Home India Ministry of Power Parliament Question: Creation of Infrastructure for Transmis...
Date: 2025-07-24 Category: Not Applicable State: Union Government Country: India

Parliament Question: Creation of Infrastructure for Transmission Systems

Issued by Ministry of Power · Not Applicable

Research with AI Agent Chat with Document Generate Summary Translate Helpful Share Add to Project Create Task

Executive Summary & Key Takeaways

**Policy Summary: Infrastructure Development for Transmission Systems in Telangana** On July 24, 2025, the Ministry of Power addressed Lok Sabha Unstarred Question No. 759 regarding infrastructure development for transmission systems in Telangana. The Government of Telangana, through TGTRANSCO, TGDISCOMs, and TGSLDC, submitted nine proposals in 2022-23 to the National Load Despatch Centre (NLDC) for funding under the Power System Development Fund (PSDF), totaling Rs. 487.99 crore. The proposals included: 1. Renovation and upgradation of the protection system and replacement of substation equipment in TGTRANSCO 400kV and 220kV substations. 2. Strengthening of the 220kV Nagaram-Warangal DC line using HTLS conductor. 3. Remote access to Disturbance Recorders (DRs) and Event Loggers (ELs) in TSTRANSCO. 4. Automation of 21 Extra High Tension (EHT) substations in TSTRANSCO. 5. Establishment of a Next Generation Security Operation Centre (SOC) at TGSLDC. 6. Reactive Power Management via Capacitor Bank installation at 33/11kV substations by TGNPDCL. 7. Installation of 301 capacitor banks at various 33/11kV substations of TSSPDCL. 8. Voltage profile improvement by installing 25 capacitor banks at 33kV level at various EHT substations in TGTRANSCO. 9. Implementation of Automatic Generation Control (AGC) at TSSLDC. The Techno-economic Sub Group of PSDF examined these proposals. However, the Monitoring Committee of PSDF, in its meeting on June 13, 2025, prioritized investment support for Battery Energy Storage Systems (BESS) and strengthening of State Load Despatch Centres (SLDCs). The committee advised that project entities implement regular investment proposals using their own resources and recover costs through tariffs.

Key Entities Referenced

Telangana: A state in India that requested infrastructure development for its transmission systems. TGTRANSCO: Transmission Corporation of Telangana Limited, an entity that submitted proposals under the Power System Development Fund (PSDF). TGDISCOMs: Distribution Companies of Telangana, which submitted schemes under the Power System Development Fund (PSDF). Power System Development Fund (PSDF): A fund used to finance power system development projects, under which TGTRANSCO and TGDISCOMs submitted nine schemes. National Load Despatch Centre (NLDC): An organization from which TGTRANSCO and TGDISCOMs requested sanction for their schemes under PSDF. SHRI SHRIPAD NAIK: The Minister of State in the Ministry of Power who provided the answer to the parliamentary question. Battery Energy Storage System (BESS): A prioritized investment area identified by the Monitoring Committee of PSDF. State Load Despatch Centres (SLDCs): Centres whose strengthening is a prioritized investment area identified by the Monitoring Committee of PSDF.
Official Source Record View Original Source →
See Full Document Text
GOVERNMENT OF INDIA MINISTRY OF POWER LOK SABHA UNSTARRED QUESTION NO.759 ANSWERED ON 24.07.2025 CREATION OF INFRASTRUCTURE FOR TRANSMISSION SYSTEMS 759. SHRI CHAMALA KIRAN KUMAR REDDY: Will the Minister of POWER be pleased to state: (a) whether the Government of Telangana has requested to create infrastructure for necessary transmission systems of strategic importance in the State; (b) whether TGTRANSCO and TGDISCOMs submitted nine schemes under the Power System Development Fund (PSDF) during the year 2022-23 with a total cost of Rs. 487.99 crore for sanction and also requested to arrange sanction from National Load Despatch Centre (NLDC) for these schemes under PSDF; and (c) if so, the details thereof and the action taken thereon and if not, the reasons for delay? A N S W E R THE MINISTER OF STATE IN THE MINISTRY OF POWER (SHRI SHRIPAD NAIK) (a) to (c) : TGTRANSCO, TGDISCOMs and TGSLDC have submitted nine (09) proposals to NLDC during the year 2022-23 for funding under Power System Development Fund (PSDF) as per Annexure. These proposals have been examined by Techno-economic Sub Group of PSDF. However, the Monitoring Committee of PSDF in its meeting held on 13.06.2025 has prioritized investment support for Battery Energy Storage System (BESS) and strengthening of State Load Despatch Centres (SLDCs) and further advised in respect of regular investment proposals that Project entities may implement such projects through their own resources and recover the cost through tariff. **************ANNEXURE ANNEXURE REFERRED IN REPLY TO PARTS (a) TO (c) OF UNSTARRED QUESTION NO. 759 ANSWERED IN THE LOK SABHA ON 24.07.2025 ************* Details of Nine (09) proposals received from TGTRANSCO, TGDISCOMs and TGSLDC Sl. Entity Project Name No. Renovation & Upgradation of Protection system and 1 TGTRANSCO Replacement of different Substation equipment in TGTRANSCO Substations of 400kV & 220kV. Strengthening of 220kV Nagaram -Warangal DC line by replacement of existing ACSR Zebra/ Moose conductor with 2 TGTRANSCO HTLS conductor equivalent to ACSR Zebra Conductor to avoid overloading. Remote Access of Disturbance Recorders (DRs) & Event 3 TGTRANSCO Loggers (ELs) in TSTRANSCO. Automation of 21 Extra High Tension (EHT) Substations in 4 TGTRANSCO TSTRANSCO. 5 TGSLDC Next Generation Security Operation Centre (SOC) at TGSLDC Project of Reactive Power Management by installation and 6 TGNPDCL commissioning of Capacitor Bank at 33/11kV Substation Installation and Commissioning of 301 capacitor banks at 7 TGSPDCL various 33/11kV sub-stations of Southern Power Distribution Company of Telangana Ltd. (TSSPDCL) Improvement of Voltage Profile by installing 25 Capacitor Banks 8 TGTRANSCO at 33kV level at various EHT Substations in TGTRANSCO. Implementation of Automatic Generation Control (AGC) at 9 TGSLDC TSSLDC. ***********

Continue your research