**Executive Summary** This document presents the Minister of Jal Shakti's response to a question regarding the progress of the Jal Jeevan Mission (JJM) in Assam, specifically regarding Functional Household Tap Connections (FHTCs). It outlines the number of connections provided, the shortfall in achieving universal coverage, reasons for delays, and information about fund allocation. The JJM has been extended till December 2028. **Key Points / Main Content** * **Jal Jeevan Mission (JJM)** * Implemented since August 2019 in partnership with States to provide potable water to every rural household through tap connection. * The planning, approval, implementation, operation, and maintenance of water supply schemes are the responsibility of State/UT Governments. * The Government of India supports States by providing technical and financial assistance. * **Progress in Assam (as of 15.12.2025)** * 1,11,311 rural households in Assam had tap water connection at the beginning of the mission (August 2019). * 58,98,701 (81.65%) out of 72,24,242 rural households have been provided tap water connection. * 57,87,390 additional rural households have been provided tap water connection under the mission. * **Challenges in Implementation** * Presence of contaminants in ground water. * Capacity of Gram Panchayats and local communities to plan, manage, operate & maintain the water supply schemes. * Delay in release of the matching State share, especially during the Covid-19 pandemic. * **Financial Support and Mission Duration** * The Union Cabinet initially approved the JJM for five years (2019-20 to 2023-24), during which States/UTs were to complete water supply schemes. * Central financial support is available for utilization during the Mission period only; additional liabilities are to be borne by States. * The Finance Minister has announced extension of Jal Jeevan Mission till December 2028 with enhanced total outlay. * Central grants-in-aid may be released after approval from the competent authority for the extension of JJM with the enhanced outlay and following issuance of the corresponding guidelines. **Impact Analysis** **Stakeholder: Government of Assam** * **Impact**: Responsible for planning, approval, implementation, operation, and maintenance of drinking water supply schemes under JJM. * **Action Required**: Address challenges in implementation, including groundwater contamination, building local capacity, and ensuring timely release of the State share. Additional liabilities for projects beyond the initial mission period must be borne by the State. **Stakeholder: Rural Households in Assam** * **Impact**: Target beneficiaries of the JJM, aiming for assured potable water through tap connections. * **Action Required**: Monitor the progress of JJM and engage with local authorities for effective implementation. **Stakeholder: Gram Panchayats and Local Communities** * **Impact**: Play a crucial role in planning, managing, operating, and maintaining water supply schemes. * **Action Required**: Enhance their capacity to effectively manage and sustain the water supply infrastructure.

Key Entities Referenced

Jal Jeevan Mission (JJM)-Har Ghar Jal: Flagship program of the Government of India to provide Functional Household Tap Connections (FHTCs) to every rural household by 2028. Ministry of Jal Shakti: Union Ministry responsible for water resources, river development and rejuvenation, and drinking water and sanitation, and the implementation of the Jal Jeevan Mission. Assam: A state in India where the Jal Jeevan Mission is being implemented, and which is the specific focus of the parliamentary question in the document.
Official Source Record View Original Source →
See Full Document Text
GOVERNMENT OF INDIA MINISTRY OF JAL SHAKTI DEPARTMENT OF DRINKING WATER & SANITATION LOK SABHA UNSTARRED QUESTION NO. – 3123 ANSWERED ON 18/12/2025 FHTCs UNDER JAL JEEVAN MISSION IN ASSAM 3123. MD. RAKIBUL HUSSAIN Will the Minister of JAL SHAKTI be pleased to state: (a) the total number of households that have been provided Functional Household Tap Connections (FHTCs) under the Jal Jeevan Mission in Assam; (b) the current shortfall in achieving universal household tap connections in the said State; (c) the reasons for delays, if any, in meeting the targets; and (d) the details of funds yet to be released to the State Government of Assam under the said Mission? ANSWER MINISTER OF STATE FOR JAL SHAKTI (SHRI V. SOMANNA) (a) to (d) Since August 2019, Government of India, in partnership with States including Assam, is implementing Jal Jeevan Mission (JJM)-Har Ghar Jal to enable every rural household in the country, to have assured potable water through tap connection. Drinking water is a State subject, and hence, the responsibility of planning, approval, implementation, operation, and maintenance of drinking water supply schemes, including those under the Jal Jeevan Mission, lies with the respective State/UT Governments. The Government of India supports the States by providing technical and financial assistance. As reported by State Govt. of Assam, at the beginning of Jal Jeevan Mission in August 2019, only 1,11,311 rural households were reported to have tap water connection. As on 15.12.2025, total 58,98,701 (81.65%) out of 72,24,242 rural households have been provided tap water connection in the State of Assam, round 57,87,390 additional rural households have been provided tap water connection under the mission. Some major challenges, viz. presence of contaminants in ground water and capacity of Gram Panchayats and local communities to plan, manage, operate & maintain the water supply schemes, and delay in release of the matching State share in some States especially during the Covid-19 pandemic, etc. are being faced in the implementation of JJM. Page 1 of 2Union Cabinet had approved the implementation of the Jal Jeevan Mission for five years i.e. from 2019-20 to 2023-24. During this period, the States/UTs were to complete planning, approval, implementation of water supply schemes under the Mission. It had also been clarified to all States/UTs including Assam through various communication and review meetings that Central financial support under JJM may be made available for utilization during Mission period only and any additional liabilities shall be borne by States from their own resources. Further, considering the progress achieved so far and ongoing works, Hon’ble Finance Minister has announced extension of Jal Jeevan Mission till December 2028 with enhanced total outlay through budget announcements 2025-26. Central grants-in-aid may be released to eligible States only after getting approval from the competent authority for the extension of the Jal Jeevan Mission with the enhanced outlay and following the issuance of the corresponding guidelines. ***** Page 2 of 2