GOVERNMENT OF INDIA
MINISTRY OF NEW AND RENEWABLE ENERGY
LOK SABHA
UNSTARRED QUESTION NO. 5520
ANSWERED ON 25.03.2026
IMPACT OF RENEWABLE ENERGY PENETRATION ON GRID STABILITY
5520. Ms Kangna Ranaut
Dr. K Sudhakar
Smt. Mahima Kumari Mewar
Shri Alok Sharma
Shri P C Mohan
Shri P P Chaudhary
Shri Sudheer Gupta
Shri Chavan Ravindra Vasantrao
Shri Praveen Patel
Shri Pradeep Kumar Singh
Shri Vijay Baghel
Shri Krishna Prasad Tenneti
Smt. Smita Uday Wagh
Shri Nalin Soren
Smt. Sanjna Jatav
Shri Naba Charan Majhi
Shri Janardan Mishra
Shri Rodmal Nagar
Shri Bibhu Prasad Tarai
Shri Rajkumar Chahar
Shri Jugal Kishore
Shri Shankar Lalwani
Dr. Hemant Vishnu Savara
Will the Minister of NEW AND RENEWABLE ENERGY be pleased to state:
(a) whether the Government has assessed the impact of increasing renewable energy penetration on
grid stability particularly in high renewable –energy States such as Karnataka, Chhattisgarh,
Jharkhand, Maharashtra, Jammu & Kashmir, Rajasthan particularly in Bharatpur Lok Sabha
Constituency and if so, the details thereof;
(b) the steps taken by the Government to strengthen transmission infrastructure and grid capacity
for evacuation of renewable energy in the said States including progress made under the Green
Energy Corridor initiative;
(c) the details of number of renewable energy projects in the aforesaid States that are facing delays
due to grid connectivity or transmission constraints;
(d) whether energy storage systems such as battery storage or pumped hydro are being integrated
with renewable energy projects in the said States and if so, the extent of such integration and the
roadmap for expanding storage-backed renewable capacity in the coming years;
(e) the measures taken by the government to improve grid management, forecasting and renewable
energy integration for urban centers such as Bengaluru where demand for clean energy is rapidly
increasing; and
(f) whether the Government is implementing large-scale renewable energy corridors under the
Green Energy Corridor initiative and if so, the details thereof, State-wise including Rajasthan
and Chhattisgarh?ANSWER
THE MINISTER OF STATE FOR NEW & RENEWABLE ENERGY AND POWER
(SHRI SHRIPAD YESSO NAIK)
(a) to f) Government of India has notified National Electricity Plan (Volume-II Transmission) in 2024,
which outlines the transmission system requirements for the period 2023 to 2032, including the states
Karnataka, Chhattisgarh, Jharkhand, Rajasthan, Maharashtra and Jammu and Kashmir, commensurate with
projected generation capacity additions to meet the projected electricity demand.
Further following measures have been undertaken by the Government to strengthen transmission
infrastructure, grid management and forecasting to facilitate integration of renewable energy into the grid
while maintaining grid stability:
i. Comprehensive Regulations and Standards governing interconnection and operations of renewable
plants such as CEA (Central Electricity Authority) connectivity standards, flexible thermal plant
operations, and the Indian Electricity Grid Code 2023;
ii. Advanced grid support technologies such as STATCOMs and synchronous condensers for voltage
stability and dynamic response have been considered in the transmission planning and are at various
stages of implementation.
iii. Establishment of Renewable Energy Management Centers (REMCs) for real-time forecasting,
scheduling, and monitoring of RE generation across 12 RE-rich regions.
iv. Ministry of New and renewable energy is implementing Green Energy Corridor (GEC) scheme in
ten states viz., Andhra Pradesh, Gujarat, Himachal Pradesh, Karnataka, Kerala, Madhya Pradesh,
Maharashtra, Rajasthan, Tamil Nadu and Uttar Pradesh. A total of 9856 ckm transmission lines and
24, 300 MVA substation have been commissioned under GEC scheme.
v. Regulatory framework for Solar Hour and Non-Solar Hour access enabling optimal utilisation of
transmission and encouraging hybridisation with storage.
vi. Implementing two Viability Gap Funding (VGF) schemes to support development of approximately
43.8 GWh of Battery Energy Storage Systems, launched in March 2024 and June 2025, to accelerate
early-stage deployment.
vii. As of 28.02.2026, a total of 13 Battery Energy Storage System (BESS) projects with an aggregate
capacity of 798.20 MWh have been commissioned across the country. The present installed capacity
of pumped storage projects in the country is 7175.6 MW.
viii. Providing budgetary support for enabling infrastructure (Roads, Transmission lines etc.) for
development of Hydro PSP.
Details of projects whose transmission system is delayed is placed at Annexure-I.
*****
Annexure-I to reply part (f) of Lok Sabha unstarred question no. 5520 to be answered on 25/03/2026
Details of projects whose transmission system is delayed
State No. of Generators RE Quantum whose
transmission is delayed (MW)
Karnataka 6 487.48
Maharashtra 4 109.00
Rajasthan 18 2637.00
Total 28 3233.48