GOVERNMENT OF INDIA
MINISTRY OF RURAL DEVELOPMENT
DEPARTMENT OF RURAL DEVELOPMENT
LOK SABHA
UNSTARRED QUESTION NO. 1591
ANSWERED ON 28/07/2026
IDENTIFIED BACKWARD ROADS OF UTTAR PRADESH
1591. Shri Arun Kumar Sagar:
Will the Minister of RURAL DEVELOPMENT be pleased to state:
(a) whether the Central Government has identified roads under the
priority to the most Pradhan Mantri Gram Sadak Yojana (PMGSY)
by giving priority to the most backward areas within the
Shahjahanpur Lok Sabha Constituency in the State of Uttar
Pradesh;
(b) if so, the details thereof along with the names of those identified
roads; and
(c) the time by which the construction of roads is proposed to be
undertaken?
ANSWER
MINISTER OF STATE IN THE MINISTRY OF RURAL DEVELOPMENT
(SHRI KAMLESH PASWAN)
(a): The Pradhan Mantri Gram Sadak Yojana (PMGSY) was launched
as a one-time special intervention to provide single all-weather road
connectivity to eligible unconnected habitations of designated
population sizes, thereby, uplifting the socio-economic conditions of
rural population in backward and remote areas.
To ensure prioritized coverage of backward, tribal, and socio-
economically vulnerable communities, the Government has built
specific relaxations and targeted interventions across various
phases of the scheme:
1. Special Population Relaxations under PMGSY-IV:
The Union Cabinet approved Pradhan Mantri Gram Sadak Yojana-
IV (PMGSY-IV), for implementation during FY 2024–25 to FY 2028–29
with the target to provide all-weather road connectivity (construction
Page 1 of 3of 62,500 km of roads) to 25,000 eligible unconnected habitations
across the country with a total outlay of Rs.70,125 crore. There is no
separate state-wise target under PMGSY-IV. The eligibility criteria of
the habitations to be provided connectivity under PMGSY-IV based on
population norms of Census 2011 are as follows:
i. Habitations with a population of 500 and above in plains,
ii. Habitations with a population of 250 and above in Special
Category States (Arunachal Pradesh, Assam, Ladakh,
Manipur, Meghalaya, Mizoram, Nagaland, Sikkim, Tripura,
Himachal Pradesh, Jammu Kashmir and Uttarakhand),
Special Category Areas [Tribal Schedule-V Areas, Desert
Areas, Aspirational Blocks/ Districts and Hilly areas as
notified by the respective State Government (cross slope
more than 25% gradient and the elevation is more than
600 metres from the Mean Sea Level)] and
iii. Habitations with a population of 100 and above in LWE
affected Districts including Legacy & Thrust Districts
identified by MHA from time to time.
Under PMGSY-IV, a "Cluster Approach" has been introduced for
habitations. This allows grouping smaller, isolated habitations within
a radius of 500 meter (in plains) to collectively meet the population
criteria, ensuring backward habitations are connected to essential
services like schools, health centers, and agricultural markets.
2. Targeted Interventions & Convergence Schemes:
i. Dharti Aaba Janjatiya Gram Utkarsh Abhiyan (DA-JGUA):
Integrated with PMGSY-IV to give priority connectivity to
habitations having a population of 500+ with 50% or more
Scheduled Tribe (ST) population, or habitations with 50+
ST population in Aspirational Districts.
ii. Pradhan Mantri Anusuchit Jaati Abhyuday Yojana (PM-
AJAY): Integrated with PMGSY-IV to prioritize habitations
having a population of 500+ with 40% or more Scheduled
Caste (SC) population.
iii. PM-JANMAN (Pradhan Mantri Janjati Adivasi Nyaya Maha
Abhiyan): A dedicated vertical launched to provide all-
weather road connectivity to ultra-vulnerable
communities, specifically Particularly Vulnerable Tribal
Groups (PVTGs), relaxing population norms down to 100+
(or clusters of 100+) based on Census 2011 survey data.
In the Shahjahanpur Lok Sabha Constituency of Uttar Pradesh, all
eligible habitations identified under various phases of PMGSY have
Page 2 of 3been considered in accordance with these program guidelines. As per
data available on the Online Management, Monitoring and Accounting
System (OMMAS) as on 23.07.2026, a total of 91 roads of length 364
km have been sanctioned in Shahjahanpur Lok Sabha Constitency
since inception.
The details of PMGSY works sanctioned, completed and balance in
Shahjahanpur Lok Sabha Constituency are as follows: -
Sanctioned Completed Balance
Sr. No. Road No No. Road No No. Road No
Location
No Of Lengt Of Of Lengt Of Of Lengt Of
(Districts)
. Road h LSB Road h LSB Road h LSB
s (Km.) s s (Km.) s s (Km.) s
Shahjahanp
1 ur 91 364 0 91 353 0 0 0 0
Grand Total 91 364 0 91 353 0 0 0 0
Source-OMMAS
Note: The balance length will not be equal to sanctioned length minus
the completed length because some roads get completed at shorter
distance than sanctioned distance due to change in alignment and
other issues.
(b): Road-wise status of PMGSY works may be seen at
https://pmgsy.dord.gov.in >proposals>State-wise List of Roads.
(c): All road works under various verticals of PMGSY, sanctioned
in Shahjahanpur Lok Sabha Constituency have been
completed. Under PMGSY-IV, the Empowered Committee (EC) of the
Ministry of Rural Development met on 20.07.2026 to consider project
proposals submitted by the State of Uttar Pradesh.
*****