GOVERNMENT OF INDIA
MINISTRY OF NEW AND RENEWABLE ENERGY
LOK SABHA
UNSTARRED QUESTION NO. 2849
ANSWERED ON 05.08.2026
COMPANIES SELECTED UNDER SIGHT PROGRAMME
2849. DR. BYREDDY SHABARI
Will the Minister of NEW AND RENEWABLE ENERGY be pleased to state:
(a) the details of the number of proposals received and approved under each component of
the Strategic Interventions for Green Hydrogen Transition (SIGHT) Programme since its
inception, State and year-wise;
(b) the list of companies/implementing entities selected under the SIGHT Programme along
with the locations of their green hydrogen and electrolyser manufacturing facilities;
(c) the details of the amount of production achieved of electrolysers and green hydrogen by
selected companies since approval, company and year-wise;
(d) the details of the incentives eligible and incentives disbursed under the SIGHT
Programme, company and year-wise; and
(e) the details of the challenges and bottlenecks observed in the implementation of the
SIGHT Programme and the steps taken by the Government to address such challenges?
ANSWER
THE MINISTER OF STATE FOR NEW & RENEWABLE ENERGY AND POWER
(SHRI SHRIPAD YESSO NAIK)
(a) to (d) The Government of India is implementing the National Green Hydrogen Mission
(NGHM), with an objective to make India a global hub of production, usage and export of
green hydrogen and its derivatives.
Strategic Interventions for Green Hydrogen Transition (SIGHT) Programme is a key
component under NGHM, which provides incentives for production of green hydrogen and
its derivatives and electrolyser manufacturing. The details are as follows:
(i) Component I: Incentive Scheme for Electrolyser Manufacturing.
a. Under Tranche I, a total of 21 proposals were received, out of which 8 have
been awarded.
b. Under Tranche II, a total of 23 proposals were received, out of which 11 have
been awarded.
c. The details are at Annexure I.
(ii) Component II: Incentive Scheme for Green Hydrogen Production (Mode 1).
a. Under Tranche I, a total of 14 proposals were received, out of which 8 have
been awarded.
b. Under Tranche II, a total of 14 proposals were received, out of which 9 have
been awarded.
c. The details are at Annexure II.
(iii)Component II: Incentive for Procurement of Green Ammonia Production (under
Mode – 2A). The details are at Annexure III.(iv) Component III: Incentive for Procurement of Green Hydrogen Production (under
Mode – 2B). The details are at Annexure IV.
As of July 2026, no electrolyser manufacturing facility or Green Hydrogen production
facility supported under the Scheme has been fully commissioned. Consequently, no
incentive claims have been submitted or disbursed under the respective schemes.
(e) Demand creation for green hydrogen and its derivatives is a key bottleneck that has been
identified in the implementation of the SIGHT Programme.
In this regard, the following steps have been taken:
(i) Under SIGHT Mode 2A (demand aggregation for Green Ammonia)
a. Green Ammonia Sale and Purchase Agreements have been signed for the
production and supply of 6,70,000 Metric Tonnes per Annum (MTPA) of
Green Ammonia (a derivative of Green Hydrogen) to 11 fertilizer units across
India.
(ii) Under SIGHT Mode 2B (demand aggregation for Green Hydrogen)
a. 30,000 tonnes per annum of green hydrogen production and supply capacity
has been awarded for supply to the refineries of Indian Oil Corporation Ltd.
(IOCL), Bharat Petroleum Corporation Limited (BPCL), Hindustan Petroleum
Corporation Limited (HPCL) and Numaligarh Refinery Limited (NRL).
The following policy steps have also been taken:
(i) Green Hydrogen/Green Ammonia Plants commissioned on or before 31.12.2030, and
which utilize renewable energy for the production of Green Hydrogen or Green
Ammonia, have been granted exemption from the payment of ISTS (Inter State
Transmission System) charges for a period of 25 years, starting from the date of
commissioning of the project.
(ii) Duty benefits under Section 26 of SEZ Act, 2005 have been allowed to the units for
installation as well as O&M of renewable energy equipment exclusively for captive
consumption of the unit.
(iii)Exemption has been granted from ALMM (Approved List of Models & Manufacturers)
and RLMM (Revised List of Models & Manufacturers) requirements for Renewable
Energy plants located inside an Special Economic Zone (SEZ) or Export Oriented Unit
(EOU) and supplying power exclusively for production plants of Green Hydrogen (or
its derivatives).
******Annexure I
Component I: Incentive Scheme for Electrolyser Manufacturing (Tranche I)
S. Awarded Scheduled
N Successful Bidder Capacity Project Location Commissioning
o. (MWPA) Date (SCD)
Reliance Electrolyser
1 300 Dhanora, Vadodara, Gujarat 09-08-2026
Manufacturing Limited
Apparel Park,
Ohmium Operations
2 137 Doddaballapura, Bangalore 09-08-2026
Private Limited
Rural, Karnataka
John Cockerill Greenko
3 Hydrogen Solutions 300 Kakinada, Andhra Pradesh 09-08-2026
Private Limited
Gangad, Bavla, Ahmedabad,
4 Advait Infratech Limited 100 09-08-2026
Gujarat
L&T Electrolysers Suvali, Choryasi, Surat,
5 300 10-08-2026
Limited Gujarat
Matrix Gas and
6 63 GIDC, Sanand, Gujarat 28-08-2026
Renewables Limited
Homihydrogen Private Mohadi, Jalgaon,
7 101.5 09-08-2026
Limited Maharashtra
Adani New Industries Tunda, Mundra, Kutch,
8 198.5 09-08-2026
Limited Gujarat
TOTAL 1500Annexure I (continued)
Component I: Incentive Scheme for Electrolyser Manufacturing (Tranche II)
Awarded Scheduled
S.
Successful Bidder Capacity Project Location Commissioning
No.
(MWPA) Date (SCD)
Adani New Industries Tunda, Mundra, Kutch,
1 101.5 26.03.2027
Limited Gujarat
Advait GreenEnergy Gangad, Bavla, Ahmedabad,
2 200 26.03.2027
Private Limited Gujarat
Avaada Electrolyser Land identification under
3 49.5 26.03.2027
Private Limited progress
Eastern Electrolyser Sector 83, Noida, Gautam
4 30 26.03.2027
Limited Buddh Nagar, Uttar Pradesh
Greenovate Hydrogen
Private Limited Pipersewa, Bamor, Morena,
5 105 26.03.2027
(erstwhile GH2 Solar Madhya Pradesh
Private Limited)
Matrix Gas and
6 237 GIDC, Sanand, Gujarat 26.03.2027
Renewables Limited
Newage Green Electro
Private Limited (SPV:
7 300 Under finalization (Gujarat) 26.03.2027
Newage Electrogen One
Private Limited)
Newtrace Private Doddanekkundi Industrial
8 30 26.03.2027
Limited Area, Bengaluru, Karnataka
Apparel Park,
Ohmium Operations
9 137 Doddaballapura, Bangalore 26.03.2027
Private Limited
Rural, Karnataka
Suryaashish KA1 Solar
10 10 Mehsana, Gujarat 26.03.2027
Park Private Limited
Waaree Clean Energies Shankar Talav, Dungri,
11 300 26.03.2027
Solution Private Ltd Valsad, Gujarat
TOTAL 1500Annexure II
Component II: Incentive Scheme for Green Hydrogen Production (Mode 1) (Tranche I)
Scheduled
S. Capacity
Successful Bidder Project Location Commissioning
No. (TPA)
Date (SCD)
1 CESC Projects Limited 10,500 Gopalpur/Paradeep, Odisha 02.02.2027
2 UPL Limited 10,000 Jhagadia, Bharuch, Gujarat 02.02.2027
Reliance Green
Moti Khavdi, Jamnagar,
3 Hydrogen and Green 90,000 02.02.2028
Gujarat
Chemicals Limited
Gopalpur, Odisha; MMRDA
Region, Maharashtra; Tirupati
4 HHP Two Pvt Ltd 10,000 02.02.2027
District, Andhra Pradesh;
Hyderabad, Telangana
Gopalpur Industrial Park,
ACME Cleantech
5 90,000 Chamakhandi, Chatrapur, 02.02.2027
Solutions Pvt Ltd
Ganjam, Odisha
6 Greenko ZeroC Pvt Ltd 90,000 Kakinada, Andhra Pradesh 02.02.2027
JSW Neo Energy Toranagallu, Sandur Taluk,
7 3,600 02.02.2027
Limited Ballari, Karnataka
Kochi (500MTPA)
Brahmapuram, Ernakulam,
Bharat Petroleum Kerala;
8 2,000 02.02.2027
Corporation Limited
Bina (1500 MTPA), Sagar,
Madhya Pradesh
TOTAL 3,06,100Annexure II (continued)
Component II: Incentive Scheme for Green Hydrogen Production (Mode 1) (Tranche
II)
Awarded Scheduled
S.
Successful Bidder Capacity Project Location Commissioning
No.
(TPA) Date (SCD)
Sagar, Uttar
1 Oriana Power Limited 10,000 28.02.2028
Pradesh
Suryadeep KA1 Project
2 19,000 In Progress 28.02.2028
Private Limited
L&T Energy Green Tech
3 90,000 Gujarat 28.02.2028
Limited
Two tentative
GH2 Solar Private
4 10,500 locations under 28.02.2028
Limited
consideration
Green Infra Renewable Tuticorin
5 Energy Farms Private 90,000 (Thoothukudi), 28.02.2028
Limited Tamil Nadu
Tata Steel SEZ,
Waaree Clean Energy
6 90,000 Gopalpur, 28.02.2028
Solutions Private Limited
Ganjam, Odisha
AM Green Ammonia Tuticorin, Tamil
7 90,000 28.02.2028
(India) Private Limited Nadu
Reliance Green Hydrogen
Dahej, Bharuch,
8 and Green Chemicals 49,000 28.02.2028
Gujarat
Limited
Matrix Gas and Yet to be
9 1,500 28.02.2028
Renewables Limited identified
TOTAL 4,50,000Annexure III
Component II: Incentive for Procurement of Green Ammonia Production (under Mode
– 2A)
List of Fertilizer Plants with Scheduled
S. Successful Project
capacity (for green ammonia Commissioning
No. Bidder Location
supply) Date (SCD)
1. Paradeep Phosphate
Limited, Paradeep (75,000
MTPA)
2. Coromandel International
Limited (CIL),
Vishakhapatnam (50,000 Balisuan
Acme MTPA) Village,
Cleantech 3. IFFCO, Kandla (1,00,000 Marshgai
1 Solutions MTPA) Taluka, 29.04.2029
Private 4. IFFCO, Paradeep (1,00,000 Kendarapada
Limited MTPA) District,
5. Paradeep Phosphate Odisha State
Limited, Zuarinagar (25,000
MTPA)
6. Indorama India Private
Limited, Haldia (20,000
MTPA)
SCC
1. Madhya Bharat Agro
Infrastructure
Products Limited-III, Dhule
Private
(70,000 MTPA) Dhule,
2 Limited (with 29.04.2029
2. Mangalore Chemicals & Maharashtra
M/s InSolare
Fertilizers Limited,
Energy
Mangalore (15,000 MTPA)
Limited)
Jakson Green
Limited (in
Gopalpur
consortium
Industrial
with M/s
Park
Ocior Energy
(TSSEZ),
India Private
1. Coromandel International Village/PO:
Limited, M/s
3 Limited (CIL). Kakinada Chamakahndi, 29.04.2029
First Element
(85,000 MTPA) Tehsil-
Private
Chatrapur,
Limited &
Dist.
M/s JGGJ
Ganjam,
Renewable
State- Odisha
One Private
Limited)
Exploring
NTPC location in 2
Renewable 1. Krishana Phoschem Limited, states:
4 29.04.2029
Energy Meghnagar (70,000 MTPA) Maharashtra
Limited and Madhya
Pradesh
1. Madhya Bharat Agro
Oriana Power Madhya-
5 Products Limited-II, Sagar 29.04.2029
Limited Pradesh
(60,000 MTPA)
TOTALAnnexure IV
Component III: Incentive for Procurement of Green Hydrogen Production (under
Mode – 2B)
Allocated Scheduled
S. Organisation Tentative
capacity (tonnes Commissioning
No. awarded Location
per annum) Date (SCD)
L&T Energy
1 Greentech Ltd Panipat, Haryana 10,000 31.12.2027
(LTEG)
Visakhapatnam
2 Ocior Energy Refinery, Andhra 5,000 31.07.2028
Pradesh
Bina Refinery,
3 Ocior Energy 5,000 30.03.2028
Madhya Pradesh
NeuEN Green Numaligarh,
4 10,000 30.09.2028
Energy Assam
TOTAL