Home India NEW AND RENEWABLE ENERGY Parliament Question: Green Energy Corridor Project in Andhra...
Date: 2026-02-11 Category: Not Applicable State: Union Government Country: India

Parliament Question: Green Energy Corridor Project in Andhra Pradesh

Issued by NEW AND RENEWABLE ENERGY · Not Applicable

Research with AI Agent Chat with Document Generate Summary Translate Helpful Share Add to Project Create Task

Executive Summary & Key Takeaways

**Executive Summary** This document summarizes the Ministry of New and Renewable Energy's (MNRE) response to Lok Sabha Unstarred Question No. 2011, concerning the Green Energy Corridor (GEC) project in Andhra Pradesh. The response details the Central Financial Assistance (CFA) sanctioned and released under the Intra-State GEC, the status of Andhra Pradesh's inclusion in Phase-II, and the renewable energy capacity integrated into the grid through Phase-I, and the date answered on 11.02.2026. The document also specifies required actions for availing CFA. **Key Points / Main Content** * **Central Financial Assistance (CFA) Status:** * CFA sanctioned and released under Intra-State GEC phase I & II across 10 states, including Andhra Pradesh is detailed in Annexure I. * Total CFA sanctioned is Rs 3164.70 Crore and total released is Rs 2839.104 Crore. * For Phase-II, total CFA sanctioned is Rs 3947.34 Crore and total released is Rs 1056.116 Crore. * **Andhra Pradesh's Involvement:** * No projects have been sanctioned to Andhra Pradesh under GEC phase II. * A proposal from the Andhra Pradesh government was submitted and later withdrawn. * **Green Energy Corridor (GEC) Scheme:** * The Government of India has launched a GEC scheme to strengthen intra-state transmission. * Under GEC Phase-I, intra-state transmission projects were implemented in eight RE-rich states, including Andhra Pradesh. * Around 24 GW of renewable energy has been integrated through Phase-I (state-wise details in Annexure II), and 44 GW under the GEC scheme. * **Fund Release Process:** * State Transmission Utilities (STU) submit requests for CFA to the Central Electricity Authority (CEA) with a copy to MNRE, including detailed project cost information. * CEA provides recommendations to MNRE based on evaluation reports from a Project Appraisal Committee (PAC). * Funds are released by MNRE after due diligence. * **Expansion Measures:** * The GEC scheme is implemented in ten states for evacuation of around 44 GW of renewable energy and to strengthen transmission for large-scale RE integration. * MNRE has requested states to share proposals regarding intra-state transmission systems to strengthen and expand transmission infrastructure for seamless integration of growing renewable energy capacity. **Impact Analysis** **Stakeholder: State Transmission Utility (STU)** * **Impact:** Required to initiate the process for availing CFA for eligible projects. * **Action Required:** Submit a request for CFA to the Central Electricity Authority (CEA) with a copy to the Ministry of New and Renewable Energy (MNRE) along with the necessary documents. **Stakeholder: Central Electricity Authority (CEA)** * **Impact:** Responsible for evaluation and recommendation on the STU's proposal for CFA. * **Action Required:** Evaluate the proposals and submit recommendation reports to the MNRE. **Stakeholder: Ministry of New and Renewable Energy (MNRE)** * **Impact:** Final authority for fund release based on CEA's recommendations and their own due diligence. * **Action Required:** Undertake due diligence on the proposals and release funds accordingly. Also requested states to share proposals regarding intra-state transmission systems to strengthen and expand transmission infrastructure for seamless integration of growing renewable energy capacity.

Key Entities Referenced

Green Energy Corridor (GEC) scheme: A scheme to strengthen the intra-state transmission system and integrate renewable energy into the grid. Central Financial Assistance (CFA): Financial assistance sanctioned, released, and pending under the Intra-State Green Energy Corridor Project. Ministry of New and Renewable Energy (MNRE): The ministry responsible for the Green Energy Corridor Scheme and release of funds. Central Electricity Authority (CEA): An authority to be submitted the request for availing the eligible CFA. Andhra Pradesh: A state participating in the Green Energy Corridor project. It is discussed in terms of funds received and project status.
Official Source Record View Original Source →
See Full Document Text
GOVERNMENT OF INDIA MINISTRY OF NEW AND RENEWABLE ENERGY LOK SABHA UNSTARRED QUESTION NO. 2011 ANSWERED ON 11.02.2026 GREEN ENERGY CORRIDOR PROJECT IN ANDHRA PRADESH 2011. SHRI G LAKSHMINARAYANA Will the Minister of NEW AND RENEWABLE ENERGY be pleased to state: (a) the total Central Financial Assistance (CFA) sanctioned, released and pending under the Intra- State Green Energy Corridor Project in the country including the grant eligible for Andhra Pradesh, amount released so far and balance pending along with the reasons for any delay; (b) the status of Andhra Pradesh’s inclusion in Phase-II of the Green Energy Corridor Project; (c) whether a proposal has been submitted by the Government of Andhra Pradesh in this regard and if so, the details thereof and the criteria for selection of States under Phase-II; (d) the total renewable energy capacity integrated into the grid through Phase-I of the Green Energy Corridor, State-wise including Andhra Pradesh and impact on grid stability and renewable energy evacuation; (e) the steps taken by the Government to ensure timely release of pending funds and to assist States in preparing and submitting proposals for subsequent phases; and (f) the measures envisaged to expand intra-state transmission infrastructure under Green Energy Corridor to further integrate renewable energy into the grid, reduce curtailment and promote adoption of clean energy? ANSWER THE MINISTER OF STATE FOR NEW & RENEWABLE ENERGY AND POWER (SHRI SHRIPAD YESSO NAIK) (a) The total Central Financial Assistance (CFA) sanctioned, released under the Intra-State Green Energy Corridor (GEC) phase I & II in 10 States including Andhra Pradesh is placed at Annexure I. (b) No projects have been sanctioned to Andhra Pradesh under GEC phase II. (c) A proposal had been submitted by the State Government of Andhra Pradesh. However, the project was withdrawn by the State Government. (d) The Government of India has launched Green Energy Corridor (GEC) scheme to strengthen intra state transmission system. Under GEC Phase-I, intra-state transmission projects were implemented in eight RE-rich states including Andhra Pradesh to integrate around 24 GW of renewable energy. The state wise detail of total renewable energy capacity integrated into the grid through Phase-I of the Green Energy Corridor is attached at Annexure -II. (e) As per GEC Scheme guidelines, request for availing the eligible CFA shall be submitted by the State Transmission Utility (STU) to the Central Electricity Authority (CEA) with a copy to the Ministry of New and Renewable Energy (MNRE) alongwith the documents such as Detailed Project Cost (DPR), awarded cost, copy of notice inviting tender, award of contract etc. CEA provides its recommendations to MNRE.A Project Appraisal Committee (PAC) is constituted which will evaluate and recommend the proposals to MNRE based on the recommendation reports received from CEA. Thereafter funds are released by MNRE following due diligence. Further during 2024, the Ministry has written letters to the states for preparing transmission plans for next phase in advance. (f) The Green Energy Corridor (GEC) scheme is implemented in ten states for evacuation of around 44 GW of Renewable Energy (RE) and to strengthen transmission for large-scale RE integration. Further, in order to strengthen and expand the transmission infrastructure for seamless integration and evacuation of growing renewable energy (RE) capacity across different states, MNRE has requested states to share their proposal regarding intra-state transmission system. *****Annexure-I to reply part (a) of Lok Sabha unstarred question no. 2011 to be answered on 11/02/2026 Sanction Total release Amount State Amount (Rs. (Rs. Crore) Crore) Andhra 361.25 302.48 Pradesh Gujarat 746.40 561.845 Himachal 237.28 206.658 Pradesh Karnataka 326.50 326.50 Madhya 655.09 624.239 Pradesh Maharashtra 67.49 46.758 Rajasthan 241.35 241.35 Tamil Nadu 529.34 529.282 Total 3164.70 2839.104 State-wise detail of InSTS GEC Phase-II Sanction Total release State Amount Amount (Rs. Crore) (Rs. Crore) Gujarat 1200.12 - Himachal 161.53 - Pradesh Karnataka 341.96 108.781 Kerala 138.71 49.280 Rajasthan 290.70 - Tamil 237.52 Nadu Uttar 1576.80 898.055 Pradesh Total 3947.34 1056.116Annexure-II to reply part (d) of Lok Sabha unstarred question no. 2011 to be answered on 11/02/2026 S. No. State RE capacity evacuated MW 1 Andhra Pradesh 2370.7 2 Gujarat 2992 3 Himachal Pradesh 552.2 4 Karnataka 4343.1 5 Madhya Pradesh 4283.5 6 Maharashtra 1038 7 Rajasthan 5798.4 8 Tamil Nadu 3190 Total 24,567.8

Continue your research