ASSESSMENT OF NATIONAL POWER GRID
2035. SHRI JAI PRAKASH:
Will the Minister of POWER
be pleased to state:
(a) whether the Government has undertaken any comprehensive assessment
of the preparedness of the National Power Grid to meet the rapidly growing
electricity demand arising from renewable energy integration, electric mobility,
data centres and industrial expansion across the country and if so, the details
thereof;
(b) the details of transmission capacity augmentation, grid modernization,
deployment of smart grid technologies, battery energy storage systems and
cyber security measures initiated during the last three years, State-wise and
project-wise; and
(c) whether the Government proposes to formulate a long term National Grid
Resilience Strategy to ensure uninterrupted, secure and affordable power
supply while addressing climate related risks, cyber threats and peak demand
fluctuations and if so, the details thereof?
A N S W E R
THE MINISTER OF STATE IN THE MINISTRY OF POWER
(SHRI SHRIPAD NAIK)
(a) : To strengthen the transmission infrastructure in line with the growing
electricity demand, the Government of India notified the National Electricity
Plan (Volume-II: Transmission) in 2024. The plan outlines the transmission
system requirements for the period 2023–2032, commensurate with the
projected generation capacity additions and anticipated growth in electricity
demand across various emerging and conventional sectors of the economy
(including electric mobility, data centres and industrial expansion across the
country). The transmission planning also takes into account evolving load
centres and new categories of electricity demand, while ensuring reliable
integration of renewable energy.
The transmission plan includes the addition of central and state
transmission systems to meet the projected peak electricity demand of 388 GW
by 2032. As per the plan, the transmission network is likely to expand from 5.09
lakh ckm (as on June, 2026) to 6.48 lakh ckm by 2032 and transformation
capacity from 1,478 GVA (as on June, 2026) to 2,345 GVA. Also, the inter-
regional transmission capacity is planned to increase from 120 GW (as on June,
2026) to 168 GW by the year 2032.(b): The details of transmission capacity augmentation, grid modernization,
deployment of smart grid technologies, battery energy storage systems and
cyber security measures initiated during the last three years are as follows:
1. Details of Transmission capacity augmentation:
A total of 35,172 circuit km of transmission lines and 270,174 MVA of
transformation capacity (220 kV and above) have been added during the last
three years (FY 2023-24 to FY 2025-26). Summary of the transmission lines and
transformation capacity augmented is given at Annexure-I.
2. Grid Modernization and deployment of smart grid technologies:
Advanced grid support technologies such as Static Synchronous
Compensators (STATCOMs), Synchronous Condensers (SynCONs), and other
Flexible AC Transmission System (FACTS) devices are being deployed to
enhance voltage stability, improve system strength, and support reliable
integration of renewable energy. Further, several measures have been taken
to facilitate renewable energy integration, including establishment of Regional
Energy Management Centres (REMCs) for renewable forecasting and real-time
grid management, implementation of Automatic Generation Control (AGC) and
Ancillary Services (SRAS/TRAS) for frequency regulation and balancing etc.
3. Battery energy storage system (BESS):
As on 30.06.2026, the installed capacity of Battery Energy Storage
Systems (BESS) with capacity greater than 1 MWh is 2,927.85 MW / 8,660.20
MWh in the country. State wise details are given at Annexure-II.
4. Cyber security measures:
To strengthen the cyber security of Indian electricity grid, the
Government of India has established a sector specific cyber security
incident response team, namely, Computer Security Incident Response Team
– Power (CSIRT-Power) in April, 2023 for coordinating, reporting, and
responding to cyber security incidents in power sector. Cyber security
measures undertaken during the last three years include approval of funding
under Power System Development Fund (PSDF) for establishment of a
Security Operations Centre (SOC) and a Network Operations Centre (NOC) to
strengthen cyber security monitoring and incident response.
Further, cyber security training programmes, workshops and capacity-
building initiatives are being organized regularly in collaboration with the
Indian Institutes of Technology (IITs), Rashtriya Raksha University (RRU),
the National Critical Information Infrastructure Protection Centre (NCIIPC)
and other institutions to enhance cyber security awareness and capabilities
across the power sector.(c) : The Government has already initiated several measures to enhance the
resilience, reliability and security of the national grid. In this regard, Task Force
on Cyclone Resilient Robust Electricity Transmission and Distribution
Infrastructure in Coastal Areas has recommended a comprehensive set of
measures including, enhanced transmission planning based on higher
contingency criteria, Critical Infrastructure Protection Framework, Mapping of
Transmission and Distribution (T&D) infrastructure in cyclone affected zones,
Designing of Distribution network in Ring or Mesh configuration, emergency
restoration systems, Mobile substations, Mobile DGs set, digitalisation of
power system assets, deployment of distributed energy resources,
Standardization and use of Energy efficient equipment, use of advanced
technologies such as Unmanned Arial Vehicles (UAVs) / Drones for inspection
and monitoring, Underground transmission corridor along coastal highway
project etc.
Cyber resilience of the National Grid is being strengthened through
round-the-clock (RTC) monitoring through the Security Operations Centre (SOC)
and Network Operations Centre (NOC) at CSIRT-Power and GRID-INDIA; the
system has also continuously been monitored by CERT-IN and National Critical
Information Infrastructure Protection Centre (NCIIPC). Periodic Vulnerability
Assessment and Penetration Testing (VA/PT) of Information Technology (IT)
and Operational Technology (OT) infrastructure, and continuous capacity
building in collaboration with reputed technical and national security
institutions, so that preparedness keeps pace with the evolving cyber threat
landscape.
***********ANNEXURE-I
ANNEXURE REFERRED IN REPLY TO PART (b) OF UNSTARRED QUESTION NO.
2035 ANSWERED IN THE LOK SABHA ON 30.07.2026
*************
A. Transmission Line (Commissioned - 220 kV and above) in ckm:
Year Inter State Intra State Total (ISTS +
Transmission Transmission InSTS)
System (ISTS) System (InSTS)
2023-24 6,283 7,920 14,203
2024-25 3,652 5,178 8,830
2025-26 6,009 6,130 12,139
Total 15,944 19,228 35,172
B. Transformation Capacity (Commissioned - 220 kV and above) in MVA:
Year Inter State Intra State Total (ISTS +
Transmission Transmission InSTS)
System (ISTS) System (InSTS)
2023-24 31,820 38,908 70,728
2024-25 39,335 47,098 86,433
2025-26 72,905 40,108 1,13,013
Total 1,44,060 1,26,114 2,70,174
***************ANNEXURE-II
ANNEXURE REFERRED IN REPLY TO PART (b) OF UNSTARRED QUESTION NO. 2035
ANSWERED IN THE LOK SABHA ON 30.07.2026
*************
State-wise details of the installed Battery Energy Storage System (BESS) capacity:
Sl. Details of BESS Deployment State Capacity
No. MW MWh
1. 10MW/10MWh BESS project with Lithium-ion Delhi 10 10
Battery-NMC at Tata Power-DDL’s sub-station in
Rohini
2. 20MW solar power project integrated with an Andaman & 16 8
16MW/8MWh BESS at Dollygunj and AttamPahad in Nicobar
South Andaman
3. Modhera Sun Temple Solar with BESS (6 MW SPV Gujarat 6 19.2
with 6MW/19.2 MWh BESS
installed at Village Sujanpura& 50 kW SPV with 150
kWh BESS installed at the Sun Temple
4. 1.7 MW Solar PV Power Plant (300 kW at Agatii & Lakshadweep 0.5 1.4
1400 kW at Kavaratti) with 0.5 MW/ 1.4 MWh BESS
(at Kavaratti) at Lakshadweep
5. BESS project at Rajnandgaon, Chhattisgarh Chhattisgarh 40 120
- 100 MW(AC) Solar PV Project with 40 MW/120
MWh Battery Energy Storage System
6. GSECL Gujarat Solar plus Storage Hybrid - 35MW Gujarat 12 57
Solar PV with 57 MWh BESS Location: Kutch
Lignite Thermal Power Station (KLTPS)
7. SECI Peak Power 1200 MW with 75 MW/150 MWh Karnataka 75 150
BESS
8. SECI RTC 400 MW with 25MW/100MWh BESS Rajasthan 23 92
9. 20 MW/ 40 MWh BESS in Delhi under Tariff-Based Delhi 20 40
Competitive Bidding
10. VRFB (Vanadium Redox Flow Battery) Storage Uttar Pradesh 0.6 3
System of 0.6 MW/3 MWh at NETRA, NTPC Greater
Noida
11. 185 MW (AC) Solar PV with 45.4 MW for 4 Hour (Min. Bihar 70.5 282
254 MWh) BESS at Kajra, Lakhisarai
12. 250kW/1,200 kWh BESS supporting solar power Gujarat 0.25 1.2
projects at the Khavda Renewable Energy Park in
the Rann of Kutch,
13. Kolkata Metro Rail Corporation 4 MW four-quadrant West Bengal 4 6.4
inverters using LFP or LTO batteries as energy
storage element.
14. 180 MW/360 MWh Standalone BESS in Gujarat at Gujarat 180 360
400 KV Charal Substation sanand 2, GIDC, Charal
15. Juniper Merchant Sale BESS Rajasthan 250 500
16. ACME Merchant Sale BESS Rajasthan 800 3,200
17. Adani Merchant Sale BESS Gujarat 1,200 3,370
18. Pilot Projects of 300 MW/600 MWh Standalone Maharashtra 220 440
BESS by Pace Digitek under TCGCB for MSEDCL
Total 2,927.85 8,660.20
Legend:
SECI-Solar Energy Corporation of India Limited
TBCB- Tariff-Based Competitive Bidding
MSEDCL-Maharashtra State Electricity Distribution Company Limited
GIDC- Gujarat Industrial Development Corporation
RTC- Round The Clock
***************