Official TranscriptGOVERNMENT OF INDIA MINISTRY OF ROAD TRANSPORT AND HIGHWAYS RAJYA SABHA UNSTARRED QUESTION NO - 4256 ANSWERED ON - 01/04/2026 FUND ALLOCATION TO ODISHA 4256. SHRI MANAS RANJAN MANGARAJ: Will the Minister of ROAD TRANSPORT AND HIGHWAYS be pleased to state: (a) the total funds allocated and released to Odisha for National Highway development during the last five years; (b) the year-wise utilization...
GOVERNMENT OF INDIA MINISTRY OF ROAD TRANSPORT AND HIGHWAYS RAJYA SABHA UNSTARRED QUESTION NO - 4256 ANSWERED ON - 01/04/2026 FUND ALLOCATION TO ODISHA
4256. SHRI MANAS RANJAN MANGARAJ:
Will the Minister of ROAD TRANSPORT AND HIGHWAYS be pleased to state:
(a) the total funds allocated and released to Odisha for National Highway development during the last five years;
(b) the year-wise utilization status; and
(c) the major projects funded under the said allocation? ANSWER THE MINISTER OF ROAD TRANSPORT AND HIGHWAYS (SHRI NITIN JAIRAM GADKARI)
(a) Rs. 26558 Crore has been allocated and Rs. 26223 Crore has been released to Odisha for National Highway (NH) development during the last five years.
(b) The year wise utilization status is as below:
Fund Allocated Expenditure Finance Year (Rs. in Cr.) ( Rs.in Cr.) 2020-21 5336 5336 2021-22 4510 4510 2022-23 4643 4643 2023-24 5948 5948 2024-25 6121 5786
(c) The list of 113 major projects funded under the said allocation is annexed.ANNEXURE ANNEXURE REFERRED IN REPLY TO PART (c) OF RAJYA SABHA UNSTARRED QUESTION NO. 4256 FOR 01-04-2026 ASKED BY SHRI MANAS RANJAN MANGARAJ REGARDING FUND ALLOCATION TO ODISHA Sl Name of Major Project No 1 O&M of 4L Bhubneshwar - Puri Section from km. 0.00 to km. 56.500 of NH-316.
2 Balance Work of Puri By Pass Road of Bhubaneswar-Puri Section from km. 56.500 to km. 67.500.
Construction of S-VUP (3x12) at Gandarpur at Km. 23+500 on Chandikhole-Jagatpur-Bhubaneswar 3
Section of NH-16 in the State of Odisha.
Construction of 4 Nos. of FOB i.e. 1 No of FOB at Baramunda, 1 No of FOB at Palasuni and 2 Nos.
4 of FOB at Manguli on Chandikhole-Jagatpur-Bhubanewar Section of NH-5 (New Nh-16).
Balance work of 6 Lane Flyover at Km 5+680 Naharkanta Flyover on Chandikhole-Jagatpur- 5 Bhubaneswar Section of NH-5 (NH-16) from Km. 414.00 to Km 419.000 and Km. 0.000 to Km
62.000 in the State of Odisha on Item rate basis.
Construction of Light Vehicular Underpass (4x12) at Birabhadrapur at Km. 51+500 on 6 Bhubaneswar-Puri Section of NH-316 in the State of Odisha Development of Six lane Dhanara-Hatibena Section of NH130CD from km 124.661 to Km 146.500 7 under Bharatmala pariyojana in the state of Odisha on HAM.(Pkg. OD-01) Development of Six lane Hatibena-Badakumari Section of NH130CD from Km 146.500 to Km 8
179.000uneder Bharatmala pariyojana in the state of Odisha on HAM.(Pkg. OD-02) Development of Six lane Badakumari -Karki Section of NH130CD from km 179.000 to Km 226.500 9 under Bharatmala pariyojana in the state of Odisha on HAM.(Pkg. OD-03) Development of Six lane Karki- Kaliaguda Section of NH130CD from km 226.500 to Km 249.000 10 under Bharatmala pariyojana in the state of Odisha on HAM.(Pkg. OD-04) 6L Greenfield Kaliagura to Baunsagura Section of NH-130CD Road from Km. 249+000 to Km.
11 293+000 (Package OD-5) 6L Greenfield Baunsagura to Baraja Section of NH-130CD Road from Km. 293+000 to Km.
12 338+500 (Package OD-6) 6L Greenfield Baraja to Kandili Section of NH-130CD Road from Km. 338+500 to Km. 342+500 13 (Package OD-7) 6L Greenfield Kandili to Tumbigura Section of NH-130CD Road from Km. 342+500 to Km.
14 365+033 (Package OD-8)Cuttack-Angul Section of NH-42 (New NH-55) from km 0.400 to km 60.200 (Pkg-I) in the State of 15 Odisha Cuttack-Angul Section of NH-42 (New NH-55) from Km.60.200 to Km. 112.000 (Pkg-II) in the 16 State of Odisha 4 Laning of Talcher to end of Kamakhyanagar Bypass km 8.844 - km 15.725 of NH-149 and km 17
301.875 - km 335.946 of NH-53 (Pkg-I) 18 4 laning of End of Kamakhyanagar Bypass - Duburi from km. 335.946 to km 388.382 (Pkg-II) 19 4 Laning of Duburi Chandikhole from km 388.376 to km 428.074 (Pkg-III) 4L Godibandha to Ballhar Chhak, Ballhar Chhak to Banarpal & Banarpal to Start of Angul bypass at 20 Km.314.130 to Km.321.035 of NH53, at Km.75.200 to Km.84.000 of NH149 & at Km.84.000 to Km.86.100 of NH55 3L Major Bridge over River Brahmani at Km. 401.250 (Duburi - Chandikhole Section) of NH-200 21 (New NH -53) 22 O&M of Pallahara to Pitiri section of NH-149 from Km.0.000 to 68.280 in the State of Odisha Construction of 02 nos. of VUPs at Km. 2.300 (Near Gandhi Chhak) and Km. 4.720 (Dhumabati) on 23 Cuttack-Angul section of NH-42 (New NH-55) (Km.00.400 to Km.60.200) Construction of LVUP at Baisingha (Km.339+360) in the stretch of End of Kamakhyanagar bypass 24 to Duburi section of NH-53 in the state of Odisha Rehabilitation & Upgradation to four laning of Singara to Binjabahal section from Ch. Km.311.000 25 to Km.414.000 (Design Chainage from Km.310.806 to Km.414.982) of NH-6 (New NH-49) in the State of Odisha under Hybrid Annuity Mode.
Rehabilitation and Up Gradation to Four laning of Binjabahal to Telebani section, Km 414.000 to 26 Km 491.710 (Design Chainage Km 414.982 to Km 493.300) of NH-6 ( New NH-49) in the state of Odisha under NHDP-IV on Hybrid Annuity Mode Rehabilitation and Up-Gradation to 4–Laning of Biramitrapur–Brahmani Bypass end of NH-23 (New NH-143) Km.211.200 to Km 237.100 & From Km 0.000 to Km 3.300 (Brahmani Bypass) i.e. up to 27 Km 240.250 on NH-23 beside BNR weigh bridge in the state of Odisha under NHDP-IV on EPC Mode, Pakage-I(A).
Rehabilitation and up-gradation to 4-laning of NH-23 (New NH-143) from Km 240.250, i.e.
28 Brahmani Bypass end beside BNR Weigh Bridge to Km 287.200, i.e. Rajamunda Section in the state of Odisha under NHDP-IV on EPC Mode, Package–1(B).
Rehabilitation and up-gradation to 4-laning from Km 287.200, i.e. Rajamunda to Km 337.185, i.e.
29 Barkote Section of NH-23 (New NH-143) on EPC Mode.
Rehabilitation and up-gradation of existing 2 lane to 4-lane standards to Rimuli (Km.163.000) – 30 Koida (Km.206.200) Section of NH-215 (New NH-520), i.e., Package-I in the State of Odisha under NHDP Phase III on EPC Mode.
Rehabilitation and up-gradation of existing 2 lane to four laning from of Koida (Km 206.200) to 31 Rajamunda (Km 259.453) section of NH-215 (new NH-520) in the State of Odisha Under NHDP Phase III, Package II on EPC Mode32 Construction of New 6-lane Flyover at Ainthapali Junction on NH-6 in Sambalpur Construction of 6-Lane flyover (Size-40 Nos.of 25m Span x 6m Height) through Separate agency 33 including RE wall approches with Flexible Pavement in the Elephant Corridor of Angul-Sambalpur
section of NH-42 (New NH-55) at Km.202+533 on EPC Mode in the State of Odisha 34 Construction of 3 lane bridge at IB river in Kanaktora-Jharsuguda Section of NH-49 35 Angul-Sambalpur Section of NH-55 36 6-laning of Tangi – Bhubaneswar section of NH-16 37 4/6-laning of Puintola-Tangi section of NH-16 Construction of road from km 0/0 to 72/0 of NH-26 such as 4 lane from km 0/0 to 21/0 (Bargarh to 38 Barpali) and widening & strengthening of double lane with paved shoulder from km 21/0 to 72/0 (barpali to Bolangir) in the state of Odisha.
Widening and strengthening to two lane with paved shoulders from km 296/500 to 336/500 39 (Mundamarai to Ratanpur Section) of NH-59 in the state of Odisha on EPC mode.
40 Strengthening to NH-326A from km 0/0 to 35/0 in the state of Odisha on EPC Basis.
41 Strengthening of Road from km 175/880 to 181/000 of NH-26 in the state of Odisha. strengthening of existing carriageway from km 35/350 to 58/000 (Angabira to Naktideul) of NH- 42 153B” in the state of Odisha on EPC basis 43 Strengthening to NH-53 from km 314/130 to 321/00” in the state of Odisha on EPC basis strengthening of existing carriageway from km 75/100 to 84/000 (Except ROB portion from 77/650 44 Km to 79/250 Km) section of NH-149” in the state of Odisha on EPC basis Strengthening of road from Km 174/570 to 186/094 Km, 210/570 to 234/751 & Km 235/748 to 45 243/648 km of NH-20” in the state of Odisha on EPC basis strengthening of existing carriageway from km 277/461 to 280/249 Km, 281/400 to 286/725 Km, 46 287/883 Km to 289/454 km, 304/720 km to 341/741 km & Km 346/000 to 360/391 km of NH-55” in the state of Odisha on EPC basis Re-construction of HL Bridge over Kantyali Nallah at 47/200 km of NH-153B for the year 2020-21 47 in the state of Odisha.
Construction of truck parking at Bijakhaman of Bolangir town from km 79/700 to 80/00 adjacent to 48 NH-26 in the state of Odisha.
Construction of Bypass on NH-59 from Km 336/350 to 349/910 (13.56 km) near Berhampur town 49 including 4-lane RoB in the state of Odisha.Construction of Railway over Bridge at km 60/200 Matiapada on Puri-Konark Road, NH-316 (LC 50 No KP-42 of Khurdha - Puri main line) in the state of Odisha.
Construction of 5 HL Bridges at km 379/000 (Pangam), km 439/400 (Potteru), km 444/237 51 (Kongurukonda), km 457/075 (MV-90) and km 468/150 (MV-96) of NH-326 (Malkangiri-Motu Road) in the state of Odisha.
Widening to two lane with paved shoulder of Bhanjanagar to Aska road of NH-157 from km 119/000 52 to 159/500 (Design chainage km 117/000 to 157/500) in the state of Odisha on EPC mode.
Construction of four lane ROB and its approaches in lieu of existing Level Crossing No. RV-71 at 53 km 435 on NH-217 (New NH-353) at Khariar including land acquisition under NH(O) in Annual Plan 2021-22 for the state of Odisha for F.Y. 2021-22 to F.Y 2033-34 Construction of 4 lane ROB with approaches in lieu of LC No. RV-172 at km 176.00 of NH-201 54 (present NH-26) at Kesinga including land acquisition in the state of Odisha on EPC mode under Annual Plan 2021-22 Strengthening and improvement of road safety from km 282.900 to 285.800 of NH-57 (one time 55 improvement) in the state of Odisha on item rate basis.
Construction of bypass to Nayagarh town from km 235.469 to 252.482 of NH-57 including land 56 acquisition in the state of Odisha.
Strengthening including improvement of safety from km 38/0 to 45/0, km 50/0 to 60/0 and km 65/0 57 to 70/0 of NH-326A in the state of Odisha under Annual Plan 2021-22.
Construction of Bypass to Khordha town from Km 294/000 to 300/300 on NH-57 including LA in 58 the State of Odisha on EPC mode.
Construction of H.L Major Bridge at Ch. 323/957, H.L. Major Bridge at Ch. 323/780 & RCC Box at 59 Ch. 323/500 over Kolab river, near Patraput (Koraput district) on NH-326 in the State of Odisha.
Construction of Bypass road to Balangir town from km 72/400 (Desing km 0/0) to km 79/800 60 (Design km 11/670) of NH-26 in the State of Odisha.
Construction of HL Major Bridge across river Baitarani including land acquisition at km 105/080 of 61 NH-220 in the State of Odisha under Annual Plan 2021-22.
Construction of two lane with PS including LA from km 56/780 to km 68/367 of NH-59 (Rigdol to 62 Belgaon section) in the State of Odisha.
Construction of proposed bypass at Reamal on NH-53 in the State of Odisha under Annual 63 Plan 2021-22.
Widening to 2 lane with paved shoulded of Jareikela (Jharkhand/Odisha Border) - Dhabaleswar 64
section from 0/0 to 36/0 of NH-320D in the State of Odisha under Annual Plan 2021-22.
Construction of four lane bypass to Jeypore town on NH-26 including land acquisition in the State of 65 Odisha under Annual Plan 2021-22.
Construction of 2 lane with paved shoulder bypass to Bhawanipatna town incluiding LA on NH-26 in 66 the State of Odisha under Annual Plan 2021-22 Construction of Kotpad Bypass to two lane with paved shoulder configuration on NH-63 in the State 67 of Odisha under Annual Plan 2021-22.Construction of Bridge across Simuli Nallah (missing link) at km 107/470 of NH-220 in the State of 68 Odisha under Annual Plan 2021-22.
Widening and strengthening to 2L+PS including LA of Kandarpur-Balikuda from km 277/500 to 69 318/970 of NH-55 in the State of Odisha under Annual Plan 2021-22.
Construction of 4 HL bridges at Ch. 377/420, Ch. 423/800, Ch. 433/750 and Ch. 484/500 on 70 Malkangiri-Motu Road on NH-326 in the State of Odisha under Annual Plan 2021-22.
Reconstruction of HL major bridge across river Tel near Sonepur at km 51/200 of NH-57 in the State 71 of Odisha under Annual Plan 2021-22.
Widening and Strengthening to 4L+PS/2L+PS from km 0.000 to 35.800 (Kuakhia - Mangalpur 72
section) of NH 20 in the state of Odisha on Annual Plan 2021-22." Widening & strengthenlng to 2L+PS from km 0.000 to 40.000 (Dhaugaon- Podamari section) of NH 73 326 in the State of Odisha under Annual Plan 2021.22.
Widening of existing road of Kalinga Ghat in Valley side for elimination of Black spot using innovative Reinforced Earth Composite/Hybrid system from km 86/330 to 86/615 including 74 Reconstruction Minor Bridge at Ch. 86/700 of NH-157 in the State of Odisha under Annual Plan 2021-22.
Construction of four lane ROB and its approaches in lieu of existing level crossing No. RV-168 75 (Presently RV-172) at km 176 on NH-201 (New NH-26) at Kesinga including land acquisition under NH(O) in Annual Plan 2021-22 for the State of Odisha.
Construction of Jharsuguda Bypass including land acquisition on NH-49 from km 256/636 to 76 283/300 (Desing chainage km 258/636 to 289/786) under NH(O) in Annual Plan 2022-23.
Widening and strengthening to 2L+PS including LA from km 318/0 to 353/450 (Balikuda - Mulakani 77
section) of NH-55 under NH(O) in Annual Plan 2022-23 in the State of Odisha.
Widening & strengthening to two lane with paved shoulder from km 59/594 to 60/042 & km 60/292 78 to 63/400 (Missing section of Rairangpur to Jashipur Section) of NH-220 under NH(O) in Annual Plan 2022-23 in the State of Odisha.
Construction of Borigumma Bypass on NH-26 from km 317.400 to km 320.700 (design chainage 79
317.400 to km 321.415) under NH(O) in Annual Plan 2022-23 for the State of Odisha Construction of Baghamari Bypass on NH-57 from Km 281/700 to 285/330 in the State of Odisha on 80 EPC mode under AP 2022-23.
Construction of HL Major Bridge over Dahuka River at km 226/377 (Design Chainage) of NH-57 81 including approaches in AP 2022-23 in the State of Odisha.
Realignment from km 227/700 to 227/970, km 233/260 to 233/980, km 234/090 to 234/860 and km 82 235/980 to 236/770 of NH-26 (Missing section of Bhawanipatna - Koksara stretch) on EPC mode in the State of Odisha under Annual Plan 2022-23.
Widening & strengthening to 2L with paved shoulder from km 256/455 to 256/503, km 256/820 to 256/960, km 265/760 to 266/800, km 270/975 to 271/055, km 276/460 to 277/480, km 285/780 to 83 291/050 and Construction of 3 nos of Bypass from km 266/800 to 267/300, km 270/025 to 270/975 and km 284/700 to 285/780 on NH-53 under NH(O) in Annual Plan 2022-23 for the State of Odisha.
Construction of new Minor Bridge across Jeriguda Nallah at km 297/520 (Design Ch.) of NH-326 84 including approaches in the State of Odisha on EPC mode under Annual Plan 2022-23.Construction of new bridge over Sagada river at Ch. 192/030 on NH-26 including approaches in the 85 State of Odisha on EPC mode under Annual Plan 2022-23.
Widening to 2L+PS from km 86/040 to 91/770 & km 103/260 to 107/870 of NH-220 under the 86 Annual Plan 2022-23 on EPC mode in the State of Odisha under Annual Plan 2022-23.
Improvement of major junction at Ch. 152.000 (at Madhapur) on NH-57 in the State of Odisha on 87 EPC mode under Annual Plan 2022-23.
Construction of new bridge over Ret river at Ch. 149/753 on NH-26 including approaches and LA in 88 the State of Odisha on EPC mode under Annual Plan 2022-23.
Construction of Bypass road to Daspalla town from km 195/250 to 200.635 of NH-57 including land 89 acquisition in the State of Odisha on EPC mode under Annual Plan 2022-23 Construction of bypass to Titlagarh town from km 45/162 to 52/678 and widening & strengthening 90 from SL/DL to 2L+PS from km 44/000 to 45/162 of NH-59 (Missing Link) on EPC mode under NH(O) in Annual Plan 2022-23 for the State of Odisha.
Construction of Dharmagarh Bypass on NH-130C including land acquisition in the State of Odisha 91 on EPC mode under Annual Plan 2022-23 Widening of the existing road to 2L+PS from km 45/750 tp 47/590 of NH-57 in Sonepur town in the 92 State of Odisha under Annual Plan 2022-23.
Construction of bypass road to Phulbani town from km 29/800 (Design km 0.00) to km 39/000 93 (Design km 7.250) of NH-157 in the State of Odisha on EPC mode under Annual Plan 2022-23.
Construction of Major Bridge with approaches from km 0/000 to 1/200 (Madhopur - Badabanta 94
section) of NH-20 under NH(O) in Annual Plan 2022-23 in the State of Odisha.
Construction of flyover at Ch. 165/200 (Pastikudi) on NH-26 including land acquisition in the State 95 of Odisha on EPC mode under Annual Plan 2022-23 Widening and strengthening to 2L+PS of NH-26 from km 367/480 to 376/480 for the year 2022-23 96 under NH(O) in the State of Odisha.
97 Construction of Bypass road on NH-26 for Nabarangpur town under Annual Plan 2022-23.
Construction of two lane Bypass road at Rairangpur on Ranchi-Vijayawada Corridor on NH-220 in 98 the State of Odisha on EPC mode under Annual Plan 2022-23.
Construction of bypass road to Rayagada town and J. K. Pur town on NH-326 in the state of Odisha 99 on EPC mode under Annual Plan 2023-24.
Strengthening of the stretch from km 35.840 to 71.120 (Rairangpur - Jashipur section) except km 100 59.594 to 60.042 & 60.292 to 63.400 of NH-220 in the State of Odisha on EPC mode under Annual Plan 2023-24.
Reconstruction of culverts at km 388/495, km 396/407, km 409/710 & km 415/061 of NH-26 in the 101 State of Odisha for the year 2023-24 Widening and strengthening of Daringbadi ghat portion from km 231.000 to 256.000 (Design 102 chainage from km 229.500 to 256.468) of NH-59 on HAM in Annual Plan 2023-24 for the State of OdishaWidening and strengthening of existing 2L+PS to 4L+PS from km 67.400 to km 70.400 (Khariar 103 Road section) of NH-353 under Annual Plan 2023-24 in the State of Odisha Reconstruction of 3 nos of damaged bridges of NH-326 at Toyaput Nallah at km 261/060, 104 Khudipadar Nallah at km 268/780 and Debagarh river at km 270/260 on NH-326 for the year 2023- 24 in the State of Odisha.
Widening and strengthening of existing 2L+PS to 4L+PS from km 80/330 (Nuapada) to km 88/497 105
(Ghatipada) of NH-353 in the State of Odisha on EPC mode under Annual Plan 2024-25.
Rehabilitation of Railway Over Bridge at Rayagada from km 202/175 to 202/790 and Nagavali River 106 bridge from km 192/797 to 193/050 of NH-326 under item rate contract in the State of Odisha Onetime Improvement of Kalasandhapur town portion on NH-59 from km 303.960 to 306.100 for 107 the year 2024-25 Construction of new major bridge over Indravati at km 302/280 of NH-26 in the State of Odisha on 108 EPC mode under annual plan 2024-25 Construction of major bridge over Nagavali river on NH-326 at ch 192.380 in the state of Odisha on 109 EPC mode for the year 2024-25 Widening & strengthening of NH-20 from Mangalpur to Kayangola from chainage 35.800 km to 110 47.600 km including construction of spur length 4.724 km from Kayangola to Aradi (Akhandalamani Temple) in the state of Odisha on EPC mode for the year 2024-25.
Widening and strengthening of existing land to 2L+PS from km 239/280 (Koksara) to Km 294/280 111
(Nabarangpur) of NH-26 in the State of Odisha in EPC mode under Annaual Plan 2024-25.
Construction of Mahendra Tanaya Bridge at km 92.250 on NH-326A in the state of Odisha on EPC 112 mode for the year 2024-25 Construction of bypass road to Champua town on NH-20 in the State of Odisha on EPC mode for the 113 year 2024-25.
*****