GOVERNMENT OF INDIA
MINISTRY OF NEW AND RENEWABLE ENERGY
LOK SABHA
UNSTARRED QUESTION NO. 2920
ANSWERED ON 05.08.2026
INSTALLATION OF ROOFTOP SOLAR SYSTEMS ON GOVERNMENT OFFICES
2920. DR. M K VISHNU PRASAD
Will the Minister of NEW AND RENEWABLE ENERGY be pleased to state:
(a) whether all Central Government offices have been directed to install rooftop solar systems;
(b) if so, the number of Government buildings that have installed rooftop solar systems;
(c) the estimated reduction in electricity expenditure achieved therefrom;
(d) whether the Government proposes to make rooftop solar mandatory in all Government institutions; and
(e) if so, the timeline fixed for achieving this objective?
ANSWER
THE MINISTER OF STATE FOR NEW & RENEWABLE ENERGY AND POWER
(SHRI SHRIPAD YESSO NAIK)
(a) to (e) Presently, there is no proposal to make installation of rooftop solar (RTS) mandatory in all Government
institutions, however, the Ministry of New and Renewable Energy (MNRE) had requested all Central
Government Ministries/Departments to issue necessary directions to all departments, office and institutions for
utilisation of vacant rooftops of their buildings for installation of solar panels. All States/UTs have also been
requested to issue necessary directions for installation of RTS systems on all buildings owned by them.
Further, saturation of Government buildings by installation of RTS systems is one of the components of the PM
Surya Ghar Muft Bijli Yojana (PMSG: MBY). Detailed guidelines in this regard providing various
implementation models and allocating Central Public Sector Enterprises (CPSEs) with experience in deployment
of renewable energy technologies to assist Central Ministries & States/UTs in deploying RTS systems on their
buildings, have been issued.
However, no Central Financial Assistance (CFA) is available for government buildings as installation of RTS
systems is financially viable for them even without CFA.
The Union Territories namely Chandigarh, Dadra Nagar Haveli and Daman & Diu, and Ladakh have reported
saturation in solarisation of Government buildings with installation of RTS systems.
MNRE has received Action Plans from the respective Ministries for solarisation of 41,972 Central Government
buildings of which 24,376 buildings have been solarised with a cumulative installed capacity of about 854 MW
as on 16.7.2026.
Similarly, the States/UTs reported solarisation of 81,754 Government buildings with a cumulative installed
capacity of about 1,447 MW.
The reduction in electricity expenditure on installation of RTS systems will depend upon various factors
including the applicable electricity tariff, cost of installation of RTS systems and solar power generated from the
RTS systems. The same may vary for different Government buildings.
*****