Home India Ministry of Ports, Shipping and Waterways Parliament Question: Connectivity of ports to industrial cor...
Date: 2026-03-24 Category: RAJYASABHA_QNA State: Union Government Country: India

Parliament Question: Connectivity of ports to industrial corridors

Issued by Ministry of Ports, Shipping and Waterways · Not Applicable

Research with AI Agent Chat with Document Generate Summary Translate Helpful Share Add to Project Create Task
Official Source Record View Original Source →
See Full Document Text
GOVERNMENT OF INDIA MINISTRY OF PORTS, SHIPPING AND WATERWAYS RAJYA SABHA UNSTARRED QUESTION NO. 3676 ANSWERED ON 24.03.2026 CONNECTIVITY OF PORTS TO INDUSTRIAL CORRIDORS 3676. SHRI C. VE. SHANMUGAM: Will the Minister of PORTS, SHIPPING AND WATERWAYS be pleased to state: (a) whether Government has conducted any survey regarding theconnectivity of ports toindustrial corridors and Special EconomicZones in the country; (b) if so, the details of the list of ports that have been identified havinglow connectivity to the said zones of the country, State-wiseparticularly in Tamil Nadu; (c) whether Government proposes to provide proper connectivity of suchzones to the ports; (d) if so, the details thereof, State-wise particularly in Tamil Nadu; and (e) the total amount of funds allocated, released and utilized for thepurpose of increasing connectivity of ports to the said zones acrossthe country, State-wise particularly in Tamil Nadu? ANSWER MINISTER OF PORTS, SHIPPING AND WATERWAYS (SHRI SARBANANDA SONOWAL) (a) to (d) Department for Promotion of Industry and Internal Trade (DPIIT) has undertaken a comprehensive assessment of port connectivity and prepared a Comprehensive Port Connectivity Plan (CPCP) in 2022 byreviewing connectivity of theoperational ports and identified the ports which needed improvement of road and/ or rail connectivity with nearby economic hubs. In furtherance, MoPSWalong with Ministry of Road Transport and Highways (MoRTH), Ministry of Railways (MoR), and State Maritimes Boards conducted a comprehensive review and consolidation exercise forassessing road and rail connectivity to the ports. A totalof 157 road connectivity projects and 124 rail connectivity projects have been identified for implementation to provide last-mile port connectivity including in the state of Tamil Nadu where 10rail and 8 road port connectivity projects have been completed and 16 projects are under various stages of implementation and planning. The details of these connectivity projects are available at Annexure I. MoPSW has been regularly updating the list of road and rail connectivity projects as per the recommendations received from all major ports and other than major ports (OTMP).(e) A total of 19 road and rail connectivity projectsamounting to ₹1,496.97 crorehave been sanctioned with financial support of ₹365.56 crore under Sagarmalaschemeby the Ministry of Ports, Shipping and Waterways. The details of funds allocated, released and utilized for thepurpose of increasing connectivity of ports including in the state of Tamil Nadu are available at Annexure II.Annexure I A. Port Road Connectivity Projects: Sl. Name of Project State Port Status No. Ennore-Manali Road Improvement Project Tamil 1 (EMRIP) to connect Chennai and Kamarajar Chennai Completed Nadu Port V. O. Widening of 4 to 6 lane (VOC Port to Junction Tamil 2 Chidambar Completed of NH 138 & NH 38) Nadu anar Southern port access road connectivity to Tamil 3 Kamarajar Completed Kamrajar port Nadu V. O. Tamil 4 Road Connectivity to Hare island Chidambar Completed Nadu anar Development of coastal road to the East of Tamil 5 Chennai Completed container Terminal II at Chennai Port Nadu Construction of Port Internal Roads, Parking Tamil 6 Kamarajar Completed Bay, Rest Shelter, etc. Nadu Construction of widening the Korampallam V. O. Surplus course bridge and rail over bridge - Tamil 7 Chidambar Completed RoB including widening of road from western Nadu anar boundary to TTPS Modern elevated steel bridge for safe transport V. O. Tamil 8 of tourists from Vivekananda Rock to Chidambar Completed Nadu Thiruvalluvur statue anar Under Tamil 9 Maduravoyal elevated road corridor project Chennai implement Nadu ation Mahabalipuram to Mugaiyur connectivity of Under Tamil 10 Puducherry - Marakkanam - Sadaras - Chennai implement Nadu Kovalam - Coromandel - Chennai - NH -332 ation Construction of four EXIM Godowns and Under Tamil 11 concrete roads around EXIM Godowns Chennai implement Nadu at Chennai Port ation 6 Lane Vehicular Underpass with 2 Lane V. O. Under Tamil 12 Service Road on Tuticorin - Tirunelveli Chidambar implement Nadu section of NH-138 anar ation 4 to 6 laning of road from Northern gate of Tamil Under 13 Kamarajar Ennore port to Thachur- outer ring corridor Nadu planning New Road over bridge from the proposed Tamil Under 14 Chennai Goods shed to NH 179A Nadu planning Road connectivity from Cuddalore Port to Tamil Under 15 Cuddalore NH-45A (1 km) 2L to 4L Nadu planning Widening of existing narrow lane in railway Tamil Under 16 land and widening of Natrampalli - Jolarpet 2 Chennai Nadu planning lane road to 4 lane road New road over bridge from the proposed Tamil Under 17 Chennai Goods shed at Jolarpet to NH 179A Nadu planning Widening road connecting Kakinada Port to Andhra 18 NH-16 at Rajanagaram in Godavari District Kakinada Completed Pradesh under Package-1Sl. Name of Project State Port Status No. Improvement/upgradation of 4 lane road to 6 Andhra Visakhapa 19 lane road from East Breakwater to convent Completed Pradesh tnam junction Improvements to Visakhapatnam Port Road (Rehabilitation of distressed bridges i.e., Andhra Visakhapa 20 Nehru Centenary & Ambedkar flyovers in Completed Pradesh tnam between convent junction and Sheelangarjuncton) Road connectivity between Nagarnar and Andhra Visakhapa 21 Completed Visakhapatnam Pradesh tnam Andhra Visakhapa 22 Road Connectivity of VPT to NH-16 -Phase II Completed Pradesh tnam 2 to 4 laning of road connecting Achampeta Kakinada Andhra 23 Junction to joining NH 16 at Kathipudi in East Deep Completed Pradesh Godavri District in AP Water Construction of grade separator from H-7 area Andhra Visakhapa 24 to Port connectivity Road by passing Convent Completed Pradesh tnam Junction 2 to 4 laning of port road connectivity to NH – Andhra Visakhapa 25 Completed 5 -Phase II Pradesh tnam Widening road from 2 to 4 lanes between Under Andhra 26 Samalkota and Achampeta, connecting Kakinada implement Pradesh Kakinada Port to NH-16 (Package-2) ation Widening Achampeta–Kakinada road from 2 Under Andhra 27 to 4 lanes to connect Kakinada Port with Kakinada implement Pradesh NH-16 (Package-3) ation Under 4 laning of Varagali Road from Chillakur Andhra Krishnapat 28 implement Cross to Chintawaram Package II Pradesh nam ation Mulapeta Under 4-Lane Road connectivity to NH 16 from Andhra 29 (Bhavanap implement Bhavanapadu Port Pradesh udu) ation Under 6 lane road to Krishnapatnam Port from Andhra Krishnapat 30 implement Naidupeta in AP (pkg - IV) Pradesh nam ation Under Construction of 4-laning of Chilakaru Andhra Krishnapat 31 implement crossroad to TurpuKanupuru Pradesh nam ation Construction of flyover/underpass at Under Andhra Visakhapa 32 Visakhapatnam airport junction to set up at implement Pradesh tnam NH-16 ation Under Dedicated port road to Krishnapatnam Port Andhra Krishnapat 33 implement (Package-I) to 18 km Pradesh nam ation Greenfield road connecting north and south Under Andhra Krishnapat 34 industrial cluster of Khandaleru Creek near implement Pradesh nam Krishnapatnam port ation Improvements / Upgradation of existing 4 lane Under Andhra Visakhapa 35 road to 6 lane from Convent junction to implement Pradesh tnam Sheelanagar Junction(NH-16) ation 36 Port boundary to Chevuru Road Jn. Andhra Ramayapa UnderSl. Name of Project State Port Status No. Connecting to NH-16. 4 lane road in initial Pradesh tnam implement phase of 5.5 km length. (Ramayapatnam Port) ation Upgradation of the hinterland road From Under Andhra Krishnapat 37 Naidupeta -in Nellore District of AP to implement Pradesh nam Krishnagiri -in TN ation Under Upgradation of the proposed NH-67 from Andhra Krishnapat 38 implement Bellary to Krishnapatnam Pradesh nam ation Under Upgrading of NH 216 from 2 lane to 4 lane Andhra Gangavara 39 implement Digamarru to Ongole Pradesh m ation Under 4 to 6 laning of road connecting VPT East Andhra Visakhapa 40 implement breakwater to Sheela Nagar Junction Pradesh tnam ation Under Andhra Visakhapa 41 Visakhapatnam Port Road implement Pradesh tnam ation Four-laning of the Kakinada Anchorage Port– Andhra Under 42 Uppada Beach Road connecting to NH-16 in Kakinada Pradesh planning East Godavari District 4 laning of road from Nellore city to Andhra Krishnapat Under 43 Krishnapatnam port to NH 5 (pkg V) Pradesh nam planning 4 to 6 laning of road connecting Andhra Krishnapat Under 44 Krishnapatnam Port to NH 5 in SPSR Nellore Pradesh nam planning District of Andhra Pradesh (pkg I ) 4-Lane road connectivity to NH 216 from Andhra Machilipat Under 45 Machilipatnam Port Pradesh nam planning Alternate alignment to connect NH 216A to Andhra Machilipat Under 46 NH-65 bypassing Machilipatnam town Pradesh nam planning Development of 4 to 6 lane highway connectivity project connecting Andhra Visakhapa Under 47 Visakhapatnam port container terminal with Pradesh tnam planning NH 16 at Bhogapuram via Rushikonda and Bhimli Fly over bridge from Sea-horses junction area Andhra Visakhapa Under 48 to dock area at Visakhapatnam Port Pradesh tnam planning Construction of a new road from the L arm road junction to Dummulapeta Beach Road at Andhra Under 49 the NCS storage system, including a bridge Kakinada Pradesh planning across Dummulapeta Creek at Kakinada Anchorage Port Gangavaram Port Gate to integrate with Andhra Gangavara Under 50 Sheelanagar - Sababvaram VPT Road at Pradesh m planning Tunglam Guntur-Narakoduru-Tenali-Chandole- Andhra Nizampatn Under 51 Nizampatnam Port Road Pradesh am planning Two lane to Four Lane Road connecting Andhra Ibrahimpat Under 52 Ibrahimpatnam and NH-65/30 (National Pradesh nam planning Waterway 4) Upgradation of existing 4-lane highway to 6- Andhra Machilipat Under 53 lane from Vijayawada to Machilipatnam (NH- Pradesh nam planningSl. Name of Project State Port Status No. 65) Mulapeta 4 L road connectivity from Mulapeta Port Andhra Under 54 (Bhavanap boundary to Narsipuram connecting to NH-16 Pradesh planning udu) Single lane to 4 Lane road connecting Dhubri Under 55 Assam Dhubri and NH-37 (National Waterway-2) planning Single Lane to 4 Lane road connecting Pandu Under 56 Assam Pandu and NH-37 (National Waterway-2) planning Single Lane to 2 Lane road connecting Under 57 Karimganj and NH-37 (National Waterway- Assam Karimganj planning 16) Single Lane to 2 Lane road connecting Under 58 Assam Badarpur Badarpur and NH-37 (National Waterway-16) planning Double Lane to-4 Lane Road connecting Under Gaighat 59 Gaighat Jetty and NH-19/82 (National Bihar implement Jetty Waterway-1) ation Road circulation plan for ease of movement of Mormugao 60 Goa Completed break bulk cargo at Mormugao Port Construction of an Up-Ramp at MPT Railway Mormugao 61 Goa Completed yard Baina Port Construction of 12m wide concrete road Mormugao 62 connecting berth 5 6 7 8 & 9 to new entry / Goa Completed Port exit road Balance Portion 4 Lane road connectivity to Mormugao 63 Goa Completed NH17 Port Flyover project connecting Mormugao Port Mormugao 64 Goa Completed with NH-366 Port Improvement of flyover from Dabolim airport Under Mormugao 65 to MES College Junction on NH 566 and Goa implement Port flyover/VUP at Queeny Nagar ation Belagavi – Panjim -NH-4A Upgrading to 4 Mormugao Under 66 Goa lane Port planning Deendayal 67 RoB on Kandla-Kutch Road Gujarat Completed Port Under Construction of Road Over Bridge (ROB) at Deendayal 68 Gujarat implement LC-233 (Old LC-235 (SPL)) Port ation Under 69 Trapaj-Manar road connectivity Gujarat Alang implement ation Alternative Road from Bhavnagar to Sosiya - Under 70 Gujarat Alang Alang Ship Recycling Yard planning Construction of highway from SH-6A to Under 71 Jamnagar Port providing connectivity to NH Gujarat Bedi planning from Rajkot Conversion of minor roads into Highway to Under 72 Gujarat Dahej enhance connectivity between Dahej-Hazira planning Deendayal Under 73 Kandla-Malia Road connectivity Gujarat Port planning Proposed Road Luni to Vadala will connect Mundra Under 74 Gujarat SH-6 (Old) planningSl. Name of Project State Port Status No. Mandvi Mundra Port & SEZ (GAPL) Mundra (Old) Mandvi Under 75 Proposed Road Mokha to Vadala Gujarat Mundra planning Port & SEZ (GAPL) Under 76 Road Connectivity to Bhavnagar Port Gujarat Bhavnagar planning Road Widening at Sachana Ship Recycling Under 77 Gujarat Bedi Yard planning Widening of approach road to all weather Under 78 Gujarat Navlakhi Navlakhi port in Gujarat planning Four lane road connecting Sahibganj Multi Modal Terminal and NH-80 with elevated Sahibganj Under 79 Jharkhand merging at NH intersection (National MMT planning Waterway-1) Under Road connectivity from Kasarkad side of 80 Karnataka Honnavar implement Honnavar Port to NH ation Under Bypass road from NH to Belekeri Port and 81 Karnataka Belekeri implement Road connectivity from Harwada to Belekeri ation Under Separate alignment is proposed for 82 Karnataka Malpe implement connectivity road of proposed Malpe Port ation Under Separate alignment of road connectivity to 83 Karnataka Keni implement Keni, Karnataka ation Under 84 Yekkambi-Haveri (Sirsi-Yekkambi-Haveri) Karnataka Belekeri implement ation Under 2 to 4 laning of NH-206 Tumakuru - 85 Karnataka Honnavar implement Honnavar Port ation New 2 to 4 laning of NH-169 from Mangalore to Under 86 Karnataka Mangalore Mudabidri to Karkala planning Port New Under 87 4 Laning of ShiradiGhat Road Karnataka Mangalore planning Port A separate road alignment is being proposed Under 88 Karnataka Kundapur to connect the Kundapur port planning New Construction of 4 lane flyover bridge from Under 89 Karnataka Mangalore KIOCL junction to Baikampady along NH-66 planning PortSl. Name of Project State Port Status No. Under 90 Road Connectivity to Bhatkal Port Karnataka Bhatkal planning Separate alignment is proposed for Under 91 Karnataka Manki connectivity road of proposed Manki Port planning New Under 92 Construction of ShiradiGhat Tunnel Road Karnataka Mangalore planning Port Old Under 93 Road connectivity to Old Mangalore Port Karnataka Mangalore planning Construction of ROB at Vallarpadam – 94 Kerala Cochin Completed Cochin Under Road connectivity to NH66 from Vizhinjam 95 Kerala Vizhinjam implement International Seaport ation Azhikkal Port - Proposed NH – Bypass and Under 96 Kerala Azhikkal widening of 2 km planning Under 97 Beypore port connectivity to Malaparamab Kerala Beypore planning Development of river side port road to Under 98 Kerala Beypore Beypore port planning Four laning of NH 966 B connecting W/Island Under 99 to Kundanoor (8 KMs) to be implemented by Kerala Cochin planning NHAI Providing ramps to the 6 lane elevated Under 100 highway being developed from the Alappuzha Kerala Alappuzha planning beach Under 101 Road from Azhikkal to Puthuvalappu Kerala Azhikkal planning Under 102 Road from Madhura Bazaar to Chullikad Kerala Beypore planning Road from Mudhiyam Beach to Madhura Under 103 Kerala Beypore Bazaar planning Under 104 Road from Payyambalam to Azhikkal Kerala Azhikkal planning Widening of road connecting from Kollam Under 105 Kerala Kollam port to NH planning Under 106 Road from Payikulangara to Alappuzha Byass Kerala Alappuzha planning Maharasht 107 6 laning of Pune-Satara section of NH 4 JNPT Completed ra JNPT - 6 to 8 laning of NH-4B- SH-54 and Maharasht 108 JNPT Completed Amra Marg ra Maharasht 109 Flyover at JNPT Y Junction JNPT Completed ra Upgrading SH 92- 96- 97 from NH17 to North Maharasht 110 Dighi Completed and South banks of Dighi Port ra Construction of flyover near North Gate Maharasht 111 JNPT Completed Complex on container road in JN Ports ra ONGC Bridge Extension work inside JNPT Maharasht 112 JNPT Completed holding yard ra 113 Evacuation road for Container Terminal - Maharasht JNPT CompletedSl. Name of Project State Port Status No. 330m extension to DPW terminal at JNPT ra Construction of approach road to Maharasht 114 Kharwadeshwari Jetty in District Palghar, Palghar Completed ra Maharashtra Under 2 to 4 laning of Panvel to Indapur section of Maharasht 115 JNPT implement NH 17 - Phase 3 ra ation Under Construction of approach road to Ro-RO jetty Maharasht 116 Karanja implement at Karanja ra ation Under Road connectivity between Madkhol- Maharasht 117 Redi implement Sankeshwar ra ation Under Construction of approach road to Narangi Maharasht 118 Virar implement Jetty ra ation 108 KM, 6 lane road, Connecting Port to Pune Maharasht Rajpuri/Di Under 119 from Indapur ra ghi planning 12 Kms 4 lane road Connecting Both Ports to Maharasht Rajpuri/Di Under 120 Pune ra ghi planning 20 kms 4 lane road from DIGHI to Agardanda Maharasht Rajpuri/Di Under 121 Terminal Access ra ghi planning 3 Grade Separators at Kolad, Maharasht Rajpuri/Di Under 122 Indapore&Mangaon ra ghi planning 4 Lane (Bitumen Road), connecting Roha to Maharasht Rajpuri/Di Under 123 Both Terminals ra ghi planning Bridge over creek near Waral, connecting both Maharasht Rajpuri/Di Under 124 terminal access road ra ghi planning Connectivity of Vadhavan to NH 8 through Maharasht Under 125 Tarapur-Boisar or Chinchani-Vangaon or Vadhavan ra planning Dahanu Linking of NH-4 and NH-8 by-passing Maharasht Under 126 JNPT Mumbra ra planning New alignment proposed - 12 kms. Karanja Maharasht Under 127 Karanja Ro-Ro jetty to JNPT road (SH-348) ra planning Separate alignment is proposed for Maharasht Under 128 Mandwa connectivity road from Mandwa to Alibaug ra planning Strengthening and expansion of Dharamtar Maharasht Dharamtar Under 129 Port to Wadkhal ra (Alibag) planning Upgradation of existing road connectivity's (NH548A & NH753F) from 2 lane to 6 lane Maharasht Rajpuri/Di Under 130 till NH66 to both sides (Agardanda side ra ghi planning &Dighi side) Upgradation of road from Korlai to Kolad and Maharasht Under 131 Korlai Korlai to Vadkal ra planning Upgradation of two lane to four lane- 54 Maharasht Under 132 Vijaydurg kmsVijaydurga to Talere ra planning Upgradation Sanegaon to Wakan and Maharasht Revdanda Under 133 Sanegaon to Kolad ra - Sanegaon planning Upgradation/ expansion of 25 kms. SH-123 Maharasht Under 134 Redi from Redi Port to Satara to 4 lane road ra planningSl. Name of Project State Port Status No. Upgradation/ expansion of 42 kms. SH-164 Maharasht Under 135 Jaigad from Jaigad to Nivali to 4 lane road ra planning A Road cum Flyover crossing the BOT Rail Paradip 136 Tracks to have unobstructed access to the Odisha Completed Port MCHP Areas Paradip 137 Road connectivity from Duburi to Panikoili Odisha Completed Port Under Paradip 138 Duburi- Chandikhole- Paradip via NH53 Odisha implement Port ation Development of road connectivity from Under 139 Odisha Gopalpur Chhatrapur on NH-16 to Gopalpur Port planning Paradip Under 140 NH 720: Duburi-Bamnipal- Keonjhar Odisha Port planning Road connectivity from Jamujhari on NH-16 Under 141 Odisha Dhamra to Dhamra port via Basudevpur planning Road cum flyover serving as 2nd exit to the Paradip Under 142 Odisha Paradip port Port planning Paradip Under 143 Tangi to Paradip 4 L Connection Odisha Port planning Double lane road connecting Varanasi Multi Modal Terminal and NH-7 with elevated Uttar Varanasi Under 144 merging at NH Intersection (National Pradesh MMT planning Waterway-1) Syama Road connectivity on NH2 from Burnpur to West Prasad 145 Completed Kolkata Bengal Mookerjee Port Syama RoB cum Flyover at Ranichak level crossing West Prasad 146 Completed at KoPT Bengal Mookerjee Port Syama Improvement of road connectivity to facilitate West Prasad 147 Completed trade and port users at KoPT Bengal Mookerjee Port Syama Improvement of road connectivity to facilitate West Prasad 148 Completed trade and port users at KoPT, Phase-2 Bengal Mookerjee Port Syama Under West Prasad 149 Development of Kona Expressway implement Bengal Mookerjee ation Port Syama Under New alignment from SH. From Balagarh to West Prasad 150 implement Balagarh Island Bengal Mookerjee ation Port Double Lane to 4 Lane Road connecting West Haldia Under 151 Haldia Multi Modal Terminal and NH-116 Bengal MMT planning (National Waterway-1)Sl. Name of Project State Port Status No. Syama From Kolkata Dock System to Diamond West Prasad Under 152 Harbour (2 lane to 4 lane) Bengal Mookerjee planning Port Syama From Kolkata Dock System to FALTA SEZ West Prasad Under 153 (2 lane to 4 lane) Bengal Mookerjee planning Port Syama From Kolkata Dock System to Raichak West Prasad Under 154 (proposed Ro-Ro site) 2 lane to 4 lane Bengal Mookerjee planning Port New alignment proposed for improving Syama connectivity of Port to NH-06. Underground West Prasad Under 155 Tunnel / RoB from NS Dock Area of Kolkata Bengal Mookerjee planning Dock System to Salap, Howrah connectivity to Port NH-06 Syama Renovation of Bascule Bridge at Kolkata West Prasad Under 156 Dock System Bengal Mookerjee planning Port Two lane to four lane road connecting West Under 157 Kolaghat Kolaghat to NH-41 (National Waterway-86) Bengal planningB. Port Rail Connectivity Projects: Sl. No Name of Project State Port Status . Railway line west of Western Yard–1 with Complete 1 a paving block platform between the new Tamil Nadu Chennai d track and the yard Complete 2 Chennai Beach-Attipattu 4th line Tamil Nadu Kamarajar d Complete 3 Chennai Beach - Korukkupet 3rd line Tamil Nadu Chennai d Doubling rail line track between Holding Complete 4 Tamil Nadu Kamarajar Yard -I and Kamarajar Port d Doubling of southern rail connectivity Complete 5 from Holding yard 1 to CTRY inside Tamil Nadu Kamarajar d Kamarajar Port Signaling and maintenance work in Complete 6 Tamil Nadu Kamarajar Kamarajar Port d V. O. Railway line between Marshalling Yard Complete 7 Tamil Nadu Chidambarana and Hare Island d r V. O. Doubling of rail connectivity between Complete 8 Tamil Nadu Chidambarana Madurai and Maniyachi d r Electrification and Doubling Works: V. O. Complete 9 Milavittan–Marshalling Yard and Tamil Nadu Chidambarana d Milavittan–Tuticorin Railway Sections r Upgradation and modification of track in Complete 10 Tamil Nadu Kamarajar Kamarajar Port Ltd. d V. O. Under Rail connectivity between Madurai - 11 Tamil Nadu Chidambarana implemen Tuticorin via Aruppukkottai r tation Rail line from Cuddalore Port to Under 12 Tamil Nadu Cuddalore Cuddalore Junction planning Rail Connectivity is proposed to the plant Under 13 from nearby Gummidipoondi station on Tamil Nadu Kamarajar planning the Chennai Central - Gudur Main line New northern railway link from the Under 14 Anupambattu station on the Chennai– Tamil Nadu Katupalli planning Gudur line to Katupalli Port Rail connectivity from southern side from Under 15 Tamil Nadu Katupalli Atipattu railway station to Ennore Port planning Under 16 Chennai-Cuddalore via Mahabalipuram Tamil Nadu Cuddalore planning Under 17 Rail connectivity to Enayam Port Tamil Nadu Enayam planning Krishnapatnam-Venkatachalam - doubling Andhra Krishnapatna Complete 18 with electrification Pradesh m d Vishnupuram- Mellacheruvu new broad- Andhra Machilipatna Complete 19 gauge line Pradesh m d 20 Rail connectivity Obulavaripalle- Andhra Krishnapatna CompleteSl. No Name of Project State Port Status . Venkatachalam Pradesh m d Doubling of line Vijaywada-Gudivada- Bhimavaram-Narasapur- Gudivada- Andhra Machilipatna Complete 21 Machlipatnam and Bhimavaram- Pradesh m d Nidadavolu -221 km Electrification of east yard revamped Andhra Visakhapatna Complete 22 lines. 23.489 TKM Pradesh m d Connection of dead-end line at North of Andhra Visakhapatna Complete 23 Rand D yard to Eastern Grid -Third line Pradesh m d from E.Co.Rlys. Providing a direct connection between Andhra Visakhapatna Complete 24 OEC and Western Sector jointing at NAD Pradesh m d curve from E.Co. Rly. Extension of line No. 11 to 15 to full Andhra Visakhapatna Complete 25 length at Rand D yard. Pradesh m d Andhra Visakhapatna Complete 26 Various Signaling works at VPT Pradesh m d Under 3rd line from Simhachalam near Andhra 27 Gangavaram implemen Visakhapatnam to Gangavaram port Pradesh tation Under Broad gauge new-line connecting Andhra 28 Kakinada implemen Bhadrachalam to Kovvuru Pradesh tation Under Andhra 29 Kotipalli to Narsapur new railway line Kakinada implemen Pradesh tation Under Andhra Visakhapatna 30 Kirandul-Jagdalpur Doubling implemen Pradesh m tation Under Andhra Visakhapatna 31 Jagdalpur-Koraput doubling implemen Pradesh m tation Under Vizianagram-Titlagarh (Sambalpur) 3rd Andhra Visakhapatna 32 implemen line Pradesh m tation Under Andhra Visakhapatna 33 Kottavalasa-Jagdalpur-Koraput DL implemen Pradesh m tation Under Andhra Visakhapatna 34 Koraput –singapur road DL implemen Pradesh m tation Under Electrification of VPT railway lines 38 Andhra Visakhapatna 35 implemen TKM Pradesh m tation Under Kakinada Gateway Port to Annavaram Andhra 36 Kakinada implemen Railway station Pradesh tation Mulapeta Under Railway line from TheruvaliJn to Gunupur Andhra 37 (Bhavanapudu implemen connecting Theruvali to Naupada Jn. Pradesh ) tationSl. No Name of Project State Port Status . Under Rail connectivity from Ramayapatnam Andhra Ramayapatna 38 implemen port to Tettu railway station Pradesh m tation Mulapeta Rail connectivity from Mulapeta port to Andhra Under 39 (Bhavanapudu Naupada Jn railway station Pradesh planning ) Rail connectivity to Machilipatnam Port - Andhra Machilipatna Under 40 Pedana Pradesh m planning Providing signaling and Mormugao Complete 41 telecommunication system for railway Goa Port d network at Mormugao Port Full rake wagon handling line with paving Mormugao Complete 42 Goa 30m wide at Mormugao Port Port d 2nd Full rake handling line RD 8A with Mormugao Complete 43 Goa 30m paving Port d Rail line from Hospet to Vasco da Gama Under passing through Hubli, Londa, Tinaighat Murmugao 44 Goa implemen and includes Vasco–Madgaon–Kulem– Port tation Castle Rock section Rail connectivity to berth No. 13- 14- 15 Deendayal Complete 45 and 16 from take-off point to west end of Gujarat Port d berth at Kandla Port Doubling of the Surendranagar–Rajkot Complete 46 Gujarat Bedi broad-gauge single line section d Patan–Bhildi new line on Bhildi– Deendayal Complete 47 Viramgam section and gauge conversion Gujarat Port d of the Mehsana–Taranga hill line Complete 48 Bhuj–Naliya meter-gauge line Gujarat Jakhau d Civil and permanent way upgradation of Deendayal Complete 49 Gujarat rail network inside Cargo jetty Port d Rail connectivity between Viramgam and Deendayal Complete 50 Samakhiali, including 125 km from Gujarat Port d Sukhpur to Samakhiali Rail connectivity between Palanpur to Deendayal Complete 51 Gujarat Samakhayali Port d Rail connectivity between Rajkot– Complete 52 Veraval, Wansjalia–Jetalsar, and Gujarat Veraval d Somnath–Kodinar railway sections Under 53 Rail Connectivity to Navlakhi port Gujarat Navlakhi implemen tation Under 54 Rail Connectivity to Okha port Gujarat Okha implemen tation Under 55 Rail Connectivity to Porbandar port Gujarat Porbandar implemen tation Under 56 Extension from Naliya to Vayor rail line Gujarat Jakhau implemenSl. No Name of Project State Port Status . tation Under Rail connectivity between Rajula City and 57 Gujarat Jafrabad implemen Jafrabad Port tation Rail connectivity to Chhara Port through Under 58 the Chhara–Kodinar broad-gauge railway Gujarat Chhara planning line Rail connectivity to Hazira Port through Under 59 Hazira–Gothangam line to link with Gujarat Hazira planning Dedicated Freight Corridor Provision of long-haul loop line in Deendayal Under 60 Gujarat Gandhidham Yard Port planning Doubling the Tuna–GIMB line to handle Deendayal Under 61 Gujarat traffic from the new Tuna Tekra terminals Port planning Rail connectivity between Kodinar and Under 62 Gujarat Mul Dwarka MulDwarka Port planning Rail connectivity between Kosad and Under 63 Gujarat Magdalla Magdalla Port planning New Rail connectivity between Netravati and Complete 64 Karnataka Mangalore Mangalore d Port New Complete 65 Kankanadi-Panambur Patch doubling Karnataka Mangalore d Port New Upgradation of platform no. 2 and 3 in the Complete 66 Karnataka Mangalore port marshalling yard at NMPT d Port New Upgradation of railway line 1 and 2 at Complete 67 Karnataka Mangalore NMPT d Port Under 68 Rail Connectivity to Honnavar Port Karnataka Honnavar planning Under 69 Rail Connectivity to Keni Port Karnataka Keni planning Under 70 Rail Connectivity to Manki Port Karnataka Manki planning Under 71 Rail Connectivity to Pavinakurve Karnataka Pavinakurve planning Under 72 Hubballi – Ankola new double line Karnataka Tadri planning New Under 73 Hassan – Mangaluru Doubling Karnataka Mangalore planning Port Complete 74 Ambalapuzha-Haripad patch doubling Kerala Cochin d Complete 75 Kurruppanthara-Chingavanam Doubling Kerala Cochin d Rail connectivity between Chenganur and Complete 76 Kerala Cochin Chingavanam d 77 Ernakulam-Kumbalam doubling Kerala Cochin UnderSl. No Name of Project State Port Status . implemen tation Under 78 Kumbalam-Thuravur doubling Kerala Cochin implemen tation Rail Connectivity to Vizhinjam Under 79 International Seaport from Balramapuram Kerala Vizhinjam planning station Rail connectivity for the BMCTPL–PSA Complete 80 Maharashtra JNPT fourth terminal d Development of DFC compliant Common Complete 81 Rail Yard (Parts I & II), including ROB Maharashtra JNPT d modification Under 3rd line rail connectivity from Jasai to 82 Maharashtra JNPT implemen JNPT tation Vadhavan port rail connectivity to trunk Under 83 line between Vangaon and Dahanu Maharashtra Vadhavan implemen Station. tation Dedicated goods line between Wadala and Under 84 Maharashtra Mumbai Kurla for freight movement from MbPT planning Railway line from Uran commercial Under 85 loading terminal to port (Karanja Terminal Maharashtra Karanja planning Logistics) Rail connectivity from Redi Port to Under 86 Sawantwadi Road Station of Konkan Maharashtra Redi planning Railway Rail Connectivity from Ratnagiri to Jaigad Under 87 Maharashtra Jaigad - Angre (Angre Port) planning Rail Connectivity from Vaibhavwadi to Under 88 Maharashtra Jaigad - JSW Kolhapur planning Rail Connectivity from Dighi port Under 89 Maharashtra Dighi (Agardanda) to Roha planning Rail connectivity from JSW Dolvi/Pen Under 90 Maharashtra Dharamtar station to JSW Dharamtar Port planning Rail Connectivity from Indo Energy Under 91 Maharashtra Revdanda (Sanegaon) to Roha planning Rail Connectivity from Bharat Freight Under 92 Maharashtra Dharamtar (Dharamtar) to Apta planning Complete 93 3rd line from Jakhapura to Haridaspur Odisha Paradip Port d New rail line bridge between Jajpur and Complete 94 Odisha Paradip Port Sukinda Road stations d Complete 95 Doubling of line from Rajatgarh to Barang Odisha Paradip Port d Complete 96 New line from Jharsuguda to Barpalli Odisha Paradip Port d Complete 97 New line from Haridaspur to Paradip Odisha Paradip Port d 98 Doubling of line from Titlagarh to Odisha Paradip Port CompleteSl. No Name of Project State Port Status . Sambalpur d Complete 99 New line from Angul to Sukhinda Odisha Paradip Port d 10 Development of rail connectivity for BOT Complete Odisha Paradip Port 0 berths at Paradip Port d 10 2nd line between Raipur and Titlagarh to Complete Odisha Paradip Port 1 decongest RV line d 10 Doubling of line from Sambalpur to Complete Odisha Paradip Port 2 Talcher d 10 Banspani-Daitari-Tomka-Jakhapura Complete Odisha Paradip Port 3 Doubling d Under 10 3rd rail line from Bhadrak to Odisha Paradip Port implemen 4 Vizanagagram tation Under 10 Flyover between Siju-Paradip Odisha Paradip Port implemen 5 tation Under 10 Chord line between Dhanmandal and Odisha Paradip Port implemen 6 Chandikhole tation Under 10 3rd and 4th line from Budhapank- Odisha Paradip Port implemen 7 Salegaon via Rajatgarh tation Under 10 Extension of 3rd rail line to Bhadrak - Odisha Paradip Port implemen 8 Nergundi tation Under 10 3rd & 4th line between Jarapaada - Odisha Paradip Port implemen 9 Budhapank with flyover at Talcher tation Under 11 New rail line between Talcher and Odisha Paradip Port implemen 0 Bimlagarh tation 11 Under Doubling of Haridaspur-Paradip rail line Odisha Paradip Port 1 planning Development of Railway Infrastructure 11 Under from Amarda Road station to Odisha Subarnarekha 2 planning Subarnarekha Port 11 Rail line from Nergundi to Kandarpur Under Odisha Paradip Port 3 bypassing Cuttack planning Mayiladuturai–Tiruvarur– 11 Complete Karaikudi&Tiruturaipundi– Puducherry Karaikal 4 d Agastiyampalli Gauge Conversion 11 Tiruchchirappalli–Nagore–Karaikal Complete Puducherry Karaikal 5 Gauge Conversion d Syama Prasad 11 Complete Panskura-Kharagpur 3rd line West Bengal Mookerjee 6 d Port Syama Prasad 11 Complete Kharagpur - Narayangarh 3rd line West Bengal Mookerjee 7 d PortSl. No Name of Project State Port Status . Upgrading to accommodate full rake Syama Prasad 11 Complete length at 7 Netaji Subash Dock and its West Bengal Mookerjee 8 d yard under KDS- KoPT Port Syama Prasad 11 Construction and upgradation of level Complete West Bengal Mookerjee 9 crossing at different areas of KDS d Port Syama Prasad 12 Recouping deficient components of rail Complete West Bengal Mookerjee 0 tracks at KDS d Port Syama Prasad 12 Upgradation of the track 10-12-14-16-18- Complete West Bengal Mookerjee 1 19-20-21- 22 and 23 at EJC yard of KoPT d Port Syama Prasad 12 Upgrade of existing rail network at Complete West Bengal Mookerjee 2 Kolkata Dock System d Port 2nd Railway Line from Durgachak take Syama Prasad 12 Complete off point to ‘A’ cabin at Durgachak at West Bengal Mookerjee 3 d HDC Port Syama Prasad 12 New alignment from Balagarh railway Under West Bengal Mookerjee 4 station to Balagarh island planning PortAnnexure II The details of funds allocated, released and utilized under Sagarmala scheme in the state of Tamil Nadu: Number Share of Fund Fund Connectivity Project cost Sl. No. of MoPSW released (₹ utilized Type (₹ crore) projects (₹ crore) crore) (₹ Crore) Rail 5 197.24 50.12 50.12 50.12 1 Goa 2 24.24 12.12 12.12 12.12 2 West Bengal 3 173.00 38.00 38.00 38.00 Road 14 1299.73 315.44 299.92 299.92 3 Andhra Pradesh 2 123.34 43.17 43.17 43.17 4 Goa 4 769.85 110.56 109.36 109.36 5 Maharashtra 2 44.41 22.20 21.47 21.47 6 Tamil Nadu 3 132.89 62.70 49.12 49.12 7 West Bengal 3 229.23 76.80 76.80 76.80 Grand Total 19 1496.97 365.56 350.04 350.04 *****

Continue your research