(a) the number of coal blocks auctioned under commercial mining in the country including
Jharkhand particularly in the Chatra Lok Sabha Constituency and the number of blocks where
production has commenced along with the status of the remaining blocks;
(b) the quantity of coal produced from commercial coal mines in the country including
Jharkhand particularly in the Chatra Lok Sabha Constituency during the financial year 2025–
26 and their contribution to the State's and country's total domestic coal production;
(c) the steps taken by the Government to facilitate the timely development of commercial coal
mines in the country including Jharkhand particularly in the Chatra Lok Sabha Constituency
through faster statutory clearances, land acquisition, environmental and forest approvals and
supporting rail and road infrastructure; and
(d) whether the Government has any special plan to expedite operationalisation of commercial
coal projects and promote local employment and infrastructure development in the country
particularly in the Chatra Lok Sabha Constituency and if so, the details thereof?
ANSWER
MINISTER OF STATE FOR COAL AND MINES
(SHRI SATISH CHANDRA DUBEY)
(a) As of 30 June 2026, a total of 132 coal blocks have been allocated through the commercial
mining auction route. Of these, 23 blocks have obtained Mine Opening Permission (MOP), and
15 blocks are currently producing coal. The remaining 8 blocks are advancing through mine
infrastructure development, while the other 109 blocks are within their scheduled development
period as per the Coal Mine Development and Production Agreement (CMDPA), progressing
through a structured timeline covering clearances, land acquisition, and infrastructure setup.
Blocks allocated in successive auction tranches are accordingly at different stages of that
timeline.
In the state of Jharkhand, 37 coal blocks have been allocated under commercial mining. Of
these, 8 commercial coal blocks have been allocated in the Chatra Lok Sabha Constituency.
The details of these blocks, along with their respective allottees and current status, are as
follows:
Page 1 of 3S.No District Coal Block Allottee Status
Non-
1 Latehar Chakla Hindalco Industries Ltd.
operational
Hazaribagh, Dalmia Cement (Bharat) Non-
2&3 Brinda & Sasai
Chatra Limited operational
North Dhadu (Eastern Non-
4 Latehar NTPC Mining Ltd. (NML)
Part) operational
North Dhadu Non-
5 Latehar NLC India Ltd. (NLCIL)
(Western Part) operational
Non-
6 Latehar Seregarha Rungta Sons Private Limited
operational
Oriental Quarries and Mines Non-
7 Latehar West of Tubed
Private Limited operational
Orissa Alloy Steel Private Non-
8 Latehar Chitarpur (Revised)
Limited operational
As reflected in the table above, all 8 blocks allocated in the Chatra Lok Sabha Constituency
are currently non-operational and are at various stages of development.
(b) Commercial coal mining, introduced in 2020, has significantly contributed to enhancing
domestic coal production and advancing the objectives of Atmanirbhar Bharat by promoting
private sector participation, increasing domestic coal availability, and reducing dependence on
imports. Production from commercial coal mines has registered consistent growth, increasing
from 1.15 MT in FY 2021-22 to 26.12 MT in FY 2025-26, reflecting sustained growth in
domestic production.
During the financial year 2025-26, the coal production from commercial mines in the
state of Jharkhand stood at 0.35 MT. It is pertinent to note that there are no coal producing
commercial mines in the Chatra Lok Sabha Constituency. The contribution of these mines to
the State's and country's total domestic coal output is accordingly reflected in the
aforementioned figures.
(c) The Government has undertaken a comprehensive and sustained programme of reforms to
expedite the operationalisation of commercial coal mines, with a strong focus on Ease of Doing
Business.In the realm of exploration, 44 private entities have been notified as Accredited
Prospecting Agencies, eliminating the need for a Prospecting Licence, while the requirement
for Ministry approval of Geological Reports has been replaced with a streamlined peer-review
mechanism. Furthermore, the number of exempted boreholes in forest areas has been increased
Page 2 of 3from 25 to 62 per 10 square kilometres, significantly simplifying the exploration process for
most projects.
To further accelerate development, coking coal has been designated as a Critical and
Strategic Mineral, exempting it from public consultation requirements and allowing the use of
degraded forest land for Compensatory Afforestation. In a major procedural reform, the
mandatory requirement for Mine Opening Permission from the Coal Controller's Organisation
has been dispensed with, and the Board of the Company is now competent to grant this
approval.
(d) The Government has taken several comprehensive initiatives to facilitate timely
development of commercial coal mines across the country, as detailed in the response to part
(c) above. These initiatives are designed to benefit all commercial coal projects uniformly and
contribute to employment generation and infrastructure development in mining-affected areas
*****
Page 3 of 3