See Full Document Text
GOVERNMENT OF INDIA
MINISTRY OF NEW AND RENEWABLE ENERGY
RAJYA SABHA
UNSTARRED QUESTION NO. 2065
ANSWERED ON 10.03.2026
ENHANCING NON-FOSSIL FUEL SOURCES
2065. SHRI BHUBANESWAR KALITA
Will the Minister of New and Renewable Energy be pleased to state:
(a) whether Government has taken any initiatives to enhance the use of non-fossil fuel sources for
incremental economic growth;
(b) if so, the details thereof and if not, the reasons therefor;
(c) whether Government has drawn up any action plan to ensure that 50 per cent of our electricity
needs are sourced through renewable energy; and
(d) if so, the details thereof?
ANSWER
THE MINISTER OF STATE FOR NEW & RENEWABLE ENERGY AND POWER
(SHRI SHRIPAD YESSO NAIK)
(a) & (b) The Government has taken several steps and initiatives to promote and accelerate
development and deployment of renewable energy capacity in the country to realize the commitment
of 500 GW non-fossil energy capacity by 2030, as given at Annexure.
(c) & (d) India has already achieved the target of 50 per cent of the country’s cumulative electricity
installed capacity from non-fossil fuel-based sources during June, 2025 i.e. more than five years ahead
of the 2030 commitment.
As on 31.01.2026, the total installed electricity capacity in the country is 520.50 GW out of which the
non-fossil fuel sources based electricity capacity is 271.96 GW which is 52.25%.
*****Annexure
Annexure referred to in reply of parts (a) & (b) of the Rajya Sabha Unstarred Question
No. 2065 to be answered on 10.03.2026
The Government of India has taken several steps and initiatives to promote and accelerate
development and deployment of renewable energy capacity in the country to realize the
commitment of 500 GW non-fossil energy capacity by 2030. These include, inter-alia, the
following:
• Standard Bidding Guidelines for tariff based competitive bidding process for procurement of Power
from Grid Connected Solar, Wind, Wind-Solar Hybrid and Firm & Dispatchable Renewable
Energy (FDRE) projects have been issued.
• To boost RE consumption, Renewable Purchase Obligation (RPO) followed by Renewable
Consumption Obligation (RCO) trajectory has been notified till 2029-30. The RCO which is
applicable to all designated consumers under the Energy Conservation Act 2001 will attract
penalties on non-compliance. RCO also includes specified quantum of consumption from
Decentralized Renewable Energy sources.
• Foreign Direct Investment (FDI) has been permitted up to 100 percent under the automatic route.
• Schemes such as Pradhan Mantri Kisan Urja Suraksha evam Utthaan Mahabhiyan (PM-KUSUM),
PM Surya Ghar Muft Bijli Yojana, National Programme on High Efficiency Solar PV Modules,
New Solar Power Scheme (for Tribal and PVTG Habitations/Villages) under Pradhan Mantri
Janjati Adivasi Nyaya Maha Abhiyan (PM JANMAN) and Dharti Aabha Janjatiya Gram Utkarsh
Abhiyan (DA JGUA), National Green Hydrogen Mission, Viability Gap Funding (VGF) Scheme
for Offshore Wind Energy Projects have been launched.
• Scheme for setting up of Solar Parks and Ultra Mega Solar Power projects is being implemented
to provide land and transmission to RE developers for installation of RE projects at large scale.
• Inter State Transmission System (ISTS) charges were waived for inter-state sale of solar and wind
power for projects commissioned by 30th June 2025, for Green Hydrogen Projects till December
2030 and for offshore wind projects till December 2032.
• Laying of new transmission lines and creating new sub-station capacity has been funded under the
Green Energy Corridor Scheme for evacuation of renewable power.
• Quality Control Orders for Solar Photovoltaic products (i.e., Solar PV Modules, Solar PV Inverters
& Storage Battery) and Solar Water Heating systems notified.
• Issued National Framework for promoting & developing Energy Storage Systems.
• Issued Guidelines for Resource Adequacy Planning Framework for India.
• Electricity (Rights of Consumers) Rules, 2020 has been issued for net-metering up to five hundred
Kilowatt or up to the electrical sanctioned load, whichever is lower.
• “National Repowering and Life Extension Policy for Wind Power Projects, 2023” has been issued.• The Offshore Wind Energy Lease Rules, 2023 have been notified vide Ministry of External Affairs
notification dated 19th December 2023, to regulate the grant of lease of offshore areas for
development of offshore wind energy projects.
• The Revised Guidelines for installation of prototype wind turbine models issued on 12th June 2025.
• Procedure for inclusion/updating Wind Turbine Model in the Revised List of Models and
Manufacturers of Wind Turbines (RLMM) issued on 31st July 2025. The amendment renames
RLMM as Approved List of Models and Manufacturers [ALMM (Wind)] and mandates usage of
listed components such as Blade, Tower, Generator, Gearbox and Special Bearings (Main, Pitch
and Yaw Bearing) along with mandatory relocation of data centres within India and prohibition of
real-time data transfer outside India.
• The Standard Operating Procedure (SOP) for ALMM-Wind and ALMM – Wind Turbine
Components (ALMM-WTC) issued on 29th October 2025, detailing the end-to-end process for
application, verification, factory inspection, component evaluation and model enlistment.
• Standard & Labelling (S&L) programs for Solar Photovoltaic modules and Grid-connected Solar
Inverters have been launched.
• To augment transmission infrastructure needed for steep RE trajectory, transmission plan has been
prepared till 2030.
• “The Electricity (Late Payment Surcharge and related matters) Rules (LPS rules) have been
notified.
• Electricity (Promoting Renewable Energy Through Green Energy Open Access) Rules, 2022,
notified on 06th June 2022 with objective of ensuring access to affordable, reliable, and sustainable
green energy for all. Green Energy Open Access is allowed to any consumer with contract demand
of 100 kW or above through single or multiple single connection aggregating Hundred kW or more
located in same electricity division of a distribution licensee.
• Green Term Ahead Market (GTAM) has been launched to facilitate sale of Renewable Power
through exchanges.
• Government has issued orders that power shall be dispatched against Letter of Credit (LC) or
advance payment to ensure timely payment by distribution licensees to RE generators.