Maharashtra, Rajasthan, Tamil Nadu and Uttar Pradesh for enabling smooth evacuation of 44GW of renewable energy (RE). (iii) Central Electricity Authority (Technical Standards for Connectivity to the Grid) Regulations lay down the minimum technical requirements for the RE generating plants to ensure safe, secure and reliable operation of the grid. The compliances to the said regulations by RE plants are verified jointly by Central Transmission Utility (CTUIL) and Grid-India/Regional Load Despatch Centres (RLDCs) before granting connectivity/ interconnection to the national grid. (iv) Indian Electricity Grid Code mandates that RE plants participate in the primary and secondary frequency control in case of contingencies. (v) Establishment of Renewable Energy Management Centres (REMCs) for real-time forecasting, scheduling, and monitoring of RE generation across 12 RE-rich regions. Further, Ministry of Power vide Resolution no. 23/03/2023-R&R dated 9th June, 2023 issued the Guidelines for Tariff Based Competitive Bidding Process for Procurement of Firm and Dispatchable Power from Grid Connected Renewable Energy Power Projects with Energy Storage Systems. These Guidelines enables the DISCOMs to procure round-the clock /demand based renewable power. (d) The initiatives undertaken by the Government for promotion of renewable energy, domestic manufacturing, grid integration and energy storage are aimed at strengthening the country’s energy security by diversifying the energy mix and reducing dependence on fossil fuels. These measures are expected to facilitate greater deployment of clean energy technologies, which in turn may contribute to reduction in carbon emissions. Further, the expansion of renewable energy capacity, manufacturing ecosystem and associated supply chains is likely to generate employment opportunities across various segments such as manufacturing, project development, installation, operations and maintenance. *****Annexure-I Annexure-I referred to in reply of part (a) of the Rajya Sabha Unstarred Question No. 2866 to be answered on 17.03.2026 Source-wise and State-wise Renewable Energy installed capacity as on 28.02.2026 (In Megawatt) Sl. STATES / UTs Small Wind Bio- Solar Large Total No. Hydro Power Power Power Hydro Power 1 Andhra Pradesh 164.51 4415.78 594.02 7208.18 3290.00 15672.49 2 Arunachal Pradesh 140.61 0.00 15.44 1615.00 1771.05 3 Assam 34.11 2.00 533.47 346.00 915.58 4 Bihar 70.70 140.22 435.34 646.26 5 Chhattisgarh 100.90 285.42 1755.40 120.00 2261.72 6 Goa 0.05 1.94 76.24 78.23 7 Gujarat 113.30 15197.19 129.85 27486.27 1990.00 44916.61 8 Haryana 73.50 326.71 2584.78 2984.99 9 Himachal Pradesh 1013.46 10.20 346.28 11421.02 12790.96 10 Jammu & Kashmir 189.93 0.00 79.48 3360.00 3629.41 11 Jharkhand 4.05 20.14 242.39 210.00 476.58 12 Karnataka 1284.73 8500.54 1917.05 11029.95 3689.20 26421.47 13 Kerala 276.52 71.52 2.50 2150.25 2008.15 4508.94 14 Ladakh 45.79 0.00 12.02 89.00 146.81 15 Madhya Pradesh 123.71 3610.15 155.46 5893.84 2235.00 12018.16 16 Maharashtra 384.28 5873.01 2998.30 19364.16 3047.00 31666.75 17 Manipur 5.45 0.00 17.52 105.00 127.97 18 Meghalaya 55.03 13.80 4.28 322.00 395.11 19 Mizoram 45.47 0.00 33.69 60.00 139.16 20 Nagaland 32.67 0.00 3.34 75.00 111.01 21 Odisha 140.63 64.22 779.32 2154.55 3138.72 22 Punjab 176.10 576.59 1566.91 1096.30 3415.90 23 Rajasthan 23.85 5229.15 207.52 38728.22 412.50 44601.24 24 Sikkim 55.11 0.00 7.56 2282.00 2344.67 25 Tamil Nadu 123.05 12102.76 1046.62 12352.49 2203.20 27828.12 26 Telangana 89.67 128.10 221.67 5065.10 2405.60 7910.14 27 Tripura 16.01 0.00 35.41 51.42 28 Uttar Pradesh 50.60 2310.39 3846.45 501.60 6709.04 29 Uttarakhand 233.82 149.57 837.89 4785.35 6006.63 30 West Bengal 98.50 351.86 320.62 1341.20 2112.18 31 A&N Islands 5.25 0.00 32.12 37.37 32 Chandigarh 0.00 78.85 78.85 33 Dadra & Nagar Haveli 3.75 134.90 138.65 and Daman & Diu 34 Delhi 85.17 413.90 499.07 35 Lakshadweep 0.00 6.57 6.57 36 Puducherry 0.00 80.71 80.71 37 Others 4.30 0.00 45.01 49.31 Total 5171.36 55132.50 11614.97 143604.37 51164.67 266687.85Annexure-II Annexure-II referred to in reply of part (a) of the Rajya Sabha Unstarred Question No. 2866 to be answered on 17.03.2026 Location-wise details of green hydrogen production plants commissioned in the country Sl. Company Name Capacity Location No. (Tonnes per Annum) 1 ACME Cleantech Solutions Pvt. Ltd 175 Bikaner, Rajasthan 2 Bharat Petroleum Corporation Ltd. 780 Bina Refinery, Madhya Pradesh 3 National Institute of Solar Energy 7.8 Gurugram, Haryana 4 INOX India Limited 190 Chittorgarh, Rajasthan 5 Hygenco Green Energies Pvt. Ltd. 16 Ujjain, Madhya Pradesh 6 Hygenco Green Energies Pvt. Ltd. 78 Hisar, Haryana 7 Hygenco Green Energies Pvt. Ltd. 230 Chhatrapati Sambhajinagar, Maharashtra 8 SJVN Limited 5 NJHPS, Jhakri, Himachal Pradesh 9 THDC India Limited 18.25 Rishikesh, Uttarakhand 10 Larsen & Toubro Limited 15 Hazira, Gujarat 11 Oil India Limited 10.95 Jorhat, Assam 12 Hero Future Energies 25 Tirupati, Andhra Pradesh 13 GAIL (India) Limited 1,752 Vijaipur, Madhya Pradesh 14 Adani New Industries Limited 876 Kutch, Gujarat 15 NTPC Limited 0.87 Kawas township, Surat, Gujarat 16 NTPC Limited 29.2 Leh, Ladakh 17 Deen Dayal Port Authority 80 Kandla, Gujarat 18 Torrent Power 72 Gorakhpur, Uttar Pradesh 19 V.O Chidambaranar (VOC) Port 7.8 V. O. Chidambaranar Port, Tamil Nadu 20 JSW Steel 3600 Ballari, Karnataka Total Capacity 7968.87

Continue your research