Home India Ministry of Power Parliament Question: Assessment of National Power Grid...
Date: 2026-07-30 Category: LOKSABHA_QNA State: Union Government Country: India

Parliament Question: Assessment of National Power Grid

Issued by Ministry of Power · Not Applicable

Research with AI Agent Chat with Document Generate Summary Translate Helpful Share Add to Project Create Task
Official Source Record View Original Source →
See Full Document Text
GOVERNMENT OF INDIA MINISTRY OF POWER LOK SABHA UNSTARRED QUESTION NO.2035 ANSWERED ON 30.07.2026 ASSESSMENT OF NATIONAL POWER GRID 2035. SHRI JAI PRAKASH: Will the Minister of POWER be pleased to state: (a) whether the Government has undertaken any comprehensive assessment of the preparedness of the National Power Grid to meet the rapidly growing electricity demand arising from renewable energy integration, electric mobility, data centres and industrial expansion across the country and if so, the details thereof; (b) the details of transmission capacity augmentation, grid modernization, deployment of smart grid technologies, battery energy storage systems and cyber security measures initiated during the last three years, State-wise and project-wise; and (c) whether the Government proposes to formulate a long term National Grid Resilience Strategy to ensure uninterrupted, secure and affordable power supply while addressing climate related risks, cyber threats and peak demand fluctuations and if so, the details thereof? A N S W E R THE MINISTER OF STATE IN THE MINISTRY OF POWER (SHRI SHRIPAD NAIK) (a) : To strengthen the transmission infrastructure in line with the growing electricity demand, the Government of India notified the National Electricity Plan (Volume-II: Transmission) in 2024. The plan outlines the transmission system requirements for the period 2023–2032, commensurate with the projected generation capacity additions and anticipated growth in electricity demand across various emerging and conventional sectors of the economy (including electric mobility, data centres and industrial expansion across the country). The transmission planning also takes into account evolving load centres and new categories of electricity demand, while ensuring reliable integration of renewable energy. The transmission plan includes the addition of central and state transmission systems to meet the projected peak electricity demand of 388 GW by 2032. As per the plan, the transmission network is likely to expand from 5.09 lakh ckm (as on June, 2026) to 6.48 lakh ckm by 2032 and transformation capacity from 1,478 GVA (as on June, 2026) to 2,345 GVA. Also, the inter- regional transmission capacity is planned to increase from 120 GW (as on June, 2026) to 168 GW by the year 2032.(b): The details of transmission capacity augmentation, grid modernization, deployment of smart grid technologies, battery energy storage systems and cyber security measures initiated during the last three years are as follows: 1. Details of Transmission capacity augmentation: A total of 35,172 circuit km of transmission lines and 270,174 MVA of transformation capacity (220 kV and above) have been added during the last three years (FY 2023-24 to FY 2025-26). Summary of the transmission lines and transformation capacity augmented is given at Annexure-I. 2. Grid Modernization and deployment of smart grid technologies: Advanced grid support technologies such as Static Synchronous Compensators (STATCOMs), Synchronous Condensers (SynCONs), and other Flexible AC Transmission System (FACTS) devices are being deployed to enhance voltage stability, improve system strength, and support reliable integration of renewable energy. Further, several measures have been taken to facilitate renewable energy integration, including establishment of Regional Energy Management Centres (REMCs) for renewable forecasting and real-time grid management, implementation of Automatic Generation Control (AGC) and Ancillary Services (SRAS/TRAS) for frequency regulation and balancing etc. 3. Battery energy storage system (BESS): As on 30.06.2026, the installed capacity of Battery Energy Storage Systems (BESS) with capacity greater than 1 MWh is 2,927.85 MW / 8,660.20 MWh in the country. State wise details are given at Annexure-II. 4. Cyber security measures: To strengthen the cyber security of Indian electricity grid, the Government of India has established a sector specific cyber security incident response team, namely, Computer Security Incident Response Team – Power (CSIRT-Power) in April, 2023 for coordinating, reporting, and responding to cyber security incidents in power sector. Cyber security measures undertaken during the last three years include approval of funding under Power System Development Fund (PSDF) for establishment of a Security Operations Centre (SOC) and a Network Operations Centre (NOC) to strengthen cyber security monitoring and incident response. Further, cyber security training programmes, workshops and capacity- building initiatives are being organized regularly in collaboration with the Indian Institutes of Technology (IITs), Rashtriya Raksha University (RRU), the National Critical Information Infrastructure Protection Centre (NCIIPC) and other institutions to enhance cyber security awareness and capabilities across the power sector.(c) : The Government has already initiated several measures to enhance the resilience, reliability and security of the national grid. In this regard, Task Force on Cyclone Resilient Robust Electricity Transmission and Distribution Infrastructure in Coastal Areas has recommended a comprehensive set of measures including, enhanced transmission planning based on higher contingency criteria, Critical Infrastructure Protection Framework, Mapping of Transmission and Distribution (T&D) infrastructure in cyclone affected zones, Designing of Distribution network in Ring or Mesh configuration, emergency restoration systems, Mobile substations, Mobile DGs set, digitalisation of power system assets, deployment of distributed energy resources, Standardization and use of Energy efficient equipment, use of advanced technologies such as Unmanned Arial Vehicles (UAVs) / Drones for inspection and monitoring, Underground transmission corridor along coastal highway project etc. Cyber resilience of the National Grid is being strengthened through round-the-clock (RTC) monitoring through the Security Operations Centre (SOC) and Network Operations Centre (NOC) at CSIRT-Power and GRID-INDIA; the system has also continuously been monitored by CERT-IN and National Critical Information Infrastructure Protection Centre (NCIIPC). Periodic Vulnerability Assessment and Penetration Testing (VA/PT) of Information Technology (IT) and Operational Technology (OT) infrastructure, and continuous capacity building in collaboration with reputed technical and national security institutions, so that preparedness keeps pace with the evolving cyber threat landscape. ***********ANNEXURE-I ANNEXURE REFERRED IN REPLY TO PART (b) OF UNSTARRED QUESTION NO. 2035 ANSWERED IN THE LOK SABHA ON 30.07.2026 ************* A. Transmission Line (Commissioned - 220 kV and above) in ckm: Year Inter State Intra State Total (ISTS + Transmission Transmission InSTS) System (ISTS) System (InSTS) 2023-24 6,283 7,920 14,203 2024-25 3,652 5,178 8,830 2025-26 6,009 6,130 12,139 Total 15,944 19,228 35,172 B. Transformation Capacity (Commissioned - 220 kV and above) in MVA: Year Inter State Intra State Total (ISTS + Transmission Transmission InSTS) System (ISTS) System (InSTS) 2023-24 31,820 38,908 70,728 2024-25 39,335 47,098 86,433 2025-26 72,905 40,108 1,13,013 Total 1,44,060 1,26,114 2,70,174 ***************ANNEXURE-II ANNEXURE REFERRED IN REPLY TO PART (b) OF UNSTARRED QUESTION NO. 2035 ANSWERED IN THE LOK SABHA ON 30.07.2026 ************* State-wise details of the installed Battery Energy Storage System (BESS) capacity: Sl. Details of BESS Deployment State Capacity No. MW MWh 1. 10MW/10MWh BESS project with Lithium-ion Delhi 10 10 Battery-NMC at Tata Power-DDL’s sub-station in Rohini 2. 20MW solar power project integrated with an Andaman & 16 8 16MW/8MWh BESS at Dollygunj and AttamPahad in Nicobar South Andaman 3. Modhera Sun Temple Solar with BESS (6 MW SPV Gujarat 6 19.2 with 6MW/19.2 MWh BESS installed at Village Sujanpura& 50 kW SPV with 150 kWh BESS installed at the Sun Temple 4. 1.7 MW Solar PV Power Plant (300 kW at Agatii & Lakshadweep 0.5 1.4 1400 kW at Kavaratti) with 0.5 MW/ 1.4 MWh BESS (at Kavaratti) at Lakshadweep 5. BESS project at Rajnandgaon, Chhattisgarh Chhattisgarh 40 120 - 100 MW(AC) Solar PV Project with 40 MW/120 MWh Battery Energy Storage System 6. GSECL Gujarat Solar plus Storage Hybrid - 35MW Gujarat 12 57 Solar PV with 57 MWh BESS Location: Kutch Lignite Thermal Power Station (KLTPS) 7. SECI Peak Power 1200 MW with 75 MW/150 MWh Karnataka 75 150 BESS 8. SECI RTC 400 MW with 25MW/100MWh BESS Rajasthan 23 92 9. 20 MW/ 40 MWh BESS in Delhi under Tariff-Based Delhi 20 40 Competitive Bidding 10. VRFB (Vanadium Redox Flow Battery) Storage Uttar Pradesh 0.6 3 System of 0.6 MW/3 MWh at NETRA, NTPC Greater Noida 11. 185 MW (AC) Solar PV with 45.4 MW for 4 Hour (Min. Bihar 70.5 282 254 MWh) BESS at Kajra, Lakhisarai 12. 250kW/1,200 kWh BESS supporting solar power Gujarat 0.25 1.2 projects at the Khavda Renewable Energy Park in the Rann of Kutch, 13. Kolkata Metro Rail Corporation 4 MW four-quadrant West Bengal 4 6.4 inverters using LFP or LTO batteries as energy storage element. 14. 180 MW/360 MWh Standalone BESS in Gujarat at Gujarat 180 360 400 KV Charal Substation sanand 2, GIDC, Charal 15. Juniper Merchant Sale BESS Rajasthan 250 500 16. ACME Merchant Sale BESS Rajasthan 800 3,200 17. Adani Merchant Sale BESS Gujarat 1,200 3,370 18. Pilot Projects of 300 MW/600 MWh Standalone Maharashtra 220 440 BESS by Pace Digitek under TCGCB for MSEDCL Total 2,927.85 8,660.20 Legend: SECI-Solar Energy Corporation of India Limited TBCB- Tariff-Based Competitive Bidding MSEDCL-Maharashtra State Electricity Distribution Company Limited GIDC- Gujarat Industrial Development Corporation RTC- Round The Clock ***************

Continue your research