See Full Document Text
GOVERNMENT OF INDIA
MINISTRY OF COAL
LOK SABHA
UNSTARRED QUESTION NO. 1797
ANSWERED ON 29.07.2026
IMPACT OF COAL MINING ON ENVIRONMENT
1797. Md. Rakibul Hussain:
Will the Minister of Coal be pleased to state:
(a) whether the Government has assessed the impact of coal mining on the environment in
Assam and if so, the details thereof;
(b) the number of coal mines that are operating in compliance with environmental norms in
the said State;
(c) whether any coal mine has been penalised for violation of such norms and if so, the
details thereof; and
(d) the measures being taken by the Government to reduce air and water pollution arising
from coal mining activities?
ANSWER
MINISTER OF STATE FOR COAL AND MINES
(SHRI SATISH CHANDRA DUBEY)
(a): The environmental impact of coal mining is assessed before commencement of any
such project through an Environmental Impact Assessment (EIA) and Environmental
Management Plan (EMP), as part of the statutory environmental clearance process.
In Assam, the Environmental Impact Assessment (EIA) and Environmental Management
Plan (EMP) have been prepared for the ongoing Tikak Extension Opencast Project (0.2 MTPA)
and the upcoming Tirap Opencast Project (0.6 MTPA) of North Eastern Coalfields (NEC), a
wing of Coal India Limited under the Ministry of Coal.
Further, regular monitoring of ambient air quality, water quality (including effluent,
drinking and runoff water) and noise levels is carried out through Government-approved
laboratories to assess the environmental impact of mining operations.
(b): Currently, NEC has only one operating mine i.e Tikak Extension OCP (0.2 MTPA)
and the same is operating in compliance with environmental norms.
(c): No penalty has been imposed on the operating mine i.e. Tikak Extension OCP for
violation of environmental norms.
(d): To control air and water pollution arising from coal mining activities, the Government
has established a comprehensive regulatory framework under the provisions of the
1Environment (Protection) Act, 1986; the Air (Prevention and Control of Pollution) Act, 1981;
and the Water (Prevention and Control of Pollution) Act, 1974.
Central Government has devised the process of Environmental Impact Assessment, as a
regulatory tool under the provisions of Environment (Protection) Act, 1986. Under the said
Act, Ministry of Environment, Forest and Climate Change (MoEF&CC) has notified the
Environment Impact Assessment (EIA) Notification, 2006 which deals with the process of
granting Environmental Clearance (EC) after having comprehensive analysis of EIA reports
prepared by the coal companies.
The respective SPCBs/PCCs issue Consent to Operate under the provisions of Air
(Prevention and Control of Pollution) Act, 1981 and Water (Prevention and Control of
Pollution) Act, 1974 to oversee the compliance of emissions/ effluent standards and take action
against violators under the provisions of Water and Air Acts.
In North Eastern Coalfields (NEC), measures undertaken to control pollution include
controlled blasting, fixed water sprinklers at coal sidings, deployment of water tankers for dust
suppression on haul roads, use of tarpaulin-covered trucks, wet drilling, regular maintenance
of mining equipment and vehicles, periodic environmental monitoring, and plantation
activities. To prevent water pollution, effluent treatment facilities, neutralization-cum-
sedimentation tanks, oil and grease traps, siltation ponds, earthen garland drains, and regular
monitoring of effluent quality have been put in place.
*****
2