GOVERNMENT OF INDIA
MINISTRY OF NEW AND RENEWABLE ENERGY
RAJYA SABHA
UNSTARRED QUESTION NO. 428
ANSWERED ON 03.02.2026
GREEN HYDROGEN MANDATE
428. SHRI AYODHYA RAMI REDDY ALLA
Will the Minister of NEW AND RENEWABLE ENERGY be pleased to state:
(a) considering Government's target of producing 5 million tonnes of green hydrogen per year
by 2030, what specific policy measures can be implemented to bridge the substantial cost gap
between green hydrogen and grey hydrogen and how the industry can ensure a stable and
predictable demand for green hydrogen to justify large-scale investments in production
infrastructure; and
(b) given the importance of renewable energy in green hydrogen production, how India can
optimize its energy mix to minimize costs and ensure reliable supply, particularly in regions
with high renewable energy?
ANSWER
THE MINISTER OF STATE FOR NEW & RENEWABLE ENERGY AND POWER
(SHRI SHRIPAD YESSO NAIK)
(a) The Government of India is implementing the National Green Hydrogen Mission (NGHM),
with an objective to make India a global hub of production, usage and export of Green
Hydrogen and its derivatives.
India’s Green Hydrogen production capacity is likely to reach 5 Million Metric Tonnes per
annum by 2030.
Significant steps have been taken under NGHM for reducing the cost of green hydrogen, details
of which are provided below:
i. Under the incentive scheme for Electrolyser Manufacturing, 15 companies have been
awarded a total manufacturing capacity of 3,000 MW per annum. The total incentive
awarded is Rs. 4440 crores.
ii. Under the incentive scheme for Green Hydrogen production, 18 companies have been
awarded a cumulative production capacity of 8,62,000 tonnes per annum.
iii. Under the incentive scheme for procurement of Green Hydrogen for refineries, 2
companies have been awarded a total capacity of 20,000 tonnes per annum.
iv. Prices have been discovered by Solar Energy Corporation of India for the production
and supply of 7,24,000 tonnes per annum of Green Ammonia (a derivative of Green
Hydrogen) to 13 fertilizer units across India.
v. Other steps taken to facilitate reduction in green hydrogen cost, are as follows:
vi. Green Hydrogen/Green Ammonia Plants commissioned on or before 31.12.2030, and
which utilize renewable energy for the production of green hydrogen or green ammonia,
have been granted exemption from the payment of Inter State Transmission System
(ISTS) charges for a period of 25 years, starting from the date of commissioning of the
project.vii. Duty benefits under Section 26 of SEZ Act, 2005 have been allowed to the units for
installation as well as Operation and Maintenance (O&M) of renewable energy
equipment exclusively for captive consumption of the unit.
The above incentives ensure stable and predictable demand for green hydrogen by securing
long - term offtake agreements and integration of green hydrogen for industrial
decarbonisation.
(b) India is optimising its energy mix for green hydrogen production by rapidly expanding low
- cost renewable energy capacity, supported by competitive tariff - based bidding, large - scale
solar and wind deployment, and enabling policy frameworks. To support this objective, the
following policy measures have been undertaken:
• Standard Bidding Guidelines for tariff based competitive bidding process for procurement
of Power from Grid Connected Solar, Wind, Wind-Solar Hybrid and Firm & Dispatchable
Renewable Energy (FDRE) projects have been issued.
• Exemption has been granted from Approved List of Models & Manufacturers (ALMM) for
Solar PV Modules and Revised List of Models & Manufacturers (RLMM) for Wind
Turbine models requirements for Renewable Energy plants located inside an Special
Economic Zone (SEZ) or Export Oriented Unit (EOU) and supplying power exclusively
for production plants of Green Hydrogen (or its derivatives), which are located inside an
SEZ or set up as an EOU.
• Foreign Direct Investment (FDI) has been permitted up to 100 percent under the automatic
route.
• Scheme for setting up of Solar Parks and Ultra Mega Solar Power projects is being
implemented to provide land and transmission to RE developers for installation of RE
projects at large scale.
• Inter State Transmission System (ISTS) charges were waived for inter-state sale of solar
and wind power for projects commissioned by 30th June 2025, for Green Hydrogen
Projects till December 2030 and for offshore wind projects till December 2032.
• Laying of new transmission lines and creating new sub-station capacity has been funded
under the Green Energy Corridor Scheme for evacuation of renewable power.
• To augment transmission infrastructure needed for steep RE trajectory, transmission plan
has been prepared till 2030.
*****