See Full Document Text
GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS
RAJYA SABHA
UNSTARRED QUESTION NO. 2527
ANSWERED ON 13.03.2026
FATIGUE RISK MANAGEMENT SYSTEM IN RAILWAYS
2527 SHRI SAKET GOKHALE:
Will the Minister of RAILWAYS be pleased to state:
(a) whether the Ministry has conducted a scientific assessment on the correlation between the 22 per
cent vacancy in loco pilot posts and the rising instances of "Signal Passing at Danger" (SPAD); and
(b) the reasons as to why the Railways has not yet implemented a Fatigue Risk Management System
(FRMS) similar to the aviation sector, despite repeated warnings from the All India Loco Running
Staff Association about the dangers of consecutive night shifts exceeding the 11-hour duty limit?
ANSWER
MINISTER OF RAILWAYS, INFORMATION & BROADCASTING AND
ELECTRONICS & INFORMATION TECHNOLOGY
(SHRI ASHWINI VAISHNAW)
(a) & (b): Indian Railways hires Loco pilots on a regular basis looking the vacancy position. As train
operation increases, and pilots retire, new positions are opened up for hiring.
The details of filling up vacancies of Loco pilots are as follow:
Year Details
2024 18,799 vacancies were notified. Selection process already completed and 15,047
candidates empanelled
2025 9,970 vacancies were notified; First stage Computer Based Tests (CBTs) have been
completed.
2026 11127 vacancies have been approved for notification.
Loco Pilots are important members of Indian Railway family who play pivotal role for moving
passenger and goods traffic in safe and efficient manner. Indian Railways is committed to ensure proper
working conditions for loco pilots. A number of steps have been taken towards the betterment of the
working conditions of Loco Pilots and Assistant Loco Pilots of Indian Railways. Some of these steps
are as follows:
i. All running rooms have been air-conditioned.
§ii. Running staff are provided with Yoga and meditation room, reading room with newspaper
and magazines for relaxing in accordance with their requirements.
iii. Provision for subsidized meals in running rooms.
iv. Availability of RO water filters in running rooms.
v. Various safety drives & special counselling programs are regularly organized for checking
the alertness and safety awareness among the running staff. Special safety seminars &
meetings are also organized for interaction with family members of running staff for
educating on role of quality rest in life of running staff.
vi. Special drives are launched regularly to counsel running staff to boost their morale and
confidence.
The hours of work and periods of rest of loco pilots and assistant loco pilots of Indian Railways are
regulated by the Railways Act, 1989. As empowered by the Act, the Ministry of Railways has made the
Railway Servants (Hours of Duty & Periods of Rest Rules 2005). In accordance with these Rules, the
following are being followed in preparation of duty rosters of loco Pilots and Assistant Loco Pilots of
Indian Railways:
i. Total duty at a stretch (from ‘sign on’ to ‘sign off’) for running staff should not exceed 11
hours.
ii. Running duty at a stretch should not ordinarily exceed 9 hours. Such duty may extend
further provided the railway administration gives at least 2 hours notice before the expiry of
9 hours to the crew that they would be required to perform running duty beyond 9 hours
with the stipulation that the total duty from ‘sign on’ to ‘sign off’ shall not exceed 11 hours.
iii. In case the train does not reach its destination, normal crew changing point or the point
where the reliever has been arranged, within the overall limit of 11 hours, and such a point
is approximately one-hour journey away, the running staff shall be required to work to that
point provided the maximum hours in that trip does not exceed 12 hours.
iv. For loco pilots of all Mail/Express trains, the running duty (for the purpose of preparation
of links only) should not exceed 8 hours. However, preparatory or complementary work
time shall not be included within 8 hours.
v. The above provision for running duty hours and total duty hours shall be applicable to all
running staff including Loco Pilots (Mail/Express), Loco Pilots (Passenger), Loco Pilots
(Freight), Motormen and Guards except wherever stated otherwise.
Duty hours of crew are regularly monitored and continuous efforts are made for ensuring adherence to
Railway Servants (Hours of Duty & Period of Rest Rules, 2005) for all railway employees covered
under these rules, including Loco Pilots and Assistant Loco Pilots.
§Continuous efforts are also made and action taken to ensure that there are an adequate number of
Assistant Loco Pilots and loco Pilots in the various Divisions of Indian Railways commensurate with
the requirement of Railway traffic.
Recruitment
Recruitment done in Indian Railways during 2004-2005 to 2013-2014 vis-à-vis during 2014-2015 to
2024-2025 is given as under: -
Period Recruitments
2004-2005 to 2013-2014 4.11 lakh
2014-2015 to 2024-2025 5.08 lakh
2025-26 till date 41,343
Railways, being central Government organization could conduct recruitment on all India basis. This is
in line with Constitutional provision of right to equality in matters of public employment. Every
candidate irrespective of gender, language, place of birth, region etc. fulfilling eligibility criteria is free
to apply. All those who apply in response to Centralized Employment Notifications (CENs), including
local candidates, are considered for recruitment on the Railways, on equal footing. No preference is
given to candidates belonging to any state or Region nor is the recruitment restricted to any State or
Region.
Presently, recruitment against 1,43,086 vacancies of non-gazetted personnel has been taken up on
Indian Railways as per Annual Calendar 2024 and 2025.
During January to December 2024, ten Centralized Employment Notifications (CENs)
for 92,116vacancies were notified for filling up of posts of Assistant Loco Pilots (ALPs), Technicians,
Sub-Inspectors, Constables in Railway Protection Force (RPF), Junior Engineers (JEs)/ Depot Material
Superintendent (DMS)/ Chemical & Metallurgical Assistant (CMA), Paramedical Categories, Non-
Technical Popular Categories (Graduate), Non-Technical Popular Categories (Under-Graduate),
Ministerial & Isolated Categories and Level-1 categories such as Assistants, Track Maintainers
and Pointsman.
First stage/Single stage Computer Based Tests (CBTs) for 92,116 posts have been completed. Details
are as under: -
§Exam Candidates Cities Languages
1st Stage CBT for the post of ALP (18,799 vacancies) 18,40,347 156 15
CBT for the post of Technician (14,298 vacancies) 26,99,892 139 15
1st Stage CBT for the post of JE/DMS/CMA (7,951
11,01,266 146 15
vacancies)
CBT for the post of RPF-SI (452 vacancies) 15,35,635 143 15
CBT for the post of RPF-Constable (4,208 vacancies) 45,30,288 147 15
CBT for Paramedical Categories (1,376 vacancies) 7,08,321 143 15
1st Stage CBT for Non-Technical Popular Categories
58,41,774 141 15
(Graduate) (8,113 vacancies)
1st Stage CBT for Non-Technical Popular Categories (Under
63,27,473 157 15
Graduate) (3,445 vacancies)
CBT for Ministerial & Isolated categories (1,036 vacancies) 4,46,013 139 15
CBT for level-1 post (32438 vacancies) 1,08,28,261 152 15
Total Candidates 3,58,59,270
2nd stage CBTs for the posts of ALP, JE/DMS/CMA and Non-Technical Popular Categories (Graduate
& Under-Graduate) have also been completed. Details are as under: -
Exam Candidates Cities Languages
2nd Stage CBT for the post of ALP
2,66,363 112 15
(18,799 vacancies)
2nd Stage CBT for the post of JE/DMS/CMA (7,951
1,17,339 118 15
vacancies)
2nd Stage CBT for Non-Technical Popular Categories
1,21,931 129 15
(Graduate) (8,113 vacancies)
2nd Stage CBT for Non-Technical Popular Categories (Under-
51,978 79 15
Graduate) (3445 vacancies)
Total Candidates 5,57,611
Computer Based Aptitude Test (CBAT) for the post of ALP and Non-Technical Popular Categories
(Graduate) and Computer based Skill Test for the post of Non-Technical Popular Categories (Graduate
§and Under Graduate) and Ministerial & Isolated Categories have also been completed. Details are
as under: -
Exam Candidates Cities Languages
CBAT for the post of ALP 1,32,044 84 2
Translation Test for Ministerial and Isolated Categories 1,233 8 2
CBAT for the post of Non-Technical Popular Categories
13,616 38 2
(Graduate)
Computer Based Typing Skill Test (CBTST) for the post of
30,341 58 2
Non-Technical Popular Categories (Graduate-level)
Computer Based Typing Skill Test (CBTST) for the post of
13,145 44 2
Non-Technical Popular Categories (Under-Graduate-level)
Total Candidates 1,90,379
Panels for more than 41,000 candidates for various posts including the posts of Technicians, Junior
Engineers, Paramedical Categories, Sub-Inspectors & Constable (RPF) and Assistant Loco Pilots have
been finalised. Majority of them are in safety categories.
In addition, as per Annual Calendar for the year 2025, nine Centralized Employment Notifications
(CENs) for 50970 vacancies have also been issued. Details are as under: -
No. of Vacancies
CEN No. Post Name Month of Notification
notified
01/2025 Assistant Loco Pilots 9,970 March 2025
02/2025 Technician 6,238 June 2025
03/2025 Paramedical categories 434 July 2025
04/2025 Section Controller 368 August 2025
Junior Engineer/ Depot
05/2025 2,585 October 2025
Material Superintendent
Non-Technical Popular
06/2025 5,810 October 2025
Categories (Graduate)
Non-Technical Popular
07/2025 3,058 October 2025
Categories (Under-Graduate)
08/2025 Isolated Categories 312 December 2025
09/2025 level-1 22,195 December 2025
§First stage Computer Based Tests (CBTs) for 12923 posts have been completed. Details are as under: -
Exam Candidates Cities Languages
Ist stage CBT for the post of ALP (9970 vacancies) 10,03,719 141 15
CBT for the post of Section Controller (368 vacancies) 4,33,748 131 15
1st Stage CBT for the post of JE/DMS (2585 vacancies) 5,74,351 133 15
Total Candidates 20,11,818
The RRB examinations are quite technical in nature entailing large scale mobilization of men and
resources and training of manpower. Railway overcame all these challenges and successfully conducted
the recruitment in a transparent manner following all laid down guidelines. No instance of paper
leakage or similar malpractice has occurred during the entire process.
Further, as system improvement, the Ministry of Railways has introduced a system of publishing the
annual calendar from 2024 for recruitment to various categories of Group ‘C’ posts. The introduction of
the annual calendar is benefitting the aspirants in the following manner:
More opportunities for candidates;
Opportunities to those becoming eligible every year;
Certainty of exams;
Faster Recruitment process, Training and Appointments
Safety:
Safety is accorded the highest priority on Indian Railways. As a consequence of various safety
measures taken over the years, there has been a steep decline in the number of accidents.
Number of Consequential Train Accidents has reduced as shown in the table below:-
Year Consequential Accidents
2014-15 135
2025-26 (upto 28.02.2026) 14 (90% lesser)
Another important index showing improvement in safety in train operations is Consequential Accident
Index, the details of which are as under:-
Consequential Accident Index:-
Year Accident Index
2014-15 0.11
2024-25 0.03 (73% lesser)
§This index measures number of consequential accidents as a ratio of total running kilometers of all
trains.
No. of consequential accidents
Accident Index =
No. of trains X million kilometers run
s
t 234
n
e
d
i
c
c
A
n 165
i
a
r
T
l 135
a
it
n
e
u
q
e
s
n
o 55
C
f
o 31
.
o
N 14
2005-06 2009-10 2014-15 2019-20 2024-25 2025-26
(Feb 2026)
The various safety measures, including track maintenance, taken to enhance safety in train operations
are as under:-
1. On Indian Railways, the expenditure on Safety related activities has increased over the years as
under:-
Expenditure/Budget on Safety related activities (Rs. in Cr.)
2013-14 2022-23 2023-24 2024-25 2025-26 2026-27
39,200 87,336 1,01,662 1,14,022 1,17,693 1,20,389
2. Electrical/Electronic Interlocking Systems with centralized operation of points and signals have
been provided at 6,665 stations up to 28.02.2026 to reduce accidents due to human failure.
3. Interlocking of Level Crossing (LC) Gates has been provided at 10,153 Level Crossing Gates up to
28.02.2026 for enhancing safety at LC Gates.
4. Complete Track Circuiting of stations to enhance safety by verification of track occupancy by
electrical means has been provided at 6,669 stations up to 28.02.2026.
§5. Indian Railways has gone for implementation of indigenously developed Automatic Train
Protection (ATP) system, which required safety certification of highest order (SIL 4). Kavach has
been adopted as a National ATP system in July 2020. Based on deployment of Kavach version 3.2
on 1465 RKm on South Central Railway and experience gained, further improvements were made.
Finally, Kavach specification version 4.0 was approved by RDSO on 16.07.2024. After extensive
and elaborate trials, Kavach Version 4.0 has been successfully commissioned on 1,452 Route
Kilometres, covering the high density Delhi- Mumbai and Delhi-Howrah routes as below:
SN Section Progress (Route Km)
(1) Delhi-Mumbai route:
i Junction cabin – Palwal – Mathura –Nagda section 667
ii Vadodara - Ahmedabad section 96
iii Vadodara - Virar section 336
(2) Delhi – Howrah route:
i Gaya Sarmatanr section 93
ii Chota Ambana - Bardhaman – Howrah section 260
Further, track side Kavach implementation work has been taken up on 24,427 RKM covering all GQ,
GD, HDN and identified sections of Indian Railways.
6. Detailed instructions on issues related with safety of Signalling, e.g. mandatory correspondence
check, alteration work protocol, preparation of completion drawing, etc. have been issued.
7. System of disconnection and reconnection for S&T equipment as per protocol has been re-
emphasized.
8. All locomotives are equipped with Vigilance Control Devices (VCD) to improve alertness of Loco
Pilots.
9. Retro-reflective sigma boards are provided on the mast which is located two OHE masts prior to the
signals in electrified territories to alert the crew about the signal ahead when visibility is low due to
foggy weather.
10. A GPS based Fog Safety Device (FSD) is provided to loco pilots in fog affected areas which
enables loco pilots to know the distance of the approaching landmarks like signals, level crossing
gates, etc.
11. Modern track structure consisting of 60kg, 90 Ultimate Tensile Strength (UTS) rails, Prestressed
Concrete Sleeper (PSC) Normal/Wide base sleepers with elastic fastening, fan shaped layout
turnout on PSC sleepers, Steel Channel/H-beam Sleepers on girder bridges is used while carrying
out primary track renewals.
§12. Mechanisation of track laying activity through use of track machines like PQRS, TRT, T-28 etc. to
reduce human errors.
13. Maximizing supply of 130m/260m long rail panels for increasing progress of rail renewal and
avoiding welding of joints, thereby improving safety.
14. Ultrasonic Flaw Detection (USFD) testing of rails to detect flaws and timely removal of defective
rails.
15. Laying of longer rails, minimizing the use of Alumino Thermic Welding and adoption of better
welding technology for rails i.e., Flash Butt Welding.
16. Monitoring of track geometry by OMS (Oscillation Monitoring System) and TRC (Track Recording
Cars).
17. Patrolling of railway tracks to look out for weld/rail fractures.
18. The use of Thick Web Switches and Weldable CMS Crossing in turnout renewal works.
19. Inspections at regular intervals are carried out to monitor and educate staff for observance of safe
practices.
20. Web based online monitoring system of track assets viz. Track database and decision support
system has been adopted to decide rationalized maintenance requirement and optimize inputs.
21. Detailed instructions on issues related with safety of Track, e.g. integrated block, corridor block,
worksite safety, monsoon precautions, etc. have been issued.
22. Preventive maintenance of railway assets (Coaches & Wagons) is undertaken to ensure safe train
operations.
23. Replacement of conventional ICF design coaches with LHB design coaches is being done.
24. All unmanned level crossings (UMLCs) on Broad Gauge (BG) route have been eliminated by
January 2019.
25. Safety of Railway Bridges is ensured through regular inspection of Bridges. The requirement of
repair/rehabilitation of Bridges is taken up based upon the conditions assessed during these
inspections.
26. Indian Railways has displayed Statutory “Fire Notices” for widespread passenger information in all
coaches. Fire posters are provided in every coach so as to educate and alert passengers regarding
various Do’s and Don’ts to prevent fire. These include messages regarding not carrying any
inflammable material, explosives, prohibition of smoking inside the coaches, penalties etc.
27. Production Units are providing Fire detection and suppression system in newly manufactured
Power Cars and Pantry Cars, Fire and Smoke detection system in newly manufactured coaches.
Progressive fitment of the same in existing coaches is also underway by Zonal Railways in a phased
manner.
28. Regular counselling and training of staff is undertaken.
§29. Concept of Rolling Block introduced in Indian Railways (Open Lines) General Rules vide Gazette
notification dated 30.11.2023, wherein work of integrated maintenance/ repair/replacement of
assets is planned up to 52 weeks in advance on rolling basis and executed as per plan.
The details of the Safety related works related to better maintenance practices, Technological
improvements, better infrastructure and rolling stock etc. undertaken by Railways are tabulated below:-
2004-05 to 2014-25 Vs.
S.N. Item 2014-15 to 2024-25
2013-14 2004-14
Technological Improvements
1. Use of high-quality rails 57,450 Km 1.43 Lakh Km More than 2
(60 Kg) (Km) times
2. Longer Rail Panels(260m) 9,917 Km 77,522 Km Nearly 8 times
(Km)
3. Electronic Interlocking 837 Stations 3,691 Stations More than 4
(Stations) times
4. Fog Pass Safety Devices As on 31.03.14: As on 31.03.25: 288 times
(Nos.) 90 Nos. 25,939 Nos.
5. Thick Web Switches (Nos.) Nil 28,301 Nos.
Better Maintenance Practices
1. Primary Rail Renewal (Track 32,260 Km 49,941 Km 1.5 times
Km)
2. USFD (Ultra Sonic Flaw 79.43 Lakh 2 Crore More than 2
detection) Testing of Welds times
(Nos.)
3. Weld failures (Nos.) In 2013-14: 3699 In 2024-25: 90 % reduction
Nos. 370 Nos.
4. Rail fractures (Nos.) In 2013-14: 2548 In 2024-25: More than 88%
Nos. 289 Nos. reduction
Better Infrastructure and Rolling Stock
1. New Track KM added (Track 14,985 Km 34,428 Km More than 2
Km) times
2. Flyovers (RoBs)/Underpasses 4,148 Nos. 13,808 Nos. More than 3
(RUBs) (Nos.) times
3. Unmanned Level crossings As on 31.03.14: As on 31.03.24:Nil Removed
(Nos.) on BG 8,948 (All eliminated by
31.01.19)
4. Manufacture of LHB Coaches 2,337 Nos. 42,677 More than 18
(Nos.) times
*****
§