See Full Document Text
GOVERNMENT OF INDIA
MINISTRY OF NEW AND RENEWABLE ENERGY
LOK SABHA
UNSTARRED QUESTION NO. 633
ANSWERED ON 22.07.2026
EXPANSION OF RENEWABLE ENERGY PROJECTS IN UTTAR PRADESH
633. SHRI JITENDRA KUMAR DOHARE
Will the Minister of NEW AND RENEWABLE ENERGY be pleased to state:
(a) whether the Government is aware of the fact that the expected expansion of new and
renewable energy schemes has not taken place in the Etawah Lok Sabha Constituency of Uttar
Pradesh;
(b) if so, the details of projects sanctioned and installed and amount spent under the Pradhan
Mantri Surya Ghar Muft Bijli Yojana (PM-SGMBY), Pradhan Mantri Kisan Urja Suraksha
evam Utthaan Mahabhiyaan (PM-KUSUM), solar rooftop installation, solar pumps and other
renewable energy schemes in the Etawah Lok Sabha Constituency during the last three years,
scheme wise;
(c) whether the Government proposes to sanction additional solar high mast lights, solar street
light and other community solar energy projects to increase energy availability in the rural and
remote areas of the Etawah Lok Sabha Constituency; and
(d) if so, the details thereof and if not, the reasons therefor?
ANSWER
THE MINISTER OF STATE FOR NEW & RENEWABLE ENERGY AND POWER
(SHRI SHRIPAD YESSO NAIK)
(a) & (b) The Ministry of New and Renewable Energy (MNRE) through state implementing
agencies, is implementing various schemes/programmes across the country including in the
Etawah Lok Sabha Constituency of Uttar Pradesh.
The PM Surya Ghar: Muft Bijli Yojana (PMSG: MBY) and PM Kisan Urja Suraksha evam
Utthaan Mahabhiyaan (PM-KUSUM) scheme are demand driven scheme, wherein no state-
wise allocation is made.
Under the PMSG: MBY, since its launch in February 2024, a total of 17,929 applications have
been received and 11,364 RTS systems have been installed, benefitting 11,364 households, and
an amount of Rs 78.27 crore has been disbursed as Central Financial Assistance (CFA) to the
beneficiaries of the scheme as on 20.07.2026, in the districts covering Etawah Lok Sabha
Constituency.
As reported by the State Implementing Agencies of the state of Uttar Pradesh, based on the
demand received from the state and sanction issued by the MNRE, a total of 414 agriculture
pumps have been solarised and an amount of Rs. 216.24 Cr has been released in Etawah Lok
Sabha Constituency of Uttar Pradesh, under the PM KUSUM scheme during the last three
years.In addition, the UPNEDA has reported solarisation of 19 Government buildings with
installation of 1933 kW capacity solar PV and an expenditure of Rs. 8.20 Cr, and installation
of 1320 solar street lights with expenditure of Rs. 2.72 Cr during the last three years in Etawah
Lok Sabha Constituency of Uttar Pradesh.
(c) & (d) Presently, there is no specific scheme operational in the MNRE for providing support
for installation of solar high mast lights, solar street light and other community solar energy
projects to increase energy availability in the rural and remote areas of the Etawah Lok Sabha
Constituency.
*****